102 AQUATIC - BORING REPORT Boring No. Al A2
Topsoil =111=1 Topsoil
•••••••• Dark Brown Fine SAND(SP)
:•••••:.:. Dark Brown Fine SAND,Trace Small
Roots(SP)
"•
1:11:11:
1:1:1:11: Brown Fine SAND With Silt(SP-SM) 10/2Brown Fine SAND With Silt(SP-SM)
V
2/2015 '
10.'22/2015
Brown Fine SAND,Some Small Roots
(SP) Brown Fine SAND(SP)
5 ---
BT @ 6.0'
w
Lu
LI
±.
cL.
Lii
0
Brown Fine SAND(SP)
10 —
BT @ 10.0'
LEGEND
111,=lli
=HIE- Topsoil Fine SAND(SP) SP Unified Soil Classification System
Fl=I I
Fine SAND With Silt(SP-SM) Silty Fine SAND(SM) Groundwater Level at Time of Drilling
Clayey Fine SAND(SC) CLAY(CH) BT Boring Terminated at Depth Below
Grade
A3 A4
— 0
III
-111= Topsoil -111= Topsoil
11111
Dark Brown Fine SAND With Silt
(SP-SM)
Brown Fine SAND With Trash
.I 1 (Plastic)(SP)
10/22/2015
10/22/2015
Dark Brown Silty Fine SAND(SM) Brown Fine SAND With Silt,Trace
it Small Roots(SP-SM) _ — 5
BT @ 6.0'
m
m
m
m
Medium Brown Fine SAND(SP)
— 10
BT @ 10.0'
Generalized Subsurface Profiles
Atlantic Beach Property
Atlantic Beach, Florida
Ellis&Associates�.
DATE: 10/26/15 PROJ.No.: 3719-0019 Figure 4
I
Boring No. B1 B2 B3
N N N
0 777..Topsoil With Concrete 11E111 Topsoil ==-111 Topsoil —
=1-1-1= Debris i
• •
2_ 2-VERY LOOSE Dark •
VERY LOOSE Dark 3 VERY LOOSE Brown
Brown Fine SAND, Brown Fine SAND(SP) • •• Fine SAND(SP)
Trace Small Roots(SP)
- — —
, •
1 I VERY LOOSE Dark Y
T. T Brown Fine SAND With
- 10/22/2015 2- 10/22/2015 2- 1 1 Silt and Trash(Plastic) 10/22/201/12"
VERY LOOSE to (SP) LOOSE Brown Fine
LOOSE Dark Brown .u...L.L.L. SAND With Trash
- • Fine SAND and Trash • (Wood&Glass)(SP)
(Plastic&Wood)(SP)
5 — 5 1 1/12"
VERY LOOSE Dark
. .
. .• Brown Silty Fine SAND . .
- With Trash(Plastic) •. .
(SM)
LOOSE Gray Clayey
- 12- ' : 1/9"- ' Fine SAND(SC)
•• ,
•
. .
• •.
. .
- 10- WOH/24"- WOH/24"
i-
LuVERY LOOSE Gray
LLI 10 ----Silty Fine SAND With VERY SOFT Gray—
±. Clay(SM) Sandy CLAY With Sill
H (CH)
a. -
Lu
a
A
.•.•.•
.•.••.
MEDIUM DENSE ••••:. : •
Medium Brown to Gray •. •
• • • •
Fine SAND(SP) .•.•
.•
- •:••:
11- 11- ::: 6
15 -----
MEDIUM DENSE
Medium Gray Fine LOOSE to MEDIUM
DENSE Gray Brown
SAND(SP) Fine SAND(SP)
_ .
9- 16- 10
20
BT @ 20.0' BT @ 20.0' BT @ 20.0'
LEGEND
111E111
111= Topsoil .....•••• Fine SAND(SP)
. •..•.•. N Standard Penetration Resistance, WOH Distanc
II=Ill Blows/Foot Under V
1:11:1:11 Fine SAND With Silt(SP-SM) Silty Fine SAND(SM) SP Unified Soil Classification System BT Boring•
Grade
-
V.: Clayey Fine SAND(SC) CLAY(CH) Y Groundwater Level at Time of Drilling
1/12" One Blow to Drive Split Spoon Sample
Twelve Inches
B4 B5 B6
N N N 0
r, ,ir Topsoil n„n Topsoil 1 1 SII Topsoil
• :.: VERY LOOSE Dark LOOSE Brown and
1- 2- Brown Fine SAND, 3 Orange Fine SAND
LOOSE Brown Fine Trace Organic Fines • With Trash(Glass)(SP)
I.
SAND(SP) (SP) -
10/22/2015T
10/22/2015
4 3 3_ . LOOSE Brown Fine _
=
SAND,Trace Small
10/22/2015 Roots(SP)
LOOSE to MEDIUM LOOSE Brown Fine
9 :::::;::'•: DENSE Brown to 3 SAND With Trash G :-: ”: 5
::• Medium Brown Fine (Glass&Paper)(SP)
SAND With TrashLOOSE to MEDIUM _
(Wood, Paper&Plastic) • DENSE Medium Brown
:.: (SP) Fine SAND(SP)
6-
5- 10-::•:••...: -
I
12- 8- : -
::::
11-.. II
I'I''I MEDIUM DENSE Medium Brown Fine m
•
10 o
I SAND With Silt
I:I::I (SP-SM) m
m
I.I.I.
• LOOSE to MEDIUM •
LOOSE to MEDIUM DENSE Medium Brown -
4- DENSE Medium Brown 4- to Medium Gray Brown •g •
-
• Fine SAND(SP) • Fine SAND(SP)
15
MEDIUM DENSE _
Medium Gray Brown
• Fine SAND(SP)
•
16- 11- 12-
...... 20
BT @ 20.0' BT @ 20.0' BT @ 20.0'
1
k
Split-Spoon Soil Sampler Dropped
eight of Drilling Tools and Hammer Generalized Subsurface Profiles
?rminated at Depth Below
Atlantic Beach Property
Atlantic Beach, Florida
EEllis&Associates bc.
DATE: 10/26/15 PROJ.NO.: 371 9-0019 Figure 3
E .. 47,_
... -- lip it u
... - . 4 co PA '
a..- ....r ifs tai
"1". 1011 01) rar ili 1 faY 0 1
Ar° 14 0 ° v4. 4 `410P0i
VI L...
IL , 11111 41
, 0.
. vi
II up
A2
elle111104 A..:40„ 0,,,. I,
Lira& t4) TOWNHOMES *r r: a
fp2 BEDROOM
00 ei
ellP11%.70 fi''' o'l it 14
till
A #4,, a fa .,,:
'. S
,,,,G.,.., :it 01,
.....
4ft A a Ths la A 01 "4- - 41L--
lire. 4....
I / (3) TOWNHOMES
PLAYGROUND 2 BEDROOM
LEGEND
S Approximate Location of Standard Penetration
m Test(SPT)Boring
0
m A Approximate Location of Auger Boring
R
M
Q
Graphical Scale
0' 40' 80'
(6) TOWNHOMES \
3 BEDROOM
(4)TOWNHOMES I VII' `IMr�
2 BEDROOM \ - ,� + ' �'0 0 VA 0A� 'r�.'/
10
eI.,, 4 isL
�0� �'
, ►
B3
gill)
� ` elf 410
, � S
i` � �rr t ,0 ❑A3 ( MI.
w
� �� +` ,•l �t O
ff1ell , to.40. 4•y,c_illsol� ►�
•
to iii 0.f...bitti, -.moi <
Pc '41 11 i'lweli,1,,..I...- iritia
dvi
.:v - tib
illit: III AMENITIES A4 �-
A -
i4.
�� �AA!
(6)TOWNHOMES ilD 7,17?
BEDROOM
alb vii 011 till. 0111101amoi. ...i. y.•
'Era Iniair
yam,. ear i/
ECI
Ellis a Associates IIIC. Field Exploration Plan
Geotechnical INMaterials Testing ■ Environmental Atlantic Beach Property
Integrated Engineering Services EB:998 Atlantic Beach, Florida
7064 Davis Creek Road Jacksonville,FL 32256
4 p:904-880-0960 1:904-880-0970 email:ellis@ellisassoc.com
Serving the Southeast since 1970. Date: 10/26/15 Project No.: 3719-0019 Figure 2
Offices: Jacksonville.FL-Brunswick.GA
EIHs&Associates .
Geotechnical ■ Materials Testing ■ Environmental is CEI
Integrated Engineering Services since 1970
REPORT OF
GEOTECHNICAL EXPLORATION
ATLANTIC BEACH PROPERTY
DUVAL COUNTY, FLORIDA
E&A PROJECT NO. 3719-0019
Prepared for:
Tribridge Residential Construction, LLC
1575 Northside Drive
Building 100, Suite 200
Atlanta,Georgia 30318
Prepared by:
Ellis&Associates, Inc.
7064 Davis Creek Road
Jacksonville, Florida 32256
October 26,2015
EIIis&Associates Inc.
Geotechnical ■ Materials Testing • Environmental ■ CEI
Integrated Engineering Services since 1970
October 26, 2015
Tribridge Residential Construction, LLC
1575 Northside Drive
Building 100, Suite 200
Atlanta, Georgia 30318
Attention: William Norris
Reference: Report of Geotechnical Exploration
Atlantic Beach Property
Duval County, Florida
E&A Project No. 3719-0019
Dear Mr.Norris:
Ellis&Associates,Inc. has completed the requested geotechnical exploration in general accordance with our
proposal dated October 12,2015.The exploration was performed to evaluate the general subsurface conditions
within the proposed building and parking/drive areas and to provide recommendations for site preparation,
foundation support and pavement design.
We appreciate the opportunity to be your geotechnical consultant on this phase of the project and look forward
to providing the materials testing and observation that will be required during the construction phase. If you
have any questions, or if we may be of any further service, please contact us.
