Loading...
535 ATLANTIC BLVD (GATE) - ROOF 0? 'f',,f,. � ' OF ATLANTIC BEACH .. :` z� CITY :_ g " ,? 800 SEMINOLE ROAD .r1 ATLANTIC BEACH,FL 32233 ii,ii9.> INSPECTION PHONE LINE 247-5814 ROOF NON SHINGLE - MUST CALL BY 4PM FOR NEXT DAY INSPECTION: 247-5814 PERMIT INFORMATION: PERMIT NO: ROOF17-0047 Description: install 60 mill TPO roofing Estimated Value: 120000 Issue Date: 12/1/2017 Expiration Date: 5/30/2018 PROPERTY ADDRESS: Address: 535 ATLANTIC BLVD 507 RE Number: 170684 0000 PROPERTY OWNER: Name: GATE PETROLEUM COMPANY Address: 9540 SAN JOSE BLVD JACKSONVILLE, FL 32257 GENERAL CONTRACTOR INFORMATION: Name: Address: , Phone: Name: TOWNSEND ROOFING & CONSTRUCTIONS SERVICE Address: 10418 NEW BERLIN RD UNIT 115 QA RANDY CRISS TOWNSEND JACKSONVILLE, FL 32226 Phone: PERMIT INFORMATION: Please see attached conditions of approval. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOU PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. * A notice of Commencement is only required for work exceeding an estimated value of $2,500. For HVAC work, a Notice of Commencement is only required when HVAC work exceeds and estimated value of$7,500. t �a City of Atlantic Beach i4APPLICATION NUMBER; Building Department (To be assigned by the Bwltlmg Department) ... 800 Seminole Road Atlantic Beach, Florida 32233-5445 Phone(904)247-5826 • Fax(904)247-5845 ( E-mail: building-dept@coab.us Date pouted :a l� I ��g4 City web-site: http://www.coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: S3 A-f l ung L 81.vd. - I +,int review required Yes No Bung -: •� Applicant: TOLA)I LAO �a 7lllf = - g"."-&Zoning Tree Administrator Project: f'\. ' ca_11 ULV (Ylt t. PQ COL)ti /1,5 Public Works Public Utilities Public Safety Fire Services Reuiew.fee $.,._ Dept:Signature- Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: "N, ',proved. ❑Denied. ❑Not applicable (Circle one.) Comments: ,BUILDING' PLANNING&ZONING Reviewed by: ��—� Date: t (V3 dt TREE ADMIN. Second Review: Approved as revised. ['Denied. Not applicable PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: ['Approved as revised. ['Denied. nNot applicable Comments: Reviewed by: Date: Revised 05/19/2017 ' ''y`, $- Buildin .Permit A �i� C at`lOn .040,),_3.-,,,..r.„..,„_,_ . City of Atlantic Beach )11NOV 2 8 2017 I 800 Seminole.Road,Atlantic Beach,FL 32233 Phone:(904).247-5826 Fax:(904)247-5845 lob Address: 535 Atlantic Boulevard Atlantic Beach FL.32233 Permit Number: �---0—OF rr- bO Legal Description 1..10-'f8 21-2S-29E 1.2 2 SALTAIR SEC 1 LOTS 788 TO 796 TO 809 RE# Valuation of Work(Replacement Cost)$ 120,000.00 Heated/Cooled SF Non-Heated/Cooled • Class of Work(Circle nne) e Addition Alteration Repair Move Demo Pool Window/Door • Use of existing/proposed Structure(s)(Circle one): - Commercial Residential • If an.existing structure,is a fire sprinklersystem installed? Circle one): Yes No N/A • Submit a Tree Removal Permit Application if any trees are to be removed or Affidavit of No Tree Removal Describe in detail the type of work to be performed: _ INSTALL 60 MILL TPO ROOFING OVER iSOCYANURATE INSUALTiON SECURED TO THE METAL DECKING Florida Product Approval# FL 5293-19e-2- for multiple products use product approval form Property Owner information Name: GATE PETROLEUM COMPANY Address: 9540 SAN JOSE BOULEVARD City JACKSONVILLE State FL Zip 32256 Phone. E-Mail BHAMiLTONQGATEPETRO.COM Owner or Agent(if Agent,Power of Attorney or Agency Letter Required) Contractor Information Name of Company: TOWNSEND ROOFING Qualifying Agent: RANDY TOWNSEND Address 10418 NEW BERLIN ROAD UNIT 115 . City JACKSONVILLE State FL Zip 32226 ' Office Phone 904-645-5887 