129 Donner Rd revised energy sheets Ask CITY OF ATLANTIC BEACH
800 Seminole Road
Atlantic Beach,Florida 32233
Telephone(904)247-5800
- FAX(904)247-5845
REVISION REQUEST SHEET OR
CORRECTIONS TO REVIEW COMMENT
Date: !G—,l Y—/G Received by: Resubmitted:
Permit Number. Ib •SF4T -! tqN
Original Plans Examiner: Project Name:
Project Address: lag 7aviu �fO.aht , r(-r 3Y233
Contractor: Elite- &'Vom //ur,e>r/I,r�d.bo+, �r.,c Contact Name: i
ContactPhone : 90y. 686-4$I1 Contact a-mail: 3X ro.v5trv-rlo064 .J uk00,lo/Yt
Revision/Plan Check/Permit Fee(s)Due: $ SO.00
Descrition of Pro osed Revision to Existin Permit:
e f
OC
I
Additional Increase in Building Value: S (Z( Additional S.F.
Site Plan Revised: ND Public W/U Approval:
By signing below.l(prim none) cKt B ` affrm that the above revision
is inclusive of[M1 posed changes.
s / loflgllb
Signa of atraMorl Age fccvmma«� �e�gn aaaRme in urnmwn> Date
ora«uu rMi>
Appmved: X_ ajwcd: N«inedby:
Plan view Comments: / !� /
my ac scb � , }�sa4_ �crscan I+ Se T. bolra roAfzc4d%\,
eM review required Y No
wilding
P Zoning
Tree Administrator Plans Examiner
Public Works G y-t b
Public Willes --- --
Public Safely
Date AmiMLls M.l
Fire Services
1
FORM R405-2014
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and Professional Regulation
Simulated Performance Alternative(Performance) Method
Applications for compliance with the 2014 Florida Building Code, Energy Conservation via the
residential Simulated Performance method shall include
❑ This checklist
❑ A Form R405 report that documents that the Proposed Design complies with Section
R405.3 of the Florida Energy Code. This form shall include a summary page
indicating home address, a-ratio and the pass or fail status along with summary
areas and types of components, whether the home was simulated as a worst-case
orientation, name and version of the compliance software tool, name of individual
completing the compliance report(1 page)and an input summary checklist that can
be used for field verification (usually 4 pagesrmay be greater).
❑ Energy Performance Level(EPL)Display Card(one page)
❑ Mandatory Requirements(three pages)
Required prior to CO for the Performance Method:
❑ Air Barrier and Insulation Inspection Component Criteria checklist(Table R402.4.1.1 -
one page)
❑ A completed Envelope Leakage Test Report(usually one page)
❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed
Form R405 Duct Leakage Test Report(usually one page)
REVISION
BP# /G- '5F'/97-- 1'/92/
DATE !O 2 ( l r 6
SIGNED I'll p
10/14/2016 2:2]:25 PM EnergyGaugeO-USRCZB v5.1 Page 1 of 1
OFFICE COPY
FORM R405-2014
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Protect Name: ECHunt3 Builder Name: File Custom Homes and Renovations
Street: Donner Rd Permit Office:
City,State,Zip: Atlantic Beach FL, Permit Number:
Amer Lambeitson Jurisdiction: 261100111
Design Location: FL,Jacksonville County:: Duval(Florida Climate Zone 2)
1. New construction or existing New(Fmm Plans) 9. Wall Types(1284.0 sgft.) Insulation Area
2. Single family or muaiple family MuWamily a.Frame-Wood,Exterior R=19.0 1204.00fl
b.Frame-Wand,Adjacent R=19.0 80.00 fP
3. Number of units,0 multiple family 1 &NIA R= ft
4. Number of Badreoms 3 d.WA R= IF
5. Is lois a worst case? No 10.Calling Types (773.0 sgfl.) Insulation Area
a.Under Attic(Verted) R=38.0 773.00 IF
6. Conditioned floor area above grade(ft') 1518 It.WA R= IF
Conditioned Door area below grade(W) 0 c WA R= ft
11.Duds R ft-
7.
]. Windows(139.5 sgfl.) Desaiplion Area a.Sup:Attic,Ret Attic,AH'. Bathroom 1 B 303.66
a. UFactor: Diol,U=0.35 121.50 ft'
SHGG SHGC-0.30
It. UFactor. Dbl,U=0.30 18.00 f? 12.Cooling systems k8tu/hr Efficiency
SHGC: SHGG-0.35 a.Central Unit 36.0 SEER-15.00
o. UFactor WA ft'
SHGG 13.Heating systems kBluthr Efficiencyd. U-Factor: Wa
A fl .Electric Heal Pump 36.0 HSPF:8.50
SHGC:
Area Weighted Average overhang Depth: 1.500 If
Area Weighted Average SHGC: 0.306 14.Hot water systems
8. FWr Types (1518.0 sgfl.) Insulation Area a.Electric Cap:40 gallons
EF:0.950
a.Foo-Over Other Space R=I 9A 770.00 fl' b. Conservation features
b.Slab-On-Grade Edge Insulation R=0.0 748.00 fl' Npnp
c.Wfl
A R= ' 15.Credits CF,Pstal
Glass/Floor Area: 0.092 Total Proposed Modified Loads: 35.98 PASS
Total Baseline Loads: 38.04
hereby certify that the plans and specifications covered by Review of the plans and
,114ES7421,
this calculation are in compliance with the FPride Energy specifications covered by this ��, ' - FOS,
Code. /Y/ calculation indicates compliance
with the Florida Energy Code. F ����„ °•��O
PREPARE/p B�Y: ' a r`i� l Before construction is completed
DATE: _" B . this building will be inspected for t1 a
compliance with Section 553.908 as °
I herebycert that this building, Florida Statutes.
dy rg,as designed,is in compliance ti
with the Florida Energy Code./ COO WE
OWNER/AGENT_ BUILDING OFFICIAL: ✓� C-
DATE: /C /q(r� DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factorys aled in accordance with R403.2.2.1.
-Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and an envelope leakage
test report in accordance with R402.4.1.2.
