Job ID: 16-ROW-2585
Job Type: RIGHT-OF-WAY PERMIT
Desc:ription: replace 35-foot class 4 wood pole, move approximately 8
feet due east, replace secondary
Estimated Value:
Issue Date: 12/6/2016
Expiration Date: 6/4/2017
PROPERTY ADDRESS:
Address: 701 BEACH AVE
RE Number: None
GENERAL CONTRACTOR INFORMATION:
Name: JEA
,N/R
Address:
Phone: - -
PERMIT INFORMATION: UTILITY DEPT.: PUBLIC WORKS:
Avoid damage to underground water/sewer utilities. Verify vertical and horizontal location of utilities.
Hand dig if necessary. If field coordination is needed,call 247-5834.
See attached Utility Map.
All runoff must remain on-site during construction.
Full right-of-way restoration, including sod, is required.
Must replace any broken concrete or asphalt.
FEES:
Fence/ROW $35.00
Total Payments: $35.00
PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA
BUILDING CODES.
City of Atlantic Beach APPLICATION NUMBER
Building Department (To be assigned by the Building Department.)
800 Seminole Road
Atlantic Beach, Florida 32233,514 MECEIVE Qls_!K1S_
(90,
Phone(904)247-5826 Fax 9041)24FJW5
E-mail: building-dept@coalh.us
Cityweb-sfte: httP:1Avw%v.coab.us NOV 16 26116 Date routed t (10
n'
APPLICATION REVIEWAND-TRACKING FORM
Property Address: Department review required Yes No
Building
Applicant: IbA Planning &Zoning
Tree Administrator
Project: �'z
L�vLt_ 4 fy-,L
poxL Public UtIliti
Public Safety
WFIreSewimsM__1
Review fee $ 111�111111111111111WI!9111�111��
—Renn.w—orRecept
Other Agency Review or permit Required Verified By Date
of Penmit
Florida Dept.of Environmental Protection
Florida Dept.ofTransportartion
St.Johns River Water Management District
Army Corps of Engineers
Division of Hotels and Restaurants
Division of Alcoholic Beverages and Tobacco
Other.
APPLICATION STATUS
Reviewing Department First Review: WAPProved [-]Denied.. A/k 4
(Circle one.) Comments: -166 *UU44
BUILDING
PLANNING &ZONING Reviewed by: Date:
TREEADMIN. Second Review: E]Approved as revised. ffD,`med�
PUBLICWORKS Comments:
PUBLIC UTILITIES
PUBLIC SAFETY Reviewed by: Date:
FIRE SERVICES Third Review: ElApproved as revised. DDenied.
Comments:
Reviewed by: Date
R.W.ed 05/14/09
City of Atlantic Beach
Building Department
800 Seminole Road
Atlantic Beach, Florida 32233-5445
Phone(904)247�5826 - Fax(904
E-mail: buIIdingAe;pt@coab.0 6 2016
SCity web-site: hftp:/tww,.coab.s
BY:
APPLICATION REVIEW�AND TRACKING FORM
Property Address: (01 ftk(A\)W9 . Department review required Yes No
Applicant: IbA building
Planning &Zoning
Project: If I A(tLt- 4 P%W L '�S—i_� wD Tree.Administrator
'Put L Public Utilid
Public Safety
ire Services
heview fee FT
$--)P-- Dept Signature r_Q11L
Other Agency Review or Permit Required Review or Receipt
Florida Dept,of Environmental Protection Of Permit Verified B Date
Florida Dept.of Transportstion
St.Johns River Water Management District
Amy Corps of Engineers
Division of Hotels and Restaurants
Division of Alcoholic Beverages and Tobacco
APPLI
,�TJON STATUS
Reviewing Department [t Review: Approved. E]Denied.
Fire w
(Circle one.) Comments:
BUILDING
FPLANNING &ZONING _Reviewed by� ate:::::
TREEADMIN.
Second Review: EIAPProved as revised. ElDenied.
VVORK Comments:
?PUBLIQ U ILITIES
11-17-T6
PUBLIC SAFETY Reviewed by: Date
FIRE SERVICES Third Review: EJAPProved as revised. ElDerded.
