Item 8A - Combined Beaches Outfall RepairAGENDA ITEM: SUBMITTED BY: DATE: BACKGROUND: CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT Combined Beaches Outfall Repair City Bid No. 1516-09 Donald D. Jacobovitz, P.E~ Public Works Director " f May9, 2016 AGENDA ITEM# SA MAY23,2016 The City of Atlantic Beach has two treated wastewater effluent force mains I outfalls (12" and 24") that discharge to the St Johns River at Sherman's Point. The 12" diameter outfall is owned and maintained by COAB and the 24" outfall is owned jointly with City of Neptune Beach and City of Jacksonville Beach (Joint Beach Combined Outfall). An inspection and study completed in December 2013 determined that the outfall pipe and pipe restraints as well as some of the wooden cross bracing and blocking would need to be replaced due to corrosion from the salt water environment. In order to reduce ongoing maintenance costs and extend the service life of the new outfall, the Cities chose to move forward on design and construction of a new buried outfall, with COAB to provide bid services and construction administrative services (with limited assistance from a consultant). Two bids for the Combined Beaches Outfall Repairs were received on March 30, 2016 as follows: J.D. Hinson Company J ax Utilities $ 532,763.52 $1,407,628.92 Both bids received exceed funds available for the project. This is a cost-shared project with the three beach communities: Atlantic Beach (45.0%), Neptune Beach (13.7%) and Jacksonville Beach (41.3%). Discussions were held with Neptune Beach and Jacksonville Beach staff to determine whether additional proportionate funding is available, in order to proceed with awarding the project this fiscal year. We have received a favorable response from both cities. BUDGET: Total original budgeted amount for the project in account 410-5506-535-6300 PU1504 is $320,000.00. Additional funds required of the three beach cities based on the low bid of $532,763.52 is revised as follows: Original Budget Revised Budget Increase Atlantic Beach 45.0% $ 144,000.00 $ 239,743.59 $ 95,743.59 Neptune Beach 13.7% $ 43,840.00 $ 72,988.60 $ 29,148.60 Jacksonville Beach 41.3% $ 132,160.00 $ 220,031.33 $ 87,871.33 $ 320,000.00 $ 532,763.52 $212,763.52 RECOMMENDATION: AGENDA ITEM# 8A MAY23,2016 Award the project to J.D. Hinson at the bid amount. Additional funding for the project is to come out of the $330,000 in account 410-5506-535-6400 not being used for the VacCon equipment purchase. Neptune Beach and Jacksonville Beach will reimburse the City for their revised portions as the contractor is paid. ATTACHMENTS: Bid Tabulation REVIEWED BY: ~4c (/OA"" ~ BID # 1516-09 Required Documents Submission in Triplicate Document Requirements Checklist Bid Form Documentation of Receipt of any Addenda (3 ) List of All Subcontractors Bid Bond (5% of bid) License-General Contractor OR Underground Utility New Vendor Information Form Drug Free Workplace Public Entity Crimes Statement W-9 Form Proof of Insurance TOTAL BID (Sum of items 1-11) City of Atlantic Beach Combined Beaches Outfall Repairs March 30, 2016 J.D. Hinson Company X X X X X X X X X X X X $532,763.52 Bid announcement was posted to the City's website and advertised in the Financial News & Daily Record on March 02, 2016. 3:00PM Jax Utilities X X X X X X X X X X X X $1,407,628.92 Thirteen companies were sent a fax and/or e-mail announcement of this bid. Calls were made to all companies reminding of prequalification deadline. Five bidders prequalified. One declined to bid due to work load, and another declined due to nature of the project. Award of Bid based on Department Analysis and Commission Approval