REVISION
BP# I& - 5r/FT -1Y9y
DATE !C7 La `// /
10I1/2016 2:37 PM EnegyGauge@USA-FlaRes2014 Section R4054.1 SC�weof .�•.,Its Pap 1M5
FORM R405-2014
PROJECT
Title: ECHunit3 Bedrooms: 3 Address Type. Street Address
Building Type: User Conditioned Area: 1518 LOIM
Owner: Lambedson Total Stores: 2 Block/SubDiAsion:
#of Units: 1 Worst Case: No RmBook:
Builder Name: Elite Custom Homes and Ren Rotate Angle: 0 Street: Donner Rd
Permit Office. Cross Ventilation. County: Duval
Jurisdiction: 261100111 Whole House Fan: City,State,Zip: Atlantic Beach,
Family Type: MultifamilyFL,
New/Existing: New(From Plans)
Comment:
CLIMATE
/
ECC Design Temp Int Design Temp Heating Design Daily Temp
V Design Location TMY Site Zone 975% 25% Winter Summer Degree Days Moisture Range
FL,Jacksonville FL_JACKSONVILLE_INT 2 32 93 70 75 1281 49 Medium
BLOCKS
Number Name Area Volume
1 - Blockl 1518 12144
SPACES
Number Name Area Volans Kdonerr Ooagmrb Bedrooms WIN IO Finished Cooled Heated
1 Living Room 340 2720 No 2 1 Yes Yes Yes
2 Dining Room 238 1904 No 2 0 1 Yes Yes Yes
3 Kitchen 170 1380 Yes 2 0 1 Yes Yes Yes
4 Bedroom 3 180 1440 No 0 1 1 Yes Yes Yes
5 Bedroom 2 280 2240 No 0 1 1 Yes Yes Yes
6 Bathroom 1 140 1120 No 0 0 1 Yes Yes Yes
7 Bedreaml 170 1360 No 0 1 1 Yes Yes Yes
FLOORS
# Floor Type Space Penn Mer Perimeter R-Value, Ane Jawt R-Value Tile Wood Carpet
1 Slab-OnCanade Edge Insulatio Living Room 37 fl 0 340 ft- 0 1 0
2 Slzh-On-Grade Edge Insulatm Dining Room 14 fl 0 238 f — 0 1 0
3Slab-On-Grade Edge Insulate Kitchen loft 0 170X' _ 1 0 0
4 Floor Over Other Space Bedroom 3 _ _ 180 X' 19 0 0 1
5 Floor Over Other Space Bedroom _ _ 280X' 19 0 0 1
6 Floor Over Other Space Bathroom 1 140 W 19 1 0 0
7 Floor Over Other Space Bedroom 1 170 f' 19 0 0 1
10/14/2016 227 PM EnegyGauge®USA-FlaRes2014 Section 8405.4.1 Compliant Software Page 2 of 5
FORM R405-2014
ROOF
/ Roof Gable Root Solar SA Emit Earth Deck Pitch
V i Type Materials Area Area Color AbsorTested Tested Insul. (deg)
1 Nip Composition shingles 1637W 0 f Medium 0.% No 0.9 No 0 226
ATTIC
1/ # Type Ventilation Vent Radio(I in) Am RBS IRCC
I Full a8ic Vented! 300 15116' N N
CEILING
# Ceiling Type Spare R-Vakie 1.Type Nee Framing Frac Truss Type
_ 1 Under Attic(Venbad) Living Room 38 Blom tfl' 0.11 Waco
2 Under Attic(Vented) Dining Room 38 Blown 16' 0.11 Wood
3 Bonder Attic(Varied) Kitchen 38 Blown 1fi' 0.11 Wood
4 UMer Attic(Vented) Bedroom 38 Blown 180fl 0.11 Wood
5 Umler Attic(Venal Bedroan2 38 Blown 280W 0.11 Wood
6 Umler Attic(Vented) Bathroom 1 38 Blown 140 W 0.11 Wood
7 Under Attic(Vented) Be .I W Blown 170 ft' 0.11 Wood
WALLS
AcRacent Cavity Wkith Height Sheathing Finish" Solar Below
To Well Type Space R-Value Ft In Ft - Fri.._.._Aneat R-Value,..Fra[Son__Ahsor__Grade%
1 W Exterior Frame-Wood Living Room 19 9 8 72.0 ft' 0.23 0.75 0
2 N Exterior Frame-Wood Living Room 19 17 8 136.0ft 0.23 0.75 0
_ 3 E Extenor Frame-Wood Living Room 19 20 8 160.0 IF 0.23 0.75 0
4 E Exterior Frame-Wood Dining Room 19 14 8 112.0 ft' 0.23 0.75 0
5 E Garage Frame-Wood Kitchen 19 10 8 80.06' 0.23 0.75 0
6 W Exterior Frame-Wood Becraon3 19 9 8 72.011' 0.23 0.75 0
-7 N Exterior Frame-Wood Bachman 3 19 17 8 136.0 ft' 0.23 0.75 0
8 E Exterior Frame-Wood Bedroom3 19 10 6 8 84.06' 0.23 0.75 0
9 N Edenor Form-Wood Bedroom 19 3 8 24.0 R' 0.23 0.75 0
10 E Exterior From-Wood Bedroom 2 19 14 8 112D ft' 0.23 0.75 0
11 E Exterbr Frame-Woad Bathroom 19 7 8 56.06' 0.23 0.75 0
12 S Exterior Frame-Wootl Bedrooml 19 3 B 24.0R 0.23 0.75 0
13 E Dderior Frame-Woad Bedroom 19 10 8 80.06' 0.23 0.75 0
14 S Exterior Frame-Wood Bedroom l 19 17 8 M.0 IF 0.23 0.75 0
DOORS
is Chat Door Type Space Stmmrs U-Vekm Width height Arm
Ft In Ft In
1 E Inflated Dining Room Nona .46 3 8 246'
10/142016 2:27 PM EnegyGauge®USA-FlaRes2014 Section R405.4A Compliant Software Page 3 of 5
FORM R405-2014
WINDOWS
Onentation shown Is the entered Proposed orientation.
