Loading...
201 MAYPORT RD -PLAT City of Atlantic Beach APPLICATION NUMBER Building Department (To be assigned by the Building Department. • 800 Seminole Road /3 SA��.. /00 Atlantic � Atlantic Beach, Florida 32233-5445 Phone(904) 247-5826 • Fax(904)247-5845 rP!oj: .))- E-mail: building-dept @coab.us Date routed: V/.5**- City web-site: http://www.coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: 021) / "Jy oier led Department review required Yes No / Building Applicant: �Q,gAis nning &Zoning Ac aT 9 ree Administrator Project: T7 /ct7 Oeite � �blic Works ublic Utili P 'c-Sat r Fire Services Review fee $ Dept Signature Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By_ Florida Dept. of Environmental Protection - Florida Dept.of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: ['Approved. enied. (Circle one.) Comments: , /oeo°75 BUILDING PLANNING &ZONING Reviewed by: "� �' Date: 2//d'/.5— TREE ADMIN. Second Review: ['Approved as revised. ❑Deni=.. PUBLIC WORKS Comments: PUBLIC UTILITIES _ S�AFFTY Reviewed by: Date: FIRE SERVIC Third Review: ❑Approved as revised. ['Denied. Comments: Reviewed by: Date: Revised 07/27/10 City of Atlantic Beach APPLICATION NUMBER Building Department (To be assigned by the Building Department.) - 800 Seminole Road 5i02 g 183A //' _ SA * /0010 Atlantic Beach, Florida 32233-54.5 Phone(904) 247-5826 • Fax(9e• G m 8 i� m E-mail: building-dept @coab.us Date routed: 02 / City web-site: http://www.coab.us • APPLICATION REVIEW AND TRACKING FORM Property Address: c:26 / /22/41 2,y tiler Zd Department review required Yes No / Building Applicant: _ atteAiS 67. ��T nning &Zoning - TereAdminis Administrator Project: "7/ Qee4.1a7-- ePublic Works ubIic Wit. P c..Safety Fire Services Review fee $ ) Dept Signature A"k Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: FlApproved. I 1Denied. (Circle one.) Comments: BUILDING PLANNING &ZONING Reviewed by: Date:Z (7//� TREE ADMIN. Second Review: Approved as revised. ['Denied.•OLIC V�/ORI S Comments: r `'l:LI UTILITIES PUBLIC SAFET Reviewed by: Date: FIRE SERVICES Third Review: I !Approved as revised. Denied. Comments: Reviewed by: Date: Revised 07/27/10 I, PUBLIC UTILITIES PLAN REVIEW COMMENTS Date: / Initials: Project Name/Address: �-Q ' /� �J �Q �� � '"t Application Permit#: Check Box Check Application Tracking Comments to Add Box to Comment "Print" UWSU Avoid damage to underground water/sewer utilities. Verify vertical and horizontal ❑ ❑ location of utilities. Hand dig if necessary. If field coordination is needed, call 247-5834. MBSC Ensure all meter boxes, sewer cleanouts and valve covers are set to grade and visible. ❑ RT1C A sewer cleanout must be installed at the property line. Cleanout must be covered with ❑ ❑ an RT1 concrete box with metal lid. Cleanout to be set to grade and visible. RPZB A reduced pressure zone backflow preventer must be installed if irrigation will be provided or if there is a private well on the property. Backflow preventer must be tested ❑ ❑ by a certified tester and a copy of the results sent to Public Utilities. STRM Plans note the building will be unsprinkled. If plans change, any fire line installed must be metered with a Sensus touch-read meter in a properly sized vault and an appropriate ❑ ❑ backflow preventer installed. Backflow preventer must be tested by a certified tester and a copy of the results sent to Public Utilities. FSBR If fire sprinkler system is provided, contact Malcolm Clemons at 247-5839 for backflow ❑ ❑ requirements. At a minimum, will require a double check backflow preventer. FLM Fire lines must be metered with a Sensus touch-read meter. Meters larger than 2" must ❑ ❑ be installed in a vault as noted in JEA specifications. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ City of Atlantic Beach vF,D1 APPLICATION NUMBER Building Department (To be assigned by the Building Department.) 800 Seminole Road )`,i Atlantic Beach, Florida 32233-5445 FEB Z01 /.� - 5�9�" �00 Phone(904) 247-5826 Fax(904) .5845 a / /' / E-mail: buildin de t coab.us X i Date routed: I City web-site: http://www.coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: c:2O / p de / Department review required Yes No Building Applicant: f A cAt s //,4 67 ��T nning &Zoning C ..""[M---..""[M---..""[M--- :.ministrator Project: /DE. T - Qeif ar Public Works •ublic Utilit- Pyblic.S Fire Services Review fee $ Dept Signature , Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept. of Transportation St. Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: I 'Approved. HDenied. (Circle one.) Comments: BUILDING PLANNING &ZONING Reviewed by: //. TREE ADMIN. Second Review: Approved as re' PUBLIC WORKS Comments: PUBLIC UTILITIES 0 �I ` PUBLIC SAFETY Re, / FIRE SERVICES Third Review: I JApproved as rE v, Comments: Reviewed by: date: Revised 07/27/10 2-7(474VORKS PLAN REVIEW COMMENTS � / Initials: PN ML ,..., 411101111°' /' )--' /k�ri1 . Application Permit#: Air 0 --. '7pCheck Box Check i or ' ration Tracking Comments to Add Box to Comment "Print" d ? calculations for entire lot (existing and post ❑ 0 :rol plans with installation details and maintenance ❑ ❑ e topography(flow arrows, etc.) ❑ 0 WHO -not raise lot elevation without measures to retain ❑ ❑ runoff. 0 Provide construction site management plan, including Right-of-Way Permit if using CSMP ❑ ❑ right-of-way for construction parking. TSUR Provide a pre-construction topographic survey prepared by a Florida Licensed Professional ❑ ❑ Land Surveyor, showing 1' contours. Section 24-66(b)of the Land Development Regulations requires on-site storage for LDCS increased run-off if adding 400 SF or more impervious surface. Provide Delta volume ❑ ❑ calculations and on-site retention required per Section 24-66(b). (See attached information sheet.) PCTS If on-site storage is required, a post construction topographic survey documenting proper ❑ ❑ construction will be required. RWPM A Right-of-Way Permit must be obtained for use 0 0 REPM A Revocable Encroachment Permit must be obtained. 0 0 PLWP Pool—Wellpoint (if used) must discharge into vegetated area 10' minimum from street or ❑ ❑ drainage feature (swale, structure or lagoon). All concrete driveway aprons must be 5"thick,4000 psi, with fibermesh from edge of DAPR pavement to the property line. Reinforcing rods or mesh are not allowed in the right-of- 0 0 way. (Commercial driveways—6" thick.) Any utility cuts in the road must be repaired using COJ Standard Detail Case X and must be URCT overlaid 10 feet in each direction from the center of the cut. Repair must be shown on the 0 0 plans. RWRS Full right-of-way restoration, including sod, is required. 0 0 Roll off container company must be on City approved list and container cannot be placed on ROFF City right-of-way. (Approved: Advanced Disposal, Realco Recycling, Republic Services, 0 0 Shappel's and Waste Pro). Full erosion control measures must be installed and approved prior to beginning any earth ECIN disturbing activities. Contact Public Works(247-5834)for Erosion and Sediment Control 0 0 Inspection prior to start of construction. MEET Recommend Owner/Contractor meet with Public Works Director to discuss proposed ❑ ❑ construction. Call 247-5834 to make an appointment. ❑ 0 0 0 9 CCC n b ob , u).... 00 -0 Dm 7) on o _J 0) U1 - . W NNcoD7 7 6. xi 0 t. cr CO c 71 N CD oo V 3 co3 rn co D co -iiCD Z Cr -lcncn > 'v -1 (n 573 (n -, 5' � , 10- - 5 o) 5- v Nv $ 0 ama 13 . r CD CD m ^g p Cl- 0) g r0 O 7' O FAT m n 0) aci-6- O _ C r) m O N 53 < .► 'T1 o CS 004 go 5g2 Oa) � un '< ci 2) o Qam °-) 0n .< 0C OCCea CL O � Z ,7 v cn * O - 3 ..... < 0 D 7 3 m 7. " 7 m G) m v <_ m C = c � X C° Z - 5' o d = m -. 0 13 o g (1) 8: A- -" FD -0 am = � D � -CD m W n <. 0 0 5 m ca , E co `< D G) `Z m m Tl N C 7" dW 0 m T r to a m u) m 0 �• n n 3 I- r. d & li 7 0 R CD- (n2Z0 -1 ° 31 -I (o � o 01111 O cD m C O m e O d O C ; CO '< N to 0 in 0 N t.m � m m v � W m m � nm o mob' 0) a ? 03 O 0 6 .. O N 11) ,+ _ ? O c m .. m N 0) n co 7 <m C) -I a' 7 0 m -8 x x `< o v co o an k g D °:rri v, 16 co cu 3 0 XI v _ m my cn � a o o 3 0 0 < nobo Ai n 7 U m N Com] < N m nA; m CD 0 �j T c0. o 5' y 7 .► m i m 92- m CD3 ,7 7 7 _� 7 = • In in M. X- C)0' C y v m O .� - r. O �. % O to O 71.... O O 1 O ,. > O 4 O 7 3 N m a - � 7 g u7i O 7 A C n y cn 4) 0) cii m rn N < Q N n m o 7 m ail R. N. � a �v 5 a) w rn S. 7 < °' a � m 1 oa n. c •-< �, C on �' I m o cmi y > c y v n� N cn rn O C_ O 7 o y 7 co , CD • 7 O " Z a a)n. x n ..� m O in' `� cn O Q• n xi + r rn 73 C m rn v13 m13 00 zm 0 00 C Cn0 3 IC Z m -I -4 � CD D 0 0 Z 0 X, 00 Z 0R. °: .13 < m m -9"- ...m cc) 74 m n 3 a. 0 co CI--II U) O .a N 0 J m0 A 0 m I- C 0 Z _co) v0 -v > D0 0 c� ° � " ° dm 'v g .. 3 3 St mcn n p (D A w ry m 3.a� W e 'T1 N 3 • 3 ¢U m > ca 3 0 Z -I CD , cn O _ O7 9 toO Z` O 6 0 o 73 a. cu 2 C- zo �', � o yam m COCC1 2 c 0 m 5- 2 o 3• ' ' m $ NN r W °' =' m`o' D r y 3 eo nD g m ca CD eco N O y N -+ CD n � � mm � 'm � � � pC) ca. E 3 > 3- a) � � C) mA1< X _ .� * y3 0 O � 2. R. p v CD 7 aA CD z O 8 c� �' mw 73 ` �o �, t 0 > 07 n 0 o > sn o CD 0N n I, n 0o m � o y � C rn� oo o N Cn x GI y o v v o v Qo o Z rn xi < m rn o13 rno zm n • 0-4 0 00 3 No 1 r3 Z � zz -Cl) 1 co • 1 0 d I 0 z i 0 73 0 F s m e cn ~ am c c 3 n m a I I -1 0 e N 1 o z a) J tri T1 I 0 in r c d 0 L z 0 C7 z = vvv DDC) C O cA (SD o m y (D O .— tT1 CO 71 N Ui A Co N m N co z m _' 5 cD = n Z -1 D) o_ --� CO 5' N -+ cn O N H 0 -n O 3 -0 77 c —, m * 5' U) 7z)0 N S --I r ea CL v 0 � o �� -+ � 06u oCD 3 D o � aQ �0 �' 7 � „ OD ocn L * 3 " O O * 7 (Dc) 73 H. vy TIZ cn O CD v ill CD c c -1 O N o N ? su G a. O 13 z a> w 0 7 co (� n 5. 7 C C-) ,� FD O `< . c N (D E viz ' °+ 23 ^ Q (D m 07 Q c d o ON ,C -n �. o7 -O N ((DD O -n m N (D u) Or G a < ID co j' _� p (n O 6 C O <2' C 7 ,� j Q O d N —I -4.(3--- -` (D o �' o co 0_(1) (n O a cD o n r co 0 S (3v o 0 O CD c 7 _t< m o o ,, En)(.0c n) cn __: Or, o- nu nv 3cD -h O C7 m ON Fri ca. -n 0. 7 D 7 O ff (D 7 7 d n D a .eco c, cn o 2, 0H n) o_ o O < � co -0 o < —, O v rao_ 7 r..) (II ^^ o _ (D O n .< (D Q (D CO O (D (D (D v C O O 0 d `J � � co Oa — x (cio_ (1) 3 v Q � � (nr � � a O co a0v 0 m -1a 7 N —I 3 H. & 3 C Dcrn' � ° 0 ,p Ca _ CD -x o D lD A O co N O CD N A 3 m 0 � O � c 6 z cD rn m c� � �° CD -0 v v a 0) O ~ CD D° a. Di m i v' T1 O CD (D N o (n d N O py (D 07 (<D (D -zi N FO FO Q p o N A. Q 7 (D 6 0 0 0 6 Q <n p N C sp((t, Q (D O , v - CD C s cD - OZ o_ - 1:3c O N 00 = 0 ** FAK 71 CU CD cy) ca M (D 7 6 Q. Q n CO 0 CD N - 0 j O 0 3. Q G CL (D (n X (D coo 7 Q co 7 O o _ 7 3 �v O Q o X _, Z N iZ. 0 (D O 6 v CD m N 5 O CD _ o < vcni m g a' m rn OW 3rnQQ N N CD O (CD 3 O N7• (CD O 7 v � OFr) oi CL • Cn 1— -C. `L 7 CU Q uI ag o v ° 3 � Z N— A M m X < m mC n m v G 7 ((j) 0 `D z m O C) 00 g CD �' o g � 3 m 10 -4 3 Z o D m —I 0 - -I (/) co a) -< v a D 6. 0 x O z 0 7 vZ CDz< ,. v `D r * m f z CD v `••• (/) •• d T r 1 x. nn ,n N c O 'C N m A cn O -< m r C --I O z o bb b bbbrn 6-11 000vmn c r N mm nm cn w N — — YI m (Q CO 3 'TI CD 37 C CD 3 n Z to f, = ..'I 2. m 2 5 * v 0 „ g3 v � m ~� v o a 0 Ell- N r s. mTi g % oS0S g p38 2 - o. •Ay 0 < v5 e, m '. OZ 2 c' o � � c2i m °-=. vXi' O2pm' n� O cti cAA° 3 � m mAA m o < oh0. m 0 TJ CCD y .3 O �p O 3 ^` ai O $ .....= ' O p > > a $, C o cu CO n S. oo n = N cn = m �icm c m D-0 n - n5 -n (�D m c • N O O a f� ti 3 co O N y n p j. y Q N N r co c' o x Dr. j U; �° CD nAm w o S o �_ s N -n m CO = a 3 � o n m o .N. ON 0c � � T.• O 8 � = � p p o =• ccn = (ip O y al N � * D CD < 5 D � � � c �. my � m o = � w cm- f., ' 03 n c ca v, 0 om o < cD tcto -w vc y -I z nn '0Am O. n o p U -' �` m 41 5 a 0 m N n p p m 3 o n n.. n `< 73 _ O. ii m -1 p cm- 1p of 7 U �: 3 0 N O C m in o x 03 8 � 2 ? ac @ uric x .-. 0) -8 �' �. Cn m ' Cn m m 70 m m � v � z 0 Cr) < OD ". 1m -- a § � o m a -,0 - m C7 � • �' 7 ' wm a - m - -oa m CD 7 co m � p o nm oM a -T' C co p c c 3 < ,y ca S ai v p v rn a cn n' y m �. — � �, n n -. p Nm 3 8 -v .,_ K v_ n3 - -•� m _ 7. ro m y 2 5 O a , N = O * . O 0 0 N 7 0 0 O rn m mZx• s3 = o o D CD co n 4 rn 73 < m cMc vN G NO 0 tzii 0 Z rn 0 00 C Ca0 C r- 3 Z - E -4 -4 � W n 0 Z X00 O m nI -u < co o f °) e z 0 4.2 , Cl) � " c 3 y ti3a. O 7" n ' 0f° c° 0 -a N z co 1 . 7)n - A o4 m I- C -4O z -1'' mil '' 00040i-a41,)- higele 40.04, 0_Ciri&r-/Vii ____ _____ If ,dinAti / _rll°pe'dve k nee � a.y _G c,6vp --_ Aix-, S//k'/Lft✓l A/. ,, _. - er-ei A4d ROCei Gc/�.)'l S op Ave2A,.9y / P i'Ai Gv 17 - T/ 2O //e4:075 - _dam ,e_ ie,m S `e✓e-,0 ,4/'1/x`2 gc pr O4tx- B4 'e & -�- LL 12a-t/ ��2 A•vt� ilio, ea_t/j ®i2fyh',�/4 5,,-447 4/40c7,4f,,,, 4/54'4/ , / .1--?+ee,,tg,xe 1?,_1-v_ i-.41A/0 Xi -1- ' �',7 , - /1,,*frJ,2-77.07. --- Gt/ v o «ei,6tl_ 46r afi1.x,4. -.- 7 c4Ktae..rs TPJX,IS F0,c. r".14 641J (C. 82jpoir r _ (5,44,6) Fx- CAdcveLit•n"C-<' ._ 177/47_ c/�,�e" .4,2 426 .4-4)(///e.eri-HiAg",- ,5 iy ezw.t-ryf.A' Age/z ojv.tex ot * "46 motes/ 5re6f ai.Gs°G>/sit,, /Q , rii.ei"efr-6 ,eacv. W Q } O O WF .1 , z 2 2 a. pccQ,�� "g. H1 Q u �i 2 z a gz a0 a Z cr 1 o -J S ([ p < < ... ! , !- U O 11 t ,.- . c°�i� O X $ z ( Z Et Q 0 CL I— M N Ct Z I Q � 13 C\I QM �: J �_ O U O ~ F- rt - " W Q LL m --- > a o Z IIIIIIIIIMMII ph" ›... III oeU o 7, 0 O 00 QQ O Q W Z: YW .. U Q U = 1/y W Q _ a)LL la. Ca IL �Zo D 2 'Z � Cn � � �? w uu= LiYo, 0 1-- CLI rnF- nom. V� a.� N Of I CDN V) NI < 0 Q Z Q O W 0 °a lb nori w-u L.v,wflq 11131s1031 VA�F.O NA p.rte. • Malligaggi...,....a...... ...T-.n....N. �aE> -4, F •4s.aroagi 1 g2 e W •.......):-1 E .° % pRV 11"E E Ef#°1111.: ,0�2 Sp96 min ;iK iv ,°`.� Pqc£ T f 114, i 6ENC ARK: n4+T: 6935?S. p91 �'I C pi 32�M�' NORTH RIM OF MANHOLE,ELEVATION (9.84). `e/ K°j 41yr4p w 2 1 Z " s,• 8 i c ii ELEVATIONS oj (Re REFER TO NAVDOWN THUS CF 988.(9.84). ANO CONC.Po1TER // _POLE � C-"4'749�4 arIt m,;4 •IS(ACTS 1 1' y i 1 r 24' SANITARY MANHOLE /` tiry 4;O$ PI I f y 1 TOP x (9.64) .•• ' isl N. INVERT 10" TERRA-COTTA (-0.84) a x96 �w�w 1 11�' O E. INVERT = 10" TERRA-COTTA (-0.25) gJ t. ♦ ` x Xi�.qF •���p++t E. INVERT .. 10" TERRA-COTTA (3.88)) 9,47/1. .•�•. m t :� `` � o `°O f' i1,,f •IS g S. INVERT= 10' TERRA-COTTA -0.64 i�� :-------\ I j 6 i7 9 P4 • 24' SANITARY MANHOLE _man 4,,...0-,.. ='• 4 C.O. P y 4!'R \ y •: x11./9 x Ot n gii` TOP . (10.14) k ar wRE ,r1 , 1.$. 0.` ',+ 48.96 AN. .�7 .,,:.I I N. INVERT x. 10" TERRA-COTTA (-0.46) 0• /Atat �"�1 ,A .. ` S. INVERT x. 10' TERRA-COTTA(-0.11) /// is `1 .1 •,1 \ • �`` A t orna50115.PACE 1 MIST'C licarca young // a)bO ♦1. POLE qbh 0 ��''/ ` N•IOaeM\I �'' CONC.9.5• ' • ' 10.93k rot ' 6. Q'"\ SP.LwAr /�'� 9 ' F I v lv -',..7, taNC.POMlR Pat x' a'. ��',•yy Z Z U' k ar tea w 9'f �� . O h C .It /// I , I '' �• DO.Nar EA�TIEMT PER O , 1 t 0 p oPF10Al REcoROS WIWE x0' ` at,A �', 1 re.PACE 1251.00.97-.' D. 7 *Z Q. \ 01 U1* ..) 'lin - / li Tr 9• �'/i i 0 x°. r ,// I a ` S 4 in �� • ›, S x� POLE MANHOLE SPILLwAV Ai . 9^ ¢°y •.tiy WOOD pOH b`r x9 - 1 4.t.'A+._ m . 10' TERRA-COTTA(0.26) 9w Th .� ac' 10" TERRA-COTTA(0.39) -401/.4- 0.4. ~ �? ,a °' E 8" TERRA-COTTA(5.50) as,v wax ..ii./ • �} 41 A s 6 �i'arry S.I is. Dry`, .