Loading...
Amended Agenda Item 6C- Resolution No. 17-11AGENDA ITEM: CITY OF ATlANTIC BEACH CITY COMMISSION MEETING STAFF REPORT Russell Park Tennis Court Reconstruction SUBMITIED BY: ~~a ~Av:~l.-~ Scott Williams, Interim Public Works Director # zf),_, ' DATE: August 23, 2017 BACKGROUND: Staff has obtained quotes for the milling and Resurfacing of Tennis Courts 5 & 6, and the leveling and resurfacing of Courts 3 & 4. This quote is based on costs piggybacking on the City of Jacksonville Contract CS-0354-15 dated 2015 11Sport Court Maintenance and Construction." The scope of work will include the following: Remove the existing fence on tennis court 5 & 6 on all three sides along with the net post and center anchors. Mill and crush all existing asphalt and grade the area to a proper slope. Repave the surface with a Type Ill asphalt to a depth of 1.5". Saw cut all three edges of the asphalt court in preparation for the installation of a new 10" high green vinyl 9 gauge fence with top, middle, and bottom rail throughout the new fencing. Install two new sets of net posts bases with sleeves and two center anchors. Install two new tennis nets with center nets with center straps. Restripe lines for two tennis courts on new surface. On courts 3 & 4 add a leveling course of sand mix to level out the puddled areas. Resurface with the tennis court coating and strip. Repair of Courts 3 & 4: Mill & Resurface Courts 5 & 6: TOTAL PRICE FOR COURTS 3, 4, 5 & 6: $ 22,907.60 $ 78J72.00 $101,679.60 RECOMMENDATION: Approve Resolution No. 17-11 authorizing the City Manager to sign an agreement piggy backing on the City of Jacksonville Contract: CS-0354-15, Sport Court Maintenance and Construction 2015 (Re-Bid) for Russell Park Tennis Court Reconstruction and authorize the City Manager to approve a purchase order for $101,679.60. ATIACHMENTS: 1. Proposed Resolution No. 17-11 BUDGET: 2. City of Jacksonville Sport Court Maintenance and Construction bid. 3. Price quote for Courts 5 & 6 4. Price quote for Courts 3 & 4 The current year budget includes $125,000 in Parks Maintenance account 131-6020- 572-6300 for Project PM1704-Russell Park Tennis Courts. REVIEWED BY CITY MANAGER: --G=u-~-~).L__4-----I-------- Amended Agenda Item 6C August 28, 2017 RESOLUTION NO. 17-11 A RESOLUTION OF THE CITY OF ATLANTIC BEACH AUTHORIZING THE CITY MANAGER TO SIGN AN AGREEMENT PIGGYBACKING ON CITY OF JACKSONVILLE CONTRACT CS-0354-15 DATED 2015 "SPORT COURT MAINTENANCE AND CONSTRUCTION" AND APPROVED A PURCHASE ORDER FOR $101,679.60 ON BEHALF OF THE CITY OF ATLANTIC BEACH. WHEREAS, City of Atlantic Beach staff has obtained quotes for the milling and resurfacing of tennis courts 5 & 6, and the leveling and resurfacing of Courts 3 & 4, at Russell Park; WHEREAS, the City desires to piggyback on City of Jacksonville Contract CS-0354-15 dated 2015 "Sport Court Maintenance and Construction"; and WHEREAS, the current year (FY-2017) budget includes $125,000 in Parks Maintenance account 131-6020-572-6300 for Project PM1704-Russell Park Tennis Comis; NOW THEREFORE, be it resolved by the City Commission of the City of Atlantic Beach as follows: SECTION 1. The City Manager is hereby authorized to sign an agreement piggybacking on City of Jacksonville Contract CS-0354-15 dated 2015 "Sport Court Maintenance and Construction" and