Wall Overhang
V N Dart ID Frame Panes NFRC U-Factor SHGC Area Depth Separa6pn 1M Shathe Screening
1 N 2 Vinyl Double(Tinted) Yes 0.35 0.3 48.0 fl' ifl6 in 81t0in Drapes/blintls None
2 E 3 Vinyl Double(Tinted) Yes 0.35 0.3 12.5 IF i It 6 in 8 it D in Drapes/blinds None
3 E 4 Vinyl Double(Tinted) Yes 0.35 0.3 25.0 IF 1It6m 8it0 in Drapes/blinls None
4 N 7 Vinyl Double Printed) Yes 0.35 0.3 18.0 fl' iftfi in 880 in Drapes/blinds None
5 E 10 Vinyl Double(Tinted) Yes 0,35 0.3 18.08' 186 in 880 in Drapes/blinds None
6 S 14 Vinyl Double(Tinted) Yes 0.3 0.35 18.08' 186 in 880 in Drapes/blinds None
GARAGE
i Floor Area Ceiling Ansa Exposed Wall Perimeter Avg,Wall Height Exposed Wall Insulation
1 336 8' 336 IF 64 tt 88 1
INFILTRATION
i Scope Method SLA CFM 50 EIA Ei ACH ACH 50
1 Wholehouse Proposed AGI-ki .000246 978.9 5374 101.06 .2331 4.8383
HEATING SYSTEM
77 i Syelem Type SuWype Efficiency Capacity Block Ducts
1 Eleutdc Heat Pump None HSPF:8.5 36 kBm/hr 1 sys#1
COOLING SYSTEM
i System Type Subtype Efficiency Capacity Air Flow SHR Bbd Ducts
1 Central Unit None SEER. 15 36 kBtu/hr 1080 c8n 0.75 1 avast
HOT WATER SYSTEM
# System Type Subi Location EF Cap Use Se1Pnt Conservation
I Electric None Kitchen 0.95 40 gal 60 gal 120 deg None
SOLAR HOT WATER SYSTEM
FSEC Collector Storage
Carr If Company Name System Model# Colleclm Madeti Area Volume FEF
None None fl'
DUCTS
—Supply— —Return Air CFM 25 CFM25 HVAC#
V # Location R-Value Area Location Area Leakage Type Handler TOT OUT ON RLF Heat Cool
1 Attic 6 303.68 Attic 75.9fi Default Leakage Bathroom (Defauh) (Default) 1 1
10/14/2016 2:27 PM EnergyGauge®USA-FlaRerri Section R405.4.1 Compliant Software Page 4 of 5
FORM R405-2014
TEMPERATURES
Progra nablfe 1Thermosta[t:'Y f , ` ] Ceiling Fans. fD('� ]I �p(]� rf 'Oct (gI1� I[X1]
HeatDec
ing DH Jan DG Feb DH Mar 1 1 yy n JunJun [ ]Jul ]Aug [ ] g[7 Oct R[)Nov ' ]Dec
Dec
Venting I 1 Jan I 1 Feb I1(1 Mar lXl
Thermostat Schedule: HERS 2006 Reference Hours
Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12
Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 80
PM 80 80 78 78 78 78 78 78 78 78 78 78
Cpoling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78
PM 78 78 78 78 78 78 78 78 78 78 78 78
Heating(WD) AM 66 66 66 66 66 68 68 68 68 68 68 68
PM 68 68 68 68 68 68 68 68 68 68 66 66
Heating(WEH) AM 66 66 66 fib 66 68 68 68 68 68 68 68
PM 68 68 68 68 68 68 68 68 68 68 66 66
10/14/2016 2:27 PM EnergyGauge®USA-FlaRes2014 Section R4054.1 Compliant Software Page 5 of 5
FORM R405-2014
Florida Department of Business and Professional Regulations
Residential Whole Building Performance and Prescriptive Methods
ADDRESS: Donner Rd Permit Number:
Atlantic eeaO FL,
MANDATORY REQUIREMENTS See individual code sections for full details.
13 401.3 Energy Performance Level(EPL)display card(Mandatory). The building official shall require that an energy performance level(EPL)
display card be completed and certified by the builder to be accurate and wriect before Mal approval of the building for occupancy.Florida law
[Section 553.9085,Florida Statues]requires the EPL display card to be included as an addendum to each sales contract for both presold and
nonpresold residential buildings.The EPL display card contains information indicating the energy Performance level and efficiencies of components
installed in a dwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans
and specifications submitted to demonstrate compliance for the building.A copy of the EPL display card can be found in Appendix C.
13 R402.4 Air leakage(Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of
Sections R402.1 through R402.4.4.
O R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sections R402A.1.1 and R402.4.1.2,The
sealing methods between dissimilar materials shall allow for differential expansion and contraction.
• R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in
accordance with the manufacturers instructions and the criteria listed in Table 402.4.1.1,as applicable to the method of construction.
Where required by the code official,an approved third party shall inspect all components and verify compliance.
• R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air
changes per hour in Climate Zones 1 and 2,and 3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with
a blower door at a pressure of 0.2 inches w.g.(50 Pascals).Where required by the code official,testing shall be conducted by an
approved thinl party.A written report of the results of the test shall be signed by the party conducting the test and provided to the code
official.Testing shall be performed at any time after creation of all ametretions of the building thermal envelope.
During testing:
1. Exterior windows and doors,fireplace and stove tloors shall be closed,but not sealed,beyond the intended weatherstnpping or
other intimation control measures;
2. Dampers including exhaust,intake, makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended
infiltration control measures;
3. Interior doom,if installed at the time of the test,shall be open;
4.Exterior tloors for continuous ventilation systems and heal recovery ventilators shall be closed and sealed;
5.Healing and cooling systems,if installed at the time of the test,shall be turned off,and
6.Supply and return registers,it installed at the time of the test shall be fully open.
O R402.4.2 Fireplaces. New wood-burning fireplaces shall have tight-lifting flue dampers and outdoor combustion air.
O R402.4.3 Fenestration air leakage.Windows,skylights and sliding glass tloors shall have an air infiltration rate of no more than 0.3 Cho
Per square foot(1.5 Ustm2),and swinging tloors no more than 0.5 cbn per square foot(2.6 IJs/m2),when tested according to NFRC 400 or
AAMAANDMA/CSA 101 fi.&VA440 by an accredited,independent laboratory and listed and labeled by the manufacturer.
Exception: Site-built windows,skylights and doors.
O R402.4.4 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall Da sealed to limit air leakage
between conditioned and unconditioned spaces.All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not
more than 2.0 cfm(0.944 Vs)when tested in accordance with ASTM E 283 at a 1.57 psf(75 Pa)pressure differential.All recessed
luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
0 R403.1.1 Thermoslat provision(Mandatory). At least one thermostat shall be provided for each separate heating and cooling system.
0 R403.1.3 Heat pump supplementary heat(Mandatory). Heat pumps having supplementary electric-resistance heat shall have controls
that,except during defrost,prevent supplemental heat operation when the heat pump compressor can meet the heating load.
O R403.2.2 Seding(Mandatory)All ducts,air handlers,and filter boxes and building cavities that forth the primary air containment
passageways for air distribution systems shall W considered duds and plenum chambers,shall be constructed and sealed in accordance
with Section C403.2.7.2 of the Commercial Provisions of this code and shall W shown to meet duct tightness arteria by past-construction
or rough-in testing below.
