Loading...
28 SHERRY DR - HOTEL FRAMING LETTER OrA\ John H. Dodd, Architect, Inc. FL:AR-0016867 GE:1045 2775 Racheal Avenue,Fernandina Beach,Fl 32034 Tel 904-583-4044 Email:johnnydodd @bellsouth.net Friday, February 12, 2016 Y r© EIVE Re: 28 Sherry Hotel f EB 1 7 2016 Framing Clarification at stacking door at lobby For framing the wall and header at the stacking door at - • • •y: - Use (3)ply 91/4"1v1 beam - (2)cripple studs, (2)king studs - Attach king studs to block w/ %2"diam galv rods @ 16"o.c., epoxied to exst'g cmu sidewalls - Add threaded rod ties downs @ 4'o.c. max and w/in 12" of opening framing - Add (1)h8 tie from wall to roof framing at each rafter to beam Digitally signed by JohnJohn H Dodd DN:c=US,o=ldenTrust Thanks, John Dodd ACES Business Representative, c hitecitec Architect H Dodd Arct Inc.,cn=John H Dodd, 0.9.2342.19200300.100 D odd1.1=A0109800000015 CA15FE4700009EA2 Date:2016.02.15 17:18:37-05'00' REVISION BP# /S' 61 •-t-t-- -14 DATE /_._/ SIGNED I 0frA, CIO cF y