154 BEACH GARAGE INT REMODEL 2017 (2) OFFICE COPY
EASTERN
SHORES
CONSTRUCTION
INC.
5/30/17
To: City of Atlantic Beach, Building Department
Re; 154 Beach Avenue
Please see site management plan attached. Garage structure has been built.
Driveway intact. This work was completed in June of 2015. This permit is to
complete interior build out for the living space above the garage.
R9 rds,
Obert Leinenweber -
1015 Atlantic Blvd.,Suite 240,Atlantic Beach,Florida 32233 Phone 904.545.7878
eastemshwescansnuaion_mm
OFFICE COPY
w4 . _ §i
| � | � ( \ ) \
� AQ:
•
[ oil
4 (~
` ` -
/ ( j o \ \ `� \w� W 124.15' _ ) § §
� \ _
� ` )
all.) .
!
OFFICE COPY
FORM 8405-2014
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Pmject Name: Long 154 Beach Ave_ Builder Name:
street: 154 Beach Ave Permit Office: Daval
City,state,Zip: Afamc Sisson,FL, Permit Number
0,0w1 Jurisdiction: 261100
Design Location: FL,Jacksonville County:: Duval(Florida Climate Zone 2)
1. New wnstnidion or skating Addition 9. Wall Types(796.0 sgfl.) Insulation Area
2. Single family m mubiple family Single-family a.Frame-Wood,Ealerior R=19.0 ]98.00 fl
b.WA R= fl
3. Number of units,If multiple family i c.N/A R= a'
C Number of Bedroam(Bedrms In Addition) 1(0) d.WA R= R
S. Isfhisaworslwse? No 10.Ceiling Types (599.0 Sen.) Insulation Area
e.Under Ark(Vented) R=30.0 599.00ft
6. Conditioned floor area above grade(h) 599 b.WA R= h
c.WA R= IF
Conditioned floor area below grade(re) 0 11 Duds R n
7. Windows(0.0 sgf.) Description Area e.Sup:Attic,Ret:system 1,AH:Garage 6 109.8
a. U-Fedor WA fl'
SHGC:
b. U-Fador: WA ft' 12.Cooling systems kBtLdhr Efficiency
SHGC: s.Central Unit 18.0 SEER:15.00
c. U-Fador WA ft-
SHGC: 13.Heating systems kBhft Effideray
d. U-Fador N/A a• a.Electric Head Pump 18.0 HSPF:8.50
SHGC:
Area Weighted Average Overhang Depth: 0.000 It,
Area Weighted Average SHGC: 0.000 14.Hot wader systems-
a.Ekwbic Cap:40 gallons
8. Floor Types (599.0 sgfiJ Insulation Area EF:0.950
e.Floor over Garage R=19.0 599.00 If b. Conservation features
b.NIA R= fl None
c.WA R= IF 15.Credos CF,Padel
Glass/Floor Area: 0.000 Total Proposed Modified Loads: 17.92
PASS
Total Baseline Loads: 18.64
I hereby certify that the plans and specifications covered by Review of the plans and
,,114E ST,1l�
this calculation are in compliance with the Florida Energy specifications covered by this 2 = = 0�1,
Code. calculation indicates Compliance yw = ,.•°,•
with the Florida Energy Code.
PREPARED BY: Heat&AF Before construction is completed 000-i-i3 q
DATE: 8/12 onovan this building will be inspected for O
compliance with Section 553.908
I hereby certify that this building,as designed.Is in compliance Florida Statutes.
with the Florida Energy Code. e�COD WG
OWNER/AGENT:—.. BUILDING OFFICIAL: 41 - --
DATE: DATE: -f
Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualities as
cerOffed factory-sealed in accordance with R403.2.2.1.
-Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and an envelope leakage
test report in accordance with R402.4.1.2.
6/1/20178:53 AM EnernGauge®USA-FlaRes2014 Section R405.4.1 Compliant Soldware Pagel of
FORM R405-2014
PROJECT
Title: Long 154 Bea&Ave_ Bedrooms: 1 Address;Type: Street Address
Bustling Type: User Conditioned Area: 599 Lot 0
Daher Total Stories: 1 BloWSubDivision:
Y of Unds: 1 Worst Case: No PlatBook:
Builder Name: Rotate Angle: 0 Sheet: 150 Beach Ave
Permit Office: Duval Cress Ventilation: County: Duval
Jurisdiction: 261100 Whale House Fan: City.Sbre•Zip: Atlantic Beach
Family Type: Single-family FL,
NewlFxisting: Addition
Comment:
CUMATE
IECC Design Temp Int Design ramp Hinting Design Da i,Temp
Design Location TW Site Zaire 97.5% 2.5% Khmer Summer Degrce Days Wastes _Range
FL,Jacksonville FL_JACKSONVIL E_INT 2 32 93 70 75 1281 49 Medium
BLOCKS
Number Name Mea Volume
1 BloW 599 4792
SPACES
Number Name Area Valued Kitchen, Ocwparb Bedrooms InIa ID Finished Coaled Heated
1 System 1 699 4792 N7 2 1 1 Yes Yes Yes
FLOORS
i Flocr Type Space R-Value Mee _. _Tib Weed Carpel
1 Flocrover Garage System _ — 5996' 19 0.4 0 0.6
ROOF
Roof Gable Roof Solar SA Emilt Enitt Der* Pkh
i Type Materials Am Area Color Abso, Tei Tested Insul. (deg)
1 Hip Comparison shingles 6706 0R Medium 0.96 No 09 No 0 26.6
ATTIC
VIs Type Ventilation Vent Ratio(I in) Area RBS IRCC
1 Rill attic Vented 300 59982 N N
CEILING
i Calling Type _ ,. Spam R-Value Ins Type Area Framing Frac Truss Type
1 Under Attic(Vented) System 30 Blown 599 R2 0.11 Wood
61120178:53 AM EnergyGaugeEiUSA-FlaRes2014 Section R405.4.1 Compliant Sotlware Page 2 of
FORM R405-2014
WALLS
MCavity Wltlth Height Sheathing Framing Solar Below
To — wag-ly e Space.. RVslue.�Llrr EL._.. Area RYalue_.Fiadm._Absor_-Gracie°%.