Dud tightness shall be verified by testing to Section 803 of the RESNET Standards by either an energy rater certified in accordance with Section
553.99,Florida Statutes,or as authorized by Florida Statutes,to be'substantially leak free"by either of the following:
1. Post-construction lest:Total leakage shall be less than or equal to 4 drn(113 L/min)per 100 square feel(9.29 m2)of conditioned floor area
when tested at a pressure differential of 0.1 inches w.g.(25 Pa)across the entire system,including the manufacturer's air handler enclosure.All
register boots shall W taped or otherwise sealed during the lest.
2. Rough-in test:Total leakage shall be less than or equal to 4 cfm(113 Umin)per 100 square feet(9.29 m2)of conditioned floor area when tested
at a pressure differential of 0.1 inches w.g.(25Pa)across Me system,including the manufacturers air handler enclosure.All registers shall be
taped or otherwise sealed during the test.If Me air handler is not installer)at the time of the test,total leakage shall be less than or equal to 3 cM
(65 Vmin)per 100 square feel(9.29 m2)of wnditionetl floor area.
Exceptions:
1. The total leakage lest is not required for duds and air haddlers located entirely within the building envelope.
2. Dud testing is not mandatory for buildings complying by Section R405 of this code.
10/14/2016 2:27 PM EnergyGauge®USA-FlaRes2014 -Section R405 4.1 Com Page 1 of 3
FORM R405-2014
MANDATORY REQUIREMENTS - (Continued)
❑ R403.2.3 Building Cavities(Mandatory). Building forming cavities shall not be used as ducts or plenums.
❑ R403.3 Mechanical system piping insulation(Mandatory). Mechanical system piping capable of carrying fluids above 105°F(41°C)
or below 55°F(13°q shall be insulated to a minimum of R-3.,
R403.3.1 Protection of piping insulation.
❑ R403.4.1 Circulating hotwatersystems(Mandatory). Circulating hot water systems shall be provided with an automatic or readily
accessible manual switch that can tum off the hot-water circulating pump when the system is not in use.
❑ R1103.4.3 Heat traps(Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have
beat traps installed on both the inlets and outlets.External heal traps shall consist of either a commercially available heal hap or a
downward and upward Wind of at least 3 X inches(89 mm)in the hot water distribution line and cold water line located as close as possible
to the storage tank.
❑ R403.4.4 Water heater efficiencies(Mandatory).
p R403.4.4.1 Storage water heater temperature controls
R403.4.4.1.1 Automatic controls. Service water heating systems shall be equipped with automatic temperature controls
capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use.The minimum
temperature selling range shall be from 100'F to 140'F(38'C to 60'C).
11403.4.4.1.2 Shutdown. A separate switch or a clearly marked circuit breaker shall be provided to park the power supplied
to electric service systems to be turned off.A separate valve shall be provided to peril the energy supplied to the main bumer(s)
of combustion types of service water healing systems to be fumed off.
p R403.4.4.2 Water heating equipment. Water heating equipment installed in residential units shall meet the minimum efficiencies of
Table C404.2 in Chapter 4 of the Florida Building Code,Energy Conservation,Commercial Provisions,for the type of equipment installed.
Equipment used to provide heating functions as pan of a combination system shall satisfy all stated requirements for Me appropriate water
healing category. Solar water heaters shall met the ortera Section R403.4.4.2.1.
R403A.4.2.1 Solar water heating systems. Solar systems for domestic hot water production are rated by the annual solar energy
factor of the system.The solar energy factor of a system shall be deterinetl from the Florida Solar Energy Center Directory of
Certified Solar Systems.Solar collectors shall be tested in accordance with ISO Standard 9806,Test Methods for Solar Collectors,
and SRCC Standard TM-1,Solar Domestic Hot Water System and Component Test Protocol,Collectors in installed solar water
healing systems should meet the following criteria:
1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal;and
2. Be installed man orientation within 45 degrees of true south.
❑ 11403.6 Mechanical ventilation(Mandatory). The building shall be provided with ventilation that meets the requirements of the
Florida Building Code,Residential or Florida Building Code,Mechanical,as applicable,or with other approved means of ventilation.
Outdoor surname and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating.
❑ R403.6 Heating and cooling equipment(Mandatory). The following sections are mandatory for cooling and heating equipment.
0 R403.6.1 Equipment sizing. Heating and cooling equipment shall De sized in accordance with ACCA Manual S based on the
equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies,
based on building loads for the directional orientation of the building.The manufacturer and model number of the outdoor and
indoor units ff split system)shell be submitted along with the sensible and total cooling capacities at the design conditions
described in Section R302.1.This code does not allow designer safety factors,provisions for future expansion or other factors
which affect equipment sizing.System sizing calculations shall not include loads created by local interitient mechanical ventilation
such as standard kitchen and bathroom exhaust systems.
• R403.6.1.1 Cooling equipment capacity. Cooling only equipment shalt be selected so that its total capacity is net less than the
calculated total load,but not more than 1.15 times greater than the total load calculated recording to the procedure selected in
Section 403.6,or the closest available size provided by the manufacturers product lines.The corresponding latent capacity of the
equipment shall not be less than the calculated latent load.
10H4120162:27 PM EneigyCauge®USA-FlaRes2014 -Section R405.4.1 Com Page 2 of
FORM R405-2014
MANDATORY REQUIREMENTS - (Continued)
0 8403.8.1.1 Cooling equipment capacity.(continued) The published value for AHRI total capacity is a nominal,rating-test value and
shall not be used for equipment sizing.Manufacture's expanded performance data shall be used to select cooling-only equipment.This
selection shall be used to select cooling-only equipment.This selection shall be based on the outdoor design dry bulb temperature for the
load calculation(or entering water temperature for water-source equipment),the blower cm provided by the expanded performance data,
the design value for entering wet bulb temperature and the design value for entering dry bulb temperature.
Design values for entering wet bulb and dry bulb temperature shall be for the indoor dry bulb and relative humidify used for the load
calculation and shall be adjusted for return side gains if the return quoits)is installed in an unconditioned space.
Exceptions:
1. Attached single-and multi-family residential equipment sizing may be selected so that its cooling capacity is less than the
calculated total sensible load but not less than 80 percent of that load.
2. When signed and sealed by a Florida-registered engineer,in attached single-and multi-family units,the capacity of
equipment may be sized in accordance with good design practice.
O R403.6.1.2 Heating equipment capacity
R403.6.1.2.1 Heat pumps. Heat pumps sizing shall be based on the cooling requirements as calculated according to Section
R403.6.1.1 and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load.
R403.6.1.2.2 Electric resistance furnaces. Electric resistance f rmaces shall be,sized within 4 kW of Me design
requirements calculated according to the procedure selected in Section R403.6.1.
