Loading...
Item 4A - ReportsRecreation Programs Special Events -City Commission Report ·-,_ March2016 Events, Rentals, & Facilities Feature d Events In M a rch Songwriters' Concert, Art Walk Reception, Wild Wonders, Acoustic Night, Egg Hunt One Time Fa cility Rentals Ade le Grage 1-Ba ker Center Jordan Cente r Speci al Events/Permi ts W eddings on be ach o r parks Pavilions & Parks ··I---Camping Dut t o n 1- Beac h handicap chair -1- Other -Vet Pa rk, 5k, Nature day, etc -1-Pa rty -Block Party, Party In the park Fi res on t h e b ea ch Afte r School Programs Donner After School Program Jord an After Schoo l Program City Sponsore d Ev e nts Seniors@ the Baker Cente r rr. , . · ... 1. r T I Songwriters' Con cert Zumba@ Jordan Park (4} '!· -. Acou s ti~ Night • .. . . --. Cooking Class@ Jordan Park Wild Wonders Egg Hunt J ·-' II of registrations/ applicati on s a 4 4 2 2 26 13 2 1 1 4 35 42 --1- AGENDA ITEM# 4A MAY 9, 20 16 --- II of staff/ vol, II of II of partlc lpant.s/ co mmittee occurrences attendees attended 4 4 2 2 26 13 2 1 1 4 24 27 per day 4 tutor s/1 staff 24 70 per day 6 tutors/1 st aff 13 1 1 30 1 4 28 1 1 75 1 1 15 1 2 75 1 1 200 4 ~-~ 'A·~ . -Art Show/~eception ... • 1 25 1 ·-ABET · Ch ildren 's Performances 1 77 0 -City Contract Prog rams ABET Performa nces 9 614 0 ---Te nnis-Beaches Tennis 26/12 jrs. 0 Upcoming Events & Programs In April Wild Wonders 4/9 & 4/23 - 1-Songwriters' Co n ce rt 4/10 1-I -Shakespeare in the Pa rk 4/15 & 4/16 ... 1- ~ Art Show & Ex hibit 4/21 ... 1- ~- Arts In the Park 4/23 I I ~ --Acoustic Night 4/24 1- • Please v isit us online @ coab.us/recr ea t ion for ca lendar of events ~-·- ,..Sign up for notices on "No ti fy Me" fo r -t ·-1- I programs & eve nts - City of Atlantic Beach Major Public Works Projects FY15/16-Status 4/25/16 Project Name Budget Project Activity Notes Utilities Effluent Outfall Replacement $320,000 Bid opened on 3/2; low bid exceeds budgeted This is replacement of the end ofthe beaches combined amount budget. Working with Jax Bch and effluent pipeline and is cost shared by the 3 beach Cities. Neptune Bch on additional fuhding. Consultant obtaining costs for new line suspended from piling versus buried. Atlantic Blvd Waterline Upgrade $100,000 Design only Waiting on water model completion Update Water System Model $30,000 Model built and calibrated. Consultant preparing Evaluating capital improvement requirements and impact if and running and evaluating scenarios. WTP #4 is removed from service. Well Logging -6 wells $130,000 Discussing scope with different consultant to This is a down hole check of the structural integrity of our eliminate or reduce subconsultant layeri ng. drinking water wells. Replace Water Main on Seminole Rd. $700,000 Design revisions underway -part of Seminole Finalizing design revis ions with stormwater and streetscape From Atlantic Blvd. to S-Way Road Streetscape project. components of project. WTP2 North Fence Replacement $10,000 Installation completed 4/7. Repla ce Seaspray water services $100,000 Project completed within budget. Work needed because of recurring line breaks and accompanying outages Sewer Line rehab Sea Oats $200,000 Received scope for pipe lining; coordinating Involves lining of aging sewer infrastructure to reduce water manhole lining scope/cost SpectraShield inflow & infiltration (1&1). Phosphorus Treatment Improvements $225,000 Preliminary engineering Report completed. 60% Received grant to offset portion of cost. WWTP engineering design compl eted . Permitting through FDEP and setting up temporary feed system. 2 repairs Gravity Outfall to JCW $30,000 Consultant preparing TV inspection review assessment and maintenance plan . Combined Plant Renewal and ~278,000 Addressing items separately in-house. Utility staff working with vendors & purchasing. Replacement Soft Starts WTP 1,2,3 $10,000 Awaiting final quote from vendor. Chlorine AutoControl $31,000 Equip. purchased -coordinating install date Control Bubbler System $15,000 Awaiting shop drawing from vendor. LS Control Panel $19,000 Under fabrication by supplier. LS ABCD Softstarts $55,000 LS "B" softstart install in progress. Will evaluate prior to installing at other stations. Replace Kruger Disks $6,000 On order. New Influent Screens $20,000 In Purchasing. Replace Elf Pump 112 $50,000 Commissioner Stinson investigating alternate equipment/suppliers. Replace RAS Pump $50,000 Commissioner Stinson investigating alternate equipment/suppliers. Replace Influent Pump $22,000 Awaiting results of hydraulic study. .I Pump requirements/specs may be updated. Parks Projects Russell Park Renovation $160,000 New swing set installed. Basketball lighting in Other improvements being planned . $50K grant to progress-equipment ordered by vendor. supplement funding Scope/quotes & Schedule in progress for outfield irrigating & sod. Bull Park Improvements $35,000 Replacement of playground fence in progress Landscaping complete. New swing installed . (Purchasing). Twin Lake Parks Design $25,000 Re-evaluating task based on Commission Project revised; awaiting proposal for pond bank restoration. direction and public input from community Application for FIND grand funding not submitted this year. meeting. Marsh Multipurpose Path $540,000 Bid opened on 3/2; low bidder within budget. $50% FIND Grant funded. Will overlay asphalt roadway Project to start 5/9. concurrent with Marsh Path project. Vet Park Playset Replacement $40,000 Working with Vendors to select "s hip" theme play Using COJ funding secured by Councilman Gulliford to set. supplement original budget for upgraded play set. Publi c Works Projects Seminole Road Improvements $900,000 Consultant revising design to redirect stormwater Bidding late Summer. from Saltair area and Howell Park. Francis Avenue Drainage $650,000 $100% CDBG funding. Co nstruction in progress-Shopping drawings reviewed and approved. Improvements currently mobilization and site preparation. Beach Renourishment $0 Scheduled for summer of 2016 100% paid with Federal and County funds 2016 Resurfacing Program $330,000 Milling & paving to start 5/2. Anticipate 1 week for milling, 1 week for paving and 1 week for striping and finishing. Ahern Bike Plaza $15,000 Installation by City forces in 1st quarter of 2016 Grading complete. Initial rack installation completed (3 near Lifeguard station . racks). Monitoring to gauge usage/demand . Atlantic Blvd Bike Plaza $50,000 Negotiating with property owner for location. Design not started. Sherry Safe Route to School Sidewalk $0 8' sidewalk along Sherry & Seminole from Ahern Design & survey recently started. Town Hall meeting schedule to 17th. Design and construction funded by DOT. for 5/7. Construction sc h eduled for seco nd half of 2017 . Police Building $2,892,700 Guaranteed M ax. Price and Budget Amendment GMP came in over budget. Project discussed individually with Ordinance on 4/25 agenda. Commissioners.