Job Site/Contact Number 904-226-1384 State Certification/Registration#t#G( 17x26'?moi E-Mail RANDY JTOWNSENDROOFING.COM Architect Name&Phone it EBERT NORMAN BRADY ARCHITECTS 904-241-9997 Engineer's Name&Phone# Workers Compensation LEASE EMPLOYEES Exempt/Insurer/Lease Employees/Expiration Date Application Is hereby made to obtain a permit to do the work and installations:as indicated.I certify that no workor installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulationg construction in thisjurisdictlon.I understand that a separate permit must be secured for ELECTRICAL WORK,PLUMBING,SiGNS, WELLS,POOLS,FURNACES,BOILERS,HEATERS,TANKS,and AIR CONDITIONERS,etc.. OWNER'S AFFIDAVIT:I certify that all the foregoing information Is accurate and that all work will be done in compliance with all applicable laws regulating:construction and zoning. WARNING TO OWNER:YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT iN YOUR PAYING TWICE FOR IMPROVEMENTS TO YO R PROPERTY. IF YOU INTEND- . TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER€3'i=' 'TTORNEY BEFORE. RECORDING YOUR TICE OF COMMENCEMENT. 1 .-st'' %.'.--- (Signature Owner or Agent including Contractor) (Signature of Contractor Signed and swo n to Or affirimed)before me this 7 ay-of Sig ed and sworn to(or affirme efore me this`-If; day of /V .m 46 , a=i7 ,by /-24:::',4e,../'.V;7%{ L W b41, 2.i.7 .b -71—7- ? _� � 9 — .. iii, g1av' '',, MARLENE D.TPJ.LEY ANGELIQUE M TURNER =,: I. ,a MY COMMISSION#GO 058020 :'_MY COMMISSIOi4 tt G9002604 ?.1..,. .. EXPIRES:Apr0 21,2021 , EXPIRES June 15.2020 [4 Personal Known.oR y"8).01.•` UmNotaryPuMttinderxriiors ��•• ly [ S�ersonaily Known OR ,Nal;001sa Fixidatiotarygiertexcom t I Produced identification ( I Produced Identification Type of Identification: Type of Identification; i �, APPENt3l7t :ATTACHMENT REQUIREMENTS Fait,WIND'UP)IFT RESISTdNCC Table Deck Application Type Description Page 1A Wood New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 6_ 1B-1 Wood New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 6-8 16-2 Wood New,Reroof(Tear-Off)or Recover A-2 Mech,Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 9-10 1C Wood New,Reroof(Tear-Off)or Recover B-1 • Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 10 10 Wood New,Reroof(Tear-Off)or Recover C-1 Mechanically Attached Insulation,Bonded Roof Cover 11-12 1E Wood New,Reroof(Tear-Off)or Recover C-2 Plate-Bonded Roof Cover 13 1F Wood New,Reroof(Tear-Off)or Recover D-1 Insulated,Mechanically Attached Roof Cover 14 1G Wood New,Reroof(Tear-Off)or Recover D-2 Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 14 1H Wood New,Reroof(Tear-Off)or Recover E-2 Non-Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 15-17 2A-1 Steel or Structural concrete New,Reroof(Tear-Off)or Recover B-1 Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 18-24 2A-2 Steel or Structural concrete New,Reroof(Tear-Off)or Recover B-1 Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Base and Cap Ply 25 . _..__2A-3-_.-,____Steel_or Structural concrete New,Reroof(Tear-Off)or Recover B-2 Mech.Attached Thermal Barrier,Bonded Temp Roof,Bonded Insulation,Bonded Roof Cover 26-27 -->213-1A Steel or Structural concrete New,Reroof(Tear-Off)or Recover C-1 Mechanically Attached insulation,BondedRoof-Cover --- ,-_--_-._---------28-39---.4—. 