Loading...
1728 MARITIME OAK DR - SOIL DENSITY FORM BOARD ELEVATION CERTIFICATE Duval County / Clay County Left copy on site No box Lot and Subdivision: Le-7- ! -I 4 --0" c Ac « " 2 DATE: 11 1y -16 PERMIT NUMBER: \(o S 2--a% • ADDRESS: 17 11) REQUIRED SLAB ELEVATION ON CITY APPROVED SITE PLAN: ( / qo ACTUAL ELEVATION OF FORM BOARD OR GRADE STAKE: .o`1) SURVEY COMPANY NAME: Bartram Trail Surveying, Inc. 150,1 CR 315, Suite 106 Green Cove Springs, FL 32043 SIGNATURE OF SURVEYOR: (Party Chief) FLORIDA 32256-8248 T.COM 225.5305• RROAwww ICE:8400 BAYMEADOT"IS WAY,SUITE 12•JACKSONViLL , TOLL FREE:8�" MAIN O FAX:904.353-140• FLA.-352.351.4386 Turner PHONE:904355-5308 OCALA, FLA.-772-621.7905 912.576-1300 PORT$T�I.UCIE, 1.6361 '""Pest ST.MARTS,EAC" 3M-615.0206 TAMPA,FLA.-813 68 Ol O -1OHA BEAFNAF-321-951.3325 rCo 1 tr ELBOURNE, _ PERMIT NUMBER � �p� �I -�A` SUBOIVI ON vV SECTIO ! t-.- EMPLOYEE BUILDER t• OCK Alb- - GALLONS x 4-10' CHEMICAL ® USED ADDRESS ��� DATE 1 TIME USED �1 TREATED � si r� PRE .TREAT SLAB 1 PORCH I ENTRY ��or 110111111111111111111111�.�� 1 .ppp TREATMENT I- INT STCT 1 EXT IVE I RIVE I WALKS MONOLITHIC WASTE ARMS I D DIRT FILL RAGE OF SLAB rim GALLONS USED RIMETER G NTIAtTYPE FINAL PE RESIDE TAGE COMMERCIAL FOOTAGE LINEAR FOO CIRCLE ONE SQUARE FOO IIIIIIIIIIIIIIII r LIVING AREA_,____ REA - FIRST FLOOR i _ la GARAGE _----- 11-41111 ��PATIO r PORCH r REAR .it _ HO LB4�2 1 FRONT ENTRY __J'`—l 111111161111P/Tis TREAT ` Form 0080 TOTAL , TECH • eo��rl,o�e^Idate Annual ren j J Corporate 7064 Davis Creek Road,Jacksonville,FL 32256 P:(904)880-0960 F:(904)880-0970 cm Ellis&Associateslnc. Branch Location: Geotechnical • Materials Testing • Environmental ■ CEI Services Brunswick: 227 Rose Dri e,Brunswick,GA 31520 P:(912)279-0085 F:(912)279-0086 integrated Engineering Services Daytona: 2706 S.Ridgewood Ave.,Suite 2 P:(386)944-9588 F:(386)944-9589 South Daytona,FL 32119 ellisassoc.com Work Order#: REPORT OF IN PLACE DENSITY RESIDENTIAL Project#: Subdivision: r-7 t ',--i r- c I- ( c Reported to: Report#: Location By: Gauge#: Unit or Parcel: Date Tested: '` �- Lot#/Block:_ !I / Contractor: Street Address: i - /• 1.---, , -T r,=.-f c F t ,i City: \►- -- Method: --t Course: i t Material: , Specific Requirements: Pass/ Elev/ Base/LR/ Dry Max. Dry % of Max Moist Fail/ Location Depth Asphalt/ Density Density* Density Retest /Lift Thickness .t- Z. 1, V. *Source of Proctor (Project# and/or Work Order#) P-Test Meets Specification Requirements F-Test Fails To Meet Specification Requirements R- Retest To Be Completed In Field Standby Approval i Employee Name Time Superintendent Printed Name Start/Stop Travel Standby Job Superintendent Signature (Office use) EA-10(rev.05/15) white copy-office use yellow copy-personal use pink and goldenrod-client use Page of