720 Paradise Ln early power release EARLY POWER AGREEMENT & RELEASE
CITY OF ATLANTIC BEACH
Electric power is requested now under the conditions and terms of this fully executed Agreement&Release
Job Address: a Q
GrCA� tSP ani
Permit No. _ 1(9 - E.lec- x335
Service Type(Circle One): Overh Undergroun
We,the undersigned General Contractor and Electrician,understand and agree:
1. `Early Power" is purely for our construction convenience, it is not required by Codes, and does not
substitute for Final Inspections or the C/O(Certificate of Occupancy)MW must be issued beforeoccupancy,
and as such is at the discretion of the Building Official.
2. The City of Atlantic Beach will make a special inspection prior to,the early power energizing. All rough
inspections most have prior Approval, including meter base connections.
3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of the early
electric service. Such action is expressly prohibited and penalized by The City of Atlantic Beach
Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric service
after a twenty-four hour notice.
4. "Early Power"release authority,is the Electrician and/or the Contractor and most not occur before:
a. Equipment,devices and fixtures are installed(or blanked off)safely.
b. Panel is complete with breakers and cover,and(labeling required at final inspection).
c. Service connection and grounding is complete.
d. The electric system has syafely passed through electrical check.
f Temporary address nwnlbemrs d'$played(Permanent numbers are required for C/O).
5. This fully completed form is to be submitted to the Building Department by hand,mail or fax.
6. Future such Agreements will not be accepted from those who violate anyone of the above items.
CONTRACTO co� DATE Z
PRINTNAME
ELECTRICIAN1,...,,�,_ DATE
PRINT NAME 'J��✓1 � z7-
800 Seminole Road,Atlantic Beach FL 32233
Phone:(904)247-5826 Fax:(904)247-5845 hup:':www.aoabms mvised 01 3009