2B-1B Steel or Structural concrete New,Reroof(Tear-Off)or Recover C-1 Mechanically Attached Insulation,Bonded Base and Cap Ply 40 26-1C Steel or Structural concrete New,Reroof(Tear-Off)or Recover C-1A Thermal Barrier with Vapor Barrier,Mechanically Attached Insulation,Bonded Roof Cover 41-45 2B•2 Steel or Structural concrete New,Reroof(Tear-Off)or Recover C-2 Mechanically Attached Insulation,Plate-Bonded Roof Cover 46-47 2C Steel or Structural concrete New,Reroof(Tear-Off)or Recover D-1 Insulated,Mechanically Attached Roof Cover 48-49 2D Steel or Structural concrete New,Reroof(Tear-Off)or Recover D-2 Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 49 ' 3A-1 Structural concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 50-60 3A-2 Structural concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Base and Cap Ply 60 3B Structural concrete New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 60 4A LWIC New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 61-63 46 LWIC New or Reroof(Tear-Off) A-2 MechanicallyAttached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 63 4C LWIC New or Reroof(Tear Off) E Non-Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 64 4D LWIC New or Reroof(Tear Off) F Non-Insulated,Bonded Roof Cover 65-66 SA CWF New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 67 5B CWF New,Reroof(Tear-Off)or Recover C-1 Mechanically Attached Insulation,Bonded Roof Cover 68 SC CWF New,Reroof(Tear-Off)or Recover E-2 Non-Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 69 6A Gypsum Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 69-70 6B Gypsum Reroof(Tear-Off) A-2 Mechanically Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 71 6C Gypsum Reroof(Tear-Off) B-1 Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 71-73 6D Gypsum Reroof(Tear-Off) C-1 Mechanically Attached Insulation,Bonded Roof Cover 74 --6E-------Gypsum-- Retoof-(.T.eaL-_O.ff)___ _______.__,____E-2._____ _ Non-Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 75 6F Gypsum Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover —75--- 7A 75---- 7A Various Recover A-1 Bonded Insulation,Bonded Roof Cover 76-90 7B Wood or Steel Recover C-2 Plate-Bonded Roof Cover 91-92 7C Steel Recover D-1 Insulated,Mechanically Attached Roof Cover 93 7D Various Recover F Non-Insulated,Bonded Roof Cover A* 94 4/0 Exterior Research and Design,LLC.d/b/a Trinity(ERD 5th Edition(2014)RC NON-HVI1Z EVALUATION - --- - Evaluation Report 01506,09. 5-R or FL5293-R26 Certificate of Authorization#9503 EverGuard TPO Single-Ply Roof Membrane Systems Revis n 27:08/17/2017 Prepared by: Robert Nieminen,PE-59166 GAF;(800)766-3411 Appendix 1,Page 1 of 94 I • �• ER\-,,,.,.. The following notes apply to the systems outlined herein: 1. The roof system evaluation herein pertains to above-deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction olf the Authority Having Jurisdiction, Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation, 4111/0 less otherwise noted,fasteners and stress plates for insulation or base sheet attachment shall be as follows. Fasteners shall be of sufficient length for the following engagements: F Wood Deck: Drill-Tec#12 Fastener or Drill-Tec#14 Fastener with Drill-Tec 3"Standard Steel Plate,Drill-Tec 3"Steel Plate,Drill-Tec 3 in.Ribbed Galvalume Plate(Flat)or Drill-Tec AccuTrac Flat Plate or Drill-Tec AccuTrac Recessed Plate(insulation only),Drill-Tec ASAP 3S or Drill-Tec Heavy Duty ASAP 35.Min,0,75-inch plywood penetration or minimum 1-inch wood plank embedment. Steel.Deck:_.__- .__Dr-III-Tec-#.12_Eastener,-Drill:Tec.414-Fastener_or_OriiLTec-XND_Fastener_with_Drill>T:ec3'_Standard-Steel-Riate,.Drill-T.ec3Steel-P-late,-DriII=Tea3-in.