Loading...
153 OCEAN GATE DR - EARLY POWER 09/07/2016 08:40 904-2490703 BROOKS AND LIMBUAGH PAGE 01/04 EARLY POWER AGREEMENT & RELEASE �Y. CITY OF ATLANTIC BEACH w Electric power is requested now under the conditions and terms.of this fully executed Agreement&Release Job Address: 15 0 Permit No. i L ._ Service Type(Circle One): Overhead ndergro nd We,the undersigned General Contractor and Electrician,understand and agree: 1. "Early Power" is purely for our construction convenience, it is not required by Codes and does Ito substitute uband as su h s at althds tion of the the Bu ding t ca of Occupancyjt�at must be issued before occupancy 2. The City of Atlantic Beach will matte,a special inspection prior to,the early power energizing. All rougi inspections must have prior Approval, including meter base connections. 3. eOccupancy lec ncuservicuse e. Sucthe new h action isAstruction before a expressly prohibited amend pennaO�dhby Thetutes a City not use eBe cI Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric servica after a twenty-four hour notice. 4. "Early Power"release authority is the Electrician and/or the Contractor and must not occur before: a. Equipment,devices and fixtures are installed(or blanked off)safely. b. Panel is complete with breakers and cover,and(labeling required at final inspection). c. Service connection and'grounding is complete. d. The electric system has safely ed through electrical check. .. e. Meter can is permanent)ywith address. f. Temporary address numbers displayed(Permanent numbers are required for C/O). 5. This fully completed formis to be submitted to the Building Department by hand;mail or fax. 6. Future such Agreements will not be accepted from those who violate any one of the above items. I. (,) DATE CONTRACTOR PRINT NAME , tatDir� I �ELECTRICIAN PRINT NAME CA\,.7 800 Seminole Road,Atlantic Beach FJ.,32233 Phone:(904)247-5826 Fax:(904)247-5845 http://www.coab.us revised 01 30 09