Loading...
1900 Beachside Ct ROW permit CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH,FL 32233 INSPECTION PHONE LINE 247-5814 RIGHT OF WAY PERMIT MUST CALL BY 4PM FOR NE)IT DAY INSPECFION: 247-5814 JOBINFORMATION: 3ob ID: 17-ROW-3467 Job Type: RIGHT-OF-WAY PERMIT Description: RIGHT OF WAY- DIRECTIONAL BORE I" CONDUIT Estimated Value: Issue Date: 3/28/2017 Expiration Date: 9/24/2017 PROPERTY ADDRESS: Address: 1900 BFACHSIDE CT RE Number: None GENERAL CONTRACrOR INFORMATION: Name: JEA , N/R Address: Phone: - - PERMIT INFORMATION: UTILITY DEPT.: PUBLIC WORKS: Avoid damage to underground water/sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed,call 247-5834. See attached Utility Map. All runoff must remain on-site during construction. Full right-of-way restoration, including sod, is required. Any sidewalk or curb damaged from construction must be replaced. FEES: Total Payments: $0.00 PERAHT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. City of Atlantic Beach APPLICATION NUMBER Building Department (To be assigned by the Building Department.) 800 Seminole Road Atlantic Beach,Florida 32233-5445 Phone(904)247-5826 - Fax(904)247-5845 E-mail: building-dept@coab.us Date routed: City web-site: hftp:/Avww.coab.us —a 11 �5117 APPLICATION REVIEW AND TRACKING FORM Property Address: C)C) L?_ )EAO_US J(_)C� e artment review requlroeW�No Building Applicant: Planning &Zoning Tree A ministrator Pub ic Works Project: C) P_IE: P bicUtififies Public Safety Fire WSewims 71 Review fee Dept Sigd��� Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept.of EnvironmenWl Protection Florida Dept.of Transportation St—Johns River Water Management District Amy Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverapm and—T.b.. _-6ther. APPLICATION STATUS Reviewing Department First Review: hdApproved. DDenied. (2110)5111 (Circle one.) Comments: BUILDING PLANNING &ZONING Reviewed by: Date,3 L_� TREEADMIN. Second Review: DAPProved as revised. ElDemled. PUBLICWORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date, FIRE SERVICES Third Review: ElApproved as revised. []Demed, Comments: Reviewed by: Date: Revised 06114109 City of Atlantic Beach APPLICATION NUMBER Building Department (To be assigned by the Building Department.) 800 Seminole Road Atlantic Beach, Florida 32233-5445 Phone(904)247-5826 Fax(904)247-58WR 1 3 701, E-mail: building-deptilitcoalb.us Date routed: 17 City web-site: http://�.wab.us APPLICATION REVIEW AND TRACKING FORM Property Address:19C)Q EEA J�bepartment review required Yes No Building Applicant: EA Planning&Zoning Tree Administrator R�_ �T(C)A �� C;P:ub'lc Wor's Project: Pu�bfi,Utilities Publi-c Safety Fire Services Review=P,,t,, Data Other Agency Review or Permit Required of Permit Florida Dept.of Environmental Protection Florida Dept.of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants DMvision of Alcoholic Beverages and Tobacco Other: APPYOKrION STATUS Reviewing Department First Review: EJApproved. E]Denied. (Circle one.) Comments: BUILDING PLANNING &ZONING Reviewed by: Date: '?11W[7_ TREEADMIN. Second Review: ElApproved as revised. ElDenied. 44 ORKS) Comments: vy��2,6 U 'C PU LIC UTILITIES &C/SZ Reviewed by: Date: PU LI 1;47 FIRE SERIOCES Third Review: DApproved as revised. E]Denied. Comments: Reviewed by: Date:- Revised 06/14109 fit AAA ENGINEERING DESIGN ORACLE PERMIT MAXIMO DATE REL PROJECT#:$003859 NO.: PERMIT COPY WOM— CONST. CIR. TREE TRIMMING suB-sTA:NEPTUNE BEACH N.0,165 REOD'.NONE CELL ENGINEER:BRIAN MIDKIFF NO.:— ZIP CODE:32233 CUSTOMER1 Svc PHONE LOCATION:POLE 1900 BEACHSIDE OR CENTER:CAUG N.O.:US-7534 S w 1 955 1954 75C r�C�5 1851\8 0 50A z 1939 11 2-193 258 119311 -A� 75C 1.1900 N.O.-C c B A SIDE DR --- --------- --- c —123" rZ18 2 5 50A I rr SOB 1877 50A i it rn to DIRE ONA E ORE 375'OF V CONDUIT AT MINIMUM DEPTH CTI L 10 r48FR M STREET LIGHT POLE 1900 BEACHSIDE DR TO T S 0 M 19 ST IN IF R ER 3 1 BEACHSIDE CT, PULL IN NEW 12D REET Ll GHT CABLE. r� InAn\ ENGINEERING DESIGN ORACLE PERMIT MAXIMO DATE REL PROJECT#:$003859 NO.: PERMIT COPY WO III:— CONST, CIR. TREETRIMMING SUB-STA:NEPTUNE BEACH NO.: 565 REOD:NONE CELL ENGINEER:BRIAN MIDKIFF N.O.:— ZJP CODE: 32233 CUSTOMER/ Svc PHONE LOCATION:POLE 1900 BEACHSIDE DR CENTER:CAUG NO.:665-7534 !s R. E ?c 5 195\4 LU J5 75C 0 z LU 193 F2--1931 25W /1931 75C N.O.