em _ _
1 W Exterior Frame-Wood System 1 19 21 0 8 0 188.0 fl 0 0.23 0.8 0
—2 N Es erior Frame-Wood System 1 19 19.5 0 8 0 156.0IF 0 0.23 0.8 0
—3 E Ezledor Frame-Wood System 1 19 16 0 8 0 128.0 it' 0 0.23 0.8 0
4 E Exterior Frame-Wood System 19 14 0 8 0 112.08' 0 0.23 0.8 0
—5 S Examar Frame-Wood System 1 19 13 0 8 0 104.0 8' 0 023 0.8 0
—6 S Esoenor Frame-Wood System 1 19 6.5 0 8 0 52.0 Fe 0 0.23 0.8 0
7 W Exterior Frarne-Wood System 1 19 9.5 0 8 0 76.0 fl` 0 0.23 0.8 0
GARAGE
i Flew Area Calling Area Exposed Wall Perimeter Avg.Wall Heigh ErPoled Wall Incu0811100
1 600 ft. 6008+ 1008 88 1
INFILTRATION
it Scope Method SLA CFM 50 ELA EgLA ACH ACH 50
1 Wholehouse Best Guess .0003 471A 25.88 48.67 231 5.9018
HEATING SYSTEM
i System Type .Subtype Efficiency Capacity. _ Block Duds
1 Elastic Head Pump Nene HSPF85 18kBtulhr 1 eyeit
COOLING SYSTEM
M System Type Subtype Efficiency Capacity AMFInw SHR Bleck Ducts
1 Central Unit None SEER:15 18 kBkdhr 540 ckn 0.75 1 SY M1
HOT WATER SYSTEM
M System Type SubType Conation EF Cep Use Belpre Conaenalion
1 Electric Noes Garage 0.95 40 gal 40 gal 120 dog Nene
SOLAR HOT WATER SYSTEM
FSEC Collector Storage
Cert i Company Name System Madel M Collector Model i Am Volume FEF
None None ft'
DUCTS
—Supply —Realm— Ar CFM25 CFM25 HVAC
V a Location R-Value Area Location Area Leakage Type Handler TOT OUT ON RLF Heat Cool
1 Adic 6 109.8ft System 19.95ft Debut Leakage Garage (Detsuft) (Debut) 1 1
6/180178:53 AM EnergyGauge®USA-RaRes2014 Section R4054.1 Compliant Software Page 3of4
FORM R405-2014
TEMPERATURES
Pngramable ThemwstaL V r00' rf 'AlanCr[[ei]]]ling Fans:[00[9�'� r00r00'' [[7(]� [�y� I00'
Hentmg [ )Jan ]Fes )%]Mar )J(] f IMS 11Jun t ]Ad A�q I ISW � M .
NM [ ]Dec
Venting
Thertnoabt SMeeule: HERS 2006 Reference Hems
Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12
Cooling(WO) AM 7' 78 78 78 78 78 78 78 80 80 80 80
PM 80 80 78 78 78 78 78 78 7$ 78 78 78
Cooling(WEH) PAM PM 78 78 78 78 78 78 78 78 78 78 78 7' 78 78
Heating(WD) AM fib 66 fib 66 66 68 68 68 68 6B 68 68
PM 68 68 68 68 68 68 68 68 68 68 66 66
Hea8n9(WEH) PPM 88 68 88 68 68 68 68 68 88 68 88 86
611120178:53 AM EnergyGauge®USA-FlaRes2014 Section R4054.1 Compliant Software Page 4of4
FORM R405-2014
ENERGY PERFORMANCE LEVEL (EPL)
DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX' = 96
The lower the EnergyPerformance Index,the more efficient the home.
154 Beach Ave,Atlantic Beach, FL,
1. New construction or existing Addition 9. Wall Typas Insulation Area
2. Single family or multiple lemity Single-family e.Frame-Wood,Exterior R=19.0 796.00 ft'
b.WA R= ft'
3. Number of units,H multiple family 1 c.WA R- ft
4. Number of Bedrooms 1(0) d.N/A R= IF
5. Is this a worst rase? No 10.Ceiling Types Insulation Area
e.Under Attic(Vented) R=30.0 599.001
B. Coodiboned floor area(112) 599 b.MA R= ft'
7. WiMowa" Description Ansa c.WA R= ft
a. U-Factor. WA ft' 11.Ousts Rf?
a.Sup:Attic,Ret:System 1,AH:Gaage 6 109.8
SHGC:
b. U-Fader. WA ft
SHGC: 12.Gaoling systems d1huhr Efficiency
c. U-Factor. WA ft' a.Central Unit 18.0 SEER:15.00
SHGC:
d. LLFador. WA ft' 13.Healing systems dthithr Efficiency
SHGC: a.Eachic Heal Pump 18.0 HSPF:8.50
Area Weighted Average Overhang Depth: 0.000 ft.