R403.6.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmosphere bumers
shall not be less than the design load calculated in accordance with Section R403.6,1,
O R403.6.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or healing equipment capacity on an
intermittent basis,such as anticipated additional loads caused by major entertainment events,shall have equipment sized or controlled to
prevent wntinuous space cooling or heating within that space by one or more of the following options:
1. A separate cooling or healing system is utilized to provide cooling or heating to the major entenainmerd areas.
2. A variable capacity system sized for optimum performance during base load penods is utilized.
❑ R403.7 Systems serving multiple dwelling units(Mandatory). Systems serving multiple dwelling units shall comply with Sections
0403 and 0404 of the Commercial Previsions in lieu of Section 8403.
❑ R403.8 Snow matt system controls(Mandatory). Snow and ice-melting systems,supplied through energy service to the building,shall
include automatic controls capable of shutting off the system when the pavement temperature is above 557,and no precipitation is falling
and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40-F.
❑ R403.9 Swimming pools,Inground spas and portable spas(Mandatory). The energy requirements for residential pools and
inground spas shall be as specifed in Sections R403.9.1 through R403.9.3 and in accordance with ANSI/APSP-15.The energy
requirements for portable spas shall be in accordance with ANSI/APSP-14.
O R403.9.1 Pool and spa heaters. All pool healers shall be equipped with a readily accessible on-off switch that is mounted
outside the heater to allow shuding off the heater without adjusting the thermostat setting.
R403.9.1.1 Gas and oil-fired pool and spa heaters. All gas-and oil-fired pool and space heaters shall have a minimum
thermal efficiency of 82 percent for heaters manufactured on or after April 16,2013 when tested in accordance with ANSI Z 21.56.
Pool heaters fired by natural gas or LP gas shall not have continuously burning pilot lights.
R403.9.1.2 Heat pump Pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance
with AHRI 1160,Table 2,Standard Rating Conditions-Low Air Temperature.A test report from an independent laboratory is
required to verify procedure compliance.Geothermal swimming pool heat pumps are not required to meet this standard.
O R403.9.2 Time switches. Time switches or other wntrol method that can automatically tum off and on healers and pumps according to a
preset schedule shall be,installed on all heaters and pumps.Heaters,pumps and motors that have bulk in timers shall W deemed in
compliance with this equipment.
Exceptions:
• 1. Where public heats standards require 24-hour pump operations.
2. Where pumps are required to operate solar-and waste-heat-recovery pool heating systems.
3. Where pumps are powered exclusively from on-site renewable generation.
O R403.9.3 Covers. Heated swimming pools and inground permanently installed spas shall W equipped with a vapor-retardant cover on or
at the water surface or a liquid cover or other means proven to reduce heal loss.
Exception: Outdoor pools deriving over 70 percent of the energy for heating from site-recovered energy,such as a heat pump or
solar energy source computed over an operating season.
❑ RR404.1 Lighting equipment(Mandatory). A minimum of 75 percent of the lamps in Permanently installed lighting futures shall be
high-efficacy lamps or a minimum of 75 percent of permanently installed lighting fixtures shall contain only high efficacy lamps.
Exception: Low-voltage lighting shall not be required to utilize high-efficacy lamps.
O R404.1.1 Ligh0ngequipment(Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights
❑ R405.2 Performance ONLY. All ducts not entirety inside the building thermal envelope shell be insulated to a minimum of R-6.
O R406.2.1 Pedormanw ONLY. Ceilings shall have minimum insulation of R-19.Where single assemby of the exposed elect,and beam type or
concrete deck roofs do not have sufficent space,R-10 is allowed.
10/14/20162.27 PM EnergyGauge®USA-FlaRes2014 -Section R405.4.1 Cam Page 3of3
FORM R405-2014
ENERGY PERFORMANCE LEVEL (EPL)
DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 95
The lower the EnergyPerformance Index, the more efficient the home.
Donner Rd, Atlantic Beach, FL,
1. New construction or existing New(From Plans) 9. Wall Types Insulation Area
2. Single family or multiple family Multi-familya.Frame-Wood,Exterior R=190 1204.008
b.Frame-Wood Adjacent R=19.0 80.008
3. Number of units,d multiple family 1 c.NIA R= ft'
4. Number of Bedrooms 3 d,NIA R= 8
5. Is this a worst case? No 10.Ceiling Types Insulation Area
a.Under Attie(Vented) R=38.0 773.008
6. Conditioned Noor area(ft0 1518 to WA R= 8
7, Windows" Description Area c.N/A R= 8
a. U-Factor Dbl,U=0.35 121.508 11. Duds R 8
SHGCSHGC=0.30 a.Sup.Attic,Ret:Attic,AH:Bathroom 1 6 303.6
:
b. U-Factor: Obl,U=0.30 18.008
SHGC SHGC=0.35 12.Cooling systems kBtu/hr Efficiency
c U-Factor WA 8 a.Central Unit 36.0 SEER 15.00
SHGC:
tl. U-FacSHGC r: WA ft' 13.Heating systems k6tu/hr Efficiency
SHGC:
Aree Weighted Average Overhang Depth: 7.500 R. a.Electric Heat Pump 36.0 HSPFSs0
Area Weighted Average SHGC: 0.306
8. Floor Types Insulation Area 14.Hol water systems
Cap:4
a.Electric 0 9:10.95
a.Floor Over other Space R=79.0 770.008 EF:0.95
b.Slab-On-Grade Edge Insulation R=0.0 748.008 b. Conservation features
c.N/A R= 8
None
15.Credits CF,Petal
I certify that this home has complied with the Florida Energy Efficiency Code for Building FINE ST4p
Construction through the above energy saving features which will be installed(or exceeded) �o _ - ,
h0 Ib . , .n
Builder n nature: m is features.
Date: u +t 5
In this home before final inspection. Otherwise, I new PL Display Card will be completed
based on installed Code com iant feaWres.
0
Address of New Z4 '�wy� - &A City/FL Zip: f--t_ 33233
COUWE�J
`Note: This is riot a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient
mortgage(EEM)incentives if you obtain a Florida EnergyGauge Rating. Contact the EnergyGauge Hotline at(321)
638-1492 or see the EnergyGauge web site at energygauge.com for information and a list of certified Raters. For
information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support
staff.
"Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
10/14/2016 2:27 PM EnergyGauge®USA-FIaRes2014 -Section R405.4.1 Compliant Software Page 1 of 1
FORM R405-2014
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
project Name. ECHun63 Builder Name: Elite Custom Homes and Renovations
Street: Donner Rd Permit Office:
City,Stale,Zip: Atlantic Basion.FL permit Number.
Owner: Lambenson Jurisdiction: 261100111
Design Location: FL,Jacksonville
COMPONENT CRITERIA CHECK
Air barrier and thermal barrier A continuous air barrier shall be installed in the building envelope.
