Copper Mixing Zone - Allocation-Staff ReptCITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Contract for Effluent Copper Mixing Zone, Phase II SUBMITTED BY: Donna Kaluzniak, Utility Director DATE: February 27, 2004 BACKGROUND: On June 9, 2003, the City Commission authorized staff to negotiate a contract with Camp, Dresser & McKee (CDM) to conduct a study in order to obtain an effluent copper mixing zone from the Department of Environmental Protection (DEP). This would allow the three beach cities to discharge a higher level of copper in the combined effluents based on the results of the study. The Copper Mixing Zone study was to be conducted in two phases, as per RFP No. 0203-7. Phase I consisted primarily of sampling, analysis, and development of a modeling workplan to submit for DEP's approval, and has been completed. Phase II will consist of modeling and permit modification activities. Staff has negotiated a price of $26,500 for Phase II of the Effluent Copper Mixing Zone project. BUDGET: Funding for Phase II of the Effluent Copper Mixing Zone is available in the Sewer Fund, miscellaneous professional services, account no. 410-5508-535-31-00. The project will be funded by all three beach cities as follows: Treatment Plant Design Flow, MGD (Total = 10.9) Percent of Total of All 4 Treatment Plants Cost for Phase I of the Effluent Copper Mixing Zone Study. Jacksonville Beach 4.5 41.3% $10,944.50 Neptune Beach 1.5 13.7% $3,630.60 **Atlantic Beach 4.9 45% $11,925.00 **Total of Wastewater Plant #1 (3.0 MGD) plus Wastewater Plant #2 (1.9 MGD) RECOMMENDATION: Award the contract for Phase II of the Effluent Copper Mixing Zone to Camp, Dresser & McKee in the amount of $26,500. ATTACHMENTS: 1. Proposal from CDM dated February 16, 2004. REVIEWED BY CITY MANAGER: 1 N N w H FC Q DELIVER BY DATE: 0 z o 0 H O CD W O O W CO 00 x O N N O M M w o m o W cn o z w o O a O Q H O a z 0 W >C U W H Q 0 U) H O o4 N a O m Q zw 0 O 0 cn z o • H • a a O H W O o0 H W Q l0 z z N a H W M NiO • z w REQUISITION BY: KALUZNIAK SHIP TO LOCATION: PUBLIC WORKS TO CONDUCT Un Q • W a Q H W O I Un U1 H W O Q U a W H W g J z cn Fc U)00a W N a W Un Oa O a O zaUn Z.. H x H j<,0 UzHzO W FC3 W zUxrO H W I H C7aor) a zao(Y1 W ON U o ENGINEERING a FC H zz0>0 O 5.10E-,0 H 'a H X O a a Q Z cnU 00 W U -,) XU U W 0 0 O )OD U ZWUUn a FC a, H REQUISITION TOTAL: z 0 H H 0 P4 0 U) z H H z D 0 U U H o 0 zo 0 0 • O o 0 w co FI w N N m M PROJECT PROFESSIONAL SERVICES O O N) M H CO zo 0 40 OLO O O O H g W Z H a REQUISITION IS IN THE CURRENT FISCAL YEAR. REQUISITION COMMENTS: 0 FC 0 Lf) CD Q p4 CO H o Zw . • •U W w r o ff C0 g� rnrOH FC Ow ca rz U)0 N)vvra W H H H H • uryr{raC zo FC C> W Ni Un a a Ix FC ow w D a co r- • • • dP H a H M 40 0'- d H V W H UY� M 0 M z O z 0 H Un Un H 0 0 0 U >+ H H >1 U PO Q w 0 Ux a a Q Z U) w 0 t 9 W z .W M W o a x \ U 7 M cn Q N \m � D 0 a z H H O UI FC w O ZUx O a 0 w H 00 000H UUnz W 000 HinOH ZZ • •U -1H Q Urxzw0Unw inn •0000H I • • vi0 H U) O z z U d H H W O W O FC W U1'i H O H 0 0 0 Z O Z UI O H >+ OOa0aHH0FC H a s G.