Loading...
121 Donner Rd early power release EARLY POWER AGREEMENT & RELEASE CITY OF ATLANTIC BEACH < � D Electric power is requested now under the conditions and terms of this(oily eneouted Agreement&Release Job Address: /), I Permit No. ZZ 16 / Service Type(Cirele One): Overh ndmgroun D A 6G- F-LEc - zZ, / We,the undersigned General Connector and Electrician,understand and agree: 1. "Early Power".is pmely for our enqutnrW on fonvenience, it is nTLTuired by Codes and does 30l subsume for Final insPeetions or the C/O(Certltmam of Occupancy must be issued IT on occupancy, and as such is at the discretion of The Buildmg Official. 2. The City of Atlantic Beach will make a special inspection prior to,the early power energizing. All Tough inspections must have prior Approval,including meter base connechom. 3. Occupancy or use of the npw construcnun before a formal C/O constitutes fraudulent use of the early eleemc service. Such aetum is expressly prphibited and penalised by The City of Atlantic Beech Ordmenees. &vio]ation of this Agreement shell result m a request for prompt removal of electric service aftcr a twenty-four hour notice. 4. "Barly Power"release authority is the Electrician an the Contractor and must out occur before: a. Pqm men;devices and Sxtures are installed(or blanked o�safely. b. PmeeYis complete with breakers and cover,end(labeling required it£anal inspection). e. Service connection and grounding is complete. & The electric system has safely passed through electrical check. e. Meme can u¢ermanentl�marked with address. f. Temporaryadtlresa num ars displayed(Permanent numbers are required for C/O). 5. This ally completed form ism be submitted to the Building Depar ment by hand,mad or fax. 6. Future such Agreements will not be accepted from those who violate any enc of the above items. CONTRACTOR !r Af DATE PRINTNANM /4rywe'O 4 ELq– ,/ –7 ECTRICIAN � DATE / PRTNf NAME Y1f c!�(a f.ea4lT- 800 Seminole Reed,Atlantic Beach PL 32233 Phmc:(904)2, 7.5826 Fax:(904)247-5945 hup://www.wab.ms revised Ol3009