Very truly yours,
ELLIS&ASSOCIATES, INC.
Digitally signed by Robert W Clark
DN:c=US,o=ldenTrust ACES Business
Robert W.Clark,P.E. Representative,ou=ELUS AND
Sr.Geotedtnical Engineer ASSOCIATES,Cn=Roberl W Clark
Registered,Florida No.52210 0.92342.19200300.100.1.1=A01091300
000014D0050848A000015FB
Date:2015.10.2614:24:39-0400'
Robert W. Clark, P.E. Joey Broussard, P.E.
Senior Project Engineer Director of Geotechnical Services
Registered, Florida No. 52210 Registered, Florida No. 58233
Distribution: Mr. William Norris—Tribridge Residential 1 pdf
7064 Davis Creek Road,Jacksonville, FL 32256• Phone: (904)880-0960&(800)273-0960/Fax: (904)880-0970
Offices:Jacksonville, FL, Daytona, FL,and Brunswick, GA
www.ellisassoc.com
EIIis&Associateskic. Atlantic Beach Property
TABLE OF CONTENTS
Subject Page No.
1.0 PROJECT INFORMATION 1
1.1 Site Location and Project Description 1
2.0 FIELD EXPLORATION 1
2.1 SPT and Auger Borings 1
3.0 VISUAL CLASSIFICATION 1
4.0 GENERAL SUBSURFACE CONDITIONS 2
4.1 General Soil Profile 2
4.2 Groundwater Level 2
4.3 Normal Seasonal High Groundwater Level 2
5.0 DESIGN RECOMMENDATIONS 2
5.1 General 2
5.2 Foundation Design Recommendations 3
5.3 Pavement Considerations 4
6.0 SITE PREPARATION AND EARTHWORK RECOMMENDATIONS 5
6.1 Clearing and Stripping 5
6.2 Temporary Groundwater Control 5
6.3 Compaction 6
6.4 Structural Backfill and Fill Soils 6
6.5 Foundation Areas 6
6.6 Pavement Areas 7
7.0 QUALITY CONTROL TESTING 7
8.0 REPORT LIMITATIONS 7
FIGURES
Figure 1 Site Location Plan
Figure 2 Field Exploration Plan
Figure 3 &4 Generalized Subsurface Profiles
APPENDICES
Appendix A Soil Boring Logs
Field Exploration Procedures
Key to Soil Classification
3719-0019 i October 26,2015
EAEIIis&Associates bC. Atlantic Beach Property
1.0 PROJECT INFORMATION
1.1 Site Location and Project Description
The project site is located at the northwest corner of the intersection of Atlantic Boulevard and
Aquatic Drive in Atlantic Beach, Florida. The general site location is shown on Figure 1.
At the time of our exploration,the site was undeveloped, with surface cover consisting of sparse to
thick trees.The site was relatively level with a slight slope upward from Aquatic Drive.Surface water
was not observed near planned structural areas at the time of our exploration.
You provided project information via several discussions and emails. We were provided with a
conceptual site plan for the potential construction. This plan indicated the boundary limits for the
property,the existing roadways adjacent to the site and the layout of the proposed construction.
We understand that the property will be developed for multi-family residential with two to three-story
townhomes and associated paved parking and drive areas. We expect that the proposed buildings will
be of block or wood frame construction with slab-on-grade floors. We were not provided detailed
structural loading and grading information. For the purposes of this report, we expect maximum
column, wall,and floor loads of 50 kips, 3 kips per linear foot(klf)and 100 pounds per square foot
(psf),respectively. We also expect that less than 2 feet of fill(and only nominal cuts)will be required
to achieve final grades in structural areas.
If actual building loads or fill/cut heights vary from these conditions,then the recommendations in this
report may need to be re-evaluated.We should be contacted if any of the above project information is
incorrect so that we may reevaluate our recommendations.
2.0 FIELD EXPLORATION
We performed a field exploration on October 23, 2015. The approximate boring locations are
indicated on the attached Field Exploration Plan (Figure 2). Our personnel determined the boring
locations using paced measurements from existing roadways and site features.The boring locations on
the referenced Field Exploration Plan should be considered accurate only to the degree implied by the
method of measurement used.
2.1 SPT and Auger Borings
We located and performed six Standard Penetration Test (SPT) borings, drilled to a depth of
approximately 20 feet below the existing ground surface,in general accordance with the methodology
outlined in ASTM D 1586 to explore the subsurface conditions within the area of the proposed
structure. Split-spoon soil samples recovered during performance of the borings were visually
classified in the field and representative portions of the samples were transported to our laboratory for
further evaluation.
We located and performed five auger borings, drilled to a depth of approximately 6 feet below the
existing ground surface in general accordance with the methodology outlined in ASTM D 1452 to
explore the subsurface conditions within the proposed pavement areas. Representative soil samples
also were recovered from the auger borings and returned to our laboratory for further evaluation. A
summary of the field procedures is included in Appendix A.
3.0 VISUAL CLASSIFICATION
A geotechnical engineer classified representative soil samples obtained during our field exploration
using the Unified Soil Classification System(USCS) in general accordance with ASTM D 2488. A
Key to the Soil Classification System is included in Appendix A.
3719-0019 1 October 26.2015
&
EIIis&Associates inc. Atlantic Beach Property
4.0 GENERAL SUBSURFACE CONDITIONS
4.1 General Soil Profile
A graphical presentation of the generalized subsurface conditions is presented on Figures 3 and 4.
Detailed boring records are included in Appendix A. It should be understood that the soil conditions
will vary between the boring locations. The following table summarizes the soil conditions
encountered.
GENERAL SOIL PROFILE: BUILDING AREA
TYPICAL DEPTH(ft)
FROM TO SOIL DESCRIPTION USCS(1)
0.0 0.5 Topsoil ----
0.5 2 Very Loose fine Sand SP
2 6-10 Very Loose to Medium Dense fine Sand and silty fine Sand SP,SM
with trash(plastic,paper,glass and wood)
6 10 12 Very Loose to Medium Dense fine Sand,silty or clayey fine SP,SM,SC,CH
Sand and Very Soft sandy Clay
12 20 Loose to Medium Dense fine Sand SP
(1)Unified Soil Classification System
4.2 Groundwater Level
Groundwater was encountered at each boring location and recorded at the time of drilling at depths
varying from 2 to 4 feet below the existing ground surface. We note that groundwater levels will
fluctuate due to seasonal climatic variations, surface water runoff patterns,construction operations,
and other interrelated factors. The groundwater depth at each boring location is noted on the
Generalized Subsurface Profiles and on the Log of Boring records.
4.3 Normal Seasonal High Groundwater Level
The normal seasonal high groundwater level is affected by a number of factors. The drainage
characteristics of the soils, land surface elevation,relief points such as drainage ditches,lakes,rivers,
swamp areas,etc.,and distance to relief points are some of the more important factors influencing the
seasonal high groundwater level.
Based on our interpretation of the site conditions, including the boring logs and Duval County Soil
Survey, we estimate the normal seasonal high groundwater level at the site at the pond area to be
approximately 2 to 3 feet above the groundwater levels measured at the time of our field exploration.It
is possible that groundwater levels may exceed the estimated normal seasonal high groundwater level
as a result of significant or prolonged rains.
5.0 DESIGN RECOMMENDATIONS
5.1 General
Our geotechnical engineering evaluation of the site and subsurface conditions at the property, with
respect to the planned construction and our recommendations for site preparation and foundation
support,are based on(1)our site observations,(2)the field data obtained,(3)our understanding of the
3719-0019 2 October 26,2015
EllissiAssociatesint Atlantic Beach Property
project information and structural conditions as presented in this report,and(4)our experience with
similar soil and loading conditions.
If the stated structural or grading conditions are incorrect, or should the location of the structure or
pavement areas be changed,please contact us so that we can review our recommendations. Also,the
discovery of any site or subsurface conditions during construction that deviate from the data obtained
during this geotechnical exploration should also be reported to us for our evaluation.
The recommendations in the subsequent sections of this report present design and construction
techniques that are appropriate for the planned construction. We recommend that E&A be provided
the opportunity to review the foundation plans and earthwork specifications to verify that our
recommendations have been properly interpreted and implemented.
5.2 Foundation Design Recommendations
As stated previously, sands with buried trash consisting of plastic, paper, glass and wood were
encountered in most of the borings.These unsuitable materials should be removed from the structural
and pavement areas of the site.Removal of these materials and general site work recommendations are
provided in Section 6 of this report. Provided the site preparation and earthwork construction
recommendations outlined in in this section are performed,the following parameters may be used for
foundation design.
5.2.1 Bearing Pressure
The maximum allowable net soil bearing pressure for use in shallow foundation design should not
exceed 2,500 psf.Net bearing pressure is defined as the soil bearing pressure at the foundation bearing
level in excess of the natural overburden pressure at that level. The foundations should be designed
based on the maximum load that could be imposed by all loading conditions.
5.2.2 Foundation Size
The minimum widths recommended for any isolated column footing and continuous wall footing are
24 inches and 18 inches,respectively.Even though the maximum allowable soil bearing pressure may
not be achieved,these width recommendations should control the size of the foundations.
5.2.3 Bearing Depth
The exterior foundations should bear at a depth of at least 12 inches below the exterior final grades,
and the interior foundations should bear at a depth of at least 12 inches below the finish floor
elevation. These embedment depths are to provide confinement to the bearing level soils. It is also
recommended that stormwater be diverted away from the building exterior to reduce the possibility of
erosion beneath the exterior footings.
5.2.4 Bearing Material
The foundations may bear in either the compacted suitable natural soils or compacted structural fill.
The bearing level soils, after compaction, should exhibit densities equivalent to 95 percent of the
modified Proctor maximum dry density (ASTM D 1557), to a depth of at least one foot below
foundation bearing levels.
