Loading...
1588 OCEAN BLVD EARLY POWER EARLY POWER AGREEMENT & RELEASE CITY OF ATLANTIC BEACH Electric power is requested now under the conditions and terms of this fully executed Agreement & Release Job Address: ,1 TIF 6 CC VJ l Permit No. ( ` 9•1("7 Service Type (Circle One): Overhead ndergrouttd We, the undersigned General Contractor and Electrician, understand and agree: 1. "Early Power' is purely for our construction convenience, it is gg$ required by Codes and does aid substitute for Final - Inspections or the C!O (Certificate of Occupancy) that must be issued before occupancy. and as such is at the discretion of the Building Official. 2. inspectionsfmustt Atlantic Beach Approval, including meter base connections early power energizing- All rough . 3. Occupancy or use of the new construction before a formal CO - constitutes fraudulent use of the earl electric service. Such action is expressly prohibited and penalized by The City of Atlantic Beat Ordinances. A violation of this Agreement shall result in a request for prompt removal of electnc service after a twenty-four hour notice. 4. "Early Power" release authority is the Electrician andior the Contractor and must not occur before: a. Equipment, devices and fixtures are installed (or blanked off) safely. b. Panel is complete with breakers and cover, and (labeling required at final inspection). c. Service connection and grounding is complete. 4. The electric system has safely passed through electrical check. e. Motor can is permanentl • marked with address. f. Temporary address numbers displayed (Permanent numbers are required for C /O). 5. This fully completed form is to be submitted to the Building Department by hand, mail or fax. 6. Future such Agreements will not be accepted from those who violate any one of the above items. CONTRACTOR DATE 4//g/ PRINT NAME 4 ,. , . ) V/6 ELECTRICIAN DATE I / / PRINT NAME 57r- k Lr 800 Seminole Road, Atlantic Beach FL 32233 Phone: (904)242 -5820 Fax: (904)247-58 hRp: viviw.onab.tis revised 01 30 09