approve a purchase order for $101,679.60 on behalf of the City of Atlantic Beach. SECTION 2. This Resolution shall take effect immediately upon its passage and adoption. PAS SED AND ADOPTED by the City of Atlantic Beach, this 28th day of August, 2017 Mitchell E. Reeves, Mayor Attest: Donna L. Bartle, City Clerk Approved as to form and correctness: Brenna M. Durden, City Attorney Amended Agenda Item 6C August 28, 2017 P A A K S, A E C R E A T I 0 N A N D C 0 M M U N I T Y S E R V I C E S D E P A R T M E N T September 7. 2016 MEMORANDUM TO: Greg Pease. Chief Procurement Division FROM: ~Daryl Joseph~ W Director ~ sa> RE: BID CS-0354-l~Sports Court Maintenance and Construction Second Renewal Recommendation The Parks. Recreation and Community Services Department respectfully recommends approval to utilize the second of three renewal options with Court Surface s, Inc . to continue providing sports court maintenance and construction with the annual expenditure In the amount of $152.615.00. The not to exceed maximum Indebtedness will be Increased to $457,845 .00. Master Blanket 503690. Funding will be from various CIP accounts and RPCM011 PG 04938 . Your assistance In concurring with this recommendation for the respective award would be appreciated. If you have any questions or If further information Is required. please contact Renee Harriman (255-8294). ' DJ/rlh Attachment: Renewal Letter from Court Surfaces, Inc . Latest Award Copy cc: Claire Stine. Financial Manager Chelsey Renfroe. Purchasing Analyst 2111 N. I Ionon Slr ,'Je t -<l•r. floor 1 Jockson viil e . f.L 32202 1 Pllono (904) ?55 ·7',00 1 f-o x (9()cl ) 255 · 7'144 1 www.coJ.net Amended Agenda Item 6C August 28, 2017 SUBJECT : SPORTS COURT MAINTENANCE AND CONSTRUCTION (RE·BID) BID #: CS-0354·15 OPEN DATE: 2015-01 ·14 GENERAL GOVERNMENT AWARDS COMMITTEE KIND AND BASIS OF CONTRACT: CONSTRUCTION SUPPLY-FROM DATE OF AWARD THROUGH SEPTEMBER 30,2015, WITH THREE (3) ONE (1) YEAR RENEWAL OPTIONS AG ENCY : PARKS, RECREATION AND COMMUNITY SERVICES BASIS OF AWARD: TOTAL BASE BID, TO THE LOWEST RESPONSIVE, RESPONSIBLE BIDDER NUMBER OF BIDS INVITED: ;! NUMBER RECEIVED: ;! OTHER: ! SUMMARY OF BIDS AND RECOMMENDED ACTIONS: Recommend approval to utilize the second (2) of three (3) renewal options to Court Surfaces, Inc. to continue providing sports court maintenance and construction for the Parks, Recreation and Community Services Department. Period of service will be October 1, 2016 through September 30, 2017 . Total annual expenditure not-to-exceed $152,615.00 for a tota l maximum indebtedness not-to-exceed $457,845.00. Funding for this award to be encumbered by various CIP and RPCM01 1 PG-04938, to be executed by purchase order(s). This award is subject to appropriation by the City in the fiscal year beginning October 1, 2016. No funds have been appropriated to date. The City has no obligation for payment and work hereunder is not authorized unless funds are appropriated for the work herein. A written notification will be provided in the event that funds are appropriated. Attachments: Recommendation Memo, Vendor Letter, Terms and Conditions, Specifications, Tabulation Result s , Previous Awards cy~ alyst: ~ ~HELSEY RENFROE CONCURRENCE BY: Daryl Joseph, Director of Parks, Recreation and Communit'l Services Department (ALL AWARD