5.2.5 Settlement Estimates
Post-construction settlements of the structure will be influenced by several interrelated factors,such as
(1)subsurface stratification and strength/compressibility characteristics;(2)footing size,bearing level,
applied loads, and resulting bearing pressures beneath the foundations;and (3)site preparation and
3719-0019 3 October 26, 2015
i
Ellis&Associates inc. Atlantic Beach Property
earthwork construction techniques used by the contractor. Our settlement estimates for the structure
are based on the use of site preparation/earthwork construction techniques as recommended in Section
6.0 of this report. Any deviation from these recommendations could result in an increase in the
estimated post-construction settlements of the structure.
Using the recommended maximum bearing pressure,the supplied/assumed maximum structural loads,
and the field test data that we have correlated to geotechnical strength and compressibility
characteristics of the subsurface soils,we estimate that total settlements of the structure could be on
the order of one inch or less.
Differential settlements result from variations in applied bearing pressures and compressibility
characteristics of the subsurface soils. Because of the general uniformity of the soils encountered in
our borings and the recommended site preparation and earthwork construction techniques outlined in
Section 6.0, we anticipate that differential settlements of the structure should be within tolerable
magnitudes.
5.3 Pavement Considerations
Based on the results of our exploration,we consider the subsurface conditions at the site favorable for
support of a flexible pavement section when constructed on properly prepared subgrade soils as
outlined in Section 6.0 of this report.Typical pavement sections used in northeast Florida are shown
on the following table. If requested, we can prepare a project-specific pavement design if specific
traffic data is provided.
TYPICAL PAVEMENT SECTION
Pavement Layer Auto Parking&Traffic Truck Areas
Lanes
Asphaltic Concrete Wearing Surface 1.5" 2.0"
•
Limerock Base 6.0" 8.0"
Stabilized Subgrade 12.0" 12.0"
5.3.1 Wearing Surface
The wearing surface should consist of Florida Department of Transportation(FDOT)Type S asphaltic
concrete having a minimum Marshall Stability of 1,500 lbs.Specific requirements for Type S asphaltic
concrete wearing surface are outlined in the 2000 edition of the Florida Department of
Transportation, Standard Specifications for Road and Bridge Construction. As an alternative, the
wearing surface may consist of a Type SP-9.5 asphaltic concrete as outlined in the current edition of
the Standard Specifications.
5.3.2 Base and Subgrade
The limerock base course should have a minimum Limerock Bearing Ratio(LBR)of 100 and should
be compacted to 100 percent of the modified Proctor maximum dry density(ASTM D 1557)value.
The subgrade material should have a minimum LBR of 40 and be compacted to 98 percent of the
modified Proctor maximum dry density(ASTM D 1557)value.
3719-0019 4 October 26. 2015
•
&
EllisaAssociateut Atlantic Beach Property
5.3.3 Underdrains
Satisfactory pavement life is dependent on dry/stable pavement support provided by the base and
subgrade courses. Accordingly, a minimum clearance of 2 feet must be maintained between the
normal seasonal high groundwater table and the bottom of the base layer. Depending on final
pavement grades, underdrains may be required to maintain dry base and subgrade materials.
6.0 SITE PREPARATION AND EARTHWORK RECOMMENDATIONS
Site preparation as outlined in this section should be performed to provide more uniform foundation
bearing conditions,to reduce the potential for post-construction settlements of the planned structure(s)
and to maintain the integrity of a flexible pavement section.
6.1 Clearing and Stripping
Prior to construction,the location of existing underground utilities within the construction area should
be established. Provisions should then be made to relocate interfering utilities to appropriate locations.
Underground pipes that are not properly removed or plugged may serve as conduits for subsurface
erosion, which may subsequently lead to excessive settlement of overlying structures.
Site preparation should consist of clearing the existing vegetation and near surface organic topsoil.
The clearing/stripping operations should extend within and to a distance of at least five feet beyond the
perimeter of the proposed building areas and three feet beyond pavement areas. During grubbing
operations,roots with a diameter greater than 0.5-inch,stumps,or small roots in a concentrated state,
should be grubbed and completely removed.
Based on the results of our field exploration, materials containing trash were encountered at depths
varying between 2 to 10 feet below the existing ground surface. We recommend that this material be
removed from within and to a distance of 5-feet beyond the structural and pavement areas. Some of
the borings did not encounter buried trash. However, the actual extent and depth of unsuitable
materials should be determined by Ellis & Associates, Inc. using visual observation and judgment
during earthwork operations.The over-excavated unsuitable soils should be replaced with compacted
structural fill soils as discussed below.
Excavation side slopes should be in accordance with OSHA requirements for loose sandy soils.
Temporary slopes cut back at 1.5 horizontal to 1 vertical(1.5H:1 V)may be used.The 1.5H:1 V slopes
are contingent upon the dewatering system adequately controlling slope groundwater seepage.
6.2 Temporary Groundwater Control
The borings encountered groundwater at depths varying from 2 to 4 feet below the existing ground
surface at the time of our exploration. It may be necessary to install temporary groundwater control
measures to dewater the area to facilitate the removal of the unsuitable materials and to perform
compaction of the surface soils in other portions of the site.Groundwater control measures should be
determined by the contractor,and they should remain in-place until backfilling in over excavated areas
has reached a height of 2 feet above the groundwater level at the time of construction.The site should
be graded to direct surface water runoff from the construction area.
Note that discharge of produced groundwater to surface waters of the state from dewatering operations
or other site activities is regulated and requires a permit from the State of Florida Department of
Environmental Protection (FDEP). This permit is termed a Generic Permit for the Discharge of
Produced Groundwater From Any Non-Contaminated Site Activity. If discharge of produced
groundwater is anticipated,we recommend sampling and testing of the groundwater early in the site
3719-0019 5 October 26,2015
Ellis&Associates Inc. Atlantic Beach Property
design phase to prevent project delays during construction. E&A can provide the sampling,testing,
and professional consulting required to evaluate compliance with the regulations.
6.3 Compaction
In areas where no trash removal is required,the exposed surface should be compacted with a vibratory
drum roller having a minimum static, at-drum weight, on the order of 4 to 6 tons. Typically, the
material should exhibit moisture contents within±2 percent of the modified Proctor optimum moisture
content (ASTM D 1557) during the compaction operations. Compaction should continue until
densities of at least 95 percent of the modified Proctor maximum dry density(ASTM D 1557)have
been achieved within the upper 2 feet of the compacted natural soils at the site.
Should the bearing level soils experience pumping and soil strength loss during the compaction
operations,compaction work should be immediately terminated,and(1)the disturbed soils should be
removed and backfilled with compacted structural fill,or(2)the excess moisture content within the
disturbed soils should be allowed to dissipate before recompacting.
Care should be exercised to avoid damaging any nearby structures while the compaction operation is
underway.Prior to commencing compaction,occupants of adjacent structures should be notified,and
the existing conditions of the structures should be documented with photographs and survey (if
deemed necessary).Compaction should cease if deemed detrimental to adjacent structures,and Ellis&
Associates, Inc. should be contacted immediately. We recommend the vibratory roller remain a
minimum of 50 feet from existing structures.Within this zone,use of a track-mounted bulldozer,or a
vibratory roller operating in the static mode, is recommended.
6.4 Structural Backfill and Fill Soils
Structural backfill in areas where undercutting trash is required or fill for site development should be
placed in loose lifts not exceeding 12 inches in thickness when compacted by the use of the above
described vibratory drum roller.The lift thickness should be reduced to 8 inches if the roller operates
in the static mode or if track-mounted compaction equipment is used. If hand-held compaction
equipment is used,the lift thickness should be further reduced to 6 inches.
Structural fill is defined as a non-plastic,inorganic,granular soil having less than 10 percent material
passing the No.200 mesh sieve and containing less than 4 percent organic material.The fine sand and
fine sand with silt or fine sand with clay,without roots,as encountered in the borings,are suitable as
fill materials and, with proper moisture control, should density using conventional compaction
methods. Soils with more than 10 to 12 percent passing the No. 200 sieve will be more difficult to
compact,due to their nature to retain soil moisture,and may require drying. Typically,the material
should exhibit moisture contents within±2 percent of the modified Proctor optimum moisture content
(ASTM D 1557)during the compaction operations.Compaction should continue until densities of at
least 95 percent of the modified Proctor maximum dry density(ASTM D 1557)have been achieved
within each lift of the compacted structural fill.
6.5 Foundation Areas
After satisfactory placement and compaction of the required structural fill,the foundation areas may be
excavated to the planned bearing levels.The foundation bearing level soils,after compaction,should
exhibit densities equivalent to 95 percent of the modified Proctor maximum dry density(ASTM D
1557) to a depth of one foot below the bearing level. For confined areas, such as the footing
excavations,any compactive effort should be provided by a lightweight vibratory sled or roller having
a total weight on the order of 500 to 2,000 pounds.
3719-0019 6 October 26, 2015
EIIis&Associatesinc. Atlantic Beach Property
6.6 Pavement Areas
After completing the clearing/stripping operations and removal of areas of buried trash in the
pavement areas,structural backfill and fill required to achieve the finish pavement grades can then be
placed and compacted as described in Section 6.3 above. As an exception, densities of at least 98
percent of the modified Proctor maximum dry density(ASTM D 1557)should be obtained within the
upper one foot of the materials immediately below the proposed base course.
7.0 QUALITY CONTROL TESTING
Ellis & Associates, Inc. should be retained to perform the construction material testing and
observations required for this project,to verify that our recommendations have been satisfied.We are
the most qualified to address problems that may arise during construction,since we are familiar with
the intent of our engineering design.