+ H H 00 10U)ZU x U •• I x r.11-11-1 W O xUz W >41.10 Wxz UCO 0QP7cnz •00000 wH0 I H O r.GHO U ZOO •OWcna)WHxa W •0 1 HPgcnW ZHUGHUct'z HPIOZOU) W O H 0HOZ HFC C7UzZQ WU)0O>C041-1>C0QaW z HOFCOFC WHFCU0aH0 H O W U h z FC h aI 0 Ffi H (� SPLIT BASED F f PURCHASE REQUISITION NBR: 0000032945 M H w H Q VENDOR PART NUMBER U z Q H H z U) w0 W H O NI x x w U U) r rn ▪ W H H H U) H U) M U) z O Cr) D O • a o 0 a a U) X 4 • o U W W n W a U) H O 0 N Z M zD ow cna Z w z H O H H H ▪ H aQ FGn mz D O H U) FC H W cna REQUISITION BY: KALUZNIAK SUGGESTED VENDOR: SHIP TO LOCATION: PUBLIC WORKS QUANTITY UOM DESCRIPTION w za H W az O O 0 0 U) N O O o O H 0 0 O 0 U) N M w• z0 0 H g H o N W �0 axwz a x W W N 0 0 0 0 X H H$FCOH wwa a X W H w w WFC HOW Q a co z U) cnw� X • W W H H--xxa0 W HaHHDzcn Z Q U) XU)w00 C7HHU)aU W Z -H W H H H '$ a w FC FC H Q 0 x 0 1 W FC W 0 H W UOZFc as a H z FC HOocna) FCU) W H OUC7 D W Q a a z W £) x U O O H HH UcnaUa FCXaFCFCa w a FC DOW UW wU I a 5 -.Hz Q 3 a • Q a H 0>+OODUWCD XaaFCH 0 H a OI a a Q FCOZ W W >1 0 a FC x z HO W FC 0)0 •H) NH W HHC7QU H 0 0 a H z 0 0 Z H H W U H U) 0 r� �FCDHX co C7WOH0W00 axamwwCU) O H a W a U) REQUISITION TOTAL: z 0 H H z 0 w z H H z D 0 U U H o 0 Z O o D . 00 0 U)0 0 Lo oho N N N PROJECT PROFESSIONAL SERVICES 0 0 M U) M U) Hoo zo D Un OU) U o O w Z H H a REQUISITION IS IN THE CURRENT FISCAL YEAR. REQUISITION COMMENTS: • X Q 0 GI W w H a FC x O H 0 O H .wU H Z W Cza H W z zwm z C7H a O FC H g FC N U) a Z W O o 0 0 H - 0 17 W O Un u-) o, co • I Z • N. • o a H a N N Un W \ H X' a • M d' N U) M a 0 H H z O co H a N 4 X 0 H H D U) � z a H • U} U} U)- W�-1 W l0 H W X U) H o Z O (7 a W W Qi • II II II H H z H axaa w5 Oa a U D a s 0 OFC C7ao)° \° W Z I UW W r-CMr --av) Or W a z • oho a H I Z HHMM H W U)M OMaC7d'H 'U z cn0 Q H H H (V H XZX - x a ZOO) U G H 0 0 0 0 U W X H FCw t7 2 C7 2 C7 FC W Oa0n In a Q m w z O w w- H H 410 2 6) W H a I z Zi z U) In Lc) • 0 •>+ I O H O W U) W • • d' W z H W op h ODFCU) r -I Zw H •I a al g -- -- I D U v' N z G -i a., U) 1 XHa MH O G,>+ I xOU-.U) m>IUUr w a n O w W Z O W W 0 Z H W x W z O— H U) z O n z Q O 0 H H Q H O H H W W H FC W H O U) -, W > U)zU>wzHzU)N>FCHO z H W H W D z g W H O Q z a w Xa0 HFC U) azDa H z Xaaxoxa,POO U O>I1.1FCwHFCa>1O- WZ C W o W W I7 '7.z FC I7 a 121 FC 4 FC ABSENCE PURCHASE REQUISITION NBR: 0000033728 • H O O W H 0 DELIVER BY DATE: N a w Z O 0 N Z O H O C7 Z w O H H O X x LI) H U X X, Fa w • a a w o O V) o U U) O W O I a O H a rn Z H a a M U W Z • o H 0 • N • M 0 Z O 0 H O O O O N H N ALL ITEMS ADD FUNDS H Z O 0 H U) g H W cna SUGGESTED VENDOR: AND PERMITTING a H O 0 Ga 4 a W H ZOZ O W O H H O C7 q • c7 Z z H Fa H X g H H H [n Z O H a a 7C W a0H m w a aaw a 0 w O a H U w Z rC a0 a C7 H H H ZZU)U) a H w a Z l D W cn W l . H x C7 CI) GacnX Z O GaCW OH X w H 3 a H W • H • O W H`U)0a' HZ H H O a H M o Cin W 1,UN OZ HOr� aw FC W . • x P� kO H •. •• a m H H O W W W H O w H W>.U)HU) HHaf2440X H Hxa'ixOO r7›HaaZU a H a H X H W P7 a 0 0 OUXNOOH O 1) H w f H 0 0 O 0 H N REQUISITION TOTAL: Z 0 H H U) 0 Z H H Z D 0 U U H o O ZO O 0 • O O O XO o g Un u) N N 0 0 w • O PROJECT PROFESSIONAL SERVICES O O H M m H co Z 0 c) OH U O H 4 d' w Z H a REQUISITION IS IN THE CURRENT FISCAL YEAR. REQUISITION COMMENTS: AGENDA ITEM Q Cr) C7 wZ H H(3) H • U O H • x -- .0 O j r CO H o W H o • W Z (.n O In co Q • M M i-7 d' H 0, M a w (3)m x H H o II W H II H x U) H II t-- • �• (Z1 H M W O W H II a a M II a, 4 w,r)• x H •d' U)$N'H it 0 II II S w au-)U0 H U)Ga •Oa H a a Ga H 0I1 II r.. OHg$ HO -x • cn 0 Fl Z U U)HH C+U0 U) U) a O Z - U w O O Z w H O Z O 0 0 0 2 Z • W H4 aaa a• 4 4 w 4 c W hZ COMMISSION ON