Exterior thermal envelope contains a continuous bamer.
Breaks or joints in the air barrier shall be sealed.
Air-permeable insulation shall not be used as a sealing material.
Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the
insulation and any gaps in the air barrier shall be sealed.
Access openings,drop down stairs or knee wall doors to unconditioned v
attic spaces shall be sealed.
Comers and headers shall be insulated and the junction of the foundation
Walls and sill plate shall be sealed.
The junction of the top plate and the top or exterior walls shall be sealed.
Exterior thermal envelope insulation for framed walls shall be installed in V/
substantial contact and continuous alignment with the air barrier.
Knee walls shall be sealed.
Windows, skylights and doors The space between window/doorjambs and framing and skylights and /
framing shall be sealed. V
Rim joists Rim joists are insulated and include an air barrier.
Floors (including above-garage Insulation shall be installed to maintain permanent contact with underside
and cantilevered floors) of subfloor decking.
The air barrier shall be installed at any exposed edge of insulation.
Crawl space walls Where provided in lieu of floor insulation, insulation shall be permanently
attached to the crawlspace walls. )/
Exposed earth in unvented crawl spaces shall be covered with a Class I
vapor retarder with overlapping joints taped.
Shafts, penetrations Duct shafts, utility penetrations,and flue shaft openings to exterior or
unconditioned space shall be sealed.
Narrow cavities Batts in narrow cavities shall be cut to ft,or narrow cavities shall be filled
by insulation that on installation readily conforms to the available cavity
spaca&
Garage separation Air sealing shall be provided between the garage and conditioned spaces.
Recessed lighting Recessed light fixtures installed in the building thermal envelope shall be
air tight, IC rated,and sealed to the drywall.
Plumbing and wiring Batt insulation shall be cut neatly to fit around wining and plumbing in
exterior walls,or insulation that on installation readily conforms to available
space shall extend behind piping and wiring.
Showerllub on exterior wall Exterior walls adjacent to showers and tubs shall be insulated and the air
barrier installed separating them from the showers and tubs. V
Electricagphone box on The air barrier shall be installed behind electrical or communication boxes Of
air sealed boxes shall be installed.
HVAC register boots HVAC register boots that penetrate building thermal envelope shall be Vsealed to the sub-floor or drywall.
Fireplace An air banner shall be installed on fireplace walls. Fireplaces shall have
gasketed doom
10/14/2016 2:27 PM EnergyGauge®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 1 of 1
FLORIDA ENERGY EFFICIENCY CODE
FOR BUILDING CONSTRUCTION
Envelope Leakage Test Report
Prescriptive and Performance Method
Project Name: ECHunit3 Builder Name: Elite Custom Homes and Rerwvabons
Street: Donner Rd Permit Office:
City.State,Zip: Atlantic Beach,FL, Permit Number:
Design Location: FL,Jacksonville Jurisdiction: 261100111
Cond.Floor Area:: 1518 sq.ft. Cord.Volume: 12144 co R.
Envelope Leakage Test Results Leakage Characteristics
Regression Data:
C: n: R: CFM(50):
Single or Multi Point Test Data
HOUSE PRESSURE FLOW: ELA.
1 Pa cfm EgLA:
2 ._... Pa cfm ACH:
3 Pa ctm ACH(50): _.
4 Pa - cfln
5 Pa._. curl SLA-
Per
LAPa ctm
R402.4.1.2 Testing. The building or dvrelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour
in Climate Zones 1 and 2,3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure of 0.2
inches w.g.(50 Pascals).Where required by the mtle official,testing shall be conducted by an approved third party.A written report of the results of the
test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all
penetrations of the building thermal envelope.
During testing:
1.Exterior windows and doors,fireplace and stove doom shall be closed,but not sealed,beyond the intended weatherstripping or other
Infiltration control measures;
2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration
control measures;
3. Interior doom,if installed at the time of the lest,shall be open;
4.Exterior doors for continuous ventilation systems and heal recovery ventilators shall be closed and sealed,
5.Heating and cooling systems,g installed at the time of the test,shall be turned off;and
6.Supply and return registers,'d installed at the time of the test,shall be fully open.
I hereby certify that the above envelope leakage Where required by the code official, FTHE ST4T
performance results demonstrate compliance testing shall be conducted by an y� ___ g,FW
with Florida Energy Code requirements in a
ppm of third party.A written
accordance with Section R402.4.1.2. report of the results of the test shall
be signed by the third party
Conducting the test and provided to
SIGNATURE: the code official.
PRINTED •I�COD wfi
�y ' BUILDING OFFICIAL: -
DATE: �(/ _. _. DATE:
10/14120162:27 PM EnegyGaugee,USA-FlaRes2014 -Section R4054.1 Compliant Software Pagel oft
Project Summary Job: ECHunit3
Entire House Date: Jun 06,1016
BY: Monies S.Baooa
For: Lambertson, Elite Custom Hanes and Renovations
Donner Rd. 3,Atlantic Beach, FI
Notes:
EL%LUULOINNI
Weather: Jacksonville, FL, US
Winter Design Conditions Summer Design Conditions
Outside db Outside db
Inside db 6B F 93 'F
Insitle db
Design TO 36 'F Design TO 75 18 'F
Daily range M
Relative humidity 50 y*
Moisture difference 52 gr/Ib
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 26759 Btuh Structure 18340 Btuh
Ducts 7131 Btuh Ducts
Central vent(0 otm) 0 Btuh Central veot 8727 Btuh
Humidification (0 cfm) 0 Stub
Piping 0 Btuh
3389Blower 0 Btuh
Equipment load 0 Btuh Use manufacturer's data
Infiltration Eatelswing multiplier 1.lNly
q pment sensible load 27067 Btuh
Methal Simplified Latent Cooling Equipment Load Sizin
Construction quality Average 9 q P ment g
Fireplaces 0 Structure 2688 Btuh
Area ft' Hea,n Cooling Central vent (0 cfm) 0 Btuh
Vdume(ft'
( )) Ducts 1946 Btuh
1912 1912 Equipment latent load 4635 Btuh
7464
Air changes/hour 10.5 10.26 Equipment total load 31701 Btuh
Equiv.AVF(cfm) 146 76 Req. total Capacity at 0.70 SHR 3.2 ton
Heating Equipment Summary Cooling Equipment Summary
Make Ruud Make Ruud
Trade RUUD Trade RUUD
Model RP1536AJlNA Cond RP153SAJlNA
AHRI ref 7512116 Coil RH1V3617STANJA
Efficient AHRI ref 7512116
Y 9 HSPF Efficiency 12.5 EER, 15 SEER
Heating input Sensible cooling 25200 Btuh
Heating output 35400 Btuh @ 47'F Latent cooling 10800 Stub
Temperatture rise 27 'F Total cooling 36000 Stuh
Actual air floor 1200 cfm Actual air flow 1200 cfm
Air ftav factor 0.035 dni/Btuh Air flow factor 0.044 cfm/Btuh pressure 0.5 in H2O Static pressure 0.5 in H2O
Space thermostat Load sensible heat ratio
Capacity balance point= 31 'F 0.85
Backup:
Input= 8 kW, Output=28971 Btuh, 100 AFUE
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
* wrightsofV RgMSRO U,Nm,1201717.0.09RSUUN5 3016. c-1811:59:91
_.arl*eum"ts% 1pMsa HV C\Dem*\ECHunil316.mp Ca -MJO Fm Dwf6 s E Pbe1
Load Short Form Jab: Jun 06,2
Date: Jun 04,2016
Entire House By: Monica S.Bac"
Project .