-Ribbed-Galvalume-Plate(Fiat).or-Drill-Tec------ AccuTrac Flat Plate or Drill-Tec AccuTrac Recessed Plate(Insulation only). Minimum 0.75-Inch steel penetration,engage the top flute of the steel deck. ➢- Structural Concrete: Drill-Tec#14 Fastener or Drill-Tec CD-10 with Drill-Tec 3"Standard Steel Plate,Drill-Tec 3"Steel Plate,Drill-Tec 3 in.Ribbed Galvalume Plate(Flat)or Drill-Tec AccuTrac Flat Plate or Drill-Tec AccuTrac Recessed Plate (insulation only) or Drill-Tec Heavy Duty ASAP 3S, Minimum 1-inch embedment. Fasteners installed with a pilot hole in accordance with the fastener manufacturer's published installation instructions. 3. Unless otherwise noted, insulation may be any one layer or combination of polyisocyanurate, polystyrene, wood fiberboard, perlite, gypsum-based roof board or mineral wool roof board that meets the CIA requirements of F.A,C,Rule 61G20-3 and is documented as meeting FBC 1505,1 and,for foam plastic,FBC Chapter 26,when installed with the roof cover. Refer to GAF published Installation instructions for details and requirements regarding the use of polystyrene insulation in EverGuard°roofing systems: Insulation: High Traffic Applications: Recover Applications: > Expaned polystyrene(EPS)meeting or exceeding ASTM C578,Type II, ➢ Extruded polystyrene(XPS) meeting or exceeding ASTM C578,Type > XPS Fan-Fold Recover Board with plastic facer meeting or exceeding nominal 1.5 ib/ft2 density and minimum 15 psi compressive strength. IV,minimum 1-inch thick and minimum 25 psi compressive strength. ASTM C578,Type IV,3/8-inch thick and minimum 25 psi compressive '- Expanded polystyrene(EPS)with plastic facer meeting or exceeding D Expanded polystyrene(EPS)with plastic facer meeting or exceeding strength. ASTM C578,Type II,nominal 1.5 lb/ft2 density and minimum 15 psi ASTM C578, Type IX, minimum 1-Inch thick and minimum 25 psi > EPS Recover Board meeting or exceeding ASTM C578,Type IV, 1/2- compressive strength. compressive strength. inch thick and minimum 25 psi compressive strength. > EPS Recover Board with plastic facer meeting or exceeding ASTM C578, Type II, 1/2-inch thick and minimum 15 psi compressive strength. TOPCOAT°FlreOut'r"Fire Barrier Coating,VersaShield°Fire-Resistant Roof Deck Protection or VersaShield®Solo""Fire-Resistant Slip Sheet,installed in accordance with GAF published installation instructions and fire resistance certification listings,may be used as a non-load-bearing,fire-barrier/slip-sheet component within any system outlined herein. 4. Minimum 200 psi,minimum 2-Inch thick lightweight insulating concrete(LWIC)may be substituted for or installed below the rigid insulation board for System Type C-1(mechanically attached insulation,bonded roof cover),System Type C-2(plate-bonded roof cover)or System Type D(mechanically attached membrane),whereby the insulation or membrane fasteners are installed through the LWIC to engage the structural steel _or concrete deck. For Type C=1,the top insulation layer shall be that specified in the applicable Table. For Type C-2 orD if the LWIC is installed below,_the rigid insulation board_mayconsist of_min 0.5-inch EnergyGuard Polyiso Insulation, EnergyGuard NH Polylso Insulation, EnergyGuard Ultra Polyiso insulation, EnergyGuard NH Ultra Polyiso Insulation, EnergyGuard RA, EnergyGuard RN, EnergyGuard HD Polylso Insulation,EnergyGuard NH HD Polyiso Insulation,EnergyGuard HD Plus Polylso Insulation, EnergyGuard NH HO Plus Polyiso insulation,EnergyGuard RH HD Polyiso Insulation or Structodek High Density Fiberboard Roof insulation or min.0.25-inch SECUROCi(Gypsum-Fiber Roof Board,SECUROCI(Glass-Mat Roof Board or Dens Deck. The structural deck shall be of equal or greater type,thickness and strength to the steel and concrete deck listings. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. This is a wind uplift resistance allowance and does not purport to address non-wind-uplift-relatated issues,such as deck venting or moisture levels within the LWIC and the potential effect on overlying components. 5. Preliminary insulation attachment for System Type D=Minimum four fasteners per 4 x 8 ft board or minimum two fasteners per 4 x 4 ft board. 6. Unless otherwise noted,insulation adhesive application rates are as follows. Ribbon or bead width is at the time of application;the ribbons/beads shall expand as noted in the manufacturer's published instructions, Hot Asphalt(HA): Full mopping,25-30 lbs/square, b LRF Adhesive M(LRF-M): Continuous 0.75 to 1-inch wide ribbons, 12-Inch o.c. ' OlyBond Adhesive Fastener(Classic): Full coverage,1 gal/square. ' OlyBond 500(08500): Continuous 0,75 to 1-inch wide ribbons,12-inch o.c,using PaceCart,SpotShot or Canister delivery methods, Note:OlyBond C ss 1,0Bond 500 Green maybe used in place of OlyBond 500. )Y GAF 2-Part Roofing Adhesive(GAF 2-Part): Continuous 2.5 to 3.5-Inch ribbons,12-Inch o.c. e' ›. Note: When multiple layers(s)of insulation and/or coverboard are Installed In ribbon-applied adhesive,board Joints shall be staggered. Y Note: The maximum edge distance from the adhesive ribbon to the edge of the insulation board shall be not less than one-half the specified ribbons spackig. Exterior Research and Design,LLC,d/b/a Trinity lERD 5th Edition(2014)FBC NON-HVii2 EVALUATION Evaluation Report 01506,09.05 LS293-R26 Certificate of Authorization 49503 EverGuard TPO Single-Ply Roof Membrane Systems Revislon7: 8/17/2017 Prepared by: Robert Nieminen,PE-59166 GAF;(800)766-3411 Appendix 1,Page 2 of 94 iNJ ERD 7. Unless otherwise noted,all Insulations are flat stock or taper board of the minimum thickness noted. Tapered polyisocyanurate at the following thickness limitations may be substituted with the following Maximum Design Pressure(MDP)limitations, In no case shall these values be used to'increase'the MDP listings in the tables;rather if MDP listing below meets or exceeds that listed for a particular system in the tables,then the thinner board listed below may be used as a drop-in for the equivalent thicker material listed in the table. > Hot Asphalt(HA): MDP= -240.0 psf (Min.0.5-inch thick) > GAF 2-Part Roofing Adhesive(GAF 2-Part): MOP -117.5 psf (Min,1.0-inch thick) 5 LRF Adhesive M(LRF-M): MDP= -232.5 psf ((Min, 0,5-inch thick EnergyGuard Polyiso Insulation, EnergyGuard NH Polyiso Insulation, EnergyGuard Ultra Polyiso Insulation, EnergyGuard NH Ultra Polyiso Insulation) > OlyBond 500(08500): MOP= -315.0 psf (Min.0.5-inch thick EnergyGuard RH or RN) OlyBond 500(08500): MOP= -487.5 psf (Min.0.5-Inch thick EnergyGuard RA) > OlyBond 500(08500): MDP= -292,5 psf (Min. 0.5-Inch thick EnergyGuard Polyiso Insulation, EnergyGuard NH Polyiso Insulation, EnergyGuard Ultra Polyiso Insulation, EnergyGuard NH Ultra Polylso Insulation) 8, Bonded polyisocyanurate insulation boards shall be maximum 4 x 4 ft. 9. For mechanically attached compohents or partially bonded insulation,the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC Cbapter_16.Zon.e52and3shalLemploy_a.n-attachment.density_designed-by_a_qualified.design_professionel_to_resist_the-elevated_pressure-criteria—Commonly-used-methods-are-ANSI/SPRI-W D1,-FM-Loss-Prevention-- Data Sheet 1-29 and RAS 117, Assemblies marked with an asterisk*carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29(January 2016)for Zone 2/3 enhancements. 10. For assemblies with all components fully bonded In place,the maximum design pressure for the selected assembly shall meet or exceed critical design pressure determined in accordance with FBC Chapter 16,and no rational analysis is permitted. 