� tl ' s~A ��ia a./ , k j ti • 9 c i? El' F' SARRMY MEP 441$315.4 (f� "."%•• w M I � ' ° •. erR /�,�/� �'`',` a ,°, O Pat ,�' /�/ f I 1 I �`` ' 99° x , Pw P«E 1 .� ti �• e- \ 1/ ,� b I x90 \� A. � M I I x s x ��� gy Ir r cCocc. POLE 111 $ I1 0 ' 96 �a ( i0.2 )1 .' ' kS 0' C! 1A I�`` •..,POMFR P0.E DORNar EASENEMT PER O , 6 -�---- aT wwE N�p ` omaAL RECORDS.auc 12.1•1' :.$ I 0. t -- P. xw.i- -- h .rk PACE 1251,ErT'A' ' -1 y� y u,pERalaJlg7 m f7 t4 ♦`OTO/R) ".y� ws rANK - r �'� •�.pd' / aAa TANK H i I I A K !9161 ./' 11 1 O y... s, ,! :.. 094. / ge 141' ,� ,uKt.1.oY I,. -, ., _,, is lt' ` I �/ R / ' x1° 1 , -3,-; ffiv/ . yi 1 1 reale. '�'. .. I 1 ♦ x'f s ♦ 9016K a . . ° i `� 1x 0 .,.... /is} Pi,t/ /°�LA il tx`f ri ees'18,1 i 9- Alb:.s 4401• �» `0.;< \ 4) / 18.06 , 1 0 ��10. ,} e wDOD PorcR POLL \ \ ,° h AI. / 15 °� 10 ° (49.'•/� x-.....° 9 k ar TKwE ^° \\\ ht, y 90 xa' .itg;KILL'...AP . x''' 1 /C 6 \ 9• . rj I v ; • . mann,,9. kcur RvaE ASPHALT �PAVL1 ,ENT c 0. %2 i� �, ;? I ///10.•4 6.61 raR A \\\ • ' 'v0� N� �+v `' t ny 1.63 I °1 •9 SOK °‘ \ 1,..9)..,' Wr .4 ° • , .424•1. . II 1 .�0��� _61 �=1-" �wry . MANN= .7 } A. . ,0.•' � IP �� GAS TANK r /IINOFAGRDIRTD 6^ ,001 ( 0 1` iSx y{ x‘° -A�D Q '- i • Mliblah=r1d.WMAISHMORIMINKANIIMMI,ler••"MAW tt N `��\c.' ry f El `W .._•-N E o v 609 V r / B plc, 8ENCF ARK: Jp9j 1.:�. NORTH RIM OF MANHOLE. ELEVATION (9.84). •�/hf..�4..4 ��� 3j 2.S" w ? ELEVATIONS SHOWN THUS (9.84),AND /' �• X4`4,.„, .�yAO.44r 231St•Ot(4, REFER TO NAV) OF 1988. co,.c.pc, /to je ; ♦ ` yr�q 13•'°� i,.. OS. '•: (qCT 24" SANITARY MANHOLE ' RIF, •♦ TOP (9.84) '4� ` ���'�il Q, •4 �t`�4�.� N. INVERT r 10" TERRA-COTTA i��tr ..���� ��������� (-0.84) < ' •41{14' �••�`\•� • E. INVERT -. 10" TERRA-COTTA (-0.25) ` !��,• '`,•`f. a I��4A.� ������� S. INVERT .. 10" TERRA-COTTA (3.88)- A.- ,•.� :p•� .�.�••.... •PII ♦• ` •�f4.4.4 ��. S. INVERT r 10" TERRA-COTTA (-0.64) / ,•1 -.4►.��.**1'i..,.ts �* •I �♦4�` ] 4., 44:'• // V �A4"1, i..0•44'.40►V�t. 4 ,...4.4.:fr . 1. s10 G 0 0►,1i 0 t.•►..4►♦ w ►004 24" SANITARY MANHOLE ••' C au.c.POWER vac�I!Y't+�r w :► 1►C`.iv:!�,�! O*1'4w'� . • A TOP .• (10.14) ""w1E /404►�..�.v0100000000VO00.ov� O• *t+�4�>001' N. INVERT r 10" TERRA-COTTA(_00.46) / *���;^ 4�':��ff f•ffr ♦. f��f•f t•', •��f�f�41.f��4.'. S. INVERT r 10" TERRA-COTTA ) 0•►i�i4���. v0.000000.000�0C4►•,.♦0•.0004, _ ell.P* lZx.men•c• ,,,., >.�•,.., �•�'�. '�.0.� 00 :0>4♦ -4►0..4►0 • 4,o. r.4 Um,O) N'4/..�VtV'•:�i�����1A*4,4 i�>! VV`;V�v�```�4,►"%v VV��V�, O f,�� ac �MI�?Vi�� t' 4 �t� �6V4� 4t♦ f�1 4VViV�j', �•• 1..00000000000..:�A04►00000.01 ► t►,00004 rii ��'� d Q ro,Y /4114i.... • • •• 000000000��:��04y000A4000l00110000h0> IIo yIa `" 11. //" 4. VP O ` N 0•►00•►♦000♦0000000109 ►A�4'V���•►�t'I►0�4►��, , f^ 4. i11�►���t►�`►�Vi��������V�� VV•V4►t� �V�4►'����1 1f�������t� ►V��� - u/!I4►.��'i*��4►4►4►4►����������� .4►.:>!�4►•C���1 _. *•* ,• SPILLWAY/ •14h>Ii►�V�V��V1����V���V�VV������V�V4►�������V�,►��r��, +:!VAA.,, 41 ivpi''►��r4►V41V4►�V► Y MANHOLE /�� ������� I��c :V>Vi t�::V<��V4►f�>��i� ;���V.,y�►� /. ) .41 10" TERRA-COTTA (0.26) `/���...•;�f• ••'�•����4►�����•��������1�����<��Il•��4,0 •����?)i••"4",.....•A1f.��., 4.10" TERRA-COTTA (0.301 //�j,�.�♦�4.4'' ��4•it',• •0 •••••••�►:4►•���♦�����•������1/*• '4* 4�,������•/.I4-•4..*.4''•••W S.••♦•• O 8" TERRA-COTTA (5.5(;100 oo►°n.""" u'' Vfi pii �V�VVVi��+tom�VV!�VVV44, VV� VVt<•�VVf-*.�.VVVVVI••:1I �,.40, V4►•44•�Vi 414'V 0�►V V O�VVV�VVVVV•►V��Vw4!V4►►+�31VVVOV•V•t�1�0 V V 0 V 41'� i. 0 0♦ . ♦ l 0 0 V 0 0<, VVI/VVI V41 >'��VI►�riI.1•� <►•,►0�04►♦ • VC.voncn/� ,�••1��'I''/V��41��t+•��•V 4►.4►�f�V�VVV�i-���1VV4• ►4►II'• ri�i•4. �VVV f, • A 1•V*�0••f�•4���'�►w�^�ir��V•V7•••.• ��!►. ►••� ••V•4►��Ot 1>>��•G���♦•>•�•�•0•0•t +`4 ��4► ,•*.f :t*P ..'7. ►•4AIt���� ►VVI•j�� j!�414r*•�ft`•• • e�.�/44"i0J , � 1001.1►00:►001► ►41rti •�i�i000�9000 !l0�► 000 0000.0 '•001► 904►0041 0.4.•0000>000� 1�►i`.�.� 4,-,�0�0�0�4►+s'.• 0�j�•0�0�0�0�0�0�0�0�0�j�0�0�f%.-4:-�����0�4 04'0�4►�j������0�0�0�♦�0�4►�04►�; s' i kl*j4/�►•••.•i►000�t_i'�e!0<;►001.►j►V,,,,,. 00V0•00004►00•0�•►•00Vf�!�t����0 i>0•00� t►1 A00�����000000•.4: o • !`'♦'t"�`:'41>000000ti 4:c. 40*•�0000000C 0f0'0'0�0�0�o1��0•00�rv"r0'`:>�•V0ii0000�' cp^(°co1 01►- P1(i.e 0i►t.0V��V0 '� 0VV0004V,V��die�1- `�1t O•iV0••••♦•01`010'►00000000001�:� �'�►•0.0.0.0•0.4►•0.0•I Ii00_•ii'4►•0.0.0.0�ii�4 ���<'A`•'V' 4.IP 1 • �►,���404�4Vo•�4�0�404V4V0•4004•44�1.' •••0•0•V•�OV•V•��•�0•V•V��l► ••l1�•0V�V0V�V0•••�•�•�44-0 ••��•*•�•:'' ►��4w0a1 c0°( �p1�00���4�•�•000♦:♦•0•0•0•0••0.0.4►••0�►0f•0.4►•�•0.4►•0•�•�•�1!�I/0.0.4►��•�•�400V•i0••A-IP f•I•.11 V-•.4 4►01•• 4,i►•'. `: 1. IF�0.0.0•Vo4►•0.0.1`�0.0.0.0.0.••♦•0.0f�10.0•�•i•VV0.0•0•0 /11►0.0.1410.0.1�t1.0•1•f/1� i E 44, ,0 °i' <, .��j0j•i •�00�•v'�000< �G!• 0V000 ��j•A �00• 0.0•�i��:>�0��V0�f�jj1.y'Vj j jt 40,-•j j��jV!!IjOVV0�►.►: c> 10•0•O•G��0•0•0�►Z�`'1�'V�1►O.0.0.O..e.:10".•:::;:$,`,44.• 0•��1►•0•0•�0.e�• . .•4"•• 41.1.•.•••04�j� 1•t' ��1/1.•�i14►•.•��►1�(' ►�1���0••V�0.1�0Iv0v1►0•<��•ili•,•0f��1. ...0•�•i •,.••0.0.04,ii.••4.•1.••- �0��10�0.0.0.0.0.01►1; �f♦►����:0�0�0�0���i�0�0�0�1�0�r!V�_0�0�1�0�i��.1�{�V��i�i�i�i�!�i..1..i•:•i�i cvli�.0.0.0.0V?S0V0•0�070VJ•VVO�V4.„, 00�►�' .IVt�����i a, ���j� :iii�: ri i ��•.0•t►�000.0•0•I.••:�0V0•�i�0 700 447• '.... ��!•0S<►f'.. f, �'►01vv�v►"����0000.00004►0000000000004►�iO4►4►04►01••00�000'1 • 4►0' ••�0♦ 100�0�f►�000000�►000�0�0�0100�*J� •r��►0/....t►0�0.0�0�4►•!�i 0V00000�0"4'i•00�110•�•fl�Ii10000•��•00�►''. '�0�!�.0000V4►4►� �►000< 0 W 000A000 .•00000V'►v O�0001000:i000000�0r. / ' ,•:•:«��*`�A� . ��4414 1:5 ` 0v� �i�!���0�0�•`*•44• -•••••'\o�0�i��1����1,.• •►04►��4►4, �t�4►�V /' ♦♦♦0 •! ►•Y 4►.i♦♦ '�*441',40••.0! S•O•V•• 'V•�•.:1•0♦O4p��`�'I�I.10•V•�f•00044►•1�0.0�• 1►4, V�0�0t1000V�0•!i01r .�/►�!3L000000�♦0��At...AN, �5�•,1V�C•4.:*'•�0��•�04►4•,..• 0/ 00000�010004��►�; ,. .CR vac �/•4&"40 g 4V�V44/:VV�."�04;4'4.' 0 .•0'►4•�'Y�!•4.0,1.••••14.•1 ' ♦ �� 41, ''' Ift•..:04-.4 - -v-t •"'_--.y,....- "�'o.�,'�.-id" _ .•:•i,�,,.��r-4- -,ry,�1..4►���►�=‘. ..4►' '4"0'ri 444 /�tifr .. "4 I ��<1�0 t��4►�w�•�>.01♦0�1��•0 0 0(••••.:0,..f.► •0 ��i► •-•�0 �•�►•.•.•t•••A. 0.0.0 0.0�►•0.0.*1.0.0'1•�0.0i►!. t��"iS.iiy;'�' W 1 1 Lsfi -;.,_,,,, u y1! 1 i���`�jjy�:: V d 26 Q to L ,A*41.41‘.sl' *i i 4 4 1111-11 0 i lilt! lit \r I. 7 111141 :. - g p y �i •1I \ ,\ z 20 riliik li I > 5 CO MI le b i1!11�'y ti Pill DZi3 1 i1 113 .. ill z : °o , , 11114 La 111/R1$e # illiiii�.' taj it ,1 r i A smy4 5Is bXPiX AWEi ; i i a 1114 1: r = i.lII1 gli110 o K :. li I e Sa§14 m R . bid i 1 3 ;l � i i 1141111 1 § W $il am i! oa Ilium „'l 14483 !d 111111 til 1 II II I !1411111 sY` "< $�`� z< e i N !: $� 1S il1iaiaid d1 ji 1a a 1;1a1a''r1d; e ria ie106 14 0 12 14001 gi33 i s �gW'~b 1 11 1 liiiiiiii � II 11 !!' iilinii1'1i III -494 III c 1.;� 1,44/11,4 es. ervle o/F .iw 141..ifibil 4 15$ :1 §gilli � II!' 1!Yill; iW i 0 ag s 5§ 1 r $ Fed Xe < �� i ts,0901pli XN S> �`n y:7�N ff`W $ GE � b�111 2 yv` R1)KbS S1 1 SII 1 a � I; ` 4. i 'w b<$ ee l- illiA*AIRIR ali le 1 . o66i Wigg � Flit 1 gBB�$; l �h !a 1 OW C- "ill i "2"-. 114 li C) ger ` € 21:Per e i = o ;55 n it � ! aifl f�1ia ��l �o Abse ivit I Igo a l _< 11 ; gts i: ' II/11411 Gliii �"; 1111,1111 � 1 i liiiiiiii iliilli 111"."' i 5.1 A Mitis.ieW 1.4 YA 5t411stX3h.lil§s � H it 1: 11 1 i g iill{$i; Willa illiiii lit g! #a . 4 ,131 tla i Els g t < X 25 i i iI 1 l 11 11 i z` 11§x it: <90 jz < sg illt N a da ;� 00 it§i' &i W �8 ee- O S Dim iia $w.- g H �l g O4 q t; 14!ing 4 T1 tkv ilt" U 3 z U s < > o $O :6 a ''i- b gG U O ��!Il�b <s z 31- 1 d� lOgtet,g_ W 0 a <5 E '61 Ii PIX 41446V°Ifw ''' xPlay w ' _ ...s..i z x 04' k�i 0U - ,in . 4y,4 lc' --a a `oma Sw`o `p- ?� _ 'il" et§....1= o o, Nwe=o ie $%�s hE pwt 31g 2E co' r H 1.-1.=.=!- _4 4-- _C !G . C E y Y G V O• z �y y e� . Y H.. M4CoM G _ _ �E 'm\ �E }�'.�- NG'� 4" = 1-: 4 w a` L'E o i1.5,N h t. N E t� ;i Zi zy.G.L.. f- �ry7 ,e `04� Y^h1N tt1C �jl �i� G4�re- H abN� Toff ,xsg' . • 0 Z3 M` -4-.:. �` N, o E`4 O> Y::-,' Y O.4 VI o f '. p Z Z w D,�1.p -'-' :.4! .p Y O V i O Q V G; n2g aE r i.a ,,17b.Y. „„ N;� nil Gl C +4 p 1241:2; O b..4-,y O`C j4 4 Q y N Y u b' `` A $ '''2't C` Y}, .. �' tc ..32!E'01 �J Gni + e „win �_ 'Q ° S N S a L i v.c>E�' �i.. z w Q o 4' ` o ff zrsz. 4 : .,. ... `` CC 2;2 `y4 4 Y y y a Y Vi 1j 1. y 4 0� O O o 4 4 O o o C v L 4�\M w O N':.G C� g � .Y. r�Y` O� � i H L� og�i�by 3.,� �l ���.i ;i;G.o `;73 g b E % _` x_ 4;Y BY Zo 3x 2;2 b "3 G P.o Nrr N..pP I c N e _4; i,sx G=am ax°_°•.:M o� .1!'7,'2o5Q� C zgfytlEzt b „`" t Z E b iw 1.k .„ H N C H a,= lea H D ``4'�b 0 b'1-1 '''''O x+�Op y -z-:.q 4 0 b N b .G.. y,N y p 8 4 .:Zi 4 " 1, 4 u+_ Q�Q o .`.x„C..G.D.� `.H H EOO yy 2gZ.44;4x M t w r L 4;1 .`4= ti CA Y y v i x O E O t124:01 Y;$ 4 q Ypp 4 M Y C Y y G y�> Y 4 3 u `O rV E .`a. vi M yE "E�S pO a +�y 0 G CC 4 a Y G Y`1�'�O. O'=M M 4 1 G G�jV[' a.� .`. E 1 C - Z O M ppy3 4`i `=$ Y e O Ly 111,-.7. a- G+ > OA` t1OtMGOF !;!12!:.44. yy YCtOO A:g y D4 84 q O CO• GYZ±Z Oi: V 3 4_ j `4 O N L4•E g 1, O V N H !O I;g M n V q 5.",-.212. !:1 p 2 O N F. y 4` E E M w!> 1 N±y! `a H E a C E p NN., .gip ' L2%r _E y b H O V Y Y i 2 i yO . E +M Cr Y_Y'E D 4 y oV pp 4 Y 7.4 C C ``Y, r E y 4y`a D O •N�'O N V C w w E. pp;%, yJ k G Y' C; j=y am_O r,t t, y p y� - pi O4.,E M;` `C N OM_`e t*Ii %;0-; ; '~ i, O `2 N O Y 2 "' 4 ►x - = E N_pb y „pit;moE2$gi. Hoo E? .OMo;H a EZr$ b Le- '4 N: go: gq Y z; /t 44 Nom, pYl�4q M ��+'- f, �� G_ $ _E��E �$�gE �'G :� X ; O I 0 0! E Y r ' ;_V yy.-$C i .`r 4 Q 2 o[ y 4 M Y M` N -,0; 4 1 V 4 0 D� `O Y Y'�'`^ '�D.C.G.4_ O S a S N�b>L�j O M 4�• � � ` y r `• N �a EO G�CO�Nl � i w -i,--, Y`' p 2.:2� �.b.N`EtN 0 a=� +'4a ''.� -a le p`MG of O„Oi�'yy e;y+ _ :Q i' G.'% W$ uEoNc, gl:=.- Y�Yy Y t,po $ -'21 4 4 N a E 0 Y411;7131 `p'n=D<Q O Y;` J H_H b i t W C = m Z Y O M V a N .. p g E . C M y�. , 4 4 G y OC� N U I a pG`C ;;:;!..;i,: rgDp+w cM�o�:�G iolxD%'1-1 di i bto �_' VI Jc g aiTzkl :04,V Ili!. c g b Zn, b C Y Y 4.__ gby z b p E y y - •]a p-.M O ::: : 0::: :: t E 6C qH Vii , `CV221 Ora O wp u>O y X• •y` OPQICa b ♦y; a` aO` "3r 2.. n O ;4 C p'y4Q w i; 01.' O E A' v a esi g 0 0_ '!.2 0. �MG AI , O H Y 4 D Z y O> tat a N' x G a O!J G C w N N D r 1 O H J Gam. .4.Z_V x'G"a ; 4 v M . :zit.Y„ CY P D 5.i; i 0 O 4 y p V C O 4 S rV D�y �r_ ♦♦ _ n.11 �♦ ' ._ C at'.;G O G p Y 4 N D i O Y V> 0 0 x C `Q N``Y.0 }' =-4t.14 4 N V SOY x Y J F ,p`N O x¢J O D t S g N -,!:,.,t, Y C -V1 O �E4„ i>b .b."'$ Eo.b.ao±i vz •��c ! cN EQ 4t. ±o,l`2o c `ues-40 yyyy'exO br;;4 ll.y, y 0 4 b 4 4;N 4'\ G x Y i 11° Y O % g. *.v-, .by� ;p E O E t. ' y Y J Cp >a .G r- N p Q M Y y S Yy 4 r „ C `COC p''Y bcNa yOt S.Ce y eoNppa4 '1.14:t! 1:i7 i VO x,1", Vi18.'.-.1-?.'2810..:::-"I E4bG1r4V UO2' '-g �O EDO y4r SV> E 4 p O�. ;O Y G\ p J Y Y Y' b D O O G O O D 4 Y 4 N _ Yj C 4 M _ O..M < Q 4 " M p 4 4 • Y N 4 r H D .G. 4 V CC N;C C tg C g 4 p 4 yy tag g b JF-a.y }y e O\ yy 4 i y .O. p x y..7 a 4 a r D Y O b 4\ N tl O > O O a 'Z O q X o C �` G O V j`O V O O`�D_N C b r P 4 7 4 ` N ti ;p Y •V Y R E O 4 v �"O ��..^X`4Y y� 'a G =°EY h YX� pm�Y.c°•cDk `uic AG p ..4G ^ Do `G a gLyg-Y'_E, � GL.OY J 40 `= 4 .. M OL Y Y Y C C E O V Y O Y E ! `2 J c b i 4A ;A. w `'c „ ` ^a ,�ll!'2' eihi i ` t vy .4.0� A v O O yyyy 4 y U Oil o04 Tx,' Za± ;V Mey`.r2N'`g1x „u..YM ;Exoa 1; YYV gV O�Ne V`1G � OCrU E M IO a4\';„ Y YNa.i`4$l V 4 C b .g:V� gra: N-iLYo4z` ; b'a` NC. E `� :'W aux o> 8 `gya g";' .,18t-s's g•;`* 8 CCp 4` V M lit! �V 4 C b�`a M��O M V>b L O N�� �i� �O U'�'��''`�=0 p O•„``i l ct V l M 8 1••i J r\i Y xp S O D}��E N O IP! P O'gg %q1;101:1' 4 C`V;j0 E'A4; _NJ`O b0i iVrC4N �•GrrY }t?4Ci;rY ;Ny OaiO 4Y_D_:d>G C YSa` ;?4. gu V $ `` � '-` g Co Z'3 f`.:.-i!.zta N^g0_0♦0>YW- OO4 j \ON. 44 NO dry=� x '� NG j y�<g- Yc S����a • O L 1 !! � P�P �r ��h��ii C Q O 4 `D ;= x E Y V 4 : y- C �` a V+Z1 C e$"V# $\D� ;: 'g 1;101:1' oyaoEo :Wit g'S °qe Vr �g1e:EAW-,Vogt p�a x Itr; b Y Y C Hp 4:-.u. > E ti H y °14;"""'” ..V y r H a H>t N M G N 1` M V N 0 V% O OFy b py 3^ w`r `y M t:N D i k`r X x` O�V E]O S z i Y I y`J E 4 G> .11 6 2 Q.`.N G ly-N V O ,,,. g x O Y QO Q S r ,. Z11-1:t V1 l i N U O�G�O O� G A�`4 t .Z p V O C C�1 y�O P O 3 b ^ Q C r h _ y _ ^ _ O G E 4 Vim•� ` N O V H Y yN n G X q N C 4 y O N G G A O 11:!! W`v 4 1 1 `FE` o-c o _ -= P „N K g�'^6 = o ` a ^yv Nr p„ og IT o ^ i"2" i z c ;x'o ;Mea 'J' _.7, wing oo Oo o4.i. Oil yy p w N: 1,,_ -g...„ c Y a S'Z= p y C N R x p P W O R 4 y G D y 4'� �e V Yii V C r c `m .t.4...! a �o �$ `„' *aa. a 1Z".' Z'Za ag g`E gao! 3 b leo p1+ ti €aa �` > 90 xr N M "eo L xge� AKHio bNx � i.k 3ci4 P wg.ox `13 Ili 4�„_ '^ ., ‘,'6' O 9 =_ 8 4x ` o` ,'�x(Y O oO.V'.O g�'5_= 4G "a S q V 4 r c.C, b p V `E J l i g,G` �: 3 4 "!5 4 4 4 V ,°-%17, by V g C.!, a W >p li tq„ ‘'''P'" v Z '0.$ y ,A:01.2.51 4'^"-it; H F"`.;� o V`v'; `u o g p 3 y V..cY o 21 0 ¢c .-,4 6 a.Gy ll�,� \ = i..o gF°,i '' D% O an 4 c4 3: a4`eq� 0e^ �:'� op p„ o O._Y.�r ' t!:-...p iii Yi! ax E g Q b V r b y �. N` ■P E \. .,t N� 5O` vC' lar.:i7 ! CMg .,, v-,-,t . X„g a rb!Iyaj '1,! y m D 'o i E M b ^ phi. Z ....N C N Y. Y 6 `b' t P` a s O L't y ` 0 y• y Dy y i q 64„r % - yq �::::p`c v �o i; c� *LE oa`� L`Y „'�HSNo w`owgc Y,' 03 H? n y c H i i i i o c N `O G p r ~ = P r .CO C C V y O y Yy b b a`4 0 C` 4:r O, „Y O x r a.. r E.+N C' `Yy Y.y y Y t E M m b M Y b ` \C O O P_ V E \C.N Y C V Y V E j Y a D 40 0 4_4 C Y` y O V 4 g G Y O L t y N E� o;�O O 1� x`'3 H'�aGGO`y niN 0 e��V414Y FpFV ;�`11�O r�� aN�OaU � �.'�.C�xY OE �nN Ef`G N p�000 YCO O D_ S G_ J O E g P 6 r O i O x 4 4< r410:: .. `` G _ A o 7 r.0.... E a 0'V Q 2 C r_ g `'''t .U ;li pr 1= „ y4 II1III ; 05a. 4iW �. r?\1 ptO�0o 1 :` oo N ;r fllfl k>O 8 m'J 4p � W' O� WO C,C : Y M O N Oyy � �_C '`(` C o . n> o �g4 gWZr` kx�_~ H H W 0 36 3 „ O D Z Ya p C •O•4N7< 4Z`oo '¢ .. 0 4$8 .``, W .. a :` g o O p R.2 V 1-. . 1 K I.A p N .. .y..j �vi U S X .. S C 8B F r 2 � i kin.o `.�o h r.\ y N worm w-u �on+e.tw..+w.wrr §Z! !¢ \,iE ■ kle W ii%"Y 2 m § P9t \gym;■ � k !tZ-Kkp Nc41 \ ��`®f�� ~&%®E%( ( 25RW■ | = 7 ■ ! ! ; ; ■ ; ; � 11:11011:. ■ $| g . 2 „ W :21 . �ff! 44 44, 44 . . - Il!! � �� a i 11:1; ! � ' ■ i 1 1 1 § 1 1111111111111i �� A 1 ! � 01 ! 1ilie �,!| !8 � ! | � � � � � i � | ! ! � ��!,!� | ! 1 qailthil i \ /.�! ||! li01111! ■ 1111 ! |\ . , . ti ' 1. Y1 I | _! ■ ; ; ; ; ■ | }|t { 1 7 1 ai 1 } 4 1 } 4 ! 4 iJo ! 1 % | _ ! ID f � � | � s �� \ ra � � � !} � 11i iii � | �■li 11 11 11 k �� %! | |II! - . • l � : l � � ! !! ! 1 q § . �� I - i � -! 0 � h , i! ! ' 2' ! • • • • • 7 ) i !I| ! !q il + --- „, Building Department (To be assigned b the Building Department.) .- �� iy, 800 Seminole Road .-:�-� Atlantic Beach, Florida 32233-5445 Phone(904)247-5826 • Fax(904)247-5845 /, f . E-mail: building-dept@coab.us JUL 1 4 2014 Date routed: / City web-site http://www coab.us — • APPLICATION REVIEW AND1'ACKING FORM Property Address: e=20 / ,/ a far /i De•art ent review required Yes No _Buildi • Applicant: rC QeAf S .n'r /Tannin 1'. Tree Administrator Project: f ( 41I !.! ._.