Area Weighted Average SHGC: 0.000
8. Floor Types Insulation Area 14.lot water systems- Cap:40 gallons
a.Floor over Garage R=19.0 599.00 ft' a.Electric EF 0.95
b.WA R= R b. Conservation features
c.WA R= ft Nene
15.Credits CF,Pstat
I certify that this home has complied with the Florida Energy Efficiency Code for Building OFgF1E S7g7F
Construction through the above energy saving features which will be installed(or exceeded) J o
in this home before fin?t inspection. Otherwise,a new EPL Display Card Will be completed y�,4j'° -=
based on installed Cede compliant features.
u�
X
Builder Signature: _ )(Date: (z, fl �1 �
a
XAddress of New Home: � �-t Y CF�+pU� )(City/FL Zip: 13 i
3z33 °ew5i
'Note: This is not a Building Energy Rating. If your Index is below 70,your home may qualify for energy efficient
mortgage(EEM)incentives if you obtain a Florida EnergyGauge Rating. Contact the EnergyGauge Hotline at(321)
638-1492 or see the EnergyGauge web site at energygauge.com for information and a list of certified Raters. For
information about the Florida Building Code, Energy Conservation,contact the Florida Building Commission's support
staff.
**Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
611/20178:55AM EnergyGauge®USA-FlaRes2014 -Section R405.4.1 Compliant Software Page l oft
FORM R405-2014
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: Long 154 Beach Ave_ Builder Name:
Street: 154 Beach Ave Permit Office: Duval
City,Stale,Zip: Atlantic Beach,FL, Permit Number
gyne' Jurisdiction: 261100
Design Location: FL,Jacksoraille
COMPONENT CRITERIA CHECK
Air barrier and thermal barrier A continuous air barrier shall be installed in the building envelope.
Exterior thermal envelope contains a continuous barrier.
Breaks or joints in the air barrier shall be sealed.
Air-permeable insulation shall not be used as a sealing material.
Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the
insulation and any gaps in the air barrier shall be sealed.
Access openings,drop down stairs or knee wall doors to unconditioned
attic spaces shall be sealed.
Comers and headers shall be insulated and the junction of the foundation
Walls and sill plate shall be sealed.
The junction of the top plate and the top or exterior walls shall be sealed.
Exterior thermal envelope insulation for framed walls shall be installed in
substanfial contact and continuous alignment with the air barrier.
Knee walls shall be sealed.
Windows, skylights and doors The space between window/doorjambs and framing and skylights and
framing shall be sealed.
Rim joists Rim joists are insulated and include an air barrier.
Floors (including above-garage Insulation shall be installed to maintain permanent contact with underside
and cantilevered floors) of subfloor decking.
The air bamer shall be installed at any exposed edge of insulation.
Crawl space walls Where provided in lieu of floor insulation, insulation shall be permanently
attached to the mWspace walls.
Exposed earth in unvented Crawl spaces shall be covered with a Class 1
vapor retarder with overlapping joints taped.
Shafts, penetrations Duct shahs, utility penetrations,and flue shaft openings to exterior or
unconditioned space shall be sealed.
Narrow cavities Batts in narrow cavities shall be cut to fit a narrow cavities shall be filled
by insulation that on installation readily conforms to the available cavity
spaces.
Garage separation Air sealing shall be provided between the garage and co x itioned spaces.
Recessed lighting Recessed light fixtures installed in the building thermal envelope shall be
air tight, IC rated,and sealed to the drywall.
Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in
exterior walls,or insulation that on installation readily conforms to available
space shall extend behind piping and wing.
Shower/tub on exterior wall Exterior walls adjacent to showers and tubs shall be insulated and the air
barrier installed separating them from the showers and tubs.
Electrical/phone box on The air barrier shall be installed behind electrical or Communication boxes or
air sealed boxes shall be installed.
HVAC register boots HVAC register bums that penetrate building thermal envelope shall be
sealed to the sub-floor or drywall.
Fireplace An air banner shall be installed of fireplace walls. Fireplaces shall have
gasketed doors
&1/20178:55M EnergyGauge®USA-FlaRes2014 Section R405 41 Compliant Software Page t of 1
FORM R405-2014
Florida Department of Business and Professional Regulations
Residential Whole Building Performance and Prescriptive Methods
ADDRESS: 154 Beach Ave Permit Number.
Atlantic Beach,FL,
MANDATORY REQUIREMENTS See individual code sections for full details.
❑ 401.3 Energy Performance Level(EPL)display card(Mandatory). The building ofidal shall require that an energy performance level(EPL)
display card be completed and cedfied by the builder to he accurate and correct before final approval of the building for occupancy.Floka law
[Section 553.9085,Florida Statues]requires the EPL display card to be included as an addendum to each asks contract for both presold and
nonpresold residential buildings-The EPL display card contains information indicatrg the energy performance level and efficiencies of components
installed in a rivalling unit.The bunking official shall verify that the EPL display card completed and signed by Me builder accurately reflects the plans
and specifications submitted to demonstrate compliance for the building.A copy of thne EPL display card can he found in Appendix C.
❑ 11402.4 Air leekaga(Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordancewith the requirements of
Sections R4021 through R4024.4.
O R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sedions R402 4.1.1 and R402.4.1.2.The
sealing methods between dissimilar materials shall allay for differential expansion and contraction.