Comments:
Reviewed by: Date:—
Revised asliwos
701
701
701
701
70i
701
If.*t -
J00 CITY OF ATLANTIC BEACH
CONSTRUCTION PERMIT WITHIN CITY RIGHTS OF WAY AND EASEMENTS
f Boo Semmle Road 90�247-5800
Atl..ft Beach.Florida=��S Fax 904-247-58�
PLEASE SUBMIT(3)COMPLETE SETS OF PLANS WITH APPLICATION.
Date bldve� &e� t 6 PERMIT*
Job Address 61'7 I'm -,4- Ill ISSUED By THE CITY
Permitee: — i-Gia Telephone It 77 94
Permittee Address: Z-1 (4/0,d;1� CA a e.,4 s il
Requesting Perm
,!%,.n,l,.C,n=:,_,I I;�� - f
1,4&C-f tf —"Id' P2,01C,� -17ill
Location: (ReferencetoCross-Street)_
1. Applicant declam$ that prior to filing this application he has ascertained the loc�atiodn of all existing ARMS.
both aerial and underground and the accurate locations are shown on the sketches.
A Letter of Notification was mailed to the following UblitiestMunicipalities:
Jacksonville Electric Authority Yes No Date-
Bell South Telephone Company 'Yes No Date:
Ferrell Gas Date:
Comeast 1 Date:
2. Whenever necessary for the construction, repair. improvement, maintenance, safe and efficient operation,
alteration or relocation of all,or any portion of said street or easement as determined by the Director of Public
Works, any or all of said poles, wines. pipes, cables or other facilities and appurtenances authorized
hereunder, shall be immediately removed from said street or easement or reset or relocated hereon as
required by the Director of Public Works, and at the expense of the Permiltee unless reimbursement is
authorized.
3. All work shall meet City of Atlantic Beach o,.Fi� d D partment of Transportation Standards and be
Performed under the supervision of (Contractors Project
I.". C4Z�__
Superintendent)located at 7,1 Telephoneif:
4. All materials and equipment shall be subject to inspection by the Director of Public Works or his designee.
5. All city property shall be restored to its original condition as far as practical, in keeping with city specifications
and the manner satisfactory to the city.
6. A sketch of plans covering details of this installation, as well as, a copy of a recent survey shall be made a
part of this permit. Calculations showing any increase in Impervious area on owner's lot or in the city
Right of Way are to be included with this application.
7. This peirmittee, shall commence actual construction in good faith with 60 days. If the beginning date is
more than 60 days from date of permit approval. then permittee mustmvi" the permit with the Director of
Public Works to make sure no changes have occurred in the area that would affect the permitted construction.
a. It Is understood and agreed that the rights and privileges heren set out am granted only to the extent of the
City's right, title and interest in the land to be entered upon and used by the holder, and the Holder will. at all
times, assume all risk of and indemnify, defend, and save harmless the City of Aflantic Beach from and
against any and all loss, damage, and cost of expenses arising in any manner of the exercise or attempted
exercises by the holder of the aforasaid rights and privileges.
9. The Director of Public Works shall be notified twenty-four (24) hours prior to starting work and again
immediately upon completion.
OWNER
signed Cox,
Befors on.tt,i. yod�nm.courtycd Duval,
state Of Flovida,has Woonally appaerix!
Notaq Poolic at tar,,e,Siste of F�a.Caaady of oval.
my�Mloskai expuss, Peoxonally
Procluosd lftrdflficatxx�:
ENGINEERING DESIGN
ORACLE PERMIT MAXIMO DATE REL
PROJECT#.19180 N 0 8003837 WO#: 24145021 CONST.11118116
CIR. TREE TRIMMING
SUB-STA: NEPTUNE BEACH NO.: 563 REO`D:NONE
CELL
ENGINEER:Robert Simpson NO.: WA ZIP CODE: MIA
CUSTOMER] Svc PHONE
LOCATION: 40 7TH STJ REPLACE POLE 563 CENTEFRSSSC N.O.:665-7793
1�5
ll�p VOT
STA 1, P# 40 7TH STJ REPLACE 35/4W, MOVE POLE
EASTAPPROX S', REPLACE SECONDARYTO STA2.