— - 1) •u• is afety Fire Services — -- Review fee $ ?L‘. Dept Signature G2_ Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept. of Transportation y — St.Johns River Water Management District —” Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS —---- Reviewing Department First Review: Approved. [Deni€ (Circle one.) Comments: n 4)(4/4 BUILDING PLANNING &ZONING Reviewed by: Date: ?/l-yr/ TREE ADMIN. Second Review: nApproved as revised. [Denied. PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: — FIRE SERVICES Third Review: [Approved as revised. [Denier' Comments: Reviewed by: Date: • Revised 05/14/09 c� PUBLICCLWORKS PLAN REVIEW COMMENTS \11N 0 Date: /_ / /�/T Initials: PNyff MLA\N Project Name/Address : f/ f l icr_cip V /eel', Application Permit#: / V—//� Check Box Check Application Tracking Comments to Add Box to Comment "Print" IMPS Provide table of impervious surface calculations for entire lot(existing and post construction). ❑ ❑ ESCP Provide erosion and sediment control plans with installation details and maintenance schedule. 0 0 DPLN Provide drainage plans showing site topography(flow arrows, etc.) 0 0 RMRO All runoff must remain on-site. Cannot raise lot elevation without measures to retain runoff. ❑ ❑ CSMP Provide construction site management plan, including Right-of-Way Permit if using right-of-way for construction parking. ❑ ❑ TSUR Provide a pre-construction topographic survey prepared by a Florida Licensed Professional Land Surveyor, showing 1'contours. ❑ ❑ Section 24-66(b)of the Land Development Regulations requires on-site storage for LDCS increased run-off if adding 400 SF or more impervious surface. Provide Delta volume ❑ ❑ calculations and on-site retention required per Section 24-66(b). (See attached information sheet.) PCTS If on-site storage is required, a post construction topographic survey documenting proper ❑ ❑ construction will be required. RWPM A Right-of-Way Permit must be obtained for use 0 0 REPM A Revocable Encroachment Permit must be obtained. 0 0 PLWP Pool—Wellpoint(if used) must discharge into vegetated area 10' minimum from street or ❑ ❑ drainage feature (swale, structure or lagoon). All concrete driveway aprons must be 5"thick,4000 psi, with fibermesh from edge of DAPR pavement to the property line. Reinforcing rods or mesh are not allowed in the right-of- 0 0 way. (Commercial driveways—6"thick). Any utility cuts in the road must be repaired using CO1 Standard Detail Case X and must be URCT overlaid 10 feet in each direction from the center of the cut. Repair must be shown on the 0 0 plans. RWRS Full right-of-way restoration, including sod, is required. 0 0 Roll off container company must be on City approved list and container cannot be placed on ROFF City right-of-way. (Approved: Advanced Disposal, Realco,Shappelle's and Waste IJ 1 Management). i Full erosion control measures must be installed and approved prior to beginning any earth ECIN disturbing activities. Contact Public Works(247-5834)for Erosion and Sediment Control 0 ❑ Inspection prior to start of construction. MEET Recommend Owner/Contractor meet with Public Works Director to discuss proposed ❑ ❑ construction. Call 247-5834 to make an appointment. ❑ ❑ 0 0 Building Department ru-r��l.H I `, ION NUMBER �' (To be assigned bythe Building Department.) �� 800 Seminole Road r": • >,-.3•• Atlantic Beach, Florida 32233-5445 / M Phone(904)247-5826 • Fax(904)247-5845 • 'r E-mail: coa buildin -dep @ t b.us 2014 JUL 1 4 Date routed: Mir City g web-site http://www coab.us 1 • APPLICATION REVIEW ANC %ING FORM Property Address: t=2 0 1 ma p far j& / De•art:a-,ent review required Yes No J Buildin• Applicant: °A iaekS .TNT 41 FIannin;. Zoning> — Tree Ad:''inistrator - Project: __-_ 6_i i 4 f'n et. ,e"u.lic — R''c ii6tie 'U. IC 1i7•y Fire Services --�. Review fee $ ,4" Dept Signature Other Agency Review or Permit Required Review or Receipt of Permit Verified B y Date Florida Dept. of Environmental Protection Florida Dept. of Transportation — - _ St.Johns River Water Management District -- Army Corps of Engineers Division of Hotels and Restaurants — -- Division of Alcoholic Beverages and Tobacco Other: _ _ APPLICATION STATUS Reviewing Department First Review: pproved. nDenie (Circle one.) Comments: BUILDING PLANNING &ZONING Reviewed by: g Date: ZI? Of TREE ADMIN. _ Second Review: ❑Approved as revised. nDenied. I •• 4-� Comments: Alr yr PI9BLIC SAFE ' Reviewed by: Date: FIRE SERVICES Third Review: nApproved as revised. nDeniec' • • Comments: Reviewed by: Date: Revised 05/14/09 , I PUBLIC UTILITIES PLAN REVIEW COMMENTS Date: 7 / `/ /£ Initial ip Project Name/Address: 20 j _ Applica lo Permit#• Check Box Check Application Tracking Comments to Add Box to Comment `Print" UWSU Avoid damage to underground water/sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed,call 247-5834. M BSC Ensure all meter boxes, sewer cleanouts and valve covers are set to grade and visible. 0 0 RT1C A sewer cleanout must be installed at the property line. Cleanout must be covered with an RT1 concrete box with metal lid. Cleanout to be set to grade and visible. ❑ RPZB A reduced pressure zone backflow preventer must be installed if irrigation will be provided or if there is a private well on the property. Backflow preventer must be tested 0 0 by a certified tester and a copy of the results sent to Public Utilities. STRM Plans note the building will be unsprinkled. If plans change,any fire line installed must be metered with a Sensus touch-read meter in a properly sized vault and an appropriate ❑ ❑ backflow preventer installed. Backflow preventer must be tested by a certified tester and a copy of the results sent to Public Utilities. FSBR If fire sprinkler system is provided, contact Malcolm Clemons at 247-5839 for backflow requirements. At a minimum, will require a double check backflow preventer. ❑ ❑ FLM Fire lines must be metered with a Sensus touch-read meter. Meters larger than 2" must be installed in a vault as noted in!EA specifications. ❑ ❑ ❑ 0 ❑ 0 ❑ 0 ❑ 0 ❑ 0 O 0 ❑ 0 ❑ 0 O 0 DUmLUI1'kJ, I ION CITY OF ATLANTIC BEACH 800 Seminole Road, Atlantic Beach, FL 32233 Office (904) 247-5826 Fax (904) 247-5845 Job Address: 201 Mayport Rd. Permit Number: Legal Description see survey Parcel# Floor Area of Sq.Et. Sq.Ft Valuation of Work$ 4500.00 Proposed Work heated/cooled non-heated/cooled Class of Work(circle one): New Addition Alteration Repair Move Demolition pool/spa window/door Use of existing/proposed structures)(circle one): Commercial Residential If an existing structure,is a fire sprinkler system installed? (Circle one): Yes No N /A Florida Product Approval# For multiple products use product approval form Describe in detail the tvne of work to be performed: install 6'chain link fence per site plan for construction storage and laydown yard. Property Owner Information: Name: Beaches Habitat Address: 797 Mayport Rd City_ Atlantic Beach State FL Zip 32233 Phone#904-241-1222 E-Mail or Fax#(Optional) Contractor Information: Company Name: Beaches Habitat Qualifying Agent: Rob Peterson Address: 797 Mayport Rd City Atlantic Beach State FL Zip 32233 Office Phone 904-241-1222 Job Site/Contact Number 904-334-1202_ Fax#_904-241-4310 State Certification/Registration# Architect Name&Phone# Engineer's Name&Phone# Fee Simple Title Holder Name and Address Bonding Company Name and Address Mortgage Lender Name and Address Application is hereby made to obtain a permit to do the work and installations as indicated. I certifi,that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. This permit becomes null and void if work is not commenced within six(6)months,or if construction or work is suspended or abandoned for aperiod of six(6)months at any time after %work is commenced. I understand that separate permits must be secured for Electrical-Work,Plumbing,Signs, Wells, Pools, Furnaces, Boilers, Heaters, Tanks and Air Conditioners,etc. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOu R NOTICE OF COMMENCEMENT. I hereby certify that I have read and examined this a plication and know the same to be true and correct. All provisions cif-laws and ordinances governing this type of work will be complied with whether speci ted herein or not. The granting of a permit does not presume to gve authority to violate or cancel the provisions of any other federal,state,or local law regulating construction or the performance of construction. / Signature of Owneroo Signature of Contractor Print Name Ii. - 1e,- CS ( -s Print Name -{e r3.. Sworn to and subscribed before me subscribed be ore me this i"Day ofI 2 HURRAY :. y ,20 1 Y MY COMMIS&ON it EEtg5723 • MY E1 Notary Public EXPIRES April 02. yam''., ,' ' 1 s7 ' .2016 (401)30641s3 FbriOSMotr�enb.oom O01A ••• ••• ••• I„D nn ,•1 r am „1 �.��y � r� - -. 1,, r _, J J - - [ i, „, z A k OUADPLEX LOT TRIPLEX LOT DUPLEX LOT p BUILDING TYPES cak, m II 1 E -----<74.!,•44,71-41., erq•0•.•ia itaera DONOR 4.111141akr/ a r Y WWI,MOM. \ as Dr.ra oURa N a.e Oma D.a Me.MIR Y (N FEET) >00MPFLANa roII wen 1 Ind. J0 RNAe N LOcarot uir s mo o[iNi \ \ ! I I re. BENCHMARK: � �` rsu um.. 4. \ NORTH RIM OF MANHOLE.ELEVATION(984) ELEVATIONS SNONN THUS(9.84). ANO 0fReC -?z T9, REFER TO NAV)OF 1988 i T Z 4yT`' J`�"4L) Iti Q 9. MIN III a TRIPLEX �\� 'Otk / \ �`_ W illi o a ' .tII 7 1,/ •.A1. _ --4 O Rea.M 1ie 1-- 7 4 FT SOEMMX $I OUADPLEX • !rt SOEMe1X ^/I ;711141111-... Z ' Q i II CCI 8 1V ,7z -sT /00h { 4.q �:•• { / , /14 OUADPLEX r me am.Na e 27 • . • M [ m TRIPLEX ` I , -,./...,..;,...s.,,,,�� A' � g` �V �/ . `MSD d '�.1� A� COMMUNITY NTt� {mir � \L'�p`yi /l .4.,--e- li iir, el .1.;4a' • jr- loco S. 4.l+t *--p. a'•°ODWO O +� 13]9' .NT OE `. .• _ . $QY i aLL S U•e e e • R II, 1Nl e� L. fD >� U. NT "w--1, s r Q. • .tilAe.• _ _ - -{x101, DUPLEX .. ' � ,,, 96 SY ,. /,f 147 L $I 11 OPEN / / r Ce a I I 13 DUPLEX r� l'•.' SPACE P/ '', i O 00 8 DUPLEX j - f/ . / Z 14 Y I DUPLEX I 4 n o // 5 ce CL 0 VI W a �.► .. , RCC) 'rr J- ._ ��'. NO CAP. 0.9M iLiT t_.."�i —16 p7.O4.25• w,.) 'OQ.�. ►IIODEnry UNE " ^J /h� !' N OT08.6S'*OCT) ^O` (�13857 � J N 3'ig x(c) c i City of Atlantic Beach APPLICATION NUMBER Il 4.1: , Building Departmets: To be assigned by the Building Department.) RECEIVED :� l t.= ¢ 800 Seminole Road j (/ Q i',1 \, - ---;_ Atlantic Beach, Florida 32233-5445 ( V ICS — /�� ' "� Phone(904)247-5826 • Fax(904) 247-5E0EC 1 6 2014 111 'teni-036;" City web-site: http:llv✓ww.coab.us L�� Jate routed: V BY: . _ ___________ APPLIC:''~" TI414 REVIEW ANIt TRACKING FORM Property Address/ /271y Sly ,d' Desartrment review required Yes No / ` Building Applicant: r 71 ,` LC iee Planning&:Zoning _iree Administrator Public Wor' project: ::::5Wr. / fit-7W/ L Public Utilities Public Safety / \ ` ire ery .es.... ...... Review fee $ - ' — Dept Signature CONTRACTOR EMAIL ADDRESS CONTRACTOR CONTACT # APPLICATION ST; TUS Reviewing Department First Review: [Approved. fDenieri (Circle one.) Comments: 7,1 BUILDING PLANNING & ZONING Reviewed by: ." _Date: ) )1/$4 TREE ADMIN. Second Review: Approved as revised. Denied. PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: _ ,_ FIRE SERVICES _ ___ Third Review nApproved as revised. I 'Denied. Comments: Reviewed by: Date: /ISED 09252014 PUBLIC WORKS PLAN REVIEW COMMENTS Date: 1O� -16' /V Initials: PN ML Project Name/Address : t72-(,/ /27 Kr ,ed,, AppliccatiPermit#: Check Box Check Application Tracking Comments to Add Box to Comment "Print" IMPS Provide table of impervious surface calculations for entire lot(existing and post ❑ ❑ construction). ESCP Provide erosion and sediment control plans with installation details and maintenance ❑ ❑ schedule. DPLN Provide drainage plans showing site topography(flow arrows, etc.) 0 0 RMRO All runoff must remain on-site. Cannot raise lot elevation without measures to retain ❑ ❑ runoff. CSMP Provide construction site management plan, including Right-of-Way Permit if using ❑ ❑ right-of-way for construction parking. TSUR Provide a pre-construction topographic survey prepared by a Florida Licensed Professional ❑ ❑ Land Surveyor,showing 1'contours. Section 24-66(b)of the Land Development Regulations requires on-site storage for IDCS increased run-off if adding 400 SF or more impervious surface. Provide Delta volume ❑ ❑ calculations and on-site retention required per Section 24-66(b). (See attached information sheet.) PCIS If on-site storage is required,a post construction topographic survey documenting proper ❑ ❑ construction will be required. RWPM A Right-of-Way Permit must be obtained for use 0 0 REPM A Revocable Encroachment Permit must be obtained. 0 0 PLWP Pool-Weilpoint(if used)must discharge into vegetated area 10'minimum from street or ❑ ❑ drainage feature(swale, structure or lagoon). All concrete driveway aprons must be 5"thick,4000 psi,with fibermesh from edge of DAPR pavement to the property line. Reinforcing rods or mesh are not allowed in the right-of- 0 0 way. (Commercial driveways-6"thick.) Any utility cuts in the road must be repaired using CO1 Standard Detail Case X and must be URCT overlaid 10 feet in each direction from the center of the cut. Repair must be shown on the 0 0 plans. RWRS Full right-of-way restoration, including sod, is required. 0 ❑ ROFF Roll off container company must be on City approved list and container cannot be placed on ❑ ❑ City right-of-way. (Approved:Advanced Disposal and Republic Services). Full erosion control measures must be installed and approved prior to beginning any earth ECIN disturbing activities. Contact Public Works(247-5834) for Erosion and Sediment Control ❑ 0 Inspection prior to start of construction. MEET Recommend Owner/Contractor meet with Public Works Director to discuss proposed ❑ ❑ construction. Call 247-5834 to make an appointment. 0 ❑ ❑ 0 A .ice CITY OF ATLANTIC BEACH _. 800 Seminole Road 904-247-5800 - pit Atlantic Beach, Florida 32233-5445 Fax 904-247-584 SITE DEVELOPMENT PERMIT (for filling, grading or topographically altering land) PLEASE SUBMIT(2)COMPLETE SETS OF PLANS WITH APPLICATION. Date December 09,2014 PERMIT# Job Address 201 Mayport Rd, Atlantic Beach, Florida ISSUED BY THE CITY Permitee: Brown & Luke Contracting Company Inc. Telephone# 904-285-7079 Permittee Address: 12249 Shadow Creek Court, Jacksonville, Florida 32226 Email Address _ Tomb-Icontractinq.com Fax Number: 904-285-0512 Requesting Permission to commence site development involving the following activity: Eroision Control (Silt Fence) Filling and Grading Site Location: (Reference to Cross-Street) North of Atlantic Blvd The following permits have�..-en submitted — Tree Removal Demolition THIS APPLICAT • 'T'LUDES�-''/• FO-/ATION REQUIRED BY THE CITY'S SITE DEVELOPMENT PERMIT CHECKLIST �,/ _/, .„ ,gi - (Must be signed by Applicant) 1. Applicant declares that prior to filing this application he has ascertained the location of all existing utilities, both aerial and underground and the accurate locations are shown on the sketches. 