R402.4.1.1 Installation.The components of Me buiking Memel envelope as listed in Table R402.4.1.1 shall be installed in
accordance with the manufacturers insludions and Me criteria listed in Table 4024.1.1.as applicable to the method of construction.
Where required by Me code official,an approved third party shall inspect all components and verify compliance.
14402A.1.2 Tasting. The building ordeelling unit shall be tested and verifietl as having an air leakage rale of not exceeding 5 air
changes per hour in Climate Zones 1 and 2,and 3 air changes per hour in Climate Zores 3 through 8.Testing shall he conducted vt
a blower door at a pressure of 0.2 inches w.g.(50 Pascals).Where required by the code official,testing shall be conduced by an
approved third party.A written repod ofthe results of the test shall be signed by Has party conducting Me last and pmvked to the code
official.Testing shall be perfomed at any lime after aeabon of all perebafions of Me building thermal envelope.
During resting:
1.Exterior windows and doors,fireplace and stove doors shall he dosed,but not sealed,beyond Me intended eammersthpping or
other intimation control measures;
2.Dampers including exhaust,intake,makeup air,backdraft and Pore dampers shall be dosed,but not sealed beyond intended
infiltration control measures;
3.Interior doom,it installer)at the time of the test,shall be open;
4.E denor doom for continuous ventilation systems and heat recovery ventators shall be dosed and sealed;
5.Heading and cooling systems,if installed at to time of the lest,shall be turned orf;and
6.Supply and return regishe,if installed at Me time of the had,shall be fully open.
O 84024.2 Fireplaces.New wend-burning fireplaces shall have fight-fitting flue dampers and outdoor combustion air.
O 11402.4.3 FenseOration air Ieakagel+Tindows,skylights and sliding glass doom shall have an air intimation rete of no mora than 0.3 ctm
per square fool 0.5 Usfm2),and swinging doors no more Man 0.5 dm par square foot(2.6 Usfm2),when tested according to NFRC 400 or
AAMAANDMAICSA 101/LS.2/A440 by an accredited,independent laboratory and listed and labeled by the manufacturer.
Exception: Ste-buit windows skylights and doors.
0 R402.4.4 Reoessad lighting. Recessed luminaires installed in to building thermal envelope shall be sealed M limit air leakage
between conditioned and unconditioned spaces.All recessed luminaires shall be IC+ated and labeled as having an air leakage rate not
more Man 2.0 chn f0.944 Us)when tested in accordance with ASTM E 283 at a 1.57 psf(/5 Pa)pressure differential.All recessed!
luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
❑ R403.1.1 Thermostat provision(Mandatory}At least one thermostat shall be provided for each expands heaumg and cooling system.
❑ R403.1.3 Heat pump supplementary beat(Mandatory).Heal pumps having supplenerhtary electric-resistance heal shall have controls
Mat,except during defrost,prevent supplemental heat operation when Me heal pump compressor can meet the heating load.
❑ R403.2.2 Spring(Mandator ll duds,air handlers,and filter boxes and bulking cavifies that form Me primary air containment
passageways for air distribution systems shall he considered duds and plenum cambers,shall he constructed and sealed in accordance
vith Sedion C403.2 7.2 of Me Commercial Provisions of Has code and shall be shown to mast dud tightness criteria by post-constudion
or mugh-in testing below.
Dud lightness shall be worked by lestng to Section 803 of tie RESNET Standards by ether an energy r4lar certified in accordance with Section
553.99,Florida Statutes,or as autho sired by Florida Statutes,to be,'substantially leak fine'by ether of the kllovirg:
1. Poet-construction test:Total leakage shall be less Man or equal to 4 cam(113 Umk)per 100 square feel(9.29 m2)of conditioned floor area
when tested at a Pressure differential of 0.1 inches w.g.(25 Pa)across the entre system,including the manufacturers air handler enclosure-All
register boots shall be taped or othervdse sealed during the beat.
2. Rough4n test:Total leakage shall be less Man or equal to 4 cfm 113 L/min)per 100 square feet(9.29 m2)of conditioned flow area when tested
at a pressure differential of 0.1 inches w g.(25Pa)across Me system,including the manufacturers air handier enclosure.All registers shall be
taped or oMemise sealed during Me last.If Me air handier is not installed at Me time of Me test.total leakage shall be less than or equal to 3 dm
(85 Umin)per 100 square feel(9.29 m2)of conditioned Poor area.
Exceptions:
1. The local leakage test is not required for duds and air handlers located entirely within the bulking envelope.
2. Dud testing is not mandatory for buildings complying by Sedion R405 of this code.
6/1/20178:55 AM EnegyGauge4D USA-FlaRes2014 -Section R405A.1 Com Page 1 of
FORM R405-2014
MANDATORY REQUIREMENTS - (Continued)
❑ R403.2.3 Building Cavities(Mandatory). Building framing cavities shall not be used as duds or plenums.
❑ R403.3 Mechanical system piping Insulation(Mandatory). Mechanical system piping capable of carrying fluids above 105-F(41°C)
or below 55°F(13"C)shall be insulatetl to a minimum of R3.,
R403.3.1 Protection of piping Insulation.
❑ /2403.4.1 Circulating hot water systems(Mandatory). Circulating hot water systems shall be provided with an automatic or readily
accessible manual switch that can tum off the hot-water c mulafing pump when Me system is not in use.
❑ R403.4.3 Haattraps(Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have
heat traps installed on bath the inlets and outlets.External heat traps shall coming of after a commercially available heat trap or a
downward and upward bend of at Wast 3'A inches(89 mm)in the hot water disMbution line and mid water line located as dose as possible
to Me storage tank.
