Loading...
Exh 4DAGENDA ITEM #4D FEBRUARY 28, 2005 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Paradise Oaks Subdivision -Acceptance of Water and Sewer Infrastructure for City Ownership and Maintenance SUBMITTED BY: Donna Kaluzniak, Utility Director DATE: February 17, 2005 BACKGROUND: Construction on the Paradise Oaks Subdivision infrastructure has recently been completed. This subdivision is located in the City of Jacksonville on the north side of Dutton Island West. The contractor has completed construction in accordance with approved plans, and has submitted all necessary documentation. City staff completed a final inspection, and the Department of Environmental Protection has cleared the water and sewer systems for service. BUDGET: No immediate impact to operating budget. The attached schedule of values will be added to the City's assets. RECOMMENDATION: Accept the water and sewer infrastructure in the Paradise Oaks Subdivision for ownership and maintenance by the City of Atlantic Beach. ATTACHMENTS: 1. Letter of Transmittal from Braddock Construction dated 1/18/OS, lisring submitted paperwork. (Actual submittal available in City Clerk's office) 2. Schedule of Values that will be added to City's assets. REVIEWED BY CITY MANAGER: 1 AGENDA ITEM #4D FEBRUARY 28, 2005 Braddock Construction, ~ lnc. P.O. BOX 51328, JACKSONVILLE BEACH, FLA 32250 PHONE: (904) 247-2302 FAX: (904) 247-2337 TO: DATE: Janaury 28, 2005 JOB NUMBER 7370 City of Atlantic Beach ATTENTION: Mark Lyon 1200 Sandpiper Lane REFERENCE: Paradise Oaks Atlantic Beach, FL 32233 GENTLEMEN: WE ARE SENDING YOU: X_ATTACHED -For approval -Approved as submitted _Release for construction X For your use _Approvcd as noted ,-Resubmit copies Cor approval _As requested _Returned for correction _Submit_copies for distribution -For review and comment _ ,_Return_corrected prints COPIES DATE NUMBER DESCRIPTION 1 01!26105 Guarantee letter -Original 1 01 /26/05 Release of Lien -Original 1 Schedule of Values 1 Ellis & Associates Reports (1-10) 1 Florida Pipe Tech Report 1 1/13&1/12 Bac-T's Mark - -~ 7o follow up on the 2 water/sewer asbuilts I delivered to you earlier this week. 4 I am enclosing the remaining close out package documents. if you need anything else -please let me know. COPY T0: • 7370 -1 SIGNS • isa Olliff, Assistant Project Manager • 1F ENCLOSURES ARE NOT AS NOTED, KINDLY NOT{FY US AT ONCE. I - _ _ __. _.._--~--- -- . _ I _.__ -_ ~~ ~y AGENDA ITEivI #4D FEBRUARY 28, 2005 PARAD{SE OAKS SCHEDULE OF VALUES SEWER CONNECT TO EXISTING SMH 1 EA $2,161.78 $2,161.78 R&R ASPHALT 1 LS $6,874.13 $6,874.13 8" PVC SEW ER AVG 6.8' CUT 390 LF $13.61 $5,307.90 DEWATERING 1 LS $3,514.14 $3,514.14 MANHOLES AVG 6.5' CUT 4 EA $4,305.55 $17,222.20 SERVICES 13 EA $645.84 $8,395.92 TESTING 390 LF $5.37 $2,094.30 SEWER TOTAL $45,570.37 WATER LOCATES ~ 1 LS $726.83 $726.83 8" x 6" TAP & VALVE 1 EA $3,507.45 $3,507.45 6" DR 18 PVC,VLV'S, & 500 LF $24.82 $12,410.00 TESTING 500 LF $3.25 $1,625.00 SINGLE SERVICES 3 EA $387.99 $1,163.97 DOUBLE SERVICES 5 EA $714.91 $3,574.55 SET METER BOXES 13 EA $87.39 $1,136,07 SAMPLE POINTS 2 EA $385.76 $771.52 FIRE HYD. ASSEMBLY 1 EA $2,732.47 $2,732.47 TRAFFIC CONTROL 1 LS $2,138.47 $2,138.47 WATER TOTAL $29,786.33 ~:.<e,......~ i :K::i:: r.:;; ~ _ ~, iii111 GRAND TOTAL $75,356.70