2. Any work proposed in City rights of way or easements shall be subject of a separate Right of Way and Easement Permit Application. 3. Ail work shall meet City of Atlantic Beach, City of Jacksonville or Florida Department of Transportation Standards and be performed under the supervision of Tracy Holmes (Contractor's Project Superintendent) located at 12249 Shadow Creek Crt Jacksonville, Florida Telephone#: 904-545-5116 4. al I, i.n • i . -• i - - i iii.- is -r-- •n owner' I. .n. / .r in - 'i.h .f A . .r- • be included with this application. 5. All city property shall be restored to its original condition as far as practical, in keeping with city specifications and the manner satisfactory to the city. 6. This permittee shall commence actual construction in good faith within 6 days. If the beginning date is more than 60 days from date of permit approval, then permittee must review the permit with the Director of Public Works to make sure no changes have occurred in the area that would affect the permitted construction. 7. The Director of Public Works shall be notified twenty-four (24) hours prior to starting work and again immediately upon completion. OWNER 0614-c rr�S (1x73 01-74 lMi.= }1`unl H`t--'I r' , Pii C i;,-;A L. izL'-X, t3.L�s 11)i'..� i Signed: v - Date: I L-t Z (y / Y Before me t /Z r`- day of rJzr�,.1ti' in the County of Duval, L._- -__. State Of Florida, has personally appeared Notary Public at Large,State of Florida,County of Duval. My commission expires: Personally Known: Produced Identification: . KYLE MURRAY 's. r_ MY COMMISSION I EE185723 t• EXPIRES AprI 02,2016 t401}3060153 Fq,nA,Naar.ft.,..w....._ HrrL C:A I ION NUMBER Building Department::, o be assigned by the Building Department.) i _ 800 Seminole Road • +� ,; v ', /� /D O O Z j� •34'..,‘if ;� Atlantic Beach, Florida 32233-5445 I v y Phone (904)247-5826 Fax(904) 2417-5845 J U L 1 4 2014 �����f� ,t • ' E-mail: building-dept@coab.us Jate routed: City web-site http://www coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: ___/1 i/`/ o,eT _b_l_ Department review required Yes No J Applicant: 9 � Buildin lanninc Zonin Tree Ad. -istrator __ Project: 1_ . .. evi. 6/9/r1>GI lic Works _ Public S<< ?.ty - Fire Ser ?.s (,Z) Review fee $ Dept Signature _ - - Other Agency Review or Permit Required Review or Rec. Date of Permit Verifiec _ Florida Dept. of Environmental Protection ----- _ _ _ _ Florida Dept. of Transportation -_— _ St. Johns River Water Management District Army Corps of Engineers —- ___ ______ Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS _ _ `V'_ _ _ _ Reviewing Department^ First Review: LJApproved. fDenie: (Circle one ) Comments: -1 --LQ --)_9 (.) ,___ �v.„.., C »..A BUILDING A..t-, _,e_ ncc 0 PLANNING &ZONING Reviewed b • y: Date 1/71( - TREE ADMIN. Second Review: Approved as revised. nDenie, PUBLIC WORKS Comments: p SI Je.____ ' ,. 1,r Y ^�- cf'� b PUBLIC UTILITIES ) 5(‘"":4 ri` `"t' � /� � 61.14 a.. t ' IFZ PUBLIC SAFETY Reviewed by: Date: )-1-//67(y FIRE SERVICES Third Review: 1Approved as revised. nDenied. iNA,Y Ld �i)0 . Reviewed by: Date: Revised 05/14109 r !.'17,f�,. /...;,;: !..2.,,,,:r, r r IJ: A CITY OF ATLANTIC BEACH 800 Seminole Road 904-247-5800 "!J,t 9.? Atlantic Beach, Florida 32233-5445 Fax 904-247-584 SITE DEVELOPMENT PERMIT (for filling, grading or topographically altering land) PLEASE SUBMIT(2)COMPLETE SETS OF PLANS WITH APPLICATION. Date 7.11.2014 PERMIT# Job Address 201 Mayport Road ISSUED BY THE CITY Permitee: David Fleeman, P.E. Joe Loretta, RLA Telephone# 904-730-9360-239 Permittee Address: 9822 Tapestry Park Circle, Suite 201, Jacksonville, FL 32246 Email Address poretta@genesisgroup.com Fax Number: 904-730-7165 Requesting Permission to commence site development involving the following activity: Community Development Plans. LA plans will be submitted separately. prior to CO. Location: (Reference to Cross-Street) East of Mayport, north of Atlantic The following permits have been submitted _ Tree Removal Demolition X . !ON, !r,!; : ili)ES A..: 'N! .�USMA11C)N REOUIRELi BY 1tit CL SITE IIFVC.LOi'MFNT :,c ;iN. . 4 1-• 1 (Must be signed by Applicant) 1. pli :I - tares that prior to filing this application he has ascertained the location oflI a existing utilities, both aerial and underground and the accurate locations are shown on the sketches. 2. Any work proposed in City rights of way or easements shall be subject of a separate Right of Way and Easement Permit Application. 3. All work shall meet City of Atlantic Beach, City of Jacksonville or Florida Department of Transportation Standards and be performed under the supervision of Bill Davis (Contractor's Project Superintendent) located at no physical address Telephone#: 545-3369 5. All city property shall be restored to its original condition a. far as practical, in keeping with city specifications and the manner satisfactory to the city. 6. This permittee shall commence actual construction in good faith within 60 days. If the beginning date is more than 60 days from date of permit approval, then permittee must review the permit with the Director of Public Works to make sure no changes have occurred in the area that would affect the permitted construction. 7. The Director of Public Works shall be notified twenty-four (24) hours prior to starting work and again immediately upon completion OWNER /' Signed: `�� �il Date: 7 tatty Before me ' day of ?.Ay in the County of Duval, State Of Florida,has pe 7.11y appeared Notary Public at Large,S te of Florida,County of Duval. My commission expires: Personally Known: $ Produced Identification Aat"iiiefofic. KYLE MURRAY �� MY COMMISSION#EE185723 ,///„....-- EXPIRES April 02,2016 t4or)J8e-ol53 nond,tvoarjsmvbe com 1 Carper, Rick From: Carper, Rick Sent: Thursday, August 07, 2014 11:11 AM To: 'Joseph P. Loretta, RLA' Cc: Hubsch, Jeremy; James P. Sullivan, P.E.; David Fleeman, P.E.; Kaluzniak, Donna; Arlington, Daniel; Layton, Douglas; Bill Melrose; Showman, Lisa Subject: 201 Mayport-Site Development Review Comments Attachments: CityReviewcomments_201 Mayport-Habitat.docx Joe, Public Works comments attached. Completion of review delayed waiting for response to easement width issue raised earlier, and included here. Rick Rick Ricky L. Carper, P.E. Deputy Public Works Director City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 rcarper a(�coab.us PH: (904)247-5834 Fax: (904)247-5843 From: Joseph P. Loretta, RLA [mailto:jioretta@genesisgroup.com] Sent: Wednesday, July 23, 2014 10:46 AM To: Carper, Rick Cc: Hubsch, Jeremy; James P. Sullivan, P.E.; David Fleeman, P.E.; Kaluzniak, Donna; Arlington, Daniel; Layton, Douglas; Bill Melrose Subject: RE: 201 Mayport - Street Names - Development Names Thanks Rick.. This is definitely a big impact. I appreciate you giving us the heads up. We will either alter the route of our drainage lines, or need to shift some units around.. Sincerely, Joe Loretta Genesis 904-730-9360-239 From:Carper, Rick [mailto:rcarper@coab.us] Sent:Wednesday,July 23,2014 10:11 AM To:Joseph P. Loretta, RLA Cc: Hubsch,Jeremy;James P.Sullivan, P.E.; David Fleeman, P.E.; Kaluzniak, Donna;Arlington, Daniel; Layton, Douglas Subject: RE: 201 Mayport-Street Names- Development Names I Joe, site plan review is still in progress, but wanted to forward two comments that affect the Plat: 1) draft Plat submitted does not show the proposed drainage easements; easement width as shown on the site plans is inadequate (COJ LDR 4.4.6 requires minimum 20' width, plus 2' for each additional foot of cut below 4'. E.g., based on pipe between ST-5 and ST-4, cut is ^'7', so easement width should be 26' minimum). With 5' setbacks authorized in SPA, 10' easement width would preclude any repair/ maintenance on this pipe and pipe between ST-2 and ST-3. Rick Ricky L. Carper, P.E. Deputy Public Works Director City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 rcarper(c�coab.us PH: (904)247-5834 Fax: (904)247-5843 From: Carper, Rick Sent: Monday, June 23, 2014 9:19 AM To: Joseph P. Loretta, RLA; Layton, Douglas Cc: Hubsch, Jeremy; James P. Sullivan, P.E.; David Fleeman, P.E.; Kaluzniak, Donna; Arlington, Daniel Subject: RE: 201 Mayport-Street Names - Development Names Joe,the SPA language requires the same Plat process as other re-plats, and 24-188 requires Plat approval before building permit may be issued(entire LDR attached). LA plans are not required for Site Development submittal,just show where green space will be. For previous developments in AB, the Building Official has been our approval authority for street names. Fee schedule is in LDR Section 24-69 Rick Sec. 24-123. Platting. Where Lands within a Special Planned Area District will be platted, the platting and recordation procedures and requirements as set forth within Article IV of this Chapter shall apply. Sec. 24-188. Requirements for approval and recording of a Final Subdivision Plat or a Replat. (a) No Building Permits shall be issued for any Land that has been divided, or any Lot that has been created, except in compliance with the requirements of Division 2 of this Article and the requirements of Chapter 177, Part I, Florida Statutes. Approval of a Final Subdivision Plat or a Replat shall be required when any of the following conditions result from the division of Land. (1) The division of any Land will create three (3)or more contiguous Lots or Parcels. (2)The division of Land, or the change to a previously recorded Plat, Platted Lot or Lot of Record, will alter an access point, other than a private driveway, change a Street as shown on a recorded Plat, or change any area dedicated for shared public use, recreation, Open Space, Buffering, Easement or designated preservation area. Ricky L. Carper, P.E. Deputy Public Works Director City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 rcarper(a�coab.us PH: (904)247-5834 Fax: (904) 247-5843 2 I From: Kaluzniak, Donna Sent: Friday, June 20, 2014 9:18 AM To: Joseph P. Loretta, RLA; Carper, Rick Cc: Hubsch, Jeremy;James P. Sullivan, P.E.; David Fleeman, P.E. Subject: RE: 201 Mayport- Street Names - Development Names Joseph—we'll need to see the utility plan as well.Thanks- Donna From: Joseph P. Loretta, RLA [mailto:jloretta@genesisgroup.com] Sent: Tuesday, June 17, 2014 2:35 PM To: Carper, Rick Cc: Hubsch, Jeremy; Kaluzniak, Donna; James P. Sullivan, P.E.; David Fleeman, P.E. Subject: 201 Mayport - Street Names - Development Names Rick, We are hoping to submit our construction plans here shortly for 201 Mayport. For our submittal, I have a few questions. 1. Will we need to have our preliminary plat work completed at the initial time of construction plan submittal—or can/does this come in just after? 2. We are trying to determine road/development names. Do we handle this through AB, or somewhere else? a. The Client is looking at Brighton or Seagate. b. I told them Seagate may not be available as there is Seagate Ave just 1 mile south in Neptune Beach. 3. Can you provide the fee schedule for site development plan submittal. I plant to use the attached site development application for submittal 4. We have not began the LA plans for this development. We do plan to start this shortly,and will have plans provided,and landscape constructed within the common open space, prior to CO for any single family home. However,we do not with to have the LA plans hold us up from getting general site work approvals. Thanks, Joe Loretta Joseph P. Loretta, RLA 4 Associate Vice President GENESIS FROM VISION TO REALITY 9822 Tapestry Park Circle,Suite 201 Jacksonville,FL 32246 Tel: (904)730-9360 x239 Mob: (904)476-5147 jloretta@genesisxroup.com www.GenesisGroup.com 3 I 201 MAYPORT ROAD 201 Mayport Road SPA Application Waivers The following are the waivers requested: 1. Per section 24-171,Commercial Corridor, it references Div. 8 Landscaping which requires 50%of the required trees along the Mayport frontage road be shade trees. Due to the adjacent overhead power, shade trees are not permitted to be located in this proximity to the power lines;therefore,this buffer will only include understory trees and palm trees. 2. Per Section 23-30, Minimum Tree requirements under Division 4 General provision, which is later referenced by Division 8,for triplex parcels,we are requesting to 33%shade tree versus the required 50%shade tree requirement. Overall,there will be 40%shade trees on the development parcels. This reduction of shade trees is off-set by the additional planting that has been provided elsewhere on the property that is not required by code. 3. Per Section 23-30, Minimum Tree requirements under Division 4 General provision,we are requesting to plant 3" caliper trees versus the required 4" caliper trees. This reduction in size is requested due to availability of non-shade plant material along with costs, and is off-set by the additional planting that has been provided elsewhere on the property that is not required by code. Please note,that only required trees on-site are located on the individual residential parcels and the Landscape Enhancement area to Mayport. 4. Per Section 24-108, minimum yard requirements, requires "Front Yard setback:Twenty(20)feet." Our request is 8 foot from open porches (12 foot from building)for rectangular lots. On irregular lots we request a minimum 4 foot for open air porches,8 feet for exterior building wall (for a maximum one unit per building) most closely located to the irregular portion of the lot front boundary. 5. Per section 24-108, minimum side requirements require: a.Two-family(duplex)dwellings and townhouse: Seven and one-half(7.5)each side." We request side setbacks of 5 feet. On corner lots:To maintain a clear sight triangle at intersections, no obstructions to vision exceeding 4 feet in height shall be allowed within the straight line connection of a 10 foot offset from the intersecting right-of-way lines of two streets. 6. Per section 24-108, minimum lot width requirements of seventy five(75)feet. We request 50 feet for a duplex parcel and 68 feet for a triplex parcel type. 7. Per section 24-108, Building Restrictions which requires"The building restrictions for the RG-M zoning district shall be a 50%Maximum impervious surface. For Parcel Types 2 through 4 we request a 65% maximum impervious surface. Furthermore, on the individual units we request an average 60% impervious on exterior units and 75%impervious on internal units. 8. Per Section 24-151,Accessory Structures, Detached carports have a 5 foot side and rear yard setback requirements,and private garages have a 10 foot rear and side yard setback. We request all accessory structures have a minimum 3 foot side and rear yard setback. 9. Per section 24-252(i)cul-de-sac's require a minimum 50 foot right-of-way. We request a 44 foot right- of-way for an approximate 200 feet in length. 