A representative number of field in-place density tests should be made in the upper 2 feet of
compacted natural soils, in each lift of compacted backfill and fill,and in the upper 12 inches below
the bearing levels in the footing excavations. Density tests are recommended to verify that satisfactory
compaction operations have been performed. We recommend density testing be performed(1)at one
location for every 5,000 square feet of building area,(2)at 25 percent of any isolated column footing
locations, (3) at one location for every 100 linear feet of continuous wall footings, and (4) at one
location for every 10,000 square feet of pavement area.
8.0 REPORT LIMITATIONS
Our geotechnical exploration has been performed,our findings obtained,and our recommendations
prepared, in accordance with generally accepted geotechnical engineering principles and practices.
Ellis&Associates,Inc. is not responsible for any independent conclusions,interpretation,opinions,or
recommendations made by others based on the data contained in this report.
Our scope of services was intended to evaluate the soil conditions within the zone of soil influenced by
the foundation system.Our scope of services does not address geologic conditions,such as sinkholes
or soil conditions existing below the depth of the soil borings.
This report does not reflect any variations that may occur adjacent to or between soil borings. The
discovery of any site or subsurface condition during construction that deviates from the data obtained
during this geotechnical exploration should be reported to us for our evaluation. Also, in the event of
any change to the supplied/assumed structural conditions or the locations of the structures,pavements,
or pond areas,please contact us so that we can review our recommendations.We recommend that we
be provided the opportunity to review the foundation plans and earthwork specifications to verify that
our recommendations have been properly interpreted and implemented.
3719-0019 7 October 26, 2015
FIGURES
.....: ,.. ,..: , . i
, . 20th St
+. Sgt/ St/
Toll Brothers At Atlantic
(a\ .
t A) Beach Country Club
N r
tior 1",,,(:"" t
toz
n�
t c, ;`..D.
.0 e, o
F Q
S.',
^ fTt
2 a
�. --
-St
k co
Bayo St Island Rd N' 's..,:.
/ / - \r
-
si ro
Levy Rd 11th St
! vor 4 t N - .s., Atlantic E3e
,v so
Q ,l , Plaza
�Jtrt
7th St
4/ W 9th St rO KO
A
4' Approximate St o 03
'fl c 2 Co
Site Location c F` Q a
v
:1-.. --7'';--"T"—jl::k
0
N._ -1---- .
1
i
,�
•
--'73. —.. . Fyo;;Q,a Bay,St Al A
1 e/La O
Forest Ave
Intr ,� 5
ci
c a. iNept
l N a
tl'. T
EA Ellis & Associates inc. Site Location Plan I di,,..—...s.
.;
cr, Atlantic Beach Property
Z;
Geotechnical • Materials Testing ■ Environmental 1 i
rn Integrated Engineering Services EB:998 Atlantic Beach,Florida \._-1
n 7064 Davis Creek Road Jacksonville,FL 32256
p:904-880-0960 f:904-880-0970 email:ellis@ellisassoc.com
Q Serving the Southeast since 1970. Date: 10/26/15 I Project No.: 3719-0019 Figure 1
Offices: Jacksonville,FL-Brunswick,GA
APPENDIX A
SOIL BORING LOGS
FIELD EXPLORATION PROCEDURES
KEY TO SOIL CLASSIFICATION
EA
EIIis&Associates hc. Project No.: 3719-0019
Boring No.: B1
LOG OF BORING Sheet 1 of 1
Project: Atlantic Beach Property Client: Tribridge Residential Construction LLC
Drill Rig: Automatic Hammer Driller: B.Truitt
Boring Location: See Field Exploration Plan Drill Rod: AWJ Drill Mud: Super Gel-X
Casing Size: Length of Casing:
Groundwater Depth: 2.9 ft Time: Drilling Date: 10/22/15 Boring Begun: 10/22/15 Boring Completed: 10/22/15
v SHEAR STRENGTH
Z z Z 1 f' pp (ksf) t
O 111
W a m 4-� N W H E Q Uo°Cc urtrbed Sample
Ww 3 Q d N V U)Z 1 gockete 88netrome ter
a a DESCRIPTION , > z 1_ z 8 NNa g 0 5 V T0"�fle
2 d m z W a V C a O • Unconfined Compression
N p y m CC W Z
0 0 ® Triapal Compression
a a (%)
0 10 20 30 40 0 1 2 J
- 0 Topsoil With Concrete Debris I 3
- VERY LOOSE Dark Brown Fine SAND,Trace 1 - -
1 _ Small Roots(SP) 1 2 -
I - -
- VERY LOOSE to LOOSE Dark Brown Fine SAND
- and Trash(Plastic&Wood)(SP) > I _ -
I 2
- 2 - -
2 —
- 2 - -
3 – 5 3 5
– 4 - -
- MEDIUM DENSE Medium Brown Fine SAND 4
- (SP) 6 - -
- 6 12
6 - -
-
4 - -
- MEDIUM DENSE Gray Fine SAND(SP) 4 - -
5 _ 6 10 -
- 8 - -
- 10 1 --
N _
5 - -
0 6 - 5 -
c? – 6 11 - -
F - 15 —
a - -
o –
w
0
J
J
W – - -
a _
o – —
oi •
- 3 - -
o – 4
Z 5 9 - -
m20 Boring Terminated @ 20 ft.
o Remarks
0
0
J
EIIis&Associates MC. Project No.: 3719-0019
Boring No.: B2
LOG OF BORING Sheet 1 of 1
Project: Atlantic Beach Property Client: Tribridge Residential Construction LLC
Drill Rig: Automatic Hammer Driller: B.Truitt
Boring Location: See Field Exploration Plan Drill Rod: AWJ Drill Mud: Super Gel-X
Casing Size: Length of Casing:
Groundwater Depth: 2.8 ft Time: Drilling Date: 10/22/15 Boring Begun: 10/22/15 Boring Completed: 10/22/15
SHEAR STRENGTH
v
W z Z zW F Wit— (ksf)
O W Q to Z t ocket Pene(rpmeter
CI ro ,< y> J }W z 0 socket
dBSample ter
nJ a DESCRIPTION y j Z Z N y� 2 0 5 V Torvane
2 a 2 3 Z W Q U O ,, i a • Unconfined Compression
N o Q O U2 p
N m W W Z o c Q E Triamal Compression
CI a ( )
0 10 20 30 40 0 1 2
0 _ t .
_ Topsoilili
L 1 _ _
- VERY LOOSE Dark Brown Fine SAND(SP) 1 - -
1 — 1 2
2 - -
- VERY LOOSE Dark Brown Fine SAND With Silt1 ---
_ and Trash(Plastic)(SP) Y 1 _ _
2 — . 1 2
— VERY LOOSE Dark Brown Silty Fine SAND With 1/12" -.
Trash(Plastic)(SM) _-
3 —- 5 1 1
- 1 -- -
—
— WOH/6'
— 1/9" - -
1 — 1/9" 1/9"
— VERY LOOSE Gray Silty Fine SAND With Clay WVOH/24"
_ (SM) _ _
5 — WOH/24"
— 10 1 —
— MEDIUM DENSE Medium Gray Fine SAND(SP) :::::
o -
I- 6 —csi 5 _ _
0 — 6 11 -- -
w - 15 1 —
o —
N
co
W _ - -
a
0
n —
co _om 20 Boring Terminated @ 20 ft.
o Remarks
ci
0
EA
[Ihs&Associates . Project No.: 3719-0019
Boring No.: B3
LOG OF BORING Sheet 1 of 1
Project: Atlantic Beach Property Client: Tribridge Residential Construction LLC
Drill Rig: Automatic Hammer Driller: B.Truitt
Boring Location: See Field Exploration Plan Drill Rod: AWJ Drill Mud: Super Gel-X
Casing Size: Length of Casing: '
Groundwater Depth: 2.8 ft Time: Drilling Date: 10/22/15 Boring Begun: 10/22/15 Boring Completed: 10/22/15
ISHEAR STRENGTH
v
1_ W (ksf) t
O Ili
W a CD Z LU <.. y._ , 1 W i' 0 PUoocket Proed tS�oammple
W u' W p o_ d y V 0 Z J Q, grttuerb tleggample ter
Ja a DESCRIPTION y zuj z$ g oo 5 v Tonne
2 a 2 Z W Q W j d • Unconfined Compression
U) V O a J
Q W N m W W Z O O E1 Triaxial Compression
a a (i)
0 10 20 30 40 0 1 2
0 . . . , .
- Topsoil LI 1 - -
- VERY LOOSE Brown Fine SAND(SP) 1 - -
1 _ 2 3 - -
- LOOSE Brown Fine SAND With Trash(Wood& 1/12"
Glass)(SP) :::::; - -
2 - 1/12" 1/12"
1/12" - -
3 _ 5 1/12" 1/12"
- LOOSE Gray Clayey Fine SAND(SC) %. : 2 - -
- 4 - -
4 - 3 7
2 - -
VERY SOFT Gray Sandy CLAY With Silt(CH) %` OH/24"
5 —
WOH/24"
- 10
LOOSE to MEDIUM DENSE Gray Brown Fine - -
- SAND(SP) • —'
N 2 _ _
O —
0 6 - . 2
c9 4 6 - -
•
w - 15 —
0
v,
y _ _
J _,
W - - -
Oi
- 4 - -
—
o 7 4 - -
z :.::::.:::: 6 10
m20 Boring Terminated @ 20 ft.