ACTIONS SUBJECT TO LAWFULLY APPROPRIATED FUNDS) ACTION OF GGAC COMMITTEE ON RECOMM~NDATIONS ABOVE ! AS APPROVING _3._ MEMBERS DISAPPROVING --¢-DATE: q -6 -i_ , I OTHER: __________________ __ 1 '1 1 .i·UJ Amended Agenda Item 6C August 28, 2017 C SI LElJ Covn Sv rface s. In c. Re nee Harrimun C ity of Jackson vill e August J l. 20 I 6 Pnrks, Recreatio n und Comm unity Se rvice s 214 N . Hogan Strl'e t, Fo urt h Floo r J n~k s onv i llc. FL 32:!02 R -e nee Hnrriman, ~ ~· ~' ~~.w~· )':J.:;.3c:'\.,Jo. nor·~-~ ;;:'1 JIXI.) (Y0-1\ '20b-(;."...13 t.J,:ror..:l \A..~·. (.'..cm-JJ l i "!2J C ourt Surfaces, In c. req ue s ts u rene II'<~ I of Contract #CS -035~-1 :i ; SpN'tS Court M ain te nance & Construc ti on, d a t.:d Janu ary 2 7 , ,20 15. fo r th e p er io d of I 0/01/!6 -09/30/17 . Coun Surto ces.l nc . require s no odj usun ent to the Co nt roct Un it Pri ces. We look. fo rwar d to contin uin g our wo rk w ith the City of Jacksom·ill e . 1 Th ank you. c:; .. G=L-- L:rnv M. Pitt s Prc ~l d~nl , (IIUI'I Sur(ace5. In ~ Amended Agenda Item 6C August 28, 2017 SUBJ ECT; SPORTS COURT MAINTENANCE AND CONST RUC TION (R E·BID) . BID# C5-0354·15 OPEN DATE: 2016 -01-1 4 GENERAL GOVERNMENT AWARDS COMMITTEE KIND AND BASIS OF CONTRACT: CONSTRUCTION SUPPLY· FROM DATE OF AWARD THROUGH SE PTEMB ER 30,2015, WITH THR EE (3) ONE (1) YEAR RENEWAL OPTIONS AGENCY : RECR E ATION BASIS OF AWARD: TOTAL BASE BID. TO THE LOW EST RESPONSIVE. RE SPQNSIB !,..E BIDD ER NUMBER OF BIDS INVITED ~ NUMBER RECEIVED ~~ OTHER 1 SUMMARY OF BIDS AND BECOMMENQEP ACTION S; Recommend approval to ratify period of service from October 1, 2015 th rou g h da te of a ward . Recommend approval to ullllze the First Renewal Option to Court Surfaces, Inc ., In th e ann ua l expenditure amount ol $152,615.00. Period of service will be from date of award through September 30, 2016, with two (2) one (1) year re newal options remaining. Total revised estimated expenditure not-to-exceed $305,2.30.00. I This award to be funded by account: RPCM011PG·04938 to be processed by Purchase Order(n). Attachments : Recommendation Memo, Vendor Letter. Prevlou G Award CONCURRENCE BY: Darvl Joeeph, Dlres;tor . Park !!, Recrea llon and Commyni!Y Servic es Deeartmgnt (ALL AWARD ACTIONS SUBJECT TO LAWFU d LY AP PROPRIATE D FUND S} ACfiQN..OF GGAC COMMITTEE ON RECOMMENDATIONS ABOVE J« APPROVING ~ MEMBERS DISAPPROVING_· __ D ATE: \0:2-Cf-_=~. OTHER:. ____________ __ APPROVED ____ ~----------DBAPPAOVED _________ ~~~- OTHEA SIGNA nJAE OF AUTHENTICATION ---"~4W--II--Io'-=-\f-..IUL.--\-{j,p.L:I.~ Sam E. Mousa ---; · sll'9 th e Offi cer · Fo r: MDyo r Lenny Curry 11 1"do t Alllherlf tt-y r'110f~'-. --- E><ecutlve Order No. 2015-0 S FO RM GB-1 Ga, RoviP !Kf 1212007 Amended Agenda Item 6C August 28, 2017 SUBJECT: SPORTS COURT MAINTENANCE AND CONSTRUCTION(RE·BI O) BID# CS.0354-15 OPEN DATE: 201 5-01·14 G ENERAL GOVERNM E NT AWAR DS COMMITTE E KIND AND BASIS OF CONTRACT: CONSTRUCTION SUPPLY· FROM DATE OF AWARD THROUGH SE PTEMBER 30, :.!015, WITH THREE (3) O NE (1) YEAR RENEWAL OPTlONS AGENCY: RECREATION BASIS OF AWARD: TOTAL BASE BID. TO THE LOWEST RESPONSIVE , RESPONSIBLE BIDDER NUMBER OF BIDS INVITED ~ NUMBER RECEIVED ~ OTHER ! SUMMAR'{ OF BIDS AND RECOMMENCED ACTIONS: Recommond approval ol award to Court Sur1acoo, Inc., ae lha lowest re epons1vo, responsibl