10. Per section, 24-252 (c)(1)which states "Any subdivision of land, which creates more than ten (10) residential lots shall provide two (2)separate access points, unless other provisions,such as permanent easements, are made for emergency ingress,and provided that such entrances will not adversely affect the street system." We are providing two access points however,only one will be for ingress. Page 8 of 8 I — - V V 888 g ,., Ri Ri t ) o u VY 00 a ! fl1 cc. E v d = a > 2 Q N ce W Z Z LL} pp F W W N m p o Sd0 (QrO. pp n Q O° O O 88 N O N O 8 Qir? N ry V N N W 8 Al10VdVO N CO (•i v Ni vi v `- nV - n CO vi V o-, u; V (O co n c (seN •i (+i °r V 6 U 0 0. (Sdd) N n In a'.. 0) O Q co N .4.. aq v) Q O) u7 n 0 h O) h u') .- In (O 0) In (n O v) aq 9 ((l Q (4 u7 n h o LL p S Z AlIO013A N N N M M N M N CO (V ,- N N .- M N .- N N N R N - N (V N M N N (•i N 0 f i N N n N O _I i a a 0 V) CO 0) (c) pppp 0)rM CO 0 M CO O a0 .-- V) I,..n N V7 CO N O 1n .- op ((pp CO 0) 0 r- a0 CO n ao N ap n a0 m (%)3d015 N .- V V — O N .- O (y O N .- O N 9 .- •-- 9 ,-`19P N .- 0 0 )- 0 9 `- P O O 6666 O O O O O 0 0 0 0 0 O 6060600 .00606 O 0 0 0 p 00 0 0 0 O (00 • (NI)t131_3MIMQ .o- N N m a0 cy V in o M (Qi M (") o 03 5- cc >f • O 0 N N N N N N 0 N 0 N N N N N W Ycc ULL 'dd30No SSO1 0ON0o ol 0 ooNo oON 00 N ..- c, N0 0N0 c-4 NO No O N N O oD O 2 O co O O O O O O O O cC . Ct. U Q cc (O N V CO (n .— to M n CO CO CO O to co n co 0 N a3 M (N co O N (n N M W W F Q U (�� 0 0 0 N O .- 0 0 0 0 0 0 .- 0 .- O '- .- O .- O O O O O O N O .- O .- 0 0 0 O O O d U O �` LL SS010V3k o o 0 0 0 6 00 0 0 0 0 0 0 p 0 6 .06 p 0 0 0 (0O 0 0 0 o p o 066 0 0 0 606666 p in p L O O— N 0 O (to c O R - V .M- V .- (� O CD O N N R .M- N co C') O Ri W LL 0 O O 60 0 0 60 60 60 .00 0 0 06 60 O O O O O . - - . pJ z p p o 3 Z o m h h V7 O N N 0 O (NO 8 Or (NO 8 ") h 8 8 4 8 (On 4 OV)) n0 N O N n0 e- 2E8 ° 8 J W Z c0 (0 0) N O) N- 0) n U 0 W W - - 6 co - 0/ cd - W n - O) n - O 6 6 a0 •- O Oi to 7_ n 6 0) (O '• O (O `— O (O ; m 0 () p 1 I • p >> cr rnon m V n 88 . ..8: 81.-: 98 mi Z � o � � � inN � (n � 8 � Eno NoV " g8 � (Qi (Qi W W ' v- 0) co(o of 0 •- 9, 0 0) n 0 •- co — o 0 -' 0) (D ; co (o .- 0) 0 •- a0 m •- 0)) (0 ; of (D CIA)'A313 8 8 8 R 8 8 0 0 8 8 0 8 8 N311119 NO 131N1 N (SdO)ddOco (NI Nflti 1V1O1 0 (� (ro) a N 0 8 Ro Q cci8) 8 N of N K R V M M (D .- N '- — V J, '-f-- C.) r U /- (SdO)MOIdNI 88 88 8 $ 80 88 88 8 $ 88 88 88 88 88 88 ,� Z 0 O o o O 0 0 0 0 0 0 0 0 0 0 co 0 0 0 0 0 0 0 0 0 0 o ) ( F- ,-y�( � c0 in O) •.- •- c,-..- v V.O lviol M 0 N U) a m O O 0 O O O O O N N o M r -I l N o (NH/NI)AlISN3INI Q 0) 0 N- o o (0�. (t o w n (O (O co n n (D co n (O co n (o .` (NIW)NOLLO3S N n w a0 COM o CO M O rn o ~ • h N NIMOIdd03WI1 O o 0 0 • 0) 0 M h (`? 0 o _ o O o O d (NIW) 08 o (n`) o o0 o o8 00 ory o 8 oN o og ooVN �r- z a 'ON0O dO 3WIL o 0 0 0 Z e o % o 8 8 8 $ 8 $ $ (8 8 8 v $ o V o 8 8)• o 8 (( 8 0 E) 0 8 (r 8 0 ,. 0 a to 8 8(.7 0 1 O o Q o \.. S o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 0 0 0 N o o N o 0 0 0 0 ri o 1A 000o 48 ,28So88o88488 � 88888288g88488 ;;88 ;; 88g8B ') 8 Qo 0 o 0 O O O O .- O O .- O O - 0 0 co .-0 0 0 0 0 0 0 N6 o 0 0 0 M 0 0 (•i 0 0 0 0 0 0 0 0 o4Ej 0. 00 • 000000000ss0o0CD00gm Liid000 6o0 0o z 0 (13)1419N3l 4 v .- COn , •-• .- Co n $ N V Q9 Zw n 3NI1f a a a a a a 0. a a 0- 0. U W a a a a a. a a a a a a a Q 8 c� 3tif11Of1NIS d0 3c1A1 - -- 2f39Wf1N w a rn- m aQ ap n n (q Q (4 (? `? co V h N m (h(— 3anlOnalS D _. 0) rn (n (n CO (n (n c0 CO N o x x 2 x x xx x �x x M ►- z U U U U 2 2 0 0 0 0 O U (J 0 0 0 cc < Q1 m Q) m co co a3 a3 w W W W 00 c0 °) a3 CO °) a0. co W 03 W W Nj 00. o ° P m co ate , vt a $ 8 8 A g O 0 >- 2 co N N m u o O 0 d o c2 Z Z Z LL V- u O a 0 0 0 a F Q Z d L. a Q ON ,z z LL I- Imo, (S30) A ci gm ry 8 < < 6 U N ALYd OVO O NN- O .- O a. (sd3) .1 co .--, qeq. h Vz Appo13A o N N — N N Q (x)3dols o 0 0 o ' 0 O O O O O o j: • (NI)2131311V10 11 0 9 0• '33300 0 0 0 . CKW SSOl 0 0 Y fl 0 re f WWW oQ 0 SSO1OH(13) og0 080 Z• IJ r tE 22 V3o00 000 Ei;i 0 O0 u. -� O 0 O O W Z J W W Z Z cc 0 J w 0 > E O 2 o $ o 0 00 O wWco co r cc o r 0 LL _ cCr 9W a W w — of of of co co �r (13)'n313 m 0 891110)!O 131N1 0 0 0 $ (S30)33ONna 1Y101 cl o O J U I- (S30)MO13N1 0o a g e z 0 0 0 0 o U .) N V.01V101. 0 0 (81-uNI)AlISN31N1 o 2 Z (NM)N011035 or M /y NIMO13303W11 0 0 Ot (NM) 08 0i z a 'ONOO 30 31111 0 0 OEl 0 2 0 0 8 S 2 0 0 0 0 0 J a < 00 0 0 O 8E88 °,28 00 0 0 0 0 z 4, x 4, � M 0 a 0 0 0 6 o E $ 8 o d W o 0 0 00 0 et Q U $ (13)H1 0 R JN31 0 Z 2 11Jco 3NI1/ d .4c 8 zD 3aflOfkllS 30 3dA1 d CtX ai 2i38WilN CL W 'Y `') c? 4 �` z Z z z N O Z r Zr O W # Q ¢ 0 0 0 co LU LLI LU LL Z y a00 -' D < z - :1 z z Er- O O } g . 9i, 1 .5 N CV Cf CE q ym > > ii u Y O Z Z L" o w if 5 > z rt 0 O p w ccU LLI LL Cd a E < Z , d x a E 3 O W Z Z u• Q LL -1 `L I- IA 1.1J 1- I- (SAO) ; N S a�D, fy W GO o Q V}! ALOVdV1 ..- O O O cN •- ' Q (Sdd) u OD u .- aD u Z A1J0013A O N N r' N N J 0 111 0 3 l") tp h M CD (y)3d01S O C2 N O (') N O 0 0 0 0 0 (NI)a3131'IU mom a • - �, dd3OO CV CV .- X .....L" SSOI o0ob o 0 Y Q. � x r) W W F U (1- o o 0 0 r)0 8 0 a V al O LL SSO1 OV3H o 0 0 0 0 0 L o 4 o LL O 0 O O O W z J W aw Z Z a 82? 80 U J J g O w w - CO W � tlD aD U g LL CC a ? E88888 a w es --- w COof co cO m (L).A313 QO 11 `2i, a3n9 ao 131N1 0 0 (siz).1JoNna 1Vlot v U) O O r F• (s o)MO1LNI 8 8 8 g co N V.0WW1 0 _ 0 v (aH/NI)AlISN31NI q m n co X (NIN1)NOLL03S P. M CC NI MOld dO Will 0 a P. a (NM) o 8 o z a '0NO0 AO 3Wlt .- 0 - o 0 n go88 `r8 S o O o 0 0 0 Q < a, 000 g 126006 oa �V1J W ce cc M M M Q: O 8 O W . < . . 0 z O'O O O O O iZt• Z p (LA)Hl`JN31 R (81 Q Z W 3N11 P 0. a 0 32:111101181S JO 3dMJ, a a re CtQp Q pp O 3an1000LS • O Y } > N Z Z Z • )- $$ V O z CM O O CC 0 0 co "1 It < w z z z LU 0 re O. -J D < ZZ ? WRITTEN NARRATIVE SPA REZONING APPLICATION FOR 201MAYPORT ROAD March 5,2014 I. Overview • The subject site contains approximately 7.2 acres,and is located in the \ ® south central portion of the City of Atlantic Beach (COAB)on the east • '` side of Mayport Road (SR AlA),south of Cornell Lane. The applicant, 1 Beaches Habitat,is seeking to rezone the property from Commercial— `�1`+ / ,-- CL ( )Limited and Residential, General, Multi-Family (RG-M) to the • • Special Planned Area (SPA) zoning district in order to create a Traditional Neighborhood Community. 201 Mayport Road will be a r ' maximum 80 unit residential development,providing a mix of housing -.• opportunities to include duplex, triplex and quadplex buildings in which units will be sold fee simple. Amenity areas, including a « / community center,scenic corridor landscaping,a community park and common open space,will be provided. The homes will be arranged in —[- -- a Traditional Neighborhood Design with rear lane/alley access and buildings fronting on the scenic corridor or the main loop road with the community park. All homes will feature front porches and sidewalks that lead one through the neighborhood and Mayport Road, creating a walkable community. Prior Development Use: The prior use consisted of a multi-family community with a total 98 units,within 25 buildings. The parking facility consisted of a total of 154 spaces which did not meet code and the landscaping on the site was very sparse. The prior development, under separate ownership, went into condemnation in the middle 2000's. The buildings located on the property were later torn down at the request of the City by a separate land owner. II. Future Land Use Designations and Zoning Districts Land Use: ri.0 : ,*'�� The site has a future land use designation of Residential High Density (RH) �� „J.,4 t which allows a density of 15 DU/AC to 20 DU/AC,for a total 144 dwelling units. { I The proposed SPA development represents a 45% reduction of potential developable units on the subject property. ( 'JPrB Zoning: The western portion of the property,to a depth of approximately 150 feet, is , :•7,10 —1 currently zoned Commercial Limited(CL).This zoning district is for low intensity :w44,1��, f` 1 business and commercial uses generally intended to serve neighboring residential development. The remainder of the property is currently zoned Residential,General, Multi-Family(RG-M)and is intended for medium to high density multi-family development. The proposed SPA zoning will provide the developer with flexibility and development alternatives not possible under the standard RG-M zoning district, and will allow unified design elements, while harmonizing with the surrounding area. The land use designations and zoning districts for parcels adjacent to the subject site are shown below. The proposed residential development is compatible with surrounding land uses. 201 MAYPORT ROAD Future Land Use Designations and Zoning Districts for Adjacent Parcels Direction Future Land Use Category Zoning District East Residential- High Density (RH) Residential General, Multi- Family(RG-M) West _ Commercial (CM) Commercial General(CG) North Residential -Low Density(RL) Commercial Limited (CL) and Residential, General, Multi- Family(RG-M) South Commercial(CM) Commercial General(CG) Source:COAB Future Land Use and Zoning Maps III. Permitted and Prohibited Uses The following section lists the permitted uses for the 201 Mayport Road SPA. • A mixture of duplex,triplex and quadplex buildings sold as fee simple units;in total, not to exceed 80 units • Privately maintained Neighborhood Park with ancillary amenity building or structures • Privately maintained common open space which may include • Stormwater enhancements • Community Gardens • Community Amenity Facility • Mail Kiosk/Gazebo/Fire Pit/Other community amenities • Accessory Structures on individual lots (rear yard only) • Detached garages/carports • Storage Shed • Residential scaled fencing less than 42" in height within internal portions and western frontage of the development • 6' in height screen fencing/wall for the north,south and east perimeters • Temporary Sales and Construction Trailers IV. Development Density The SPA rezoning requests a maximum of 80 dwelling units representing a density of 11.2 units per acre. This represents a 44%reduction below the maximum density of 20 dwelling units per acre allowed by the Residential High Density land use designation; and a 20% reduction from the prior residential development. V. Development Standards Development standards have been created to ensure contextual design elements. This section describes the various types of development standards proposed for 201 Mayport Road. The current SPA site plan reflects a site plan version with 77 dwelling units, which includes a mixture of duplex, triplex and quadplex buildings in which units will be sold fee simple. The intent of this SPA is to allow Beaches Habitat the flexibility to alter the unit type based upon customer demand, while maintaining a maximum density of 80 total units. The developer is required to meet all portions of the COAB Land Development Code(LDC),unless stated within the following development standards text and waiver section of the SPA requirements. Page 2 of 8 I 201 MAYPORT ROAD • A. Buildings and Lots: The following table lists the proposed lot and building requirements for the development. Maximum allowed density per land 20 units/acre use Proposed density 11.2 units/acre Maximum number of units 80 Maximum Lot coverage by Parcel* Parcel Type 2 (Duplex): 65%. Parcel Type 3 (Triplex): 65% Parcel Type 4(Quad plex): 65% Minimum lot width, depth Parcel Type 2 (Duplex): Min.Width -50 feet;Min. Area—4,600 s.f. (rectangular shaped lots only) and Parcel Type 3 (Triplex): Min. Width -68 feet; Min.Area—6,250 s.f. Minimum Lot Area by Parcels Parcel Type 4(Quadplex): Min. Width—84 feet; Min.Area—7,725 s.f. Minimum Depth:92 feet Average Lot coverage by Individual End Unit: 60% units * Inside Unit: 75% (Note: In total, the Parcel Type allows for a Maximum Lot Coverage Of 65%) Minimum lot width (rectangular End Unit: Min. Width—26 feet; Min.Area—2,300 s.f. shaped lots only) and Minimum Lot Inside Unit: Min.Width - 16 feet; Min.Area—1,450 s.f. Area by individual units Minimum Lot Frontage for Any For irregular shaped lot,the minimum frontage can be no less than 10'less Irregular Shaped Lot than minimum lot width Minimum floor area (per unit) 1,000 SF (enclosed air conditioned living area) Maximum building height 35 feet, principle dwelling; 15 feet, accessory structure—Per COAB LDC Minimum Primary building separation 10 feet Minimum front setback (rectangular Parcel Types 2-4: 8 feet for open air porches, shaped lots only)* 12 feet for exterior building wall Minimum front setback (irregular Parcel Types 2-4: 4 feet for open air porches shaped lots)* 8 feet for exterior building wall(for a maximum one unit per building) most closely located to the irregular portion of the lot front boundary. Minimum side setback (all All Parcel Types: 5 feet structures)* All Corner Lots: To maintain a clear sight triangle at intersections, no obstructions to vision exceeding 4feet in height shall be allowed within the straight line connection of a 10 foot offset from the intersecting right-of- way lines of two streets. Community Center setbacks Front(northside):4 feet for open air porch 8 feet for exterior building wall Side and Rear:5 feet for exterior building wall Minimum Driveway / Parking area 3 feet from side property line/Parking space dimension begins 2 feet from Setback property line. Accessory Structure Setback 3 feet from side or rear lot lines; not allowed in front of unit * These relate to specific areas where we are requesting waivers. See page 8. Page 3 of 8 201 MAYPORT ROAD B. Projections into Required Yards: Stoops, balconies,awnings, bay windows,and roof overhangs may encroach into the required front yards, not to exceed 3 feet. Side and rear yards shall be measured from the property line to the outside wall of the principal structure. Projections may occur within the required side and rear yards,such as roof overhangs and bay windows, but shall not exceed two feet. In addition, chimneys may project up to one foot into the side or rear yard. C. Swimming Pools and Hot Tubs: In-ground swimming pools and hot tubs are permitted. Pool enclosures should be located only at the rear of the property and shall be no wider than the width of the principal structure. The minimum side yard setbacks for pools, decks, and pool enclosures shall be equal to the side yard requirements of each residential lot,as noted in the Lot and Building Criteria section of this SPA. Pools that do not contain a screen enclosure shall have a minimum of a five foot setback, including deck, from the rear property line. Above ground hot tubs are permitted with architectural review approval of the site and landscaping. No above ground swimming pools are permitted. All pools shall meet current COAB LDC standards. Although not currently planned for,the community is permitted to construct an HOA managed community swimming facility within the common opens space area at a future date. D. Buffering, Landscaping and Vegetation: There are