Loading...
1067 Beach Ave early power release ' EARLY POWER AGREEMENT & RELEASE CITY OF ATLANTIC BEACH 10L.D_I 10Qch J�-A OC.c.t '1>�gy�,uyzoo Electric power is requested now under the conditions and terms of this fully executed Agreement&Release Job Address: l l5 Permit No. iq S / 7- C'�U� Service Type(Circle One): Overhead =ndergrourid We,the undersigned General Contractor and Electrician,understand and agree: 1. "Early Power" is purely for our construction convenience, it is not required by Codes and does not substitute for Final Tnspections or the C/O (Certificate of Occupancyf Tit at must be issued before occupancy, and as such is at the discretion of the Building Official. 2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough inspections must have prior Approval, including meter base connections. 3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of the early Ordinanservice.vio atiion of this Agreement shall esult in and drequest penalized The al of Atlantic service after a twenty-four hour notice. 4. "Early Powerp'release authority is the Electrician and/or the Contractor and must not occur before: b. Panel its complete with brand eakers and lover,ant(labeling required at final inspection). c. Service connection and grounding is complete. d. The electric system has safely passed through electrical check. e. Meter can is permanently marked with address. f. Temporary address numbers displayed(Permanent numbers are required for C/O). 5. This fully completed form is to be submitted to the Building Department by hand,mail or fax. 6. Future such Agreements will not be accepted from those who violate anyone of the above items. CONTRACTOR_��j =PDATE 14V// -7117 PRINTNAME - s� ELECTRICIAN DATE to r 7- r-7 PRINT NAME _'N r✓I 800 Seminole Road,Atlantic Beach FL 32233 Phone.(904)247-5826 Fax:(904)247-5845 http://www.coab.us revised 0130 09