11, For mechanically attached components over existing decks, fasteners shall be tested in the existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison to the minimum requirements for the system. Testing and analysis shall be in accordance with ANSI/SPRI FX-1 or TAS 105. 12. For existing substrates in a bonded recover or re-roof installation,the existing roof surface or existing roof deck shall be examined for compatibility and bond performance with the selected adhesive,and the existing roof system(for recover)shall be capable of resisting project design pressures on its own merit to the satisfaction of the Authority Having.Jurisdiction,as documented through field uplift testing In accordance with ANSI/SPRI IA-1,ASTM E907,FM Loss Prevention Data Sheet 1-52 or TAS 124 13, For System Type D,steel deck applications,the roof membrane shall be run with Its length perpendicular to the steel deck flutes. 14, For Recover Applications using System Type C-2 or any System Type D,the Insulation is optional. Alternatively,a separator board may be Installed prior to roof cover installation when using System Type C-2 or any System Type 0 or a separator sheet may be installed prior to roof cover installation when using any System Type D. The existing roof system shall be suitable for a recover application. The separator component shall be documented as meeting FBC 1505,1 and,for foam plastic,FBC Chapter 26,when installed with the roof cover in Recover applications. • Y Separator Board Options for Recover System Type C-2 or System Type D: Min.0.5-Inch EnergyGuard Polyiso Insulation,EnergyGuard NH Polyiso Insulation,EnergyGuard RA,EnergyGuard RN,EnergyGuard Ultra Polyiso Insulation,EnergyGuard NH Ultra Polyiso Insulation,Structodeck High Density Fiberboard Roof Insulation,EnergyGuard RH HD Polyiso Insulation,EnergyGuard HD Polyiso Insulation,EnergyGuard NH HD Polyiso Insulation,EnergyGuard HD Plus Polyiso Insulation or EnergyGuard NH HD Plus Polyiso Insulation or min.0.25-inch Dens Deck,Dens Deck Prime,SECUROCK Gypsum-Fiber Roof Board or SECUROCK Glass- Mat Roof Board. > Separator Sheet Options for Recover System Type D: EverGuard Polymat Separation Layer(3 oz/yd2)or EverGuard Polymat Cushioning Layer(6 oz/ydz). 15. Lightweight insulating concrete(LWIC)shell be cast in accordance with FBC Section 1917 to the satisfaction of the Authority Having Jurisdiction. For systems where specific LWIC is referenced,refer to current LWIC ProductApproval-for specific deck construction and"limitations;Unless`otherwisenoted;fof systems where specific LVVIC is not referenced,lie minimum tlesign mix shall be 300 psi. In all cases,the minima-MI-OP:- coat inimum top-coat thickness is 2-inches. For LWIC over structural concrete,reference is made to FBC Section 1917.4.1,Point 1. 16. Side laps for EverGuard Freedom TPO with RapidSeam Technology are self-adhering. Side laps for EverGuard Freedom TPO HW are heat welded. Unless otherwise note4- ce to EverGuard Freedom TPO in this Appendix relates to either method. - <� /0 Exterior Research and Design,LLC.d/b/a Trinity IERD Sty'Edition(2014)PBC NON-HVH1 EVALUATION Evaluation Report 01506.09.05-- 27 for FLS2813-R26 Certificate of Authorization#9503 EverGuard TPO Single-Ply Roof Membrane Systems Revision 27:08/17/2017 Prepared by: Robert Nieminen,PE-59166 GAF;(800)766-3411 Appendix 1,Page 3 of 94 • i\inf ER) 17. For adhesive-applied membrane systems,side laps shall be minimum 3-inch wide sealed with min.1.5-Inch heat weld. Unless otherwise noted,membrane adhesive application rates are as follows: Membrane :.., r .Adheside Method' Rate `.. ' EverGuard TPO EverGuard TPO#1121 Bonding Adhesive Contact(both sides) 0,8 to 1.0 gal/square/surface. For use over SECUROCK Gypsum-Fiber Roof Board,the application rate changes to._ (#1121) 1,2 to 1.67 gal/sq/surface — EverGuard W6181 Bonding Adhesive To polyisocyanurate or structodek High Density Fiberboard Roof Insulation,Fiber Base HD1 or Fiber Base FIDE at EverGuard TPO (WB181) Contact(both sides) 0.63 gal/square and roof cover underside at 0,21 gal/square. To Dens Deck Prime or SECUROCK Gypsum-Fiber Roof • __ _,___-_____.