❑ /2403.4.4 Water heater efficiencies(Mandatory).
O R403.4.4.1 Storage water heater temperatum controls
RM&C4.1.1 Automatic con cols. Service water heating systema shag be equipped with automatic temperature mrtind
capable of adjustment from the lowest to the highest acceptable temperature settings for Me intended use.The minimum
temperature setting range shall be from 100'F to 140"F(38-C to 6WC).
R403A.4.1.2 Shut down. A separate switch or a deafly marked ctrct breaker shall be Provided to permit the power supplied
to electric service systems to be named off.A separate vahie shall be provided to permit the energy supplied to the main bumer(s)
of combustion types of service water heating systems to be turned o8.
O R403.4A.2 Water heating equipmsnt. Water heading equipment installed in residential units shall meet the minimum efficiendes of
Table 0404.2 in Chapter 4 of the Florida Building Code,Energy Conservation,Commercial Provisions,for Me type of equipment installed.
Equipment used to provide heating timm ns as part of a combination system shalt satisfy all stated requirements for the appropriate water
heating category. Solar water heaters shall mel Me aderia Section/2403.4.4.2.1.
/2403.4.4.2.1 Solar water heating systems.Solar systems for domestic hot water production are rated by the annual solar energy
factor of the system.The solar energy factor of a system shall be determined from de Florida Solar Energy Center Directory of
Certified Soler Systems.Solar collectors shall be tested in accordance with ISO Standard 9806,Test Methods for Solar Collectors,
and SRCC Standard TM-1,Solar Domestic Hot Water System and Component Test Protocol,Cdledons in installed solar water
heating systems should meet Me following criteria:
1. Be installed with a till angle between 10 degrees and 40 degrees Nthe horizontal;and
2. Be installed at an orientation within 45 degrees of true south.
❑ R403.6 Mschemoet ventilation(Mandatary). The building shall be pmvitled with ventilation that meets Me requirements of the
Florida Building Code,Residential or Florida Building Cade,Mechanical,as applicable,or with other approved means of ventilation.
Outdoor air intakes and exhausts shall have automatic or gravity dampers that dose when the ventilation system is not operating.
❑ R403.6 Hea4ngand coolingequipment(Mandatory). The following sections are mandatory for moling and heating equipment.
O R403.6.1 Equipment sizing. Heating and minting equipment shall be size0 in accordance with ACCA Manual S based on the
equipment loads calculated in accordance with ACOA Manual J or other approved heating and moling calculation methodologies,
based on building loads for the directional orientation of the building.The manufacturer and model number of the outdoor and
indoor units(0 spit system)shall be submitted along with Me sensible and total coding capacities at the design conditions
described in Section R302.1.This mde does rot allow designer as"factors,provisions for future expansion or other factors
which a6ect equipment sizing.System sizing calculations shall not include loads created by local intermittent medenical ventilation
such as standard kitchen and bathroom exhaust systems.
R403.6.1.1 Cooling equipment capacity. Coding only equipment shell be selected so that as total capacity is not less than the
calculated total load but net more Man 1.15 times greater than the total load calculated according to the procedure selected in
Section 403.6,or the closest available We provided by the manufacturers product lines.The corresponding Islam capacity of Me
equipment shall not be less than the calculated latent load.
611/2017 8:55 AM EnergyGauge®USA-FlaRes2014 -Section R40.5.4.1 Com Page 2 of 3
FORM R405-2014
MANDATORY REQUIREMENTS - (Continued)
O R403.6.1.1 cooling equipment rapacity.(continued) The published value for AHRI total capacity is a nominal,rating-test value and
shall not be used for equipment sizing.Manufacture's expanded performance data shall be used to select cooling-only equipment.This
selection shall be used to select cooling-only equipment.This selection shall be based on the outdoor design dry bulb temperature for the
load calculation(or entering water temperature fur waler-sourm equipment),the bbvrer chn provided by the expandnd performance data,
the design value for entering wart bulb temperature and Me design value for entering dry bulb temperature.
Design values for entering wet bulb and dry bulb temperature shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for return side gains if the relum duct(s)is installed in an unconditioned space.
Exceptions:
1. Attached single-and mul8-family residential equipment string may be selected so Mal its cooling capacity is less than the
calculated total sensible load but not less Man 80 percent of Met load.
2. NRen signed and sealed by a Flai la-registered engineer,in attached single-antl multi-family units,the rapacity of
equipment may be sized in accordance with good design practice.
0 R403.6.12 Heating equipment capacity
R403.6.1.2.1 Heal pumps. Heal pumps sizing shall be based on Me cooling requirements as calculated according to Section
R403.6.1.1 and the heat pump total contra,capacity shall not be mom Man 1.15 times greater Man the design cooling load.
R403.6.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of Me design
requiremeras calculated according to Me procedure selected in Section R403.6.1.
R403.6.1.2.3 Fossil fel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric bumers
shall not be less Men the design load calculated in accordance with Section R403.6.1.
O 8403.6.1.3 Extra capacity,required for special occasions. Residences requiring excess cooling or heading equipment mpacdy on an
intermittent basis,such as anticipated a lddional loads caused by major entertainment events,shall have equipment sized a controlled to
prevent continuous space cooling or heating within that space by one or more of the following options:
1. A separate mating or heating system is utilized to provide moling or healing to Me major entertainment areas.
2. A variable capacity system sized for optimum performance Maig base toad periods is utilized.
O R403.7 Systems serving multiple dwelling unit(Mandatory). Systema serving multiple dwelling units shall comply with Sections
C403 and C404 of the Commercial Provisions in lieu of Section R403.