STA 2, P#100 7TH ST.
C -'VERY NARROW BEACH ACCESS.....
4T
T
120/2A
713 140 STA 2 > I STA 1
7 <
75B x
75C ABC 03 N
698 OD
W
----------
_v 2/op
Elc
03
697 p
50T
66 PS90 4
12
p
66 ;o
A
619
41
1/,OT
2cu
4 U 4/OP
OP
2 C I
4CU N T 599
BIRT Report Viewer Page I of 7
JFA
CUE Reports
Estimate 19180 563 TROUBLE 40 7th ST./ Estimate DESIGN Contractor:None
Number: INSTALL 35/4W AND Type:
SECONDARY DROP
Estimate 1 563 TROUBLE 40 7th ST./ BY: SIMPRB
Version; INSTALL 35/4W AND
SECONDARY DROP
MWO*/Task: 24156971 Required 11/18/2016
Date;
Oracle SM3837 Estimated 11/14/2016
Project#: On:
Cost Estimate
.............................................................................I............-...................................... .......................
'is 311A Contractor
1.Nm Material Cost(./miss tax) $333.34 $0.0
2.Transformer Cost(wl salc�tax) $0.00 $0.00
1 ReWmed Material Salvage Value $0.00 $0.00
Labor
4. Crew Time $813.00 $0.00
5. Extraordinary Costs $0.0 $O.W
JEA overhead
6. Fringe Benefits (51.15%of lines 4& $532.08 $0.00
7)
7.Engineering Costs (Variable%of line $227.23 $0.00
4)
8, Project Equipment Cbs (40%of $567.17
total equipment costs)
9. Matenal Hantiling (8.08%of lines I& $26.93 $0.00
2)
10.Inspection (6.84%of line 4) $0.00
It.Towl Cost Of Project $2,499.77 $0.00
12.Worl,Order Estimate(Line 11 minus $1,905.66 $0.00
line 8,9,&10)
13.Billable Equipment Deprecation $850.76
(60%of total equipment costs)
�14.Billing Estimate(Including $3,980.08 $0.00
Transformer Cost)
(Unes 11 + 13+ (60.52%of 4&7))
25. Billing Estimate(WiMout Transformer $3,980.08 $0.00
Cost)
(Lines 11 + 13+ (60.52%of 4&7)
U.2)
Time Estimate
Cressr Reculnerments 121lid
Manhou
4 Man Lim Cre. 26.07
.................I.......................................... ....................... ..........................................................................
November 14,2016 2:02:36 PM EST 1 1 7
http://mx7pr.corp.jea.com/mmimo/output�_report--jea-cue reports.rptdesign&apptUAnUe... 11/14/2016
BIRT Report Vie�er Page 2 of 7
-XA
CUE Reports
Estimate 19180 S63 TROUBLE 40 7th ST./ Estimate DESIGN contractor:None
Number: INSTALL 3S/4W AND Type:
SECONDARY DROP
Estimate I S63 TROUBLE 40 7th ST./ By! SIMPRB
Version: INSTALL 3514W AND
SECONDARY DROP
MWO#/Task: 24156971 Required 11/18/2016
Date:
Oracle 8003837 Estimated 11/14/2016
Protect*: On:
CU Detail
St.ticn 01 563 TROUBLE P#40 7TH ST/INSTALL 35/4W REPLACE SECONDARY TO
STA 2.
Build Transfer Remain in Place Remove
P.35/4W
G3W-2
S6
C.2/OP 801 1 1 1 1 1
HANDDIG 51 1
S4-2/0 'I I
DEEPER 1 51 1 1 1 1 IP I.35/4W I
CUT 31 1 1 1
1 ILI I I
I I I ILI I
RUSUP 1 21 1 1 1 1 1 1 1 1 IR I USDOWN 2
1 1 1 1 1 IWOODGRD I
I I I I I IDEYE 1
S20ES-Z/0-1/0 I'I I I I I I IN I UMBER I
I I I 1 80
Station 2 563 TROUBLE Pj16O 7TH ST.