-_._Board_at 0.63 to 0.75 gal/square and roof cover underside at 0.21 to 0.25-gal/.square-_�_._.___..._..__._.__ _ EverGuard TPO EverGuard Low VOC TPO Bonding Contact(both sides) 0.46 gal/square/surface Adhesive(L-VOC) EverGuard TPO 3 Square Low VOC EverGuard TPO Bonding Adhesive(TPO 3-Square) Contact(both sides) 0.84 gal/square/surface EverGuard TPO FB Ultra Hot asphalt Wet lay(substrate) 25 lbs/square EverGuard WB181 Bonding.Adhesive --� EverGuard TPO FB Ultra (WB181) Wet lay(substrate) 0.83 to 1.0 gal/square --- EverGuard TPO FB Ultra GAF LRF Adhesive M(LRF-M)or LRF Wet lay(substrate) 1-inch wide ribbons spaced as noted in tables herein. Note:The adhesive ribbons are located directly over the Adhesive 0(LRF-0) adhesive ribbons used to secure the insulation when the cover is bonded to insulation less than 1.5-inch thick. EverGuard TPO FB Ultra GAF 2-Part Roofing Adhesive(GAF 2-Part) Wet lay(substrate) "Spatter pattern"at 3.75 lbs/sq, EverGuard TPO FB Ultra OlyBond 500 Canister Wet lay(substrate) "Spatter pattern"at 0.32 gal/square, 18. The"Triposite Roofing System"noted herein consists of loose-laid GAFGLAS Stratavent Perforated Venting Base Sheet,followed by asphalt-applied two(2)plies of Ruberoid 20 Smooth or three(3)plies of GAFGLAS FlexPly 6,followed by asphalt-applied 80-mil EverGuard TPO FB Ultra with 1-5/8"heat welded side laps. 19. Unless otherwise noted,the"Hybrid Roofing System" noted herein consists of asphalt-applied Ruberold 20 Smooth,Ruberold Mop Smooth, Ruberoid Mop Smooth 1.5,GAFGLAS#75 Base Sheet,Tri-Ply#75 Base Sheet or GAFGLAS#80 Ultima Base Sheet followed by asphalt-applied EverGuard TPO FB Ultra. 20. EverGuard Extreme TPO may be used as an alternate to EverGuard TPO. EverGuard Extreme TPO FB Ultra may be used as an alternate to EverGuard TPO FB Ultra. 21, The following insulations are interchangeable within the scope of this Evaluation Report: ---Y---EnergyGuard Polyiso-insulation-U------------EnergyGuard-NH-Polyiso-Insulation; ) EnergyGuard Ultra Polyiso Insulation b EnergyGuard NH Ultra Polylso Insulation; • EnergyGuard HD Polylso Insulation b EnergyGuard NH HD Polyiso Insulation; > EnergyGuard HD Plus Polyiso Insulation' EnergyGuard NH HD Pius Polyiso Insulation. ®,44,� 4/0$,, Cbio Exterior Research and Design,LLC.d/b/a Trinity I ERO 5th Edition(2014)FOC NON-HVHZ EVALUATION Evaluation Report 01506.09.0 -R27 for FL5293-R26 Certificate of Authorization 419503 EverGuard TPO Single-Ply Roof Membrane Systems Revision 27:08/17/2017 Prepared by: Robert Nieminen,PE-59166 GAF;(800)766-3411 Appendix 1,Page 4 of 94 X TR N ERD ...TABLE ZB IA:.STEEL OR STRUCTURAL CONCRETE,DECKS'.-NEW.CONSTRUCTION,REROOI (TEAR-OFF)OR RECOVER.. • • ' .:. •• S V A ON,BONDED.ROOF COVER • ' . • • VSTE6)(1T SEC-1: MECHAI�lCALLY.A'fT CNED.(NSLiLATI _ - .. System Top Insulation Layer MDP No. Deck(Note 1) Base Insulation Layer Type Fasten Attach Roof Cover(Note 17) (per - Min.22 ga.,Type B,Grade (Optional)One or more Min.1.5-inch EnergyGuard Polylso Insulation,EnergyGuard 1 per 2.67 EverGuard TPO FB 5.200. 