Loading...
Item 4C - Pumps for Wastewater Treatment PlantAGENDA ITEM: SUBMITTED BY: DATE: CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITtM 1#4C MARCH 14, 2016 Purchase Two (2) Gorman-Rupp Pumps for the Wastewater Treatment Plant frotn Hudson Pump & Equipment Associates, Inc . as they are the sole s ource di s tributor of Gonnan-Rupp pumps. Kayle Moore, Acting Public Works Director March 3, 2016 BACKGROUND: In preparation of the F isca l Year 2016 budget, the City's Public Utilities Department included the cost of heavy machinery needed to properly operate the Wastewaster Treatment Plant, and uphold the expectations of the Flmida DEP and the St. Johns River Water Management District. The City did not s o li cit competitive bids or quotes for thes e items, as Gotman- Rupp products became the City standard over thirty (30) years ago, and has been used exclusively ever s ince. This decision was part of the major pumping station rehabilitation project that the City undet1ook at that time. A single pump manufacturer for the rehab project was strongly encouraged, and Gorman-Rupp was s e lected . Parts for new and older models are readi ly available, and they have kept the same pump design used by the City for decades. Staff is familiar with this brand and can eas ily perform routine maintenance. John Collins of J. Collins Engineering Associates has worked on several projects fbr the City, including the upgrade of the Wastewater Treatment Plant in 20 I 0. He recommends that the City continue to use Gonnan-Rupp pumps for its wastewater applications. It is not recommended to interchange brands in any mechanical equipment appli ca tion, and to ch ange the entire system would be costly. He provided the attached statement. BUDGET: We included in the PY20 1 6 Operating Budget the purchase of two (2) Gonnan- Rupp pumps/motors, to replace the existing machinery. The combined total for both pumps is $6 1,933. ATTACHMENTS: Statement f•·om J. Collins Engineering Associates, LLC . RECOMMENDATION: To approve the purchase Two (2) Gorman-Rupp Pumps in the amount of$6 1 ,933 from Hudson Pump & Equipment Associates, Inc. as they are the sole source dis tributor of Gonnan-Rupp pumps. REVIEWED BY CITY MANAGER: :-/tk-2-<ct;l_au AGENDA I TEM #4C MARCH 14,20 16 Statement from J . Collins Engineering Associates, LLC. John Collins, PE C ity has been us ing G onna n-Rupp (GR) Pumps fo r ove r 30 years as a s tandard s el f-priming wastewa te r pump. T he process wa s d evelo p ed m a ny ye ars ago wh e n th e ci ty ha d no unifo rm s tandard practi ce o n selecti on of wastewater pumps . The prev ious use o f no n -stand ard pumps presented many maintenance iss ues as w e ll as pro ble ms of obtaining many di ffe re nt s pare parts . T he d ecis io n to have standard pumps fo r the C ity•s w as tewater li ft s ta ti o ns as well a s in many app licati o ns in the wastewater pla n t b e nefi ts the ci ty and th e public. T he sel ected pumps arc re li ability , o p erato r friendl y and mos t p arts ar e avail able in Flo rid a. S in ce th e goal o f public ut iliti es is to provid e re li able c ustomer servi ce-the s ta nd a rdi zati o n of the purchasing o f wastewater equipme nt is a commo n practi ce w ith munic ipa l ut ility departm ents s ince it increases o perator knowledge in th e m a inte na nce an d servi ce of the pumps whi ch in re turn f aci litates repa irs and obta ining parts. By minimi z ing the time to re turn wa s tewa te r pumps back into service, th e C ity reduces th e ri sk of an en v iro nme n ta l spill and F D EP pe nn it vio la tions . Staff s upp o tts the co ntin ua tion of th e u s c of standa rdi z ed O R pumps a nd o the r wastewater equipm ent in the c ity . J . Collin s E ng ineering A ssocia tes, LLC (JCEA) 11 5 I 6-3 S a n Jose Blv d . J ackson v ill e, FL 32223 904-262-41 2 1 904-7 16-6282 Cell