e b1dder for th e total base bid n the amount ol Sl52,815.00. Fundlng lor this awan:lto be encumbered by account: APCM01 t PG·04938 to bo e Meculed by Purchase Ordor(s). Attachm ents: Recommendation Memo. Bid TabulaUon Sheet, Basts ol Award/Contract Terms. Scope ol Work (ALL AW A flD A CTION S SUWECTTO L AWFUL L Y A PPROPR I ATE O F U ~) \ . ACTIQ.:! OF GGAC COMMITTEE ON AECOMMEND ATlONS ABOV E .......,...., f ~ PROVING ._...:f. MEMBERS DISAPPROVING '___ DAT E: __.,Q""'_,_....:::~::;.;:::::..-.~h_,_;>_ D IS APP PO V EO SIGN ATUA EOFAUTHEN TIC ATION -~ ~ OT HER ~ O'Tl-I ER : ________ _ Cle Yeia nd F f1111USOO liJ Deovty C h ie f Adm ln i ;ll:a tive Officer For: MayOt' Alvi n Brown Uodcc A.t lfholiwtyy;giF.f:--- Executi ve Ord er No . 2015-01 FOAM GB-10 0, Aa•laed 12f.Z 007 Amended Agenda Item 6C August 28, 2017 QWS3 2 7 0X 9/8/2016 2:2 2 PM FAML6350 VS.1 ** N~l COJ FAMIS PRODUCTION ** LINK TO: ACCOUNT SUMMARY INQUIRY FISCAL MO/YEAR I NDEX COD E SUBOBJECT P ROJE CT PROJE CT DETAIL GRANT GRANT DET AI L USER CODE 01 2017 RPCM011PG 04938 CURRENCY COD E PLAYGROUNDS & CENTERS MISCELLANEOUS SERVICES & CHARGES 0 9/08 /201 6 2 :19 PM s OCT 2 016 ANNUAL BALANCE AL L YEJl.RS BA LAN CE ESTIMATED REVENUE S REVENUES UNREALIZED REVENUES BUDGET EXPENDITURES ENCUMB RANCES PRE -ENCUMBRANCES REMAINING BALANCE F l -HELP F2 -SELECT F9-LINK .00 .00 .0 0 .00 .0 0 .00 .00 .00 .0 0 466,375.77 466,375.77 46 6,3 75 .77 -307.97 -307.97 -307 .9 7 99,900 .97 9 9 ,900 .9 7 99 ,9 00 .9 7 900 .00 90 0 .00 90 0 .0 0 365,882 .77 365,882 .77 36 5 ,882 .7 7 F4-PRIOR FS-NEXT FlO -PRIOR -MO Fl l-NEXT -MO Amended Agenda Item 6C August 28, 2017 Court Surfaces, CS-0354-15 Inc. 1---...,.------i 1/22/2015 $152,615.00 Award 10/29/2015 $152,615.00 1st Renewal Option Pending $152,615.00 2nd Renewal Option $457,845.00 Total Award Amended Agenda Item 6C August 28, 2017 R eques tf p or urc h ase Od f C rtSrf r er or ou u aces, nc City of Jacksonville Contract CS-0354-15: Sport Court Maintenance and Construction 2015 Locatlon Russell Park No . of courts 2 Dete 6/14 /17 Address 800 Semin o l e Rd . Atlantic Bea ch , FL 32233 Type rebuil d Con tact City of At lant ic Be ac h Phone Surfaced no P .O .# Item Description Un it Estimated Unit Cost Total Cost No Quanity 1 Sport Court Re-Surfacing SY $7 .10 2 Sport Court Surfacing SY 1440 $8 .80 $12,672.00 3 Sport Court Leveling SY $7.00 4 Sport Court Re-Striping EA $2 .00 5 Sport Court Striping 2 set s of p ic k l eballl i n es EA 356 $2 .50 $890.00 6 Concrete Court (Portland Cement, 5" depth) SY $38.80 7 Concrete Court (Portland Cement, Additional1" depth) SY $5.50 8 Concrete Court (Asphaltic, Finish Type Ill or FC-12 .5, 1" SY 2160 $12.50 $27,0 00.00 depth) 1 .5" dep t h 9 Concrete Court (Asphaltic , Structural -SP-1, SP-12 .5 or SY $9.40 ABC -3 , 1" depth) 10 Stabilize Subgrade (12" depth) SY $6 .00 11 Limerock (4" depth) SY $8 .50 12 Limerock (additional1 " depth) SY $1.90 13 Over-Excavation CY $20 .00 14 A-3 Fill (Contingency, De livery, Hauling & Placement CY $13 .00 15 No. 57 Stone (Delivery, Hauling and Placement CY $40.00 16 Asphaltic Concrete Removal CY $34.00 17 Portland Cement Concrete Removal CY $47.00 18 Asphalt Milling (1" depth) SY $9 .90 19 Pressure Washing SY $0 .50 20 Grass Sod (St. Augustine) SY $7.00 21 Grass Sod (Bahia) SY $6.20 22 Seed and Mulch