LO" Remarks
0
0
J
Di
[Ihs&Associates . Project No.: 3719-0019
Boring No.: B4
LOG OF BORING Sheet 1 of 1
Project: Atlantic Beach Property Client: Tribridge Residential Construction LLC
Drill Rig: Automatic Hammer Driller: B.Truitt
Boring Location: See Field Exploration Plan Drill Rod: AWJ Drill Mud: Super Gel-X
Casing Size: Length of Casing:
Groundwater Depth: 2 ft Tune: Drilling Date: 10/22/15 Boring Begun: 10/22/15 Boring Completed: 10/22/15
v SHEAR STRENGTH
W z z z Wce (ksf)r `
Z W O"'� N W H W i ® U srgren sampler
Z tL LI; W 7 Oce a.- U N Z J ak DisurettepdeSample ter
a. a a DESCRIPTION > 1-F z$ 2° V Torvane
NWW H O Z V E 0 O a Unconfined Compression
CO W W Z O O E Triapat Compression
a. a Ili (%)
0 10 20 30 40 0 1 2
- 0 TopsoilIII=1 1/12"
-Ir
- LOOSE Brown Fine SAND(SP) _ _
I
_ :::•::::: 1 I
- 3 _ _
6 - -
- LOOSE Brown Fine SAND With Trash(Wood) 2 - -
(SP) 2 4 —
- 4
5 —
4 -- -
3 -- 5 MEDIUM DENSE to LOOSE Medium Brown Fine 5 9
- SAND With Trash(Paper&Plastic)(SP) 5 - -
1 —
- : 3 _
4 :
viEIIis&Associates . Project No.: 3719-0019
Boring No.: B5
LOG OF BORING Sheet
Project: Atlantic Beach Property _ Client: Tribridge Residential Construction LLC
Drill Rig: Automatic Hammer Driller: B.Truitt
Boring Location: See Field Exploration Plan Drill Rod: AWJ Drill Mud: Super Gel-Xof 1
Casing Size: Length of Casing:
Groundwater Depth: 2.3 ft Time: Drilling Date: 10/22/15 Boring Begun: 10/22/15 Boring Completed: 10/22/15
SHEAR STRENGTH
U
W Z Z W H H (ksf)
O W W Q J tl) 2 ,w Z ~ Pocket Pene`rometer
Z W a, m w Q N W J F F li e' Undisturbed Sample
J LL W W 2 O- d H V N Z J P' DistuPocket
tted Penetrometer
a DESCRIPTION zuj Z co ~ E o
0- H 8 fn U 0 Torvdne
Q W Q 0 Z w< W O a Q • Unconfined Compression
to o U) J ce It
CO W W 0 (� Tr awal Compression
n. a (%)
0 10 20 30 40 0 1 2
—- 0 Topsoil � - -
- ��1 1
- VERY LOOSE Dark Brown Fine SAND,Trace 1 -
1 - Organic Fines(SP) 1 2
- 2 - -
- LOOSE Brown Fine SAND With Trash(Glass) Y:: 1
(SP) 1 - -
2
-_ 2 3 _ -
2 - -
1
1 - -
3 -- 5
2 3 - -
- 5 - -
- LOOSE Brown Fine SAND With Trash(Paper) 2
(SP) • • 2 - -
4 —
-_ 3 5 - -
5 - _
- LOOSE Medium Brown Fine SAND(SP) 4
3 - -
- 5 8
6 _ -
- 10 —
- LOOSE to MEDIUM DENSE Medium Gray Brown
Fine SAND(SP) - -
N —
tp -
N 1 -- -
I- 6 - 2
O -
0 — 2 4 - -
w - 15
a _
v
o
rn -,
rn -
co
J
W
a -
a --
_ 2 -- -
r,
, 7 - 4 —
o — 20 7 11 . . , ,
m Boring Terminated @ 20 ft.
o Remarks
(9
0
J
a
Bil
[IIis&Associates IOC. Project No.: 3719-0019
Boring No.: B6
LOG OF BORING Sheet 1 of 1
Project: Atlantic Beach Property Client: Tribridge Residential Construction LLC
Drill Rig: Automatic Hammer Driller: B.Truitt
Boring Location: See Field Exploration Plan Drill Rod: AWJ Drill Mud: Super Gel-X
Casing Size: Length of Casing:
Groundwater Depth: 3.3 ft Time: Drilling Date: 10/22/15 Boring Begun: 10/22/15 Boring Completed: 10/22/15
v SHEAR STRENGTH
Ili
z z z ~ f- (ksf)
Ci W d - Q J a I Z 1—
M
ocket Penetrometer
t7 y J H w M C Undisturbed Sample
W LL W - <N t_) N z J f DPocket
o kebeden mpie ter
-I _ J DESCRIPTION a W w o o 0 0
O. d 0) > /—H Z ca N E U V Torsos
Cl. 2 3 Z wQ w`" g O •
NQ O U M V O 11 J Unconfined Compression
fn J te CL Z 0 O E Tnax:al Compression
CO W 'w (%)
d d 0 10 20 30 40 0 1 2
- 0 Topsoil I-1 1 -
— —I 11-
- LOOSE Brown and Orange Fine SAND With Trash I - -
l - (Glass)(SP) —
_ 2 3 - -
- 2 - -
- LOOSE Brown Fine SAND,Trace Small Roots(SP) 3
2 - y:.:_:.:•:2 3
- 2 - -
2
- LOOSE to MEDIUM DENSE Medium Brown Fine 2 - -
3 - 5 SAND(SP) 4 6
6 - -
3 --
4 . 5 —
5 10 - -
5 - -
- MEDIUM DENSE Medium Brown Fine SAND 4
With Silt(SP-SM) 111:1 1: 5 __
5 - —
- I I •
6 11 _
-1- 0
- MEDIUM DENSE Medium Gray Brown Fine - -
u - SAND(SP) —
_ 2 - -
- -
0 6 5
c? 4 9 - -
w
- 15
a -
U _
o
U) —
rn - _ -
¢ -
wJ -
J —
W _ - -
—
a
o -
- 3
7 - 5
Z - -
- 7 12
Fe
20 Boring Terminated @ 20 ft.
o Remarks
0
0
J
El
[IIis&Associates . Project No.: 3719-0019
Boring No.: Al
LOG OF BORING Sheet 1 of 1
Project: Atlantic Beach Property Client: Tribridge Residential Construction LLC
Drill Rig: Automatic Hammer Driller: B.Truitt
Boring Location: See Field Exploration Plan Drill Rod: Flight Auger Drill Mud:
Casing Size: Length of Casing:
Groundwater Depth: 4 ft Time: Drilling Date: 10/22/15 Boring Begun: 10/22/15 Boring Completed: 10/22/15
v SHEAR STRENGTH
z z
z - w►- (ksf)
F- w v7 Q y W O Z ~ Pocket Penetrometer
Z W 't7 J y W .. H 2 Undisturbed Sample
W tL W O a' d y V N Z J e D stuerb deneiro a ter
ii2 1- a DESCRIPTION N > z i_ z g N E ov 5 'V Torvane
a a I Z W a W v • Unconfined Compression
<n 0 N COW W rt Z O O ® Triapal Compression
/ a a (%)
0 10 20 30 40 0 1 2
0 -
- Topsoil IIIA LI _ _
- - Dark Brown Fine SAND,Trace Small Roots(SP) - -
1
Brown Fine SAND With Silt(SP-SM) I"'i - -
2
- - Brown Fine SAND,Some Small Roots(SP) - -
3 - 5
- - Brown Fine SAND(SP)
4
-- 10 - Boring Terminated @ 10 ft.
N
0_ _
I- — — -
— — - -
w - 15 -
g - - -
U _ _ _
O
to
v) - - - -
a - -
_
J
J —
W _ _ —
_
a - -
of
0o _ _
- - - -
z - _
o20 - , - . . . , . '
m
b Remarks
0
0
J
Ey.ii
EIIis&Associates . Project No.: 3719-0019
Boring No.: A2
LOG OF BORING Sheet 1 of 1
Project: Atlantic Beach Property Client: Tribridge Residential Construction LLC
Drill Rig: Automatic Hammer Driller: B.Truitt
Boring Location: See Field Exploration Plan Drill Rod: Flight Auger Drill Mud:
Casing Size: Length of Casing:
Groundwater Depth: 2.7 ft Time: Drilling Date: 10/22/15 Boring Begun: 10/22/15 Boring Completed: 10/22/15
SHEAR STRENGTH
U
z Z z F= r- p tu (ksf)tr
Z W a C7. N W ~tu -i 0 Mi tuPrtied Sampler
Z tL W 1 3 0O 2 d U) U (1)Z J e s slut P Sample ter
a Fx a DESCRIPTION N j j z}- z N I.- 2 ov 5 V Torvane
Q W Q O Z U U O ° • Unconfined Compression
N rn y m re W2
Q Q ® Triapal Compression
(
/ a a
0 10 20
30 40 0 1 2
Topsoil IIII - -
I — Dark Brown Fine SAND(SP)
- - Brown Fine SAND With Silt(SP-SM) - -
2
- - :l.l.l.1. - -
Brown Fine SAND(SP)
3 - -
5
—
-
- - Boring Terminated @ 6 ft. ,
- 10 - --
I- - - -
0 _ _ -
C� — — - -
w — 15 - —
o - - - -
u) —
u) _ _ - -
a - -
0 - _ - -
J
J -
W - - - -
-, - _ -
O.
— — -
oi
0 20 - • 1 - , , , , , ,
m
o Remarks
c,
0
J
E.41
EIIis&Associates . Project No.: 3719-0019
Boring No.: A3
LOG OF BORING Sheet 1 of 1
Project: Atlantic Beach Property Client: Tribridge Residential Construction LLC
Drill Rig: Automatic Hammer Driller: B.Truitt
Boring Location: See Field Exploration Plan Drill Rod: Flight Auger Drill Mud:
Casing Size: Length of Casing:
Groundwater Depth: 3.7 ft Time: Drilling Date: 10/22/15 Boring Begun: 10/22/15 Boring Completed: 10/22/15
v SHEAR STRENGTH
z z z
(
ksf)
W J N> F
a UndfiedSm
ler
g cketadntropeter p nn 0
aDESCRIPTION o yg> 5 v TorvaneN Wa 2 Z
v • Unconfined Compression
N _J Q'
Q W Q m WE W ceZ O Q
co , Q ® Triabal Compression
0 — a. a- 0 10 (0' 30 40 0 1 2
- Topsoil IIII _
- — Dark Brown Fine SAND With Silt(SP-SM) - -
1
—- - Dark Brown Silty Fine SAND(SM) • - -
•
2 H3 -
— 5 -
-- — Medium Brown Fine SAND(SP) - -
3 •
•
•
-- 10 - Boring Terminated @ 10 ft.