For: Lambertson, Elite Custom Homes and Renovatims
Donner Rd. 3,Atlantic Beach, FI
Design
Htg Clg Infiltration
Outside db(°F) 32 93 Method Simplified
Inside db(°F) 68 75 Construction quality Average
Design TO(`F) 36 18 Fireplaces 0
Daily range - M
Inside humidity (%) 50 50
Moisture difference(gr/Ib) 30 52
HEATING EQUIPMENT COOLING EQUIPMENT
Make Ruud Make Ruud
Trade RUUD Trade RUUD
Model RP1536AJlNA Cond RP1536AJlNA
AHRI ref 7512116 Call RH1V3617STANJA
AHRI ref 7512116
Efficiency 9 HSPF Efficiency 12.5 EER, 15 SEER
Heating input Sensible coding 25200 Btuh
Heating output 35400 Btuh @ 47°F Latent coding 10800 Btuh
Temperature rise 27 `F Total cooling 36000 Btuh
Actual air flan 1200 cfm Actual air flow 1200 cfm
Air Flow factor 0.035 cfm/Btuh Air flow factor 0.044 cfm/Btuh
Static pressure 0.50 in H2O Static pressure 0.50 in H2O
Space thermostat Load sensible hent ratio 0.85
Capacity balance point= 31 °F
Backup:
Input:= 8 kW Output 28971 %iih Inn A91 I
ROOM NAME Area Mg Wad CIg load HtgAVF CIg AVF
(ft') (Btuh) (Blah) (chn) (cfm)
Living Room 340 7910 4142 280 184
Dining Room 238 4131 3728 146 165
Kitchen 170 11889 6577 421 292
Garage 336 0 0 0 0
BR 3 238 3274 3225 116 143
BR 2 280 3980 7164 141 318
Bath 1 140 787 508 28 23
BR 1 170 1918 1723 68 76
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
20160[-18 1138:31
wrightsoft Rq -6u•eeoprvssaI20171.6.89RS 13 Py 1
aMmumeMaWhpinso HV CQDano\ECHunK316.mp Cek=MJ8 Fm Dm fa es. E
Entire House d 1912 33890 27067 1200 1200
Other equip loads 0 0
Equip. @ 1.00 RSM 27067
Latent cooling 4635
TOTALS 1912 33890 31701 1200 1200
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
,,ma�yy + WrIght5OTt' MgMSWi U.v M1717AWRSUIM6 an6a1-1811:56.31
�Rtirs .. Ppe3
a%DMumm$s WrVdsMHCkDemol CHmR316mp Calc=MJ6 FMDmrra'es: E
s
acca Manual S Compliance Report Job: Jun 06, 3
Date: Jun 88,3818
Entire House By: nonira&B9
Project Information
For: tambertson, Elite Custom Hanes and Renovations
Donner Rd. 3,Atlantic Beach, FI
Cooling Equipment
Design Conditions
Outdoor design DB: 92.8'F Sensible gain: 27067 Btuh Entering coil DB: 77.2°F
Outdoor design WB: 77.3°F Latent gain: 4635 Btuh Entering coil WB: 63.6°F
Indoor design DB: 75.0°F Total gain: 31701 Btuh
Indoor RH: 50% Estimated airflow: 1200 cfrn
Manufacturer's Performance Data at Actual Design Conditions
EquipmeMtype: SpIBASHP
Manufacturer: Ruud Model: RP1536AJ1NA+RH1V3617STANJA
Actual airflov: 1200 cfm
Sensible capacity: 28000 Btuh 103%of load
Latent capacity: 4910 Btuh 106%of load
Taal capacity: 32910 Btuh 104°/6 of load SHR: 85%
Heating Equipment
Design Conditions
Outdoor design DB: 31.8`F Heal loss: 338W Btuh Entering coil DB: 66.9"F
Indoor design DB: 68.0`F
Manufacturer's Performance Data at Actual Design Conditions
Equipmenttype: Split ASHP
Manufacturer: Ruud Model: RP1536AJ1NA+RH1V3617STANJA
Actual airflow: 1200 cfm
Output capacity: 35200 Btuh 104%of load Capacity balance: 31 °F
Supplemental heat required: 0 Btuh Economic balance: -99 °F
Backup equipment type: Elec strip
Manufacturer: Model:
Actual airflm 1200 cfm
Output capacity: 8.5 kW 85%of load Temp. rise: 50 -F
Meets are all requirements of ACCA Manual S.
^- # wrightSOft R,MSfte uNamai201717.0.WRsu12M 201&0d-18 11:58]1
Pepe 1
�iQ a\Dccumenu\WnpMaDX HVAC\Demo\ECHune316 mD Cab=MJB FmM Doariecw: E
4
Residential _ Examiner Review Form Form
RPER
7
for D- •n (Loads. EaUiDment. 75 Mar 09
wowt¢mem.am�
231100 III
Header Information
Contractor: REOUIREDATTACHMENTS ATTACHED
Manual J1 Form(and supporting worksheets): Yes ❑ No
Mechanical license: or MJtAE Form*(and supporting worksheets): Yes E] No
OEM performance data(heating,cooling,blower): Yes E] No
Building plan il: Manual D Friction Rate Worksheet: Yes E] No E]
Duct distribWon sketch: Yes [] No
Home address(Street or Loan,Block,Subdivision): Donner Rd. 3, Entire House
HVAC LOAD CALCULATION (IRC M1401.3)
Design Conditions Building Construction Information
Winter Design Conditions Building
Outdoor temperature: 32 -F Orientation. Front Door faces East
Indoor temperature: 68 T xongret,wesu swm,xmn..n,xo�tn.e.uswuw.etmumw•et
Total heat loss: 33890 Ruh Number of bedrooms: 2
Conditioned floor area: 1912 fl
Summer Design Conditions Number of occupants: 0
Outdoor temperature: 93 T
Indoorte rmerature'. 75 T Wtrxlows Rwl
Grains difference: 52 91 @50% RH Eave overhang depth: 0 t
Sensible heat gain 27067 Btuh Internal shade: none
Latent teat gain: 4635 Btuh exnds.an.eaem. oepm w_
Total heat gain: 31701 Ruh Numberofskylighis: 0
EQUIPMENTHVAC • 40
Heating Equipment Data Coolina Equipment Data Blower Data
E uimen[ SPIAASHP �nui Mrype: SPIRASHP Heating cfm: 1200
� p
om.a,xnq,eoenee. lrnnaa�.,xea R�.�y,.m. Cooling clm: ^(11200
Model: Ruud Model: Ruud S�sr�ressuiniul.u150 i H2O
RP1536A11NA+RH1V3617STANJA RP1536Af7NA+RH1V3617STMJA aegnaxm.
