Loading...
Untitled (34) it a ac ENGLAND C, TIIIM& INC CONSULTING AND DESIGN ENGINEERS 6136 ATLANTIC BLVD. JACKSONVILLE. FL 32211 [904)724-9436 April 4, 1983 Mr. William M. Baldwin, P.E. P.A. Consulting Engineer Cedars Executive Center - Suite 250-E 2639 North Monroe Street Tallahassee, FL 32303 Reference: Atlantic Village Center Project City of Atlantic Beach E83-04 Dear Mr. Baldwin: Pursuant to your resubmittal of the paving and drainage plan for the referenced project I have completed the review and transmit the follow- ing comments. 1. The storm drainage system draining Royal Palm Drive should be piped to the ditch along the Northerly boundary and not be routed through the retention basin. (See Item No. 5 from previous review. ) 2. Bottom elevation of the retention basins must be raised to elevation 3.5 minimus to avoid being below mean annual high- water elevation. (See Item 7A previous review.) The retention basins should be increased in area to compensate for this loss of volume. 3. The retention basin side slopes may be 2:1 if adequate stabi- lization is provided. 4. Drainage easements for the ditch along the Westerly boundary and the Royal Palms Drive drainage system shall be prepared and submitted for review and recording prior to final approval of plans. Should you have any questions regarding these comments please call . Sincerely, ENGLAN THIMS, INC. Douglas C. Miller, P.E. Vice President DCM/cwb ,X: William Moss