SY $5.00 23 Mise Court Furnishing (Labor, 2 man crew) Se e A p p endi x 1 HR 2 30 $44 .00 $1 0,120.00 24 Mise Court Furnishing (Material(s)) See Ap p en dix 2 EA 14 050 1.20 $16,8 60.0 0 25 Mise Court Furnishing (Equipment , $100 rental cost incl EA 111.3 $100 11,130 .0 0 operator) See Appe nd ix 3 26 Project Records (per project site) EA 1 $100 $100 .00 Total Base Bid (Items 1 -30) $78 ,772 .0 0 Amended Agenda Item 6C August 28, 2017 CSI-Request for Purchase Order Page Two Notes : P .O . Ru ssell Par k 6/14 /17 0 Reb u ild Courts 5 a nd 6 after Cit y rem oves b olyard s at the ent rance t o t ho se c ourt s - remove e x is iting f ences (on t hree s ides ) net p o st ba s es a nd cent er an cho rs , c ru s h in p l ac e t he existing as p ha lt t he c ourts are m ade of , c o m p act an d grad e t he area t o p roper sl o p e, pav e wit h 1.5" as p h alt , s aw c ut the ed g es of the as p h al t i n p rep aratio n f or t he i nstall ation o f n ew 10' h i gh g ree n v i nyl 9 guag e fe nce w it h t op, m id an d bot t o m ra il t hroug h o u t , Inst all two n ew set s of net post s b ases w it h s lee ves a n d t wo cent er anc hors , i nstall t wo s ets of ex t ernal w i nd net post s , In stall t w o n e t e nnis nets w it h ce nt er strap s, ap p ly an extra c oat of ac ryl i c res u rface r re qui red b y t h e m an u f ac tu rer, st an dard c o l o r s urfac e and p l ayi ng lines f o r two t e n n i s col!rts and two set s of pi c k l eb all l ines o nto t h e t enn i s cou rts . Preconstruction Picture(s) Construction Picture(s) Post Construction Picture( s) Amended Agenda Item 6C August 28, 2017 CSI -Request for Purchase Order Page Three d L # Aooen ix 1 -ine 27 Labor Detail Mise Court Furnishing (Labor, 2 man crew) Rem ove tw o s ets o f net p o st bases and two anchor post an d d is p o s e of prop er ly Rem o v e and i nstall new 9 guage green v i nyl fenc e w it h t op, midd le and b ottom rail a nd o ne 6'w ide o pe n i ng I ns t all two net p o s t bas es w it h sleev es an d two a ncho r post s, two set s of extern a l wi nd n et p o sts and t w o te n n i s net s w it h ce nt er s t r ap s Saw cut t he ed ges of t h e as p ha lt t o s t r ai g h ed g es for proper i nst allat ion of f en ce . A p p ly a n ad d iti ona l coat o f acrylic r esu rfa cer r eq u i r ed f or new aspha lt by the ma nuf actu re r Total Mise Court Furnishing (Labor, 2 man crew) A d " 2 L" #28 F . h' \ppen IX -me urms mgs 0 "I eta1 Mise Court Furnishing (Labor, 2 man crew) Rem ov e two s et s of net p o st bases an d t wo anc hor po st an d d ispose of properl y Re m o ve and i ns t a ll new 9 g uage g reen v i ny l f en ce w it h top, midd le a nd botto m r ail a nd o ne 6 'w id e openin g Install two n et p o st b as es w it h sleev es and two anc ho r p o sts, two s ets of externa l w i nd net p o sts an d two te n n i s n et s with c e nter straps Saw c ut t he edges of t he as p halt t o s t ra igh e d g es for p r o per i nst allat ion of f ence. App ly a n addit io nal coat o f ac r yl i c r esu rfa cer re qu i r ed f o r new as p halt by t he manuf acturer Total Mise Court Furnishing (Labor, 2 man crew) HR HR HR HR HR HR Each Each Each Each Each Each P.O . 