Loading...
338 4TH STREET PW COMMENTS CITY OF ATLANTIC BEACH DEPARTMENT OF PUBLIC WORKS 12M Sandpiper Lane Athnti Bach.FL 322334319 e TELEPHONE:(90.1)247-5834 FAX: b. 20-360 ww .coab.ur CONTRACTOR: DATE: 6.27-16 Sunshine Pool Services of North Florida PERMIT 4 16-POOL-1446 4191 San Juan Avenue ADDRESS: 338 0 Street Jacksonville,FL 32210 Atlantic Beach,FL 32233 Email: brentass-poolsemn PERMIT APPLICATION FOR INGROUND POOL You Femur application has been denied by the Public Works Department for the reasons listed below. Please submit this information at Yom earliest convenience in order that we may approve you application. If you have any questions,please contact Scon Williams. Deputy Public Works Director at 904-247-5834 or email swilliams@cmb.us. coab.us. PUBLIC WORKS CORRECTION ITEMS: (Submit the following reformation to the Public Works Department) "Provide construction site management plan,including location of dumpster and portable toilet. Right-of-Way Permit is required if using right-of-way for construction parking. "Provide drainage plans showing site topography(flow arrows,etc). "Provide erosion and sediment control plans with installation details. ""Provide impervious surface calculations for entire lot(existing and post construction). "Section 24-66(b)of the Land Development Regulations requires on-site storage for increased run-off if adding 400 SF or more impervious surface. Provide Delta volume calculations and on-site retention required per Section 24-66(b). ""All runoff must remain on-site. Cannot raise lot elevation without measures to retain runoff. "Provide a pre-construction topographic survey prepared by a Florida Licensed Professional Land Surveyor, showing V contours. PUBLIC WORKS CONDITIONS OF APPROVAL: (The following comments will be printed on your permit as Conditions of Approval) "Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact Public Works(247-5834)for Erosion and Sediment Control Inspection prior to start of construction. ..All silt must remain on-site during construction. ""If on-site storage is required,a post construction topographic survey documenting proper construction will be required. ""POOL-Wellpoint(if used)must discharge into vegetated area 10'minimum from street or drainage feature (swale, structure or lagoon). A separate pool permit is required. "Roll off container company must be on City approved list and container cannot be placed on City Right-of-Way. (Approved:Advanced Disposal, Realco, Republic Services,Shapeli's,Sunshine Recycling and Waste Pro). "Full right-of-way restoration,including sod, is required. cc: Toni Gindlesperger,Building Department