many sections where this SPA exceeds the required landscape requirements by the COAB LDC. This has been done through additional landscaping and buffering to the surrounding commercial and residential properties to the north,south and east. Furthermore,the community will have enhanced landscaping within the internal loop road of the development. All landscaping within the rights-of-ways,alley ways,and common open space will be commonly maintained and replaced by the HOA. All landscaping commonly maintained by the HOA requires irrigation. Residents within the community will not be allowed to remove any installed landscaping within the commonly maintained areas managed by the HOA. It is currently envisioned that Individual lot landscaping will be maintained by the individual property owner. The residential buildings include a small storage area on the rear side of each unit to house lawn equipment. The applicant will include the landscape plans as a part of the Preliminary Site Plan submittal to COAB. D.1: Mayport Road Landscape Enhancement: A ten foot wide landscape enhancement shall be provided along Mayport Road (SR A1A) per the Commercial Corridor Code under Division 7, Section 24-171. This landscape enhancement area may include walls and/or fencing not to exceed 42 inches in height,and community sidewalks. The intent of this landscape enhancement is to include a residentially scaled landscape buffer to Mayport Road to include a curvilinear row of shrubs, and a mixture of understory trees,and palm trees. Shrubs / native grasses within this enhancement area will be planted with a 7 gallon container at time of installation to provide an instant landscape screen. Shade trees will not be planted within this enhancement area due to the proximity of the power lines along Mayport Road. Understory trees and palm trees will be planted no less than one tree for every 50 linear feet within this enhancement area. Trees may be clustered but shall be no more than 75 feet apart. For the purpose of this enhancement area, understory trees will be planted with a minimum caliper 3 inch;or if multi-stem,a minimum of 3 stems that total 3 inches in caliper size;or palm trees with a minimum 10 foot clear trunk. D.2: Northern and Southern Perimeter Landscape buffer: Although not required by code, a five foot wide landscape buffer has been located adjacent to the northern and southern property boundaries that abut the commercial developments. This Landscape Buffer has been considered and incorporated into the side yards of individual lots and alley widths. This will include a continuous landscape area with shrubs, ground covers,tree coverage, mulch and grass. No less than one tree for every 50 linear feet Page 4 of 8 I 201 MAYPORT ROAD shall be planted within this buffer. Trees may be clustered but shall be no more than 75 feet apart. These Perimeter Buffers may also include a visual screen where existing fencing/walls are acceptable,which maybe a six foot tall wood,or masonry wall,or landscaping. Planted trees within these buffers will be planted with a minimum 2" caliper trunk and/or palm trees with a minimum 8 foot clear trunk. D.3: Eastern Perimeter Buffer: Although not required by code,a five foot wide landscape buffer has been located between the alley pavement and the abutting property to the east. The adjoining property includes a six foot black aluminum picket fence. This buffer will include a continuous landscape area with shrubs,ground covers,tree coverage,mulch and grass. No less than one tree for every 50 linear feet shall be planted within this buffer. Trees may be clustered but shall be no more than 75 feet apart. These Perimeter Buffers may also include a visual screen where existing fencing/walls are acceptable,which may be a six foot tall wood,or masonry wall,or landscaping. Planted trees within these buffers will be planted with a minimum 2" caliper trunk and/or palm trees with a minimum 8 foot clear trunk. D.4: Interior Central Loop Road Right-of-Way Landscaping: The Central Loop Road and Right-of-Way includes a boulevard entryway,which merges into a 2-lane roadway,then to a one-way loop road around a central community park. Although not required by code,the boulevard portion of the road shall include for a mixture of shade,understory and palm trees, along with shrubs,ground covers, mulch and grass, within the internal median and outside the edge of pavement within this segment of the right-of-way. Although not required by code, the two-way portion of the Central Loop shall allow for a mixture of shade, understory and palm trees, along with shrubs,ground covers, mulch and grass. Although not required by code,the one-way loop road centered on a community park shall allow a similar mixture of planting on the residential frontage portion of the right-of-way. As designed,the interior portion of the right-of- way has been designed to allow use with emergency vehicles. No vegetation other than sod shall be allowed within the first 3 feet of the back of pavement on the interior portion of this right-of-way to allow for an open 20 foot width for emergency vehicles. D.5: Interior Common Area Landscaping: Common areas within the SPA shall allow landscaping at the developer's discretion. D.6: Interior Individual Parcel Landscaping: For the purposes of this submittal,other required trees will be considered on a per parcel basis(building type). The minimum tree planting requirements proposed will comply with the matrix below. Parcel Type Typical SF Required Trees Provided Trees Duplex Parcel 4,600 SF l U/1 S 1U/1 S Triplex Parcel 6,250 SF 1 U/2 S 2 U/1 S Quadplex Parcel 7,725 SF 2 U/2 5 2 U/2 S ' The above matrix when evaluated over all of the duplex,triplex and quadplex parcels,equates to 40%shade trees and 60%understory(U)trees,which is less than the required 50%shade(S)threes. It will be typical that where lots abut each other, many of the larger shade trees will be placed in the rear of each parcel and on the property line between two parcels,to allow for the greatest amount of room for the root ball to grow. This reduction of shade tree planting on an individual parcel is off-set with the additional non-required planting that has been provided across the entire development. Page 5 of 8 201 MAYPORT ROAD E. Entry Signage and Lighting: As permitted in Section 17-28 of the COAB LDC, identification signage bearing the development name may be placed at the residential main entrance. "201 Mayport Road"signage will include one ground mounted sign at the entry located on Mayport Road within the landscaped median; or a combination of signage and columns that incorporates two signs on the sides of the entry drive and a column with plaque within the median. Lighting of the sign(s)will also be provided. Neighborhood Identification signage and illumination shall comply with the maximum sign area, sign height, and minimum setbacks of Section 17-28. Should neighborhood identification signage be incorporated into two signs on either side of the entry drive,the combination of sign area shall be consistent with the maximum 32 square feet as code requires. Any additional street signage will comply with the current COAB LDC. Street lighting will comply with the current COAB LDC and in accordance with JEA service agreements. F. Vehicular Circulation, Project Access and Parking: As shown on the Sketch Plan,the development will have two vehicular access points to Mayport Road. The main entry road will consist of two-way traffic with 20 feet of pavement, measured from edge of asphalt to edge of asphalt within a minimum 44 foot right-of-way. The boulevard portion of this main entry Road will include one way drive aisles consisting of 15 feet of pavement measured from edge of asphalt to edge of asphalt. This main road will transition to a one way loop road which consists of 15 feet of pavement measured from edge of asphalt to edge of asphalt. In keeping with the traditional neighborhood design, all of the homes will have parking in the rear off a 20 foot alley-way. The alley will include a minimum of 14 foot of pavement, but will be maintained clear of vertical obstructions for the entire width of the alley,other than where the alley is widened or abuts a perimeter property boundary. A one-way exit drive to Mayport Road has been located close to the southern portion of the property and is accessed within the internal alleyway system. Upon completion Beaches Habitat reserves the right to deed the pavement areas that meet City Code within the right-of-way and alley back to the City. The Community HOA will maintain all landscaping within the rights-of-way. Parallel parking has been planned for along the main loop road and measures 8'x 22'in size to the edge of asphalt. Each dwelling unit shall provide a minimum of two off-street parking spaces. Off street parking is sized at 9 feet wide by 18 feet long. Parking has been designed to have a two foot setback from the rear or side property lines, adjacent to the alleyways. This two foot off-set from the rear property line allows the alley way pavement area to be expanded to 24 feet in width, which meets typical code,when parking is located on either side of the alley. In certain situations,double tandem parking has been provided on irregular lots,but still accommodates two cars. Although the site plan currently shows 32 additional visitor spaces,for the purpose of this SPA,at project build-out, the development will require 1 visitor space for every 4 units or a maximum of 20 visitor spaces. Visitor parking should be spread throughout the development. G. Pedestrian Circulation and Recreation/Open Space Amenities: 201 Mayport Road will feature a minimum four foot wide sidewalk within the right-of-way of the main loop road. Additional sidewalk enhancements are located within the development. Where sidewalks abut the parking areas, the sidewalk width may be a minimum of six foot wide when adjacent to either a grade transition, curb stop or pavement transition. Common open space may include landscaping, surface and/or subsurface stormwater enhancements, benches and/or shade structures (such as gazebos/mail kiosk). The area designated for the community park,while currently planned for passive recreational use,could be used for a more active recreational community amenity,such as a playground, community facility or swimming facility. Page 6 of 8 • • Rule 14-96.F.A.C. STATE OF Fl ORIDA DEPARTMENT OF TRANSPORTATION 850-040.16 DRIVEWAY/CONNECTION APPLICATION SYSTEMS PLANNING FOR ALL CATEGORIES O44 05 OFFICE USE ONLY Application Number: Received By: FOOT STAFF(TYPE OR PRINT) Category: Date: Section/Mile Post: State Road: Section/Mile Post: State Road: Instructions-To Applicant • Contact the Department of Transportation to determine what plans and other documents you are required to submit with your application. • Complete this form(some questions may not apply to you)and attach all necessary documents and submit it to the Department of Transportation. • For help with this form contact your local Maintenance or District Office. • Or visit our website at https://www3.dot,state.fl.us/OneStooPermitting/Home.asox for the contact person and phone number in your area. • You may also email-driveways@dot.state.fl.us • Or call your District or local Florida Department of Transportation Office and ask for Driveway Permits. Please print or type APPLICANT: Check one: ©Owner El Lessee ❑Contract to Purchase Name: Debbie Jones Responsible Officer or Person: If the Applicant is a Company or Organization,Name: Beaches Habitat for Humanity Address: 797 Mayport Road City,State: Atlantic Beach, FL Zip: 32233 Phone: (904)241-1222 Fax: (904)241-4310 Email: djones@beacheshabitat.org LAND OWNER:(if not applicant) Name: If the Applicant is a Company or Organization,Name: Address: City,State: Zip: Phone: Fax: Email: • I Rule 14-96,F.A.C. 850.040-15 SYSTEMS PLANNING 04/05 AUTHORIZED REPRESENTATIVE: If specified by Applicant to handle,represent,sign,and file the application- NOTE: A notarized letter of authorization must be provided with the Application Name: Jim Sullivan Company Name. Genesis Group Address: 9822 Tapestry Park Cir. Suite 201 City.State: Jacksonville, FL Zip: 32246 Phone: (904)730-9360 Fax: (904)730-7165 Email: sullivan@genesisgroup.com Address of property to be served by permit(if known): 201 Mayport Road,Atlantic Beach, FL 32233 If address is not known,provide distance from nearest intersecting public street(such as.500 feet south of Main St.) Check here if you are requesting a ❑new driveway 0 temporary driveway ®modification to existing driveway 0 safety upgrade Does the property owner own or have any interests in any adjacent property? ®No 0 Yes,if yes-please describe: Are there other existing or dedicated public streets,roads,highways or access easements bordering or within the property? ®No 0 Yes,if yes-list them on your plans and indicate the proposed and existing access points. Local Government Development Review or Approval Information: Local Government Contact: Name: Government Agency: Phone#: • Ru'e 14-'l r A C 850-040.15 SYSTEMS PLANNING 04'05 If you are requesting commercial or industrial access,please indicate the types and number of businesses and provide the floor area square footage of each. Use additional sheets if necessary. Business(Name and Type) Square Footage Business(Name and Type) Square Footage 1. 3 2. 