-C 1-1900 c B SIDE DR C 1932— r412 5 �rr 50B 1877 75C 1 8 C, 8 50A 10 DIRECTIONAL BORE 375'OF 1"CONDUI ATMIN'MUMD 48" FROM STREET LIGHT POLE 1900 BEACHSIDE D T TRANSFORMER 1931 BEACHSIDE CT. PULL F12DO STREET LIGHT CABLE. X la6n\ ENGINEERING DESIGN ORACLE PERMIT MAXIMO DATE REL PROJECTM 8003859 NO�: PERMITCOPY WO k. CONST CIR. TREE TRIMMING SUB-STA: NEPTUNE BEACH NO.:565 REaD:NONE CELL ENGINEER:BRIAN MIDKIFF NO.:- ZIP CODE: 32233 CUSTOMERI Svc PHONE LOCATION POLE 1900 BEACHSIDE DR CENTER:CAUG N.O.:866-7634 S 955 19 LL I 75C �43\5. 25BC A 0 so K ! k .1 71 UJ 71 1 1939 2-1931 25B 75C 1 19 o N.O.-C c --- I B A SIDE DR rZ18 2 5 51A �08 75C 181\8 am im io DI RECTIO14AL BORE 375'OF 1"CONDUIT AT MINI MU M DEPTH 48" FROM STREET LIGHT POLE 1900 BEACHSIDE DR TO TRANSFORMER 1931 BEACHSIDE CT. PULL IN NEW 120 STREET LIGHT CABLE. n 1860\ JaI4 DISTRIBUTION ENGINEERING JEA ....................I................................. DOT PERMIT .-Il SCHEMATIC. ......................I.................. ............ L! * DRAWING ROT TO SCALE PROFILE OF DIRECTIONAL BORE ENTRY PIT EXIT PIT -)-E TRY- E.IT-�_ ANSTE- 15� G DEG DIRECTIONAL ENDRE - " HOPE WAX REAMER FIGURE I ENGINEER: 8,,,, M;jK;r,, PHONE NO:9qOft-o—f7n4 Rol IMP 12 Alt 4t OD A\ I .. - kf AF Ni CITY OF ATLANTIC BEACH CONSTRUCTION PERMIT WITHIN CITY RIGHTS OF WAY AND EASEMENTS SOD Sranole Road 904-247-5800 Agartio beach,Florida=�WS Fax 9114-247-58,15 PLEASE SUBMIT(3)COMPLETE SETS OF PLANS WITH APPLICATION. Date 03/08/2017 PERMIT 0 Job Address 1900 BEACHSIDE DR ISSUED BY THE CITY_ Permit": JEA- BRIAN MIDKIFF MIDKBM(&.JEA.COM Telephone# (904)665-7534 Permittee Address; 21 WEST CHURCH ST Requesting Permission to Construct: DIRECTIONAL BORE 11"CONDUIT 375'AT MINUMUM DEPTH OF 48" MD�H-IN NEW IM STREET U�T(1kBUE FROM PQUE 190)BEACHSIDE Dit TO TRVISFORMER 101 B�HSI Location: Reference to Cross-Street) BEACHSIDE DR AND SEMINOLE RD I. Applicant declares that prior to filing this application he has ascertained the location of all existing ulififies, both aerial and underground and the accurate locations are shown on the sketches. A Letter of Notification was mailed to the folloiiiiing Utilities/Municipalities: Jacksonville Electric Authority Yes No Date: Bell South Telephone Company Yes No Date: Ferrell Gas Yes No Date: Corniest Yes No Date: 2. Whenever necessary for the construction, repair, improvement, maintenance, safe and efficient operation, alteration or relocation of all,or any portion of said street or easement as determined by the Director of Public Works, any or all of said poles, wres, pipes, cables or other facilities and appurtenances authorized hereunder, shall be immediately removed from Said street or easement or reset or relocated hereon as required by the Director of Public Works, and at the expense of the Permittee unless reimbursement is authorized. 3. All work shall meet City of Atlantic Beach or Florida Department of Transportation Standards and be performed under the Supervision of �EsuusrxTrg (Contractor's Proect Superintendent)located at MATolaoRATIFIFLOOR Telephone III: 4. All materials and equipment shall be subject to inspection by the Director of Public Works or his desigrise. 5. All city property shall be restored to its original condition as far as practical,in keeping with city specifications and the manner Satisfactory to the city. S. A sketch of plans covering details of this installation, as well as, a copy of a recent survey shall be made a part of this permit. Calculations showing any increase in impervious area on owner's lot or in the city Right of Way are to be included with this application. 7. This permittere shall commence,actual construction in good faith with w days. If the beginning date is more than 60 days from date of permit approval, then pertiniftee must review the permit with the Director of Public Works to make sum no changes have occurred in the area that would affect the permitted construction. 8. It Is understood and agreed that the rights and privileges herein set out are granted only to the extent of the Cily's right,fitle and interest in the land to be entered upon and used by the holder,and the Holder will, at all times, assume all risk of and indemnify, defend, and save harmless the City of Atlantic Beach from and against any and all loss, damage, and cost of expenses arising in any manner of the exercise or attempted exercises by the holder of the aforesaid rights and privileges. 9. The Director of Public Works shall be notified twenty4our (24) hours prior to starting work and again immediately upon completion. OWNER S,gnW: Date: Beloxe a this; day of in Me Coxin"If Duval, State U Florida.has;persoraily appeared Notary%blic at Large,Surte of Florida,Coxx*of Dwal. My cononxission expires —Panixonaft tonova, Produced