Loading...
Agenda Item 4B- Award Bid No. 1617-08Agenda Item 4B June 26, 2017 BID 1617-08 Required Documents Submission in Triplicate -All Documents Document Requirements Checklist Bid Form Bid Bond (5% of Bid) Drug Free Workplace Public Entity Crimes Statement W-9 Form Public Records Provision Form New Vendor Information Form Business Tax Receipt Experience-Five (5) years Qualifications: General Contractor or Underground Utility License Financial Statements for past two (2) years Insurance References-three (3) vonnrmat1on or Kec1ept or Aaaenaa (L were 1ssuea May 19th) Section 3 Documents: a. Business Employee List b. Conflict of Interest Certificate c. letters of Intent (Required for Each Subcontractor Identified in Table A) d. Business Application Certification Form e . Economic Opportunities Plan f. Resident Preference Claim Form g. Table A (List of Subcontractors & Shop Fabricators) h. Table B (Estimated Project Work Force utilization Breakdown) i. Training and Apprenticeship Memo TOTAL BASE BID (ITEMS 1 -7) City of Atlantic Beach JORDAN AND DONNER PARK IMPROVEMENTS, CDBG 2017 May 31, 2017 E.B. Morris General Contractors X X X X X X X X X X NO NO X (sealed envolpe) X X X X X NOT COMPLETED X SIGNED, BUT NOT COMPLETED 3·00 PM Hager Construction Company X X X X X X X X X X X NO X X X X X X X X X NOT COMPLETED NOT COMPL TED (Letter attached verifying hires will be Section 3) X X X X X NO $116,556 .00 $113,060.00 Upon verification of bids , a mathematical error of $90 difference was f ound in EB Morris' bid. The amount entered was $16,466. Agenda Item 4B June 26, 2017 JORDAN AND DONNER PARK IMPROVEMENTS, CDBG 2017 BID 1617-08 MAY 31,2017 E.B. Morris General Contractors Hager Construction Company UNIT UNIT DESCRIPTION QTY UNIT COST Total Cost QTY UNIT COST 1. 2-Bay Arch Swing (Donner Park) 1 LS $9 ,194 .00 $9,194.00 1 LS $6,300 .00 2. Modular Playset (Jordan Park) 1 LS $53 ,578.00 $53,578.00 1 LS $75,600.00 3. Spinning Play Unit (Jordan Park) 1 LS $8 ,432 .00 $8,432.00 1 LS $3,625.00 4. Sun Shade (Jordan Park) Included 1 LS $13 ,831.00 $13,831.00 1 LS with Playset 5. ADA Playground Access Ramps 2 EA $1 ,956 .00 $3 ,912.00 2 EA $1,000.00 6. Engineered Wood Fiber 450 CY $47 .98 $21,589.00 450 CY $41.00 7. Install New 12" Plastic Border $11.0 5 $6,020.00 $13.00 Timbers with necessary hardware 545 LF 545 LF TOTAL BASE BID (ITEMS 1-7) $116,556.00 **EB Morris only provided the Total Cost and did not include the Unit Cost. Unit Cost was entered by COAB Purchasing . **Total Base Bid was calculated at $116,556 . The written entered by EB Morris was $116,466 for a difference of $90 . Total Cost $6,300.00 $75 ,600.00 $3,625.00 Included with Playset $2,000.00 $18,450.00 $7 ,085.00 $113,060.00