Build Transfer Remain in Place Remove
W2/0 11 1
RUBUP 21 1
...2.../*......7'
http://Tnx7pr.corp.jea.com/mmimo/�utput?—mport=jea cm reports.riptliesign&appriarne... 11/14/2016
BIRT Report VtexNer Page 3 of 7
JrA
CUE Reports
Estimate 19180 563 TROUBLE 40 7th ST./ Estimate DESIGN Contractor:None
Number: INSTALL 35/4W AND Type:
SECONDARY DROP
Estimate 1 563 TROUBLE 40 7th ST./ By: SIMPRB
Version: INSTALL 35/4W AND
SECONDARY DROP
MWO#/Task: 24156971 Required 11/18/2015
Data:
Oracle $003837 Estimated 11/14/2GI6
Project 4: On:
CU Detail
St�flrni 2 563 TROUBLE P# 106 7TH ST.
Build Transfer Remain in Place Remove
520ES-2/0-2/0 I I IR I UBDOWN 2
1 JPOLECON 1
.............................................................................................................Tj.......7-
http://nix7pr.corp.jea.com/maximo/output�_report=jea.cue_mports.rptdesign&appname... 11/14/2016
BIRT Repoit Vie��ei Page 4 of 7
-WA
CUE Reports
Estimate 19180 563 TROUBLE 40 7th ST./ Estimate DESIGN Contractor:None
Number: INSTALL 35/4W AND Ty";
SECONDARY DROP
Estimate 1 363 TROUBLE 40 7th ST./ By: SIMPRS
Version: INSTALL 35/4W AND
SECONDARY DROP
MWO#/Tiisk: 24156971 Required 11/18/2016
Date:
Oracle 8003837 Estimated 21/14/2016
P,.je&#: On:
Conductor, Conduit and Pipe Detail
Quantities
From Statim To Station -q-U BuiLd Transfer Remain Rerwaint
01 2 C.I/DT 0 a 0 80
01 2 C.2/OP 80 0 0 0
6i�'i�0'2*73-6–P**M*'E...ST.........—............ ..............*........ ........—*.......4.../.......7'
http://mx7pr.corp.jea.com/maximoloutput? mport--jea_cue_reports.rptdesign&appname... 11/14/2016
BIR ) Report Vic�Ner Page 5 of 7
-AFA
CUE Reports
Estimate 19180 563 TROUBLE 40 7th STJ Estimate DESIGN Contractor:None
Number: INSTALL 35/4W AND Type:
SECONDARY DROP
Estimate 1 563 TROUBLE 40 7th ST./ BY: SIMPRB
Version: INSTALL 35/4W AND
SECONDARY DROP
MWO#/Task: 24156971 Required 11/18/2016
Data:
O,.ci. 8003837 Estimated 11/14/2016
Project#: On:
Material Summary
Itern Quantitv Itern Number Dean Geawwiption
2 EACH BOLEY004 SOLT,EYE,5/8"X 14",GALVANIZED,WITH SQUARE NUT ATTACHED
..........W.7cEw...a;;;;w;.........
VERDE"PRE-ASSEMBLED PARALLEL SOUTHWIRE 61-28-96-1, 15M FOOT REELS
.......... ......... ......................
6;...ja;wcu� CTLX4;,�W6600,
...........F-i;Z4... . ......... -------------
FWLTF
...........F.;O...�:Z;707cw......... ------ --".........
..azy0w.........(;]�WP7
.......... ...... .............
.;ZEa
2 EACH CNNCP002
TAP
CONNECTOR,*4,I/O-ZtO MAIN, 1/0�3/0 TAP COMPRESSION,PARALLEL TAP,
....................!Lmn......................................... ..............
EACH CNNCPOO5 CONNECTOR, *3,6-2 MAIN,2/0-3/0 TAP,COMPRESSION, PARALLEL TAP,
------------------------------------------------------------
CONNECTOR,6-2 SOL/10-2 SOL,VISE GRIP PARAUEL�BRONZE
.........................................................................................................