❑ R403.8 Snow mak system controls(Mande ry'). Snowand!ice-malting systems,supplied through energy service to the building,shall
include automatic controls capable of shuMng off the system when the pavement temperature is above 55-F,and no precipitation is falling
and an automatic or manual control that will allow shutoff when the addoortempershxe is above 40'F.
❑ 8403.9 Swimming pools,ingmund spin and portable spas(Mandatory). The energy requirements for residential pools and
ingmund spas shall be as specified in Sections R403.9.1 through R403.9.3 and in accordance wlth ANSI/APSP-15.The energy
requirements for portable spas shall be in accordance with ANSVAPSP-14.
0 8403.9.1 Pool antl sq heaters. NI pool heaters shall be equipped with a readity accessible on-off switch Mat is mounted
outside Me healer to allow shutting oft the heater without adjusting Me thermostat setting.
8403.9.1.1 Gas and oil-fired pool and epa healers. All gas-and oil-firetl pool and spam beaters shall have a minimum
thermal efficiency of 82 percent for heaters manufactured on or after April 16,2013 when tested in accordance with ANSI Z 2156.
Pod heaters fired by natural gas or LP gas shall not have continuously burning pilot Ighls.
R403.9.1.2 Heat pump pool Maters. Heat pump pool healers shall have a minimum COP of 4.0 when tested in somnolence
with AHRI 1160,Table 2,Standard Rating Conditions-Low Air Temperature.A lest repad firm an independent laboratory is
required to verily procedure compliance.Geot hemnal swimming pool Mat pumps are not required to meet this standard.
O 8403.9.2 Time switches. Tine switches or other control method Mat can adomatimlly tum oft and an heaters and pumps amording to a
preset schedule shall be installed on all Maters and pumps.Heaters,pumps and motors that have built in firers shall be deemed in
compliance with this equipment.
Exceptions:
• 1. Where public health standards require 24-hour pump operations.
2. Where pumps am required to oWmte solar-and waste-treat-recovery Pool heating systems.
3. Where pumps are powered exclusively from on-site renewable generation.
O R403.9.3 Covers. Heated swimming pools and Wround permanently installed Was shall be equipped with a vapor-retardant cover on or
at Me water surface or a liquid cover or other means proven fo reduce heat loss.
Exception: Outdoor pools deriving over 70 percent of tha energy for heating from site-mmveretl energy,such as a Mal pump or
solar energy source computed over an operating mason.
❑ RR404.1 Lighting equipment(Msndstory). A minimum of 75 percent of Me lamps in permanently intellect lighting thrums shall be
hgh¢Mcecy lamps or a minimum of 75 percent of permaeently installed lighting fixtures shall contain only high fill lamps.
Exception: Low-voltage lighting shell nor be required to utilize hgheSMaq lamps.
O 8404.1.1 Lighting equipment(Mandatory). Fuel gas lighting systems shell not have continuously burning pilot lights
❑ 8405.2 Performance ONLY. All duds not entirely inside the building thermal envelope shall W insulated to a minimum of Rb.
O R405.2.1 Performance ONLY. Ceilings shall have minimum insulation of RAS Where single sssemby of Me exposed deck and beam type or
concrete dealt roofs do not have sufficed space,R-10 is allowed.
6/120178:55 AM EnegyGauge®USA-FlaRes2014 -Section 8405.4.1 Com Page 3of3
Long 154 Beach Ave
HVAC Load Calculations
for
III
RHVACRKSIDUNTILAL
HVAC Lowes
I
I
Prepared By:
Thursday,June 1,2017
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are pedonned per ACCA Manual J 8th Edition,Version 2,and ACCA Manual D.
Rhvac-Residential B Light Commercial HVAC Loads Elite Software Development,Inc.
Home Enemy Services Long 154 Beach Ave
Jacksonville,FL 32218 Page 2
Project Report
General Project bx6
Project Title: Long 154 Beach Ave
Design Data
Reference City: Jacksonville, Flonda
Building Orientation: Front door faces West
Daily Temperature Range: Medium
Latitude: 30 Degrees
Elevation: 26 ft.
Altitude Factor 0.999
Outdoor Outdoor Outdoor Indoor Indoor Grains
Q[y Ruth Wet Ruth Ral.Hum Rel.Hum nri Ruth D1H66uCa i
Winter. 32 29.92 me Na 70 nla
Summer. 94 77 47% 50% 75 48
Total Building Supply CFM: 613 CFM Per Square R: 1.018
Square R.of Room Area: 602 Square fL Per Ton: 458
Volume(ft'): 4,816
Total Heating Required Including Ventilation Air: 9,797 Btuh 9.797 MBH
Total Sensible Gain: 14,226 Btuh 90 %
Total Latent Gain: 1,537 Btuh 10 %
Total Cooling Required Including Ventilation Air. 15,762 Bluth 1.31 Tons(Based On Sensible+Latent)
Rhvac is an ACCA approved Manual J and Manual D computer program
Calculations are performed per ACCA Manual J 8th Edition,Version 2,and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturers performance data at
your design conditions.