- - - -
— _ - -
w — 15 —
a — — - -
U _ _ - -
o
CO
co — _ - -
- -
m - _ - -
- -.
J
W - - - -
- - -
-
o_
z _- _ - -
O 20 —
m
L6- Remarks
0
J
Di
EIIis&Associates . Project No.: 3719-0019
Boring No.: A4
LOG OF BORING Sheet 1 of 1
Project: Atlantic Beach Property Client: Tribridge Residential Construction LLC
Drill Rig: Automatic Hammer Driller: B.Truitt
Boring Location: See Field Exploration Plan Drill Rod: Flight Auger Drill Mud:
Casing Size: Length of Casing:
Groundwater Depth: 2.3 ft Time: Drilling Date: 10/22/15 Boring Begun: 10/22/15 Boring Completed: 10/22/15
SHEAR STRENGTH
z z Z H W►- (kSf)`r t
O W su fO ce J y Lu W o ?H g 0 Und stuPrbed sample
Z W Or • 0 Q Q— V V)Z pocket Penetrometer
W t+ W O d N Disturbed Sample
a = DESCRIPTION N > t-F H$ N 2° V Torvane
2 O~. a Z W Q W N 5 g • Unconfined Compression
ILI y
N 0 OJ 0 2 0 Z Q Q ® Triapal Compression
CO d d (%)
0 10 20 30 40 0 1 2
1
- Topsoil -- -
- ,
- - Brown Fine SAND With Trash(Plastic)(SP) - -
I::::::: - -
- - Brown Fine SAND With Silt,Trace Small Roots - -
_ (SP-SM) —
- 5 H
- - Boring Terminated @ 6 ft. - -
- 10- - —
o -- -
-
O - -
W - 15 -
- -
Co - -
a - -
N _ _ - -
J —
tu
W - _ - -^
2_
O -- - —
—
z _ - -
0 20 - , , . , , ,
m
o Remarks
S
• J
Ellis&Associates.
FIELD EXPLORATION PROCEDURES
Standard Penetration Test (SPT) Borings
The Standard Penetration Test (SPT) borings were made in general accordance with the latest
revision of ASTM D 1586, "Penetration Test and Split-Barrel Sampling of Soils". The borings were
advanced by rotary (or "wash-n-chop") drilling techniques. At 2 '/2 to 5 foot intervals, a split-barrel
sampler inserted to the borehole bottom and driven 18 inches into the soil using a 140 pound hammer
falling on the average 30 inches per hammer blow. The number of hammer blows for the final 12
inches of penetration is termed the "penetration resistance, blow count, or N-value". This value is an
index to several in-place geotechnical properties of the material tested, such as relative density and
Young's Modulus.
After driving the sampler 18 inches (or less if in hard rock-like material), the sampler was retrieved
from the borehole and representative samples of the material within the split-barrel were
containerized and sealed. After completing the drilling operations, the samples for each boring were
transported to our laboratory where they were examined by our engineer in order to verify the
driller's field classification. The retrieved samples will be kept in our facility for a period of six (6)
months unless directed otherwise.
Flight Auger Boring
The auger borings were performed mechanically by the use of a continuous-flight auger attached to
the drill rig and in general accordance with the latest revision of ASTM D 1452, "Soil Investigation
and Sampling by Auger Borings". Representative samples of the soils brought to the ground surface
by the augering process were placed in glass jars, sealed,and transported to our laboratory where they
were examined by our engineer to verify the driller's field classification.
H
•
Ellis&AssociatesInc.
KEY TO SOIL CLASSIFICATION
Description of Compactness or Consistency in Relation
To Standard Penetration Resistance
Granular Materials Silts and Clays
Relative Safety Hammer Automatic Hammer Safety Hammer Automatic
Density SPT N-Value SPT N-Value Consistency SPT N-Value Hammer SPT N-
(Blow/Foot) (Blow/Foot) (Blow/Foot) Value(Blow/Foot)
Very Loose Less than 4 Less than 3 Very Soft Less than 2 Less than 1
Loose 4- 10 3-8 Soft 2 4 1 -3
Firm 4-8 3-6
Medium Dense 10—30 8—24
Stiff 8— 15 6— 12
Dense 30—50 24—40 Very Stiff 15—30 12—24
Very Dense Greater than 50 Greater than 40 Hard Greater than 30 Greater than 24
DESCRIPTION OF SOIL COMPOSITION**
(Unified Soil Classification System)
Group LABORATORY CLASSIFICATION CRITERIA
- MAJOR DIVISION Symbol FINER THAN SUPPLEMENTARY SOIL DESCRIPTION
200 SIEVE% REQUIREMENTS
GW <5. s D60/010 greater than 4 Well graded gravels,sandy gravels
Dao /(D60 x D10)between 1 &3
Gravelly soils
(over half ofGP <5* Not meeting above gradation Gap graded or uniform gravels,sandy
coarse fractionfor GW gravels
Coarse larger than
grained
No.4) GM >12* PI less than 4 or below A-line Silty gravels,silty sandy gravels
(over 50% GC >12* PI over 7 above A-line Clayey gravels,clayey sandy gravels
• by weight
coarser <5* D60/D,o greater than 6 Well graded sands,gravelly sands
than No. D302//(D60 x D10)between 1 &3
- 200 sieve) Sandy soils(over
half of coarse SP <5* Not meeting above gradation Gap graded or uniform sands,gravelly
fraction finer than requirements sands
No.4) SM >12* PI less than 4 or below A-line Silty sands,silty gravelly sands
SC >12* PI over 7 and above A-line Clayey sands,clayey gravelly sands
Silts,very fine sands,silty or clayey fine
Low ML Plasticity chart
sands.micaceous silts
compressibility
Fine (liquid limit less CL Plasticity chart Low plasticity clays,sandy or silty clays
grained than 50)
(over 50% OL Plasticity chart,organic odor or color Organic silts and clays of low plasticity
• by weight
finer than Micaceous silts,diatomaceous silts,
No.200 High MH Plasticity chart volcanic ash
- sieve) compressibility
(liquid limit more CH Plasticity chart Highly plastic clays and sandy clays
than 50)
OH Plasticity chart,organic odor or color Organic silts and clays of high plasticity
Soils with fibrous organic matter PT Fibrous organic matter;will char,burn or glow Peat,sandy peals,and clayey peat
* For soils having 5 to 12 percent passing the No.200 sieve,use a dual symbol such as SP-SM.
**Standard Classification of Soils for Engineering Purposes(ASTM D 2487)
SAND/GRAVEL DESCRIPTION SILT/CLAY DESCRIPTION
MODIFIERS ORGANIC MATERIAL MODIFIERS MODIFIERS
Sand/Gravel Modifier Organic Content Modifier Silt/Clay Content
Modifier Content Trace 1%to 2% Trace <5%
Trace <15% Few 2%to 4% With 5%to12%
With 15%to 29% Some 4%to 8% Silty/Clayey 13%to 35%
Sandy/Gravelly >29% Many >8% Very >35%
PREPARED BY AND AFTER RECORDING,RETURN TO:
Eric R.Wilensky,Esq.
Nelson Mullins Riley&Scarborough LLP
201 17th St,NW, Suite 1700
Atlanta,GA 30363
TEMPORARY CONSTRUCTION EASEMENT
AND RESTRICTIVE COVENANT AGREEMENT
THIS TEMPORARY CONSTRUCTION EASEMENT AND RESTRICTIVE
COVENANT AGREEMENT (this "Agreement") made as of the _ day of
, 20_ (the "Effective Date") by and between TBR AQUATIC OWNER,
LLC, a Delaware limited liability company ("Apartment Owner"), and SUNRISE
COMMUNITY EVANGELICAL FREE CHURCH,INC., a Florida not for profit corporation
(the"Church").
WITNESSETH:
WHEREAS,the Church owns certain real property located in the City of Atlantic Beach,
Duval County, Florida as more particularly described on Exhibit A attached hereto and
incorporated herein by reference(the"Church Property");
WHEREAS,Apartment Owner owns certain real property located in the City of Atlantic
Beach,Duval County,Florida and more particularly described on Exhibit B attached hereto and
incorporated herein by reference(the"Apartment Property");
WHEREAS, the Church desires to grant to Apartment Owner a temporary construction
easement over that portion of the Church Property shown on the plat attached hereto as Exhibit
C (the "Easement Area") in order to construct certain sidewalk and utility improvements
serving the Apartment Property;and
WHEREAS, the Apartment Owner desires to place certain restrictive covenants on the
Apartment Property on behalf of the Church.
NOW, THEREFORE, in consideration of the mutual covenants herein contained, the
parties hereby covenant and agree to and with each other as follows:
1. Temporary Construction Easement. The Church hereby grants and conveys to
Apartment Owner, its employees, agents, licensees, guests, and contractors, a temporary, non-
exclusive easement (the "Temporary Construction Easement") on, over, across, in and
through the Easement Area for purposes of accessing, staging and constructing a sidewalk
(which as constructed will lie entirely on the Apartment Property) (the "Sidewalk") as well as a
water utility line running from the Apartment Property to an existing public water utility line
within the Easement Area(which upon completion the Apartment Owner and the Church agree
will be dedicated to the City of Atlantic Beach, Florida) (the "Water Utility Line", the Water
Utility Line and the Sidewalk to hereinafter collectively be referred to as the "Improvements").