25 $44 .00 159 $44.00 19 $44.00 4 $44 .00 13 $44 .00 $44.00 23 0 $44 .00 375.00 1.2 10769 1.2 1518 1.2 380 1.2 1008 1.2 1.2 1405 0 1.2 Rus se ll Par k 06/14/17 0 $1 ,100.00 $6,996 .00 $836.00 $61 6.00 $572 .00 $0.00 $1 0 ,120 .0 0 $45 0 .00 $12 ,922.80 $1,82 1.60 $45 6.00 $1,209 .6 0 $0 .00 $16 ,86 0.00 Amended Agenda Item 6C August 28, 2017 Appendix 3 -Line #29 Eguipment Rental Deta il Mise Court Furn ishing (L abor, 2 man crew) Cr u s h in place exist in g as p halt cou rts Each 1 1 .3 $100 .00 $1 1,1 30.0 0 Each $100.00 $0 .0 0 Each $100.00 $0.0 0 Each $100 .00 $0 .00 Total Mise Court Furn ishing (Labor , 2 man crew) · 1 11.3 $100.00 $11,13 0.0 0 Amended Agenda Item 6C August 28, 2017 R eques tf p or urc h ase Od f C rtSrf r er or ou u aces, nc City of Jacksonville Contract CS-0354-15: Sport Court Maintenance and Construction 2015 Locallon CO A B -Russ ell Park Te n n is 3 & 4 No. of courts 2 Date 8/11/17 Addres s 800 Semi nole Rd . Atla nti c Beach , FL 32233 Type t enni s Coni O<:t Ji m Ri gsbee Phone Surfaced y es P.O .# Item Description Unit Estimated Unit Cost Total Cost No Quanity 1 Sport Court Re-Surfacing SY 144() $7 .10 $10,224.00 2 Sport Court Surfacing SY $8.80 3 Sport Court Leveling SY 232 $7.00 $1,624.0 0 4 Sport Court Re-Striping EA $2.00 5 Sport Court Striping EA $2 .50 6 Concrete Court (Portland Cement, 5" depth) SY $38 .80 7 Concrete Court (Portland Cement, Addit ional 1" depth) SY $5.50 8 Concrete Court (Asphaltic, Finish Type Ill or FC-12 .5, 1" SY $12 .50 depth) 9 Concrete Court (Asphaltic, Structural -SP-1, SP-12.5 or SY $9.40 ABC-3, 1" depth) 10 Stabilize Subgrade (12" depth) SY $6 .00 11 Limerock (4" depth) SY $8 .50 12 Limerock (additional 1" depth) SY $1 .90 13 Over-Excavation CY $20.00 14 A-3 Fill (Contingency, Delivery, Hauling & Placement CY $13.00 15 No. 57 Stone (Delivery , Hauling and Placement CY $40.00 16 Asphaltic Concrete Removal CY $34 .00 17 Portland Cement Concrete Removal CY $47.00 18 Asphalt Milling (1" depth) SY $9.90 19 Pressure Washing SY $0 .50 20 Grass Sod (St. Augustine) SY $7.00 21 Grass Sod (Bahia) SY $6 .20 22 Seed and Mulch SY $5.00 23 Mise Court Furnishing (Labor, 2 man crew) See App endi x 1 HR 90 $44 .00 $3,960 .00 24 Mise Court Furnishing (Material{s)) See A ppendix 2 EA 583 3 1.20 $6,999.60 25 Mise Court Furnishing (Equipment, $100 rental cost inc! EA 0 $100 operator) See A p pendix 3 26 Project Records (per project site) EA 1 $100 $100.00 Total Base Bid (Items 1 -30) $22,90 7 .60 Amended Agenda Item 6C August 28, 2017 CSI -Request for Purchase Order Page Two Notes: COA B-Russell Par k Ten n i s 3 & 4 8/11t 7 P .O. Cou r t s #3 a nd #4 at Ru ssell Par k i s a 108' by 120' batter y . Co u rt has a c o n st ruction flaw in it consisting of depress ion approximat ely 8' w ide b y 120' long a nd 2" deep. T h is is ca used b y t h e inpr oper slope in the courts constr uct ion . Ideally w e wo uld reb uild t he cou rt f or a p proxi ma te ly $71,00 0.0 0. In t h is r eq ue st ; we are ap p li ng a pat ch o v e r the sw aled ar ea an d then apply a t ack coat of c ourt pat ch b inder over the re pair. Note : Beca use of s lope i rreg u la r it ies in the origi nal courts' c o nstruction , it may n ot b e possible t o re move all water pend i ng after a r ai n , b ut t his proced ure will d r astica lly im p r o v e t he cur re nt amount o f drying t ime after a r ain . A fi ber g lass membra n e lay er w ill be appl ied