33 steel or structural layers,any combination Ultra,EnergyGuard RA,EnergyGuard RN,EnergyGuard RH Note 2 ftz Ultra/WB181 37.5 - -concrete- - - ---- - - - -- -- - Min.22 ga.,Type B,Grade 5-201. 33 steel or structural (Optional)One or more Min.1.5-inch EnergyGuard Polyiso Insulation,EnergyGuard Note 2 1 per 2 ftz EverGuard TPO FB 45.0* concrete layers,any combination Ultra,EnergyGuard RA,EnergyGuard RN,EnergyGuard RH Ultra/W5181 Min.22 ga.,Type B,Grade • (Optional)One or more Min.2-inch EnergyGuard Polyiso Insulation,EnergyGuard 1 er Z.9 verGuard TPO FB �b 5-202. 33 steel or structural layers,any combination Ultra gy y gy Note 2 pftz Ultra/W8181 45.0* concrete •�- Min.22 ga.,Type B,Grade (Optional for recover)One Drill-Tec#12(steel only)or#14 with Drill-Tec 5-203. 33 steel or structural or more layers,any Min.0.25-inch SECUROCK Gypsum-Fiber Roof Board 3"Standard Steel Plates,Drill-Tec 3 In. 1 per 3.2 EverGuard TPO FB -45.0* concrete combination,min.1-inch Ribbed,6alvalume Plates(Flat)or Drill-Tec ftz Ultra/W 8181 AccuTrac Flat Plates or with Drill-Tec ASAP 3S Min.22 ga.,Type B,Grade (Optional for recover)One Drill-Tec#12(steel only)or#14 with Drill-Tec 3"Standard Steel Plates,Drill-Tec 3 In. z EverGuard TPO FB S-204. 33 steel or structural or more layers,any Min.0,375-inch SECUROCK Gypsum-Fiber Roof Board Ribbed Galvalume Plates(Flat)or Drill-Tec 1 per 4 ft Ultra/W B181 -45.0* concrete combination,min.1-inch AccuTrac Flat Plates or with Drill-Tec ASAP 35 Min.22 ga.,Type B,Grade One or more layers,any 1 per 1.78 EverGuard TPO FB S-205. 33 steel or structural combination,min.1-inch Min.0.25-Inch SECUROCK Gypsum-Fiber Roof Board Note 2 ftz Ultra/W B181 -52.5 concrete Mtn.22 ga.,Type B,Grade (Optional for recover)One • 5-206. 33 steel or structural or more layers,any Min.0.375-Inch SECUROCK Gypsum-Fiber Roof Board Note 2 1 peri.33 EverGuard TPO FB -67.5 concrete combination,min.1-inch ftUltra/W6181 EVERGUARDTPO FB ULTRA"IN LRF ADHESIVE M,oR IRE ADHESIVE OG' .',` '. '' • ' --� - -'Min-22-gawType-B;Grade _-.-----_-..__ -_. _- _....__..__-. ___._. ._... _.-- ---.___.-- ----....._ EverGuardTPOFB-. - _. . .. ... .. .. .. S 207. 33 steel or structural (Optional)One or more Min.2-inch EnergyGuard Polyiso Insulation,EnergyGuard Note 2 1 per 4 ftz Ultra/LRF-M or LRF- -30.0* concrete layers,any combination Ultra .. 0,12-inch o.c. Min.22 ga.,Type B,Grade (Optional)One or more Min.1.5-inch EnergyGuard Polyiso Insulation,EnergyGuard 1 per 2.67 EverGuard TPO FB 5.208. 33 steel or structural layers,any combination Ultra,EnergyGuard RA,EnergyGuard RN,EnergyGuard RH Note 2 ftz Ultra/LRF-M or LRF 37.5* concrete 0,12-inch o.c, - Min.22 ga.,Type B,Grade EverGuard TPO FB 5.209. 33 steel or structural (Optional)One or more • Min.2-inch EnergyGuard RA,EnergyGuard RN,EnergyGuard Note 2 1 per 4 ft2 Ultra/LRF-M or LRF- -37.5" concrete layers,any combination RH 0,12-inch o.c. Min,22 ga.,Type B,Grade EverGuard TPO FB (Optional)One or more 1 pef' ,3 5-210. 33 steel or structural layers,any combination Min.1.75-Inch ACFoam Composite/GB Note 2 Ultra/LRF-M,12- -37.5 concrete inch o.c. Min.22 ga.,Type 8,Grade One or more layers,any Note 2(Drill-Tee3"Standard Steel Plate or OerGuard TPO FB 5-211, 33 steel or structural combination Min.0.25-inch Temple Green Glass Primed Roof Board AccuTrac Flat Plate only) 1 per 2 ftore�LRF M or LRF- 37.5 * concrete ch o,c. Exterior Research and Design,LLC.d/b/a Trinity(ERD 5th Edition(2014)FBC NON-HVH2 EVALUATION Evaluation Report 01506.09.0r FL5293-R26 Certificate of Authorization#9503 EverGuard TPO Single-Ply Roof Membrane Systems Revis)27:08/17/2017 Prepared by: Robert Nleminen,PE-59166 GAF;(800)766-3411 Appendix 1,Page 36 of 94