The Temporary Construction Easement shall include, without limitation, the right of vehicular
and pedestrian ingress, egress and regress for the movement of building materials and equipment
needed for such construction activities. Prior the expiration of the Temporary Construction
Easement, the Apartment Owner shall restore the Easement Area to substantially the condition
the Easement Area existed in prior to Apartment Owner performing the work authorized herein.
Apartment Owner also agrees that it shall indemnify and hold the Church harmless against all
claims of liens on the Church Property which arise from Apartment Owner's, its agents,
contractors or employees, use of the Temporary Construction Easement, or any damage or
destruction to the Church Property caused by Apartment Owner, its agents, contractors or
employees, as a result of its use of the Temporary Construction Easement. The Temporary
Construction Easement shall automatically terminate upon the earlier of: (a) completion of
construction of the Improvements and dedication of the Water Utility Line to the City of Atlantic
Beach,Florida,or(b)the date which is twenty-four(24)months from the date hereof.
2. Notification. Apartment Owner shall give five (5) days written notice to the
Church in advance of performing any construction work within the Easement Area. In addition,
Apartment Owner will make available to the Church a contact person seven (7) days a week to
take the call from the Church for any issues that arise during the term of the Temporary
Construction Easement. The initial contact person shall be William Norris, who can be reached
at(404)367-6523.
3. No Sunday Work; Church Activities. On Sundays, Apartment Owner agrees that,
during the term of the Temporary Construction Easement, it shall not perform,nor permit any of
its agents, contractors or employees to perform , any construction work on the Church Property
which has otherwise been authorized under this Agreement. Apartment Owner also agrees to
make good faith efforts to minimize any impact on the activities of the Church on the Church
Property during the term of the Temporary Construction Easement and shall take no actions
which will restrain or otherwise prevent the Church from engaging in any indoor activities at any
time or from engaging in any outdoor gatherings outside of the Easement Area from 8:00 am to
11:00 pm.
4. Construction. Apartment Owner shall, at its sole cost and expense, construct and
complete the Improvements. Such construction shall be performed and completed in a good and
workmanlike manner, and pursuant to all permits, authorizations and approvals as may be
required by the applicable governmental authorities.
2
5. Post-Construction Maintenance, Repair and Operation. The Apartment Owner
shall be responsible for the maintenance, repair and operation of the Sidewalk after completion
of the construction thereof. The Apartment Owner and the Church acknowledge and agree that,
upon dedication of the Water Utility Line, the City of Atlantic Beach, Florida shall be
responsible for the maintenance, repair and operation of the Water Utility Line after completion
thereof.
6. Restrictive Covenant; Other Agreements. The Apartment Owner covenants and
agrees that the area of the Apartment Property which extends fifty (50) feet south from the
northern boundary line of the Apartment Property (the "Restrictive Covenant Area") shall not
have a dumpster placed within it or otherwise be used for the permanent storage of maintenance
or other utility items (other than maintenance or utility items which may be stored within or
outside a dwelling and are the personal property of the occupant thereof). The Apartment Owner
also agrees to construct and maintain a privacy fence,of material and design to be selected by the
Apartment Owner in its sole and absolute discretion,that runs along(but not necessarily on) the
northern boundary of the Apartment Property. The Apartment Owner further agrees to maintain
a vegetation screening buffer, the species, spacing and design of which shall be selected by the
Apartment Owner in its sole and absolute discretion, between any improvements on the
Apartment Property and the Church Property. The provisions of this Section 6 shall survive the
termination of the Temporary Constructive Easement.
7. Duration; Running with the Land. Except as otherwise set forth herein, the
provisions of this Agreement shall run with arid bind title to both the Church Property and the
Apartment Property and shall remain in effect perpetually to the extent permitted by applicable
law.
8. Curative Rights in the Event of a Default. In the event that either party fails to
perform any obligation it is required to perform under this Agreement, the non-defaulting party
shall deliver notice of such failure to the defaulting party. Upon the receipt of such notice, the
defaulting party shall have fifteen (15)days to perform the relevant obligation.
9. Indemnity. Apartment Owner shall indemnify, defend, and save harmless the
Church from and against any and all third party claims, suits,demands, actions, fines, damages,
liabilities, costs and expenses suffered or incurred by the Church which results directly from any
of the Apartment Owner's activities on the Church Property,except to the extent that such claims
arise from the gross negligence or willful misconduct of the Church.
10. Miscellaneous.
(a) Governing Law. This Agreement shall be construed and interpreted under
the laws of the State of Florida.
(b) No Partnership or Joint Venture. This Agreement does not create an
association, partnership,joint venture or a principal and agency relationship between the parties
hereto.
3
(c) Cumulative Rights:No Waiver. Except as otherwise expressly set forth in
this Agreement, all rights, powers and privileges conferred hereunder upon the parties are
cumulative but not restricted to those given by law. No failure of any party to exercise any
power given such party hereunder or to insist upon strict compliance by any other party to its
obligations hereunder,and no custom or practice of the parties in variance with the terms hereof,
constitutes a waiver of any party's right to demand exact compliance with the terms hereof.
(d) Severability. Wherever possible, each provision of this Agreement will be
interpreted in such manner as to be effective and valid under applicable law,but if any provision
of this Agreement shall be prohibited by or invalid under such law, such provision is ineffective
to the extent of such prohibition or invalidity, without invalidating the remainder of such
provision or the remaining provisions of this Agreement.
(e) Amendments. Neither this Agreement nor any provision hereof may be
changed, waived, discharged, modified, or terminated orally, but only by an instrument in
writing signed by the party against whom enforcement of the change, waiver, discharge,
modification, or termination is sought.
(f) Notices. Any written notices required to be provided hereunder shall be
deemed delivered and received (a) as of the date of hand delivery; (b) as of the date that is one
(1) day following the deposit of such notice with a reputable national courier service for
overnight delivery; or (c) as of the date of such notice's transmission via electronic mail or
facsimile (with a hard copy of such notice to be sent by one of the other methods set forth in (a)
or(b)above): /,
Church: Sinvt&t ernmwn.12 audvin
2611ac�wcD- i
11fG4n11c t'�tv•h,1'L
32a?>
Attention: Se,,,,Ar KWh)r
Email: Sunnsear/wi.iAe sicrg
�ay.O
With a copy to: AJ4 vJ
Attention:
Email:
Apartment Owner:
c/o TriBridge Residential,LLC
1575 Northside Drive NW
Suite 200,Building 100
Atlanta,Georgia 30318
Attention: Steven Broome
Email: steveb@tribridgeres.com
4
TBR Aquatic Owner,LLC
c/o TriBridge Residential, LLC
1575 Northside Drive NW
Suite 200,Building 100
Atlanta, Georgia 30318
Attention: Katherine Mosley
Email: katherinem@t,ribridgeres.com
With a copy to: Nelson Mullins Riley&Scarborough LLP
201 17th Street NW,Suite 1700
Atlanta,Georgia 30363
Attn: Eric Wilensky
Email: eric.wilensky@nelsonmullins.com
Or such other address as may be provided to the other party in writing.
(g) Further Assurances. The parties to this Agreement agree to cooperate with
one another in executing any additional documents or agreements necessary to carry out the
covenants contained in this Agreement.
(h) Counterparts. This Agreement may be signed in counterparts which,when
assembled,constitute one agreement.
5
IN WITNESS WHEREOF, each of the parties hereto has caused these presents to be
signed by its respective duly authorized officer or representative, and its seal to be affixed hereto,
as of the day,month and year first above stated.
WITNESSES: APARTMENT OWNER:
TBR AQUATIC OWNER,LLC
.r l� a Delaware limited liability company
rint Name: Kevw‘ K ,\
By: �/ , /IAA
'rint Name: ( t.ueon Weicas wta, Name: o
•
Title: : - r•r\CLk1)
STATE OF i.J-Cv'r c a-- )
)SS:
COUNTY OF Coo 6 )
I HEREBY CERTIFY that the foregoing instrument was acknowledgN and executed
before this A day of. Pc p r i 1 , 2011, by rk- W4.4--, as of
�g r.��a-�( of
Tu. A$uakiC d wr n w, LLC, a Delaware limited liability company, on behalf of said limited
liability company. He is personall known to me or has produced
as identification.
Notary Public, State of 6.t-a-,5
Printed Name: VP-41,i a. act e/r S
My commission expires: [Notary Seal]
� G1DDFNs •
p 1U218 `_
OOO pUC5‘)C1cP [EXECUTION CONTINUES ON THE FOLLOWING PAGE]
�COUNT�'
6
WITNESSES: CHURCH:
SUNRISE COMMUNITY EVANGELICAL FREE
�- CHURCH,INC.,
a Florida not for profit corporation
Print Name: 141?-r"14i1(1.'
int t h^ Ork -lit ���� BY: 9/
nae Nam—e: / vyl A o.Ann0
Title: 1°� �Sr+
STATE OF fi 6\44 )
) SS:
COUNTY OF Sfi:AkAs )
I HEREBY CERTIFY that the foregoing instrument was acknowledged and executed
before this 5 " day of Or , 2011._by as Wes i i2c,-d'-------.of
Sunrise Community Evangelical Free Church, Inc., a Ft..ij.�.p,.,,iTf eh liwk,k,,, on behalf of eibritibo He is personally known to me or has produced
as identification.
•
4.