CA...LLong 154 Beach Ave.rh9 Thursday,June 1,2017,9:05 AM
- -
Rhee-Realdernlal a LIpM Commarc4l HVAC Loads Elie Software Development,I"
Home Energy Services long 154 Beach Ave
Jacksonville,FL 32218 Page 3
Miscellaneous Report _
-�- or 2door 80% Na 70 —
System 1 `- Outdoor Outdoor Outdoor
Vt Da ___ Dry Bulb_ Wet Bulb R_el.Hum
Winter: Ne
Summer: 94 77 47% 50% 75 48.06
Ma'n Tank BIl00YL5
Calculate: Yes Yes
Use Schedule: Yes Yes
Roughness Factor. 0.01000 0.01000
Pressure Drop: 0.1000 in.wg./100 ft. 0.1000 In.wg./100 ft.
Minimum Velocity: 550 ft/min 450 ft./min
Maximum Velocity: 600 ft./min 750 IL/min
Minimum Height: 0 in. 0 in.
Maximum Height: 0 in. 0 in.
Otrtaide Air D
Winter Summa[
Infiltration Specified: 0.300 AC/hr 0.300 AC/hr
24 CFM 24 CFM
Infiltration Actual: 0.300 ACRtr 0.300 AC/hr
Above Grade Volume: X 4 816 Cu.ft. X_ 4 816 Cu.ft.
1,445 Cu.ft./hr 1,445 Cu.ft./hr
X 00167 X 00167
Total Building Infiltration: 24 CFM 24 CFM
Total Building Ventilation: 0 CFM 0 CFM
—System 1—
Infiltration&Ventilation Sensible Gain Multiplier. 20.88 = (1.10 X 0.999 X 19.00 Summer Temp. Difference)
Infiltration&Ventilation Latent Gain Multiplier 32.65 = (0.68 X 0.999 X 48.06 Grains Difference)
Infiltration&Ventilation Sensible Loss Multiplier. 41.76 = (1.10 X 0.999 X 38.00 Winter Temp. Difference)
Winter Infiltration Specified: 0.300 AC/hr(24 CFM)
Summer Infiltration Specified: 0.300 AGhr(24 CFM)
1 Supply Main Attic 168 0.09 6 162 No
1 Return Main Attic 168 0.15 6 60 No
CA...\Long 154 Beach Ave.rh9 Thursday,June 1,2017,9:05 AM
Page
-NOBIderN01iLi9M Commercl0l MVAC Loads Elite Software Development,In
EnerOY Services Lonq 150 Beach Ave c
vAle,FL 3e 4
22IS _
IKa—
Load Preview Report 7e�
Sen lel N01 Sen g A�Ue Dud
Soaps Ron Nee Gwn Gain GYn Lova CFM CFM CFM Sim
SUNIq 1.31 458 602 14,226 1,537 15,762 9,197 tat 513 613
evelemt 1.31 458 502 14,225 1,537 15,762 9,787 191 613 613 14
Soodv Dud Latent 116 116
Return Dun 753 235 989 386
Zones 602 13,473 1,185 14,658 9,431 191 613 613 14
1-LivinoNoo"et Bar 380 9,837 846 10.683 6,148 124 418 410 4
26edmom1 168 2,879 213 3,092 2.326 47 131 131 2-5
341ath1 54 757 126 683 957 19 M M 1—t
CA...XLong 154 Beach Ave.rh9 Thursday,June 1,2917,9:05 AM
Rhvac-Residential&Light Commercial HVAC Loads - Elite 9oaware Development.l
Home Enemy Services Loma 154 668U1
Jacksonville,FL 32218
Duct Size Preview _-
Room« VebGm Meyl� Rou�l Dealsn... _SP Due Dud Htg CIg Act. Dud
Duct Name Sauru _ J 11140 Logic Velocity Length
Sretmn 1
Supply Runouts
Inro1
1-LMrgMwkM'et Sar M04n 4W ]fig 0.01 0.1 188.e 121 4N 4-'S
p-Batlmpnl BUS-In 4W ]50 0.01 0.1 23 47 131 2-
3aaih1 &10-In 4W 7W 0.01 0.1 394b 19 31 1-I
Other Duds In System 1
Suodv Main True, Sub-In w 900 0.01 0.1 873.4 191 813 14
Summary
SvateIn 1
Having Flow 191
Cooling Flow. 813
CA...1Lcng 154 Beech Ave.rh9 Thursday,June 1,2017,9:05 AM
Light dmmereld RVAG LosM � Elite SNtwen OwNop,m.,
eN,
ERda
Total Building Summary Loads -�
nent -. _ — _-- - Area _-_ Sen Let Sen
ENbipp(m__ _ Quan Loss .__Gam -Gain_ -
4A-6 o:Glazing-Double pane lowe(e=0.20 or less), 151 7 3,172 0 5,265 5,265
high performance,operable window,a=0.05 on
surface 2,any frame,u-value 0.55,SHGC 0.33
12E-0sw:Wall-Frame,R-19 insulation in 2 x 6 stud 644.3 1,665 0 938 938
cavity,no board insulation,siding finish,wood studs
16B-30:Root/Ceiling-Under Attic with Insulation on Attic 602 732 0 1,040 1,040
Floor(also use for Knee Walls and Partition
Ceilings),Vented Attic, No Radiant Barrier,Dark
Asphalt Shingles or Dark Metal,Tar and Gravel or
Membrane, R-30 insulation
20P-19-c: Floor-Over open crawl space or garage, 602 1,144 0 422 422
Passive,R-19 blanket insulation,carpet covering ---
Subtotals for structure: 6,713 0 7,665 7,665
People: 2 400 460 860
Equipment: 0 3,300 3,300
Lighting: 0 0 0
Ductwork: 2,078 352 2,237 2,588
Infiltration:Winter CFM:24,Summer CFM:24 1,006 785 503 1,288
Ventilation:Winter CFM:0,Summer CFM:0 0 0 0 0
AED Excursion: 0. . 0 61 61
Total Building Load Totals: 9,797 1,537 14,226 15,762
Total Building Supply CFM: 613 CFM Per Square ft.: 1.018
Square ft.of Room Amer 602 Square R Per Ton: 458
Volume(ft'): 4,816
Total Heating Required Including Ventilation Air. 9,797 Btuh 9.797 MBH
Total Sensible Gain: 14,226 Stub 90 %
Total Latent Gain: 1,537 Btuh 10 %
Total Cooling Required Including Ventilation Air: 15,762 Btuh 1.31 Tons(Based On Sensible+Latent)
_rove
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition,Version 2,and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
CA...Ung 154 Beach Ave.rh9 Thursday,June 1,2017,9:05 AM
Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc.