4. If you are requesting a residential development access,what is the type(single family,apartment,townhouse)and number of units? Type Number of Units Quadplex,Triplex, Duplex 6, 11, 10 Provide an estimate of the daily traffic volume anticipated for the entire property at build out. (An individual single family home.duplex.or quad-plex is not required to complete this section) Daily Traffic Estimate= 605 (Use the latest Institute of Transportation Engineers(ITE)Trio Generation Reoort) If you used the ITE Trip Generation Report, provide the land use code,independent variable,and reference page number. ITE Land Use Code Independent Variable ITE Report page number reference 220,210 Check with the Florida DOT Office where you will return this form to determine which of the following documents are required to complete the review of your application. Plans should be 11"x 17"(scale 1"x 50') f) Proposed access design Note: No plans larger than 24"x 36"will be accepted g) Parcel and ownership maps including easements(Boundary Survey) a) Highway and driveway plan profile h) Signing and striping plans b) Drainage plan showing impact to the highway right-of-way i) Traffic Control/Maintenance of Traffic plan c) Map and letters detailing utility locations before and j) Proof of liability insurance after Development in and along the right of way k) Traffic Impact Study d) Subdivision,zoning,or development plans I) Cross section of roadway every 100'if exclusive turn lanes are required e) Property map indicating other access,bordering roads and streets Important Notices to Applicant Before Signing Application The Department Reserves The Right To Change Traffic Features And Devices In Right Of Way At Any Time Proposed traffic control features and devices in the right of way,such as median openings and other traffic control devices,are not part of the connection(s)to be authorized by a connection permit. The Department reserves the right to change these features and devices in the future in order to promote safety in the right of way or efficient traffic operations on the highway. Expenditure by the applicant of monies for installation or maintenance of such features or devices shall not create any interest in the maintenance of such features or devices. Significant Changes In Property Use Must Undergo Further Review If an access permit is issued to you it will state the terms and conditions for its use. Significant changes in the use as defined in Section 335.182(3),Florida Statutes, of the permitted access not consistent with the terms and conditions listed on the permit may be considered a violation of the permit. All Information I Give Is Accurate I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief,such information is true,complete and accurate. Starting Work On The Driveway Connection After I Get My Permit Means I Accept All the Conditions In My Permit I will not begin work on the connection until I receive my Permit and I understand all the conditions of the Permit. When I begin work on the connection,I am accepting all conditions listed in my Permit. Applicant Name(Printed): James P.Sulliva Applicant's signature: Date 4/28/2014 City of Atlantic Beach APPLICATION NUMBER E c:'/"-*` Building Departmeb5s ,, '; ;To be assi ned by the Building Department.) t: 800 Seminole Road RECEIVED / _ C V ;h r, `�� .., . Atlantic Beach, Florida 322:33-5445 (/(/ Phone(904)247-5826 • Fax(904) 47-5EBEC16 2014 _ 2' '%_:;i7,''0` City web-site: http://www.coab.us j, Date routed: /5 I/ BY: ._. APPLICATION REVIEW AND TR, CKING FORM 7)7 Property Addressz- 1/ y Buildin SE/ ?id Department review required Yes No / 9 Applicant: Q I IL K�//JJ Planning &:Zoning Tree Administrator Project: % A/71/ L Pub is Utilities "--- ..afety fL) _ l ,Eire Ser; es.:. ... Review fee $ Dept Signature CONTRACTOR EMAIL ADDRESS CONTRACTOR CONTACT # APPLICATION STATUS Reviewing Department First Review: `°;, pproved. *Deniers - — (Circle one.) Comments: BUILDING pievuz K I y1L (/1'1 PLANNING & ZONING Reviewed by: Date: ) -11/GfV TREE ADMIN. - ------ Second Review: *Approved as revised. ❑Denied. PUBLIC W•:KS Comments: ..00/ C UTILITI s PUBLIC SAFETY Reviewed by: Date: V4.50k FIRE SERVICES Third Review QApproved as revised. ❑Denied. Comments: Reviewed by:_ -_ Date: /ISED 09252014 Kaluzniak, Donna From: David Fleeman, P.E. [dfleeman@genesisgroup.com] Sent: Friday, January 30, 2015 6:12 PM To: Kaluzniak, Donna; Joseph P. Loretta, RLA Cc: Tom Luke (tom@b-Icontracting.com); Colton Ralph; Moore, Kayle; Layton, Douglas Subject: RE: OceanGate-Water Flow Test Attachments: 6187-004_OceanGate.pdf Donna, Thanks for your help on this project. As confirmation that the last two items have been revised, please find attached a PDF showing the updated plan sheets for your records. David Fleeman, P.E., LEED®AP Project Manager AGENESIS FROM VISION TO REALITY 3910 US Highway 301 North,Suite 140 Tampa,FL 33619 Tel: (813)620-4500 x5136 Mob: (813)781-5321 dfleeman@genesisgroup.com www.GenesisGroup.com From: Kaluzniak, Donna [mailto:dkaluzniak@coab.us] Sent: Friday,January 30, 2015 3:01 PM To:Joseph P. Loretta, RLA Cc:Tom Luke (tom@b-lcontracting.com); Colton Ralph; David Fleeman, P.E.; Moore, Kayle; Layton, Douglas Subject: RE:OceanGate-Water Flow Test Joseph, Paul, with your Tampa office called to ask about my review of the resubmitted plans.They were over at Public Works, and I obtained a copy to review. The plans note pipe deflection will be used for some of the Case B offsets for water mains under stormwater pipe. The JEA detail for Case B Crossing with Pipe Deflection needs to be added to the drawings—Plate W-40(from 2015 JEA W/S/R Construction Details) httos://www.iea.com/Working With JEA/Engineering and Construction/Reference Materials/Water and Sewer Stan dards.aspx Also, I missed it, but the note on sheets C-21 and C-22 (water and sewer details)that says"For Details Not covered in Standard Details, use FDOT or City of Jacksonville Standards" should say"use JEA Standards" instead. 1 I have signed all of the permit applications for the DEP water&sewer permits and the FDOT permit application.Where should I send them,or do you want to pick them up at the Public Works office?Thanks, Donna Donna Kaluzniak, Utility Director City of Atlantic Beach 902 Assisi Lane Atlantic Beach, FL 32233 (904)270-2535 dkaluzniak@coab.us From: Joseph P. Loretta, RLA [mailto:jloretta@genesisgroup.com] Sent: Wednesday, January 07, 2015 2:20 PM To: Kaluzniak, Donna Cc: Tom Luke (tom@b-lcontracting.com); Colton Ralph; David Fleeman, P.E. Subject: OceanGate - Water Flow Test Donna, Genesis will be submitting our plans back to the City either Friday or Monday of next week. One thing that we typically do in other municipalities is check the water flow near or connection point. As we are connecting into the water main south of the site, can we ask the City complete a water flow test.. Just to triple check everything, prior to us starting construction in this area. Thanks, Joseph P. Loretta, RLA Associate Vice President ( GENESIS FROM VISION TO REALITY 9822 Tapestry Park Circle,Suite 201 Jacksonville,FL 32246 Tel: (904)730-9360 x239 Mob: (904)476-5147 jloretta@genesisgroup.com www.GenesisGroup.com 2 2 C OR N_EW MAN al p. 22 t ;t ''. .4 .,..ig v x..,7794) w Alt - oQ H 282 2 r'9 x m -.g " C u� • ill F irr i Al 1 A c 1111 NA . g o �� o oar _ g Am IAA: ` Ar[ A s7-.1O g g gig ^ha o I Ri! s" 1__(.., , -- r ip 30'TO '" Sa'YN :Iii aria"l 223A 2 "_ s: Oii) � 1 ( I , Willi jb 1 �R08 "2i3 sRia 7 " io �, L . -5 ')'. .t. s 41 gihi , ggim i U 51 rigl..§:! wa I, PA 46,74 Pi tf a to ( Ap � ���4 �," � � ; ;.5 -IAA t &I i _ ' i V'k cis !I I s N It M.i s pis =AF m s qq 44 St �e• y 6 i� Y '1 "i N O II ! ^s NI -2*.. " 1 IA .0, t 4 Y� il., ,, ,,,,3.g l go;y. �. ,C Yui q L� .,mss .. T4s silli! 2 O. i 1$ li 1 i ipai is re *.R11 F r ! • „e.."., ,r 1811!Qt II II :'!..-..--111 ��' a�! a�18t t a1 ; ID .... gf iii r -i I� t f= 1 S i IZ k �VI �g,g"1 t aii g" r a -:fa'aaro? a °!e°es es} , 0 F /! 13 `s,.' �I I C §/ § z x ,:::=1,=,. mi 1 . �_ `y x1 6° 4; a� p/ i� 1',e $g0 a— I o iR 0 I 1. .I,i.':: `v. jI� ;1 9 i1 ii fa' gt t .. 4 a '�:;: •• k:' = t(f 9xgx f a! ia '� 1 E. .i 1 fII R44 .6 11 Zl1I [ 1 ■ [ f14 I :4 nn 4lttma FtF E +�i! 3�° t 4 3gq u!A-22. 4 f "„ nn � z ' s pi ani1 a I %►. ?Ting 4 A$13"1� 1: A F .•.. . i 11914 it 1• l•• t el R1oo li 434841 1,1j 11 :it a A i I /a.' 1 9 il liA . .,..,. 1ttlk31 if lit 1 ill WA 4 i EI x dt aEp .l 1, Il :y' ` `1 `/ 1 ' iii 1 i11 ' ' =ttstsis.l it .t 1 t t o ° Jitta! F °= S $i 1 wry vs.. WATER DISTRIBUTION G 01 NOTES&DETAILS w»r."e.r-.w[.rwc[•rn[rn.yc..owt.s rt v.w r •.[O4s�N. ._ rww,•r rp,lh re e•.rn rrw-w.n„ °°. - �•° __-- N ra[nw r��.�wr. n�,.w.v ens Y[s4 OCEANGATE BEACHES HABITAT FOR HUMANITY h "/ ..�h "*".'.."../W46/ POC.... ■n„ .1w:+.MS hill•Ie ' 9,i D 1 i 5 ;t psi 6@,a d •IIiIpi'm ii' d o iii' 4', -. itt El ■ i }arc i I a- 1 t �m !� ! �� a - a p 1 S e I� gr.. i ,,- lip I- {S p8 Fa ilia 5 51 :I=O =d 6d $ Di 6 t tlT t • �ll1 1 t t fit, ea a to ' D��� I! in0 9� 2 �� •+/ I f o i 6 fi I5m i.mmi A !it lr31 ii�imi\ m� B o ? o Ir i dA I,ca� t:,t i ImI �� C n 9^ t I(7 ill i A . 1 m . 00 1,s, !,2 liA r4 4 PA bPA I.:: IL*, , i i' t. ! e -. I1 gt, i d 3 �m 0P 1 15 m lip ' Jd z `I' -1 il. I - STI �I q� 1� II , q �aay'f'�j j q ,+J¢4 q '. aj '- -ti ii Sj 1'� Gs 9 1� 8 '° I � IS 1 �I v 9 1 iii, 1 ; 1 '8 i i1 u ai f Z t y td li 1 ' 11 s ? x� 1 g II it o fl p i y m i t A 5 <_ _ x _ 1 m =_ y2 8 e I 2 1� F4 F; _-4 8 .11 -� 1 _ 111 51 l=- 1 ;ll A y bo g Z a III ITI U y aQ . ! - ..._. C - C , ii - � --;� 7 .. V' w.Il _ 1 I SW TN Irft C • GENESIS WASTEWATERNOTES&DETAILS -- OCEANGATE BEACHES HABITAT FOR HUMANITY °.''''..".. °IP,e..."11.7"' ,..-....•.. -•- ,i'. -� Nit w...Alii t+,tnt n �1 n n z � vv � Q°N) 2° ca cc o = > -‹ ' -, -0 n -1 0 . -. oD wa) wv m ( al)03 mD oo � m p0 3 0 Z -1 - o 0 13 0 S -iCD 57r = � ; -nOD x Qv •5 crcn v n_ o n_ tcn = p Z o 0 a = o o 0 0= CD C' s N' � cn -, 13 --I m c < CD (n � =- CD c)am o'.� � C w 0 I - CDDCCDDCI o) = v r- co 8- (713 a � Q3 = nm o• co 0 cn > 05. 0w = 4:2_ o (0 o- o ID a a 0 v v vi rn CU w o cn on N 000. m -*• _ -, CT (f) v o Q g o• a CD O 0 v a o o * v o — O --x N s a a < o cn- ca) n � ni N _20_, °= m -- -10 o 7" cncon. o �' oa) CD - z a jo (D D a - a) 'c a) -1 A W , m CQ D n_ cn - (1))a � vv � oo 3so -0 o o cn oco — . 0 , _ mo - < ,, cn -. o Q fINo• a , o � upn- QSv) U) cD n CT) o cD0 N n oa c00 o (a3 acn es 3 -g5 �. � 2 • Z a, _ J 5 - - T m I o N � o M t.... 5 (T) z m 0 00 0 g 0) O r- g m D m Z zz � co -‹ XI 7:1730) c) CDmc CA < « 10 c� ( 3 \ .3.\.� � .. '. v v �, (7\--- a o a) v •• -. z z 7C .� P. O .. N z 0 0 ----i Cr) II U 1 c-, -. 41 Z -<0 -4 z d V.... 0 r c 5 Showman, Lisa To: Walker, Jennifer Cc: Kaluzniak, Donna Subject: FW: CityReviewcomments2 Attachments: CityReviewcomments2.docx Jenny, 201 Mayport (Oceangate) is denied by Public Utilities, per Donna's email below. She stated she emailed the attached comments to Genesis. Thanks, Lisa From: Kaluzniak, Donna Sent: Thursday, December 18, 2014 1:30 PM To: Showman, Lisa Subject: CityReviewcomments2 Lisa, here are my comments on Oceangate—denied until addressed - Donna City of Atlantic Beach - ____ APPLICATION NUMBER tit 11.),- Building Department �� tv�'J�� (To be assigned b the Building Department.) • A , 800 Seminole Road J 1 4175-4, Atlantic Beach, Florida 32233-5445 MAY 1 2 2014 Phone(904)247-5826 • Fax 9049 247-5845 �'. E-mail: building-dept@coab.us Date routed: City web-site: http://www.coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: (72 / "Won" d - Department review required Yes No / Building Applicant: ��� �f VE 1' . 7 hoAf Planning & Zoning Tree Administrator Project: �/xC "Jiff)e rt,/G J/ ] ublic Worc Public Utilities Public Safety Fire Services 111111111111111.11111,61111111.11.111111.111161111111111.1 Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept.of Environmental Protection • Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: Approved. ❑Denied. (Circle one.) Comments: /1 s })-t"5-7 BUILDING /' I PLANNING & ZONINGReviewed by: "4/ Date: TREE ADMIN. Second Review: Approved as revised. ❑Denied. PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: ❑Approved as revised. ❑Denied. Comments: Reviewed by: Date: Revised 05/14/09 PUBLIC WORKS PLAN REVIEW COMMENTS ' /��1 Date: jo —// Initials: PN\ J ML , Project Name/Address: c2i5 f Mg.7,0 ���� . Application Permit#: � 763 Check Box Check Application Tracking Comments to Add Box to Comment "Print" IMPS Provide table of impervious surface calculations for entire lot (existing and post 0 0 construction). ESCP Provide erosion and sediment control plans with installation details and maintenance � ❑ , ��schedule. J,4-\C_. I'? DPLN Provide drainage plans showing site topography(flow arrows, etc.) 0 0 CSMP Provide construction site management plan, including Right-of-Way Permit if using right-of-way for construction parking. ❑ TSUR Provide a pre-construction topographic survey prepared by a Florida Licensed Professional Land Surveyor, showing 1' contours. ❑ LDCS Section 24-66(b)of the Land Development Regulations requires on-site storage for increased run-off if adding 400 SF or more impervious surface. Provide Delta volume ❑ ❑ calculations and on-site retention required per Section 24-66(b). (See attached information sheet.) PCTS If on-site storage is required, a post construction topographic survey documenting proper ❑ ❑ construction will be required. RWPM A Right-of-Way Permit must be obtained for use ❑ 0 REPM A Revocable Encroachment Permit must be obtained. 0 0 PLWP Pool—Wellpoint(if used) must discharge into vegetated area 10' minimum from street or drainage feature (swale, structure or lagoon). ❑ ❑ DAPR All concrete driveway aprons must be 5"thick,4000 psi, with fibermesh from edge of pavement to the property line. Reinforcing rods or mesh are not allowed in the right-of- 0 0 way. (Commercial driveways—6" thick). URCT Any utility cuts in the road must be repaired using COJ Standard Detail Case X and must be overlaid 10 feet in each direction from the center of the cut. Repair must be shown on the 0 0 plans. RWRS Full right-of-way restoration, including sod, is required. 0 ❑ ROFF Roll off container company must be on City approved list and container cannot be placed on City right-of-way. (Approved: Advanced Disposal, Realco, Shappelle's and Waste l J Management) ECIN Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact Public Works (247-5834)for Erosion and Sediment Control Inspection prior to start of construction. MEET Recommend Owner/Contractor meet with Public Works Director to discuss proposed ❑ ❑ construction. Call 247-5834 to make an appointment. ❑ 0 ❑ 0 ❑ ❑ BUILDING PERMIT APPLICATION CITY OF ATLANTIC BEACH 800 Seminole Road,Atlantic Beach,FL 32233 Office(904)247-5826 Fax(904)247-5845 Job Address: 2 D I/124p4,0 et 1- 469.41 Permit Number: Legal Description Parcel# • Floor Area of Sq.Ft. Sq.Ft Valuation of Work S 7 f/AA. Proposed Work heated/cooled non-heated/cooled Class of Work(circle one): New Addition Alteration Repair Move P•molitio. pool/spa window/door Use of existing/proposed structure(s)(circle one): Commercial Residential If so existing structure,is a fire sprinkler system installed?(Circle one): Yes No N/A Florida Product Approval# For multiple products use product approval form Describe in detail the type of work to be performed: b L M S CO ' 4 ari'C r4 I A!14" /f1 /1/ /4117,(4/1"/ At! frig s ir f r id a gee".rt, 04 de.e',treas., Property Owner Information: f'fi/r t y.' Name:it410e/ litha0."4,i4 Address: 72 7 1L4y ' / 49Q City ,�,f /it 1 .4 StateZip_ _ _ _Phone E-Mail or Fax#(Optional) Contractor Information: QQNT'RAC{OR1MAIIrADDRESS: Company Name: 4.0,!/ /1`C✓9 J Gi.r f. Qualifyin Agent: Address: r 7 f'r ®al L /t A City X State//4Zip 11 a s' 1 Office Phone 7 ob Site/Contact Number # State Certification/Registration# P14 7L /4 1., 3/4/4 Architect Name&Phone# 0 Engineer's Name&Phone# 6 C rt eJ 5 6ede•r.40 Fee Simple Title Holder Name and Address Bonding Company Name and Address Mortgage Lender Name and Address Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all lows regulating construction in this jurisdiction. This permit becomes null and void tf work is not commenced within six(6)months.or if construction or work is suspended or abandoned for a period of six(6)months at any time after work is commenced. I understand that separate permits must be secured.for Electrical Work,Plumbing,Signs,Wells,Pools,Furnaces,Boilers,Heaers. Tanks and Ale Conditioners,do WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF i COMMENCEMENT. I hereby certify that I have read and examined this plication and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether s clued herein or not. The granting of a permit does not presume to gait authority to violate or cancel the provisions of any other federal.state.or lac construction or the performance of construction. ��r Signature of Own Signature of Contractor Adf" lei./ '/�"p� Print Name Print N C i..74...C/ .._.l................ LE_e_ e..La S Bef•�• _' Da of 1t 20 •••4 ',� • r r. a. I Lir ,ia, . t. ,. ` •c s 6...':::::11.' •••• •MES. F 0869' ..r ..„,....a.„. • 0 . ti [ttpites 02/14/20 B evised 01.26.10 I 6-8 - o25- 6 I I ''kf'rf TS,���✓ • CITY OF ATLANTIC BEACH 800 sernM,ol.Road e04-247-5e00 ". 4¢ A!)antic Beach,Florida 32233-5445 Fax 904-2475845 SITE DEVELOPMENT PERMIT(for filling, grading or topographically altering land) PLEASE SUBMIT(2)COMPLETE SETS OF PLANS WITH APPLICATION. Date 4.18.2014 PERMIT* Job Address 201 Mayport Road ISSUED BY THE Cm Permitee: Joe Loretta Telephone* 904-730-9360-239 Permittee Address: 9822 Tapestry Park Circle, Suite 201, Jacksonville, FL 32246 Email Address jloretta@genesisgroup.com Fax Number 904-730-7165 Requesting Permission to commence site development involving the following activity: _ Begin site demolition /crush concrete on-site for future roadway sub-base Location: (Reference to Cross-Street) East of Mayport, north of Atlantic The following permits have been submitted — Tree Removal Demolition X THIS APPLICATION INCLUDES ALL INFORMATION REQUIRED BY THE CITY'S SITE DEVELOPMENT PERMIT CHECKLIST (Must be signed by Applicant) 1. Applicant declares that prior to filing this application he has ascertained the location of all existing utilities,both aerial and underground and the accurate locations are shown on the sketches. 2. Any work proposed in City rights of way or easements shall be subject of a separate Right of Way and Easement Permit Application. 3. All work shall meet City of Atlantic Beach, City of Jacksonville or Florida Department of Transportation Standards and be performed under the supervision of (Contractor's Project Superintendent)located at Telephone*: 4 Calculations showina any increase in impervious aleas/p owners lot and !o' ir, the city Richt of Way are t: t/e Included with this application 5. All city property shall be restored to its original condition as far as practical, in keeping with city specifications and the manner satisfactory to the city. 6. This permittee shall commence actual construction in good faith within days. If the beginning date is more than 60 days from date of permit approval, then permittee must review the permit with the Director of Public Works to make sure no changes have occurred in the area that would affect the permitted construction. 7 The Director of Public Works shall be notified twenty-four (24) hours prior to starting work and again immediately upon completion. A OWNER c)4f,q Before me this day of In the County of DwN, State Of Florida.has personally appeared Notary PuDtic at Larpa,Stats of Florida,County of Duval My commission expees: Personally Known Produced Identification' CITY OF ATLANTIC BEACH •.. Department of Community Development "/ '� 800 Seminole Road Atlantic Beach, FL 32233 fffirPhone:(904)247-5800 Fax:(904)247-5845 Internet www.coab.us TREE REMOVAL PERMIT Beaches Habitat for Humanity Re: 201 Mayport Road Tree Removal Permit: Approved The tree application submitted seeks to remove 40.5" of protected trees, while preserving 0" of unprotected trees. This will require 20.25" of new tree plantings to mitigate the loss of 40.5". Due to the size of the project and complexity of site prep work required,you have been given permission to remove these 40.5"prior to providing necessary mitigation. However,you will need to provide the 20.25" of new tree plantings along with all of the landscaping that is required by the approved SPA text prior to approval of construction plans. APPROVAL IS IN ACCORDANCE WITH THE CITY OF ATLANTIC BEACH CODE OF ORDINANCES IN EFFECT AT TIME OF ISSUANCE Jeremy Hub ch,TPO ADMINISTRATOR From: Hubsch,Jeremy jhubsch@coab.us 6' Subject: RE:201 Mayport Date: May 6,2014 at 326 PM To: Donna Rex drex@beacheshabitat.org Donna, That is correct. Arnie already got a tree removal permit. Basically, a minor amount of tree mitigation is required...which will easily be offset by the plantings that will be done on site as part of the development. Attached is the tree removal permit that I gave to Arnie. Please let Mr. Reeves know that I can assist him if he needs my help getting the demolition permit. Jeremy Hubsch Redevelopment and Zoning Coordinator City of Atlantic Beach 800 Seminole Road Atlantic Beach, FL 32233 (904) 247-5817 jhubsch a(�coab.us From: Donna Rex [mailto:drex@beacheshabitat.org] Sent: Tuesday, May 06, 2014 2:43 PM To: Hubsch, Jeremy Subject: 201 Mayport Hi, Jeremy. We are getting ready to sign a demolition contract for 201 Mayport and the contractor, Bill Reeves was inquiring in your permitting office about what he needed for his demo permit. They indicated we needed a tree survey, but I was under the impression from Arnie, that you had signed off in some way that we wouldn't need it since our plans called for extensive replanting of more trees. I just need confirmation from you that we can move forward with permitting without a tree survey. Please call if you have any questions. Best, Donna Donna Rex President&CEO Beaches Habitat for Humanity 797 Mayport Road Atlantic Beach, FL 32233 Direct 904-595-5791 Mobile 904.910.9140 DRex@BeachesHabitat.org Beaches �. - Habitat for Humanity* „,,,,.,,,,,,,,. („, t , CITY OF ATLANTIC BEACH ss% DEPARTMENT OF PUBLIC WORKS , „... r' - J 1200 Sandpiper Lane s, Atlantic Beach,FL 32233-4318 ': TELEPHONE:(904)247-5834 FAX:(904)247-5843 •-•r F3 !.) www.coab.us DESIGNER: DATE: 3-10-2015 Genesis ' PERMIT#15-SAFR-1006 3910 US Highway 301 North ADDRESS: 201 Mayport Rd. Suite 140 Tampa, FL 33619 Fax: (813)620-4980 CONCEPT PLAN Your permit application has been denied by the Public Works Department for the reasons listed below. Please submit this information at your earliest convenience in order that we may approve your application. If you have any questions,please contact Doug Layton, Public Works Director at 904-247-5834 or email dlayton@coab.us. PUBLIC WORKS CORRECTION ITEMS: (Submit the following information to the Public Works Department) **Dedication-why to COJ? **Tract A(stormwater facility)must be included with tracts to be retained by owner. **Additional easement widths added to Tracts E&F must be defined as"Unobstructed Easements". **ST-2 and 3 called out as FDOT Type C Inlets. Pipe sizes for these structures will require larger,possibly special, structures. See FDOT Standard Index 232,sheet 1. **36"opening at Flared End Section ST-11 should be grated/shielded to preclude access. Will create an "attractive nuisance”as shown. cc: Jennifer Walker, Bldg. Dept. S g z $ O O 74 > c () \ 6 \ . \ 2 $ °• Ca -0 -i \ 9� 0 = > li / •• ƒ ƒ o q Q \ e - u e - m u } / w m = J .. q 0 2 \ g 13 _ �e u z = = e a > O . \ \ 3 7 \\ W. \ \ / \ j 7 O D \ / �\ y cl- 00CD n 7 ƒ \ k � —I 73 / / g. eCD E / m a C s = - 7 CO - ° e_ _ -n CL <. ■ \ % ( $ o e $ 3 \ E y ° o \ e ° £ IeIwEe s CD .-1 o a f / ¥ & f / 2 7• 2 ®_ 2 KJ / 3 \ J % •© J \ 2 §_ � 7 � 22 § \CD m a -, o "0 CP p CD 0 ƒ & \ \ oJ / ° m \ m X = ® n ° � � / gym _. Cl) • \ k ^ / ¥. � / ° ° � $ . ° ƒ O = 0 o = § --Tr; SD n e e E a ] ¥ \ \ ( 7 2\ + / / \ « _ CO - % $ Cr CD \ / ° ° ° ° .< f // / \ \ o D CD \ = e ¥ 7a s m co ° s c • ' = co_ f U) (1, § C $ \ ' m o I 0 co \ \ \ \ izi ® ¥. Z _ CD n m 7 m X - x 0 � m11 * — z zm 0 00 g J / > m z -I -4 _ -< > 0 e 0 z 0 ƒ EE <. 7(D r- °o m > ttm K - U) -I E \ k � Co .. ¥ a c) z o \ 53n 2 - \ � f 0 c -I 0 z ...g. Z 2 D -J Ili }} 0 - �` in a - 0 % Ill Ce 0 O. 0 C U M 4) U Q U Y "a C U_ c a) c 3 i 0 u) c N y z O d 15 — Q Z 1_1 Z 0 U Q >m W z z 2 I- WC 0cn c U z E 00 0 wz U - z 0cow W0(n 0 U w 0 W Ce L LL a) TN a) C MI z 0__c) _0 () to n of E (7) N -O O .n V O co 0 O LLJ vi a) O a 6 R - O c U iti UN C r — <o 0 O c O �- m T U c� 0 g ° N Q � � I U) a) O U o O E Q U E N I- E -0 a) H 4) H a) o o 3 t0 Z co ° 0 — Q W O a� W T � 0 3p c r w tL pCL 21 Y a ui v -�, 0 3 0 ai w b 1 CL cin 0_ Q TN d (6 c Q N fC o (6 O E U EE U C (13 N N C E a) N U N WI 3N` . ON U) a) ° a `� a) .° a) .513 c a) cn a 0 c v io Q o o o o o Tli • Cl• -p .� v Z LL c 0 v) O N ai •a) O Z ca • Li- EU C @ F- Z U c 4. Nui as . a) �` Q N M cc C _ Q W (4 °)CD c a) ac)u) 0g c a) (6 0 •� U) 0-0 a_ >' d +o c c `' o y rn rn .. D I—' EhCa oay) a) a) 0 co U UOQ a00 Nz o TRANSMISSION VERIFICATION REPORT TIME : 03/10/2015 15:25 NAME : ATLCBEACH CITY WORKS FAX : 9042475843 TEL : 9042475843 SER.# : BROL7J723782 DATE,TIME 03/10 15:25 FAX NO./NAME 918136204980 DURATION 00:00:27 PAGE(S) 03 RESULT OK MODE STANDARD ECM DEPARTMENT OF PUBLIC WORKS 0 t :rif, 1200 SANDPIPER LANE ATLANTIC BEACH,FLORIDA 32233-4318 S iii; TELEPHONE:(904)247 5834 -� SA Y FAX:(904)247-5843 1, 0 SUNCOM:852-5834 .fitXhttp://ci.atlantic-beach.fl.us --•Ji3 % FAX TRANSMITTAL DATE: ?7)!O )15 TO: _CIE..aeS1S FAX #: '0) ' bap - qg 130 Total Number of Pages, Including Cover Sheet:_ FROM: on Yl I Ocie Public WorksDepartment City of Atlantic Beach COMMENTS: FAX (904) 247-5843 / PHONE (904) 247-5834 ' GENESIS FROM VISION TO REALITY Landscape00 Architecture 3910 US Highway 50 i North 4Fax e813.620.498045 Tampa,Florida 33619 www-(ienestsGroup.com UrbannDesign Engineering Planning CEI January 9, 2015 Mr. Doug Layton, PE Public Works Director City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 RE: OceanGate FKA(201 MAYPORT ROAD-BEACHES HABITAT FOR HUMANITY) PERMIT APPLICATION No. 14-100028 Dear Mr. Layton: This letter is provided in response to the City's Request for Additional Information(RAI)dated December 16, 2014. Plans documenting these changes are included for your review and approval. To assist with review of this submittal, the comments have been restated in bold followed by Genesis' response. DK, CW,MC,TNT Comments: 1. If the plan modification that was approved (stop directional drill at SW property line anti construct open-cut WM along pond w/ easement) will be done, need modified plans, and easement does. Proposed off-site water main has been revised as discussed. The amended plans are included for your review. 2. Profile drawings show water main going under storm at various locations at depths of 5 — 8 feet, but in no Case A or Bs noted on C-07. Is water main proposed to be at those depth for the length? Wherever possible, have water main over storm, and where it goes under storm it should come back up to reasonable depth—3 feet. The design intent is for the potable water to cross over the storm pipe wherever feasible. In order to maintain 36"of cover as well as 12"of vertical clearance from storm pipes,the water main the must ow 5'. cross beneath the storm pipe erhen ticall the beyond the crossingver is s slo that the amount of deethese p burial is is proposed to be deflected Y minimized. 3. Repeat—Use detail for hinged manhole covers. The hinged manhole cover detail has been added to sheet C-22 pursuant to your request. TALLAHASSEE PENSACOLA OCALA JACKSONVILLE CRESTVIEW Rick Carper Comments: 1. Repeat—Lot 11 and Lot 17 Easements (?) between ST-2 and ST-1, and ST-13 and ST-6— width as shown is inadequate. COJ LDR 4.4.6 requires minimum 20' width, plus 2' for each additional foot of cut below 4'. Estimate width should be 28' between lot lines for Lot 11 and 22' for Lot 17. Alternative is to plat unobstructed utility easement on adjacent lots. It is understood that Section 24-254 of the COAB code requires easements to be a minimum of 15' wide andthe otsnd from treet eithero side of her referenced lwide drainage easements have been addeded to public tracts s (lots 11 and 17). This to should address the City's concern regarding this matter. 2. Repeat— FDOT storm manhole approx. 150' from SW property corner appears to have no purpose when pipe from property plugged. Coordinate with FDOT to see if manhole can be capped / abandoned when new sidewalk poured over this location (Not addressed in FDOT Connection Permit Application). Connections from site have already been coordinated with FDOT. Burying manhole beneath sidewalk would make it difficult to locate should maintenance or extension of this line be needed in the future. 3. Plan uses four FDOT Type 9 curb inlets. From storm tabulation, runoff to Type 9's exceeds inlet capacity as shown in FDOT Index 214. May require use of Type 4 or COJ City Standard (preferred) inlets. Referenced inlets have been changed to COJ City Standard pursuant to your request. 4. ST-18 Closed Flume Inlet being constructed in segment of FDOT Type A (16") curb. Index 216 detail referenced uses FDOT Type F (24") C&G. Need detail showing curb modifications. Note: 216 calls for 6'6" sidewalk above if located at back of curb as in this installation. The construction plans have been revised to include a 3' transition from Type A to Type F curb on either side of the Closed Flume Inlet. Additional notes have been added to sheet C-09 instructing contractor to match back of curb in transition section. The Closed Flume inlet is currently shown with a 6'6"sidewalk in accordance with Index 216. 5. Bars in MES grates, if constructed per Index 273, are 14" center to center. May not provide the protection desired in this usage. Grate on Flared End Section not addressed in FDOT Index, detail required. .C. to So noted, the MES grates on ST-17k have ate referencedto reduce spacing to on ST 11 was erroneous aOnd has been the passage of balls within the par removed. G Please find attached four copies of the FDOT Utility Connection Permit application. Please execute as indicated so that the applicant can submit this application package to FDOT for approval. In addition, four copies of each the FDEP permit applications for water and wastewater system extensions are included for your review and execution. The following items are provided to facilitate your review: • One(1)copy of the plans(PDF format on Compact Disc) • Four(4)signed and sealed copies of the plans(22"X34") • Four(4)copies of the FDOT Utility connection permit application • Four (4) copies of the FDEP Notice of Intent to Use the General Permit for Construction of Water Main Extensions for PWSs • Four(4)copies of the FDEP Notification/Application for Constructing a Domestic Collection /Transmission System Please return all executed permit applications to my attention. Should you have any questions, please feel free to contact me at 813-620-4500, Ext. 5136. Sincerely, GENESIS David B. Fleeman, P.E. Project Manager DBF Attachment cc: Joe Loretta, Genesis File: 6187-004 • çjEN E515