Loading...
518 Selva Lakes Cir - Destructive Roofing-In-Progress Application i City of Jacksonville PERMIT NO. Planning and Development Building Inspection Division I OFFICE USE ONLY Application for: Approved by: Destructive Roofing-In-Progress Inspection Date Approved: ROOFING-IN-PROGRESS INSPECTIONS A Roofing-In-Progress Inspection is a required inspection per the Florida Building Code—Existing Building (FBC-EB(. The purpose of the inspection is to confirm any required deck nailing has been completed and proper installation of a secondary water barrier as required by Rule 9B-0475. This required inspection was not requested by the contractor prior to completing the shingle installation for the above referenced permit, and now a Destructive Roofing-In- Progress inspection must be performed by removing certain portions of shingles and/or underlayment to insure compliance with state law. Not complying with this requirement could affect your insurance coverage for storm damage. Owner Affirmation I understand that the contractor, for the reason listed below, was unable to acquire a Passed Roofing-in-Progress Inspection. I also understand the Destructive Roof in Progress Inspection will require the Contractor to remove and replace shingles and/or underlayment as required by the City of Jacksonville Building Inspection Division to verify work is in comp)"ance with all state and local codes. Before me this/ day of � in the 14d.4-7 State of Flantla, has personally appeared herein by himself/herself and affirms a4 ateme Is and decl ti Shemin are true and Sign aauate. Property Owner Notary Public at targe,state o our g(M• ff� Personally known Prod a 'll'%OfARY PUBLIC ID Type: IM_g'aSTATEUF FLOrtIDA \ \ Contractor Affirmation Lt Expires 3/1512027 Company: I-t��' Address of Project: U�J mac' v� 3 Requested By: Reason for Request A/µ111 , understand City of Jacksonville Building Inspection Division procedures ss out�Bulletin G-04-08. I also understand the Destructive Roofing-in-Progress inspection is not part of those procedures and is an exception to the procedure. In addition,I understand that any non-code compliant work Identified during this inspection may result in the assessment of additional re-inspection fees. Signed: Date: An Approved Copy of this Application Must be On-Site at Time of Destructive Roofing-In-Progress Inspection