Notary Public, '411P-,of n
Printed Name: 0 tiet 4 . •Jou-)
My commission expires: [Notary Seal]
BEVERLY H.BIRTLEY
NOTARY PUBLIC
`r -STATE OF FLORIDA
�' Comm*EE215704
Expires 10/1W2016
WITNESSES: CHURCH:
SUNRISE COMMUNITY EVANGELICAL FREE
i T^� CHURCH,INC.,
Print Name: Da vie) Irl r a Florida not for profit corporation
� ,, -
Print Name:Rccs, v, •k—bJc ,rs By: 91/4 i 2-t ��
Name: mn �r�eter
Title: re ,4c,44I—
STATE OF 'f J h d- )
SI-, ) SS:
COUNTY OF 1011 rS )
I HEREBY CERTIFY that the foregoing instrument was acknowledged and.executed
before this day of , 20J p(by IVA.hergtzz..^, as (eStie.,..l' of
Sunrise Community Evangelical Free Church, Inc., a Ft. nos f,„prop,{(silty-14i , on behalf of said
eorrvitiiOn He is personally known to me or has produced
as identification.
Notary 'ublic, S of @evi 411
Printed Name: P Je/b A. r
My commission expires: [Notary Seal]
BEVERLY H.BIRTLEY
', NOTARY PUBLIC
STATE OF FLORIDA
` '' Comm#EE215704
Expires 10/16/2016
7
Exhibit A
Church Property
TRACT 1,AQUATIC GARDENS,AS RECORDED IN PLAT BOOK 38,PAGES 71 AND
71A OF THE CURRENT PUBLIC RECORDS OF DUVAL COUNTY,FLORIDA.
41
8
Exhibit B
Apartment Property
THAT CERTAIN PIECE, PARCEL OR TRACT OF LAND, SITUATE, LYING AND BEING A PART OF THE
CASTRO Y. FERRER GRANT, SECTION 38,TOWNSHIP 2 SOUTH, RANGE 29 EAST, DUVAL COUNTY,
FLORIDA,AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE SOUTHWEST CORNER OF THOSE CERTAIN LANDS SHOWN ON PLAT OF ROYAL
PALMS ACRES,AS RECORDED IN PLAT BOOK 34, PAGE 92 OF THE CURRENT PUBLIC RECORDS OF SAID
COUNTY;THENCE SOUTH 7° 16' 02" EAST ALONG THE WES I IRLY LINE OF THOSE CERTAIN LANDS
DESCRIBED IN DEED, RECORDED IN OFFICIAL RECORD VOLUME 3248, PAGE 509 OF THE CURRENT
PUBLIC RECORDS OF SAID COUNTY, 285.23 FEET TO THE SOUTHWEST CORNER THEREOF FOR A
POINT OF BEGINNING; THENCE CONTINUING SOUTH 7° 16' 02" EAST AND ALONG THE WEST UNE OF
THOSE CERTAIN LANDS DESCRIBED IN OFFICIAL RECORD VOLUME 2479, PAGE 717 OF SAID PUBLIC
RECORDS, 525.88 FEET TO A POINT SITUATE IN THE NORTHERLY RIGHT OF WAY LINE OF ATLANTIC
BOULEVARD (100-FOOT RIGHT OF WAY AS NOW ESTABLISHED);THENCE NORTH 89° 18' 38" EAST
ALONG SAID NORTHERLY RIGHT OF WAY LINE OF ATLANTIC BOULEVARD, 152.25 FEET TO ITS
INTERSECTION WITH THE WESTERLY RIGHT OF WAY LINE OF AQUATIC DRIVE(A 60-FOOT RIGHT OF
WAY AS NOW ESTABLISHED); THENCE NORTH 7° 16' 02"WEST ALONG SAID WESTERLY RIGHT OF
WAY UNE OF AQUATIC DRIVE, 133.38 FEET TO AN ANGLE POINT IN SAID WESTERLY RIGHT OF WAY
UNE;THENCE CONTINUING ALONG SAID WESTERLY RIGHT OF WAY LINE OF AQUATIC DRIVE NORTH
11°42'30"WEST, 411.18 FEET TO A POINT SITUATE IN THE SOUTH LINE OF SAID LANDS DESCRIBED
IN OFFICIAL RECORDS VOLUME 3248, PAGE 509, THENCE SOUTH 82°43' 58" WEST ALONG SAID LAST
MENTIONED SOUTH UNE, 119.41 FEET TO THE POINT OF BEGINNING.
9
•
Exhibit C
Easement Area
• 150.° ——PROPOSED UnUTY ` 1 ,\
—..- — EASEMENT FORAWATER 1
— _' CONNECTION/
----'----- 4. i
UCTION ' Q �..
EASEMENT :11r 1 1
1 CRETE SIDEWALK . ',' �^
a.1JACENT TO PROJECT TYA
BOUND 4
.
lb
fegi
/Ac: ' b4 '
INN1IMN1IMN11 _ I1 44 111° MATCHUNEI,SEEABOVE ---
) Doom
CONSENT TO S'FORMWATER DETENTION POND
EASEMENT AGREEMENT
The undersigned (the "Church") hereby consents to that certain Stormwater Detention Pond
Easement Agreement (the "Easement Agreement") dated , 20_. and
recorded in Book ,Page ,Duval County, Florida real estate records, and agrees
that, by execution hereof, neither TBR Aquatic Owner, LLC ("TBR") nor the City of Atlantic
Beach ("COAB"), a corporate body politic, the grantee and grantor respectively under the
Easement Agreement, nor their respective successors and/or assigns, shall,by virtue of the grant
or exercise of the easements, rights and covenants set forth in the Easement Agreement, be in
violation of the covenants,restrictions and easements contained in that certain Corrective Special
Warranty Deed Including Covenants, Restrictions and Easements dated November 6, 2006 and
recorded in Book 13659, Page 2484, Duval County, Florida real estate records (the "Corrective
Special Warranty Deed"). Additionally, the Church hereby acknowledges and agrees that on
February 22, 2016 it reviewed the plans, specifications and site plans for the expansion of the
Stormwater Detention Pond (as defined in the Easement Agreement) to be performed by TBR
and COAB and does hereby provide its approval of said plans,specifications and site plans to the
extent the same is required under Section 9 of the Corrective Special Warranty Deed. TBR
agrees to indemnify, defend, and save harmless the Church from and against any and all third
party claims, suits, demands, actions, fines, damages, liabilities, costs and expenses suffered or
incurred by the Church which results directly from the expansion of the Stormwater Detention
Pond,except to the extent that such claims arise from the gross negligence or willful misconduct
of the Church.
[SIGNATURES OF CHURCH AND TBR ON FOLLOWING PAGES]
IN WITNESS WHEREOF, the Church and TBR have caused this consent to be signed
by its respective duly authorized officer or representative, and its seal to be affixed hereto, as of
the day,month and year first above stated.
WITNESSES: SUNRISE COMMUNITY EVANGELICAL
FREE CHURCH, INC., a Florida not for
jefFitit)' —
Print Name: Par,d T. M:/(,,, profit corporation
By: . 4
rint Name:bflCck Prtkmonde - Name: , 4.411 tk2aereC1.A.
Title: Prtcecttn�
STATE OF f1 D r i L _, )
) SS:
COUNTY OF YF-3-04-11-5 )
I HEREBY CERTIFY that the foregoing instrument was acknowledged and executed
before this 5517 day of *f rI I ,201‘ by as 1(e5i .e. -,- of
Sunrise Community Evangelical Free Church, Inc., a Florida not for profit corporation, on behalf
of said corporation. He/she is personally known to me or has produced
4.het as identification.
•
is-lk 4 r
Notary Public, fi of d ).9C t
Printed Name: GJ-rte S�:if
My commission expires: [Notary Seal]
BEVERLY H.BIRTLEY
NOTARY PUBLICSTATE OF FLORIDA
� -•,Is
° Com#EE24b104
Expires 10/15!2018
[SIGNATURE OF TBR ON FOLLOWING PAGE]
IN WITNESS WHEREOF, the Church and TBR have caused this consent to be signed
by its respective duly authorized officer or representative, and its seal to be affixed hereto, as of
the day, month and year first above stated.
WITN SSES: SUNRISE COMMUNITY EVANGELICAL
C � FREE CHURCH, INC., a Florida not for
Print Name: profit corporation
o' _L{Jl „; By:
(Prim Name: �i1(,� `r - ' 7:AS Name: r►inn • e/soream
Title: precut,vt f-
STATE OF non )
COUNTY OF St,J 045 ) SS:
I HEREBY CERT Y that the foregoingstrument was acknow dged and executed
before this 'S day of ( I t , 20k by Ia&t} +' 2m.- , as lts;ki,t-- of
Sunrise Community Evangelical Free Church, Inc., a Florida not for profit corporation, on behalf
of said corporation. He/she is personally known to me or has produced
as identification.
/ DC1 (t
,.%
Notary Publi r+atef ,
Printed Name: f 2iu �►if y
My commission expires: [Notary Seal] U
A BEVERLY H.BIRTLEY
�" NOTARY PUBLIC
-STATE OF FLORIDA
v�• Comm EE215704
• •
Expires 10/15/2016
[SIGNATURE OF TBR ON FOLLOWING PAGE]
WITNESSES: TBR:
TBR AQUATIC OWNER,LLC
a Delaware limited liability company
P nt N e: )6vwv, Kz,%\r •
By: 4A __
Print Name: t.>\ld tAki%v Name:
Title: ;1 erect c
STATE OF C ccs-n' a- )
) SS:
COUNTY OF Co b6 )
I HEREBY CERTIFY that the foregoing instrument was acknowledged and executed
t�
before this 2l S day of Pty�; , 20 l b by glae.rk _N e (!V}he��4 �sir , as s',",nti.4-o r 1 of
ua Gyj((Nen/ , LLC, a Delaware limited liability company, on behalf of said limited
liability
company. He is person lv knmw _t0 me _ or has produced
as identification.
Notary Public, of la t e 0--
Printed Name: leo t- G total(. .S
My commission expires: [Notary Seal]
. V p,
�' oTnGIDRyV s
p(p 11123Ro16
k%otisUN-MG:/t.‘