Home Energy Services Lanq 154 Beach Ave
LJsdwmd�.FL=8----.— Page]
[Building Pie Chart
Floor 12% Infiltration 10%
Roof 7%
Ductwork 21%
Wall 17%
Glass 32%
AED Excursion 0%
Roof 7 joor 3% Inflltration 8%
Wall 6%
Ductwork 16%
(i
Glass 33%
Equipment 21%
People 5%
C:\...\Long 154 Beach Ave.rh9 Thursday, June 1, 2017, 9:05 AM
i
Rhvac-Residential&Light Commercial HVAC Loads Elne Software Devel
Home Enemy Services LOQ 154
JecksonvMe,FL 32218
System 1 Room Load Summary
Htg Min Run Run Clg Gig Mid Act" '
Room Area Sens Htg Duct .Duct Sen`_ Let Gig Sys
No Name _...SF _ Btuh _ CFM Size
-Zone 1---
1 Living/Nook=et 380 6,148 124 4-6 570 9,837 846 448 448
Bar
2 Bedroom 1 168 2,326 47 2-5 480 2,879 213 131 131
3 Bath 1 54 957 19 1-4 395 757 126 34 34
Duct Latent 116
Return Duct 366 753 235 _...
System 1 total 602 9,797 191 14,226 1,537 613 613
System 1 Main Trunk Size: 14 in.
Velocity: 573 ft./min
Loss per 100 ft.: 0.067 in.wg
Net Required: 1.31 90%110% 14,226 1,537 15,762
Actual: 1.50 75%/25% 13,500 4,500 18,000
Heating System Cooling System
Type: Air Source Heat Pump Air Source Heat Pump
Model: NXH518GKA" NXH518GKA"
Indoor Model: FEM4X24"CL
Brand: TEMPSTAR TEMPSTAR
Description: Air Source Heat Pump Air Source Heat Pump
Efficiency: 8.5 HSPF 15 SEER
Sound: 0 0
Capacity: 17,700 Btuh 18,000 Btuh
Sensible Capacity: n/a 13,500 Btuh
Latent Capacity: n/a 4,500 Btuh
AHRI Reference No.: n/a 9596679
C:\...\Long 154 Beach Ave.rh9 Thursday,June 1,2017,9:05 AM
TECHNICAL SUPPORT MANUAL Split System Heat Pump: NxHS
a8�^`-8F^^888x"'
21 as
a8xx8
RS:^.d`.„588.„p E^7: d,.x• •^.am2.
xxxxm-xx..xx. .xe�^^-xx•x"ax^-
^888AS8S8:=8SxL ESxeR___' g:$_R
Rx :x:2"_"•x_
^SxSeR8d8:a88^o: .RBry^..CB.xW
8 Exe:'62gxoeSB,
vq C: eax gi8x"•, G38
Y ex6x3e8a8mx88g :3 �eio =''x'8"^ ^xg_
e €:sac -cap -XIV :8; (�
It
„aRx ^xggSE
(�
$; ca^ axxaxx s: ERxa:a-caxx.Rxx-. °+
aS 92 8x
e� '=83aR88x8xa88$9 ~:��8xo��sSea�
:82^
a
rRam$„ a;,xsna J
8F T
N o
mo- y m
iI
82 Rx3i^_xge3'RRS:rx
^
aES22 `.. ' Wil
i
u isi4oa��goi��f° �+ ':-O`s .R.i€i:g
e 428 04 6200 02
TECHNICAL SUPPORT MANUAL SPIN Sy"m HMl Pump'HXH5
0O1o0o � 8088 � � s o
d o S S
N 7 RAN
gg gg gg
J J `L k • § § k • a `C E E
Q p
4
m _
i f f f
t � Y Set vt .o'� vy', a e 'a aNeK `rPa ^ mev 'a
ox 000e . �exxdss deedoo �
^ a
waie Pgx ddxa a za � w ,. .. z 'a xddz x
t z w = z w w i i w
0 W W W W w N
E x
W s
X8050 $ & $ 0 & & . .. . . . . . . .. . , � & & $ wm58o ��
U Z o o c o 0 0 o d o o c c c o 0 6 0 0 0 0 0 o c o 0 0 - Z
z
8
e '
a e n a e a
k S x x i k i
$ v a _ g a a a ^ v ` a ^ v
a S Q S S .r Z z uLLl IwL LL w LL LL Iwl x
z z z z` z z z z
w w w w w w w
028 04 82M W 23