1201 Gladiola Street DENSITY REPORT /24I 6)/g- -) a /aL--
L E G A C Y 64LE2G4ABCY
ECNHGINEUELREIVNG,INC
ARD _
ENGINEERING, INC
JACKSONVILLE,FL 32216 T
904-721 1100 OFFICE Project No.:
Geotechnical&Materials Engineering and Testing p 904-722-1100 FAX
age 1 of I Report No.:
Lab No.:
Report of In-Place Density(Asphalt or Soil)Tests or Coring for Thickness(—circle one--)
Project: d v 1 a 1st,I. S
Contractor: 's Co c•r
Reported To: Method:_a 2c
Location: • iq Location by: �S
n� Course: (=;\k
Material: a
1 Uta.)✓L 4:::.
;v/ c Ca-.
Date Tested:_ LLR-I . 6 Spec. Requirements:
Pass/ Location
Fail/ Elev/ Base/LR/ Dry Max. %of Moist
Retest !ept ! Asphalt Density Dry Max %
tft Thickness Density* Den
C er Goff. - p-/.Z Mil r 6 00.5 o b..
IMINmennimiliall mil.III IX. 3 c),
Ir 9.� 141r 99.3 (4s)
1111111.1 bal. 91 .0
1111111 an
III
r r
MIII r� I
rr
r ...�rrr�r
atm _
*Source of Proctor(Project Number)
P-Test Meets Specification Requirements F-Test Fails To Meet S t
Specification Requirements R-Retest
To Be Comnletprl r,. iota —
Employee Name
Billing Comments t7-Standby Time from to Total:
_ Trip Charge(Job Canceled) CJob Time from 2,11__C_to,E1(.5.'-Total:__ ,�Q
Out of Town Mobilization ��}� travel rom "")'•t�to$1 Total:_ /,r)
O-Travel Time from �� (To rom Job)
to__Total:,.-___._,(From Job)
rota!Hovers: 4 tj 0
while copy-office Mae reUow
copy-field baz