Hxating output capacit.:mreew 3�O0 Btuh Total coding capacity: 32910 Btuh
a°°°e- ii,i y, qno <o�wm�. Sensible coolingcapacity.ps 7 2900 Btuh
Auxhealing output capacity: 28971 Ruh Latent 4
cooling capacity 4910 Btuh
HVAC DU CT DISTRIBUTION SYSTEM •
Design airflow. 1200 cfm Longest supply duce. 164 it Duct Materials Used
Equipment design ESP. 0.50 in H2O Longest return duct: 81 fl Trunk duct:Round flex metal,Round flex vinyl
Total device pressure losses: _0.2 in H2O Total effective length(TELk24445 fl
Available static pressure(ASP): 0.34 in H2O Friction ate:a.ee=nsv.lTR, ARI init0lffi Branch duct Round flex vinyl
I declare the load calwlation,equipment equipment selection and duct design were rigorously performed based on the building
plan listed above. I understand the claims made on these forms will be subject to review and verification
Contractor's printed name �, 1 Lam_,
Contractor's signature_ ,� �' 1 ' Date:
Reserved for County Town Municipality orAuthority having junsdirt-
'Home qualifies for Mi Form based on Abridged Edition Checklist
* WrlghtsoR' RgMSuXe®Univena120171700a R$U135A5
N
Level 2
BR 3
71 ctm 71 d.
BR
6 chn
to crura
76 ctm
BR 1
Job #: ECHunit3 Scale: 1 : 97
Performed by Monica S. Bacca for: Page 1
Lambertson RightSuiteOUnNersa12017
Donner Rd 3 17.0.09 RSU12595
Atlangc Beach.FI 2016-0 4812:00:18
_.ghtsg8 HVAC De.ECHunft316.r...
N
Level 1
LNing Room
1/0 db dO Cfin
1200 hO
10'
Sup R ser
Din'
4'
6
83 cfm cfm
921 cfm
Kitchen
Garage
Job#: ECHunit3 Scale: 1 : 97
Performed by Monica S. Bacca for: Page 2
Lambedson RightSuitee Unirersal 2017
Donner Rd,3 17.0.09 RSU12595
Atlantic Beach,FI 2016Od-18 12:00:18
...9htsog WAMDemolECHunit316.c..
- Duct System Summa Job: Jun 06,2
Y Summary Job:Date Jun 06,2016
Entire House By: Monica S.Bacca
Project Information
For: Lambertson, Elite Custom Homes and Renovations
Donner Rd. 3,Atlantic Beach, FI
Heating Cooling
External static pressure 0.50 in H2O 0.50 in H2O
Pressure losses 0.16 in H2O 0.16 in H2O
Available static pressure 0.34 in H2O 0.34 in H2O
Supply/return available pressure 0.228/0.112 in H2O 0.228/0.112 in H2O
Lowest friction rate 0.139 inI100ft 0.139 in/100ft
Actual air flow 1200 cfm 1200 cfm
Total effective length(TEL) 245 ft
Supply Branch Detail Table Htg Clg Design Diann H x W Duct Actual Ftg.Egv
Name (Btuh) (cfm) (cfm) FR (in) (in) Mall Ln(ft) Ln(f) Trunk
OR 1 c 1723 68 76 0.140 6.0 Ox 0 VIFx 27.4 135.0 all
OR 2 c 7164 141 318 0.142 6.0 NO VIFx 25.4 135.0 all
OR 3 c 1612 58 71 0.139 4.0 NO VIFx 28.2 135.0 all
WB A c 1612 58 71 0.139 7.0 NO VIFx 29.0 135.0 all
Bath 1 h 393 14 11 0.141 4.0 NO VIFx 26.0 135.0 sl1
snh 1A h 393 14 11 0.143 4.0 NO VIFx 24.6 135.0 all
DWq R. c 1864 73 83 0.149 4.0 Oxo VIFX 16.1 135.0 st2
D"Rix nA C 1864 73 83 0.152 6.0 Ox 0 VIFX 14.4 135.0 st2
iam.nw h 11889 421 292 0.150 6.0 Oxo VIFx 17.1 135.0 st2
LMV R. h 3955 140 92 0.149 6.0 Oxo VIFx 17.5 135.0 st2
uay ROpmA h 3955 140 92 0.150 6.0 0x0 VIFx 18.3 135.0 st2
Supply - • -
Truck Htg clg Design Veloc Diam H x W Duct
Name Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk
sit Peak AVF 353 559 0.139 712 12.0 0 x 0 MetlFlx
st2 Peak AVF 847 641 0.149 1079 120 0 x 0 VnlFlx
te 201& -Ia 11:5a 31
Mr,,ryh}SOW RgMSui iaM UnivereY 201717.0.W RSU125H5 ppe 1
An K ..azume s%VAMM1 HWC%Dano%ECHund3l6..p Calc=MJ6 From DOafspss: E
Return Branch Detail Table
Grille: I Htg ClgTEl Design Veloc Dian H x w StudlJdst Duct
ane Sae(in) (Cfm) (Cfm) (ft) FR (fpm) (in) (in) Opening(in) Mao Trunk
rb2 0x0 1 1200 1 12x0 81.0 1 0.139 7200 10.0 Ox 0 1 VIFx
;`y� wrl htsott• 2016 -1e 11:59:51
.11.M 9 RyM3uiMe unwmu 20111]0 W 851113595 ppp 2
_ao=uments%MgMsMHV C%DemMECHunR3l6.mp CY =MJ9 Fm DO f w E