over t he e ntire cent er-play ing areas of t he two co urts' s urfa ce (t he ar eas w ithi n a n d inc ludi n g the w h it e p lay i n g li ne s only of the abov e courts) a nd o ver the r ep ai red swaled area out s ide o f t he p laying lines . T he mem b r ane layer w i ll con s ist o f 3' w ide secti o n s of me mbrane wit h a s li g ht ove r lap that are to b e hel d i n p lace usi n g acryl ic c oa t i n g m aterials. An ad d itio n al c o at o f ac rylic r esu rfacer w ill b e ap plied o v er t he fiberg lass membra ne . T h is fib r g lass m em b rane p r o ced u re will so metimes slow o r p revent t he re t u rn of minor s urface c racks, at least f o r a f ew y ea rs. The re aso n f o r the re t u rn o f any cra ck is mo ve ment of t he cou rt of a s uffic ie nt amount t o e ither wri nkle o r r ip t he m embra ne that span s the cr ac k . Exception t o w arranty -A ny of t he crac k s i n ex isting c o urts' s u rfa ce may return t hrough t h e fin is h ed surface at a ny time. T w o sets of new ne tp o sts w ill b e in sta lled i nto ex isting s leeves a n d two new nets w i ll be insta lled . Preconstruction Picture( s) Construction Picture(s) Post Construction Picture(s) Amended Agenda Item 6C August 28, 2017 CSI -Request for Purchase Order Page Three d Appen ix 1 -Line #27 Labor Detail Mise Court Furnishing (Labor, 2 man crew) ap p li ng a pat c h o ve r t h e s w al ed area an d t h en ap p ly a tac k coat of co urt p atch bi n d er o v er the repa i r A fiber g lass m em b ra n e layer w ill b e ap plie d ove r the e nt i re cent er -pl aying areas of t he t wo c o u rts ' s u rface (th e ar eas w it h i n an d incl ud ing the w hi t e p lay i ng li n es o n l y of t h e above cou rts ) and o ve r t h e r epai re d swaled ar ea o ut s ide of t h e p l ay i n g lines . Tw o s ets of new netpost s w i ll b e ins t alled i nto ex ist i n g s l eeve s an d two new net s wi ll b e i nst alled . Total Mise Court Furnishing (Labor, 2 man crew) A d" 2 L' #28 F . h' \ppen IX -1ne urms 1ngs D etai Mise Court Furnishing (Labor, 2 man crew) ap p l i n g a patch over t he s w aled area an d t h en apply a tac k c oat of court p at c h bind er over t h e r ep ai r A fi bergl ass m embr ane l ay er w ill b e a pplied o v er the ent i re c e nter-pl ayi ng areas of t he t w o c o u rts ' surfac e (t he areas w it hin an d incl uding t h e w hite p laying lin es o nlY_ of the abo v e c ourts) a nd o v er th e re pa ired s wa le d Two s et s of n ew netpost s wi ll b e i ns ta lled i nt o exist i ng s l eeves a nd t w o new net s w ill b e i nst alled . HR HR HR HR HR HR Each Each Each Each Each Each COA B-Rus s ell Par k Tenn is 3 & 4 08/11/17 P.O . 0 6 4 $44.00 $2,816.00 26 $44.00 $1 ,144.00 0 $44.00 $0 .0 0 $44.00 $0 .00 $44.00 $0.00 $44.00 $0 .00 90 $44.00 $3 ,9 6 0 .0 0 374 0 1.2 $4,488 .0 0 12 6 0 1.2 $1 ,512.00 833 1.2 $9 99 .6 0 1.2 $0 .00 1.2 $0.00 1.2 $0 .00 Amended Agenda Item 6C August 28, 2017 / / I Total Mise Court Furnishing (Labor, 2 man crew) 583 3 1 .2 $6,9 99 .60 A d. 3 L' #29 E . \ppen IX -me :qu1pment R I D 'I enta eta1 Mise Court FurnishinQ (Labor, 2 man crew) Each $100.00 $0 .0 0 Each $100.00 $0 .0 Each $100 .00 $0 .00 Each $100 .00 $0.0 0 Total Mise Court Furnishinq (Labor, 2 man crew) 0 $100 .00 $0 .00 Amended Agenda Item 6C August 28, 2017