3 FEET COM0028 CONDUCTOR,#4 SOLID,SOFT DRAWN,BARE COPPER,200',25*.ON PLASTIC
REEL,4-X 11.5"W/2*HOLE
----------;T-iiF— ;71;7........65W66aW,
DIAMETER 1480#BREAKING STRENGTH C 50#COIL-427-
j6w,. ....................... .........
---------- ---j;71zw; -----------------------------------------
;U;F;S, IZZW, 1/2'X 1/2'X 96%GRAY PLASTIC
.......... ---------------------- ...........................................
2 EACH INSSU002 52-9 NEMA STRENGTH 10000#,GALV.
............................=a...............................................................
mw NLrrEYD02 NUT,EYE,5/8-,HOT DIPPED GALVANIZED
..........;7i;F�... .... -----------------*----------------.......
w:zz L'- ..............
......................................... ........................... I mn .......
ROD,GROUND,THREADLESS, 5/8 X ir,SHIP ON OPE N FLATBED ONLY!
I EACH TAGH0007 FOR ADHESIVE BACK CHARACTERS((NOT FOR
-SUDE IN'CHARACIERS)). 19.5-HIGH X 2-WIDE WITH 3-1/8'NAIL HOLES 0
THE TOP AND THE BOTTO14. (MG.OF 50 EACH)
-------------- .......................... ............. .................. ..........
! W�T;;6jj WAS HER,SQUARE FLAT,3"S Q X 1/4",S/S-X 3/4-BOLT S IZE GALVM IZE D------
.... ...... ---------- --- --- ------- ---- --- -- ---- ----- ---------- -- ------ -- -
19 EACH X)OIYYDoO DUMMY ID,
.......... ................... ...................... - -------------------
..........................0 .....................................n .................--ffi ................n= .....M.A....=...................J.0 ...... . .....
Now.ber 14,2016 2:02:36 PH EST S/ 7
http://lx7pr.corp.j".Com/m�imo/OutPut�—MPOrt--jea—cue reports.rptdesign&appname... 11/14/2016
BIRT Report Viewer Page 6 ot'7
_XA
CUE Reports
Estimate 19180 563 TROUBLE 40 7th ST./ Estimate DESIGN Contractor:None
Number: INSTALL 35/4W AND Type:
SECONDARY DROP
Estimate 1 563 TROUBLE 40 7th ST�/ By: SIMPRB
Version: INSTALL 35/4W AND
SECONDARY DROP
MWO#/Task: 24156971 Required 11/18/2016
Date:
Or.clo 8003837 Estimated 11/14/2016
Project#: On:
CU Summary
CU Ham Quantity D.sarlotion
C.Z/op so 210 AAC PAP W/2/0 AAAC NEUTRAL
CUT 3 CUT POLE OR CROSSARM
DEEPER 5 SET POLE DEEPER, PER".
G3W-2 1 WOOD POLE-NON-EQUIPMENT GROUND
HANDDIG 5 No Desc,lption...
P.35/4W 1 35 ff.CLASS 4 WOOD POLE
RUMP 4 LINE RUBBER INSTALLATION,PER SECT.
520ES-2/0-1/0 I
S20ES-2/0-2/0 I SECONDARY CONNECTION AT POLE
S'l-M 2 SECONDARY DEADEND
S6 2 DOUBLE EYEBOLT
CU Misms, Quan ft"HyHon
C.I/OT so 1/0 TRIPLEX
DEYE I S6 REMOVAL
LI 1 70W HPS ROADWAY FIXTURE
NUMBER I POLE TAG REMOVAL
P.35/4W 1 35 Fr.CLASS 4 WOOD POLE
POLECON 1 S20 REMOVAL
RUBDOWN 4 LINE RUBBER REMOVAL,PER SECT.
WOODGRD 1 WOOD POLE NON-EQUIP.GRD REMOVAL
JRANSFER __ - I
CU Ha ouantlltv D"cHPUon
Ll 1 70W HPS ROADWAY FIXTURE
0"2':'3"6...PM...E'S"T"*..................*......*............................... ....... ........... ...-67 '7'
http://mx7pr.corp.jea.com/maximo/output�_report=jea�cm reporls.rptclesign,kappnarne... 11/14/2016