Loading...
Service Reliability to Atlantic Beach v SERVICE RELIABILITY TO ATLANTIC BEACH May 12, 1997 by Ron Weeks JEA Executive Vice President, Service Delivery JEA MISSION • Customer Satisfaction • Low Cost Provider • High Level of Service Reliability Jacksonville Electric Authority Electric Rate Comparison (Typical Customer Billing) Florida Utilities - March, 1997 Residential $120 1000 KWH $100 $87.14 $00.44 $80.00 $91 Q6 $80 $00.15 $74 10 $76.40 $77.64 $77.47 $77.75 $78.37 $79.30 $81.31 H — — $40 — — — — iIJfT $20 — — — — — — --I JEA Gainesville Orlando TECO FPC Tallahassee Vero Beach Lakeland FP&L Ocala Jax Beach Kissimmee Ft. Pierce Small Business 1500 KWH $200 $150 $111.90 $113.05 $113.12 $114.21 $119.36 $22.52 $123.88 $120.30 $129.09 $133.20 5138 AQ 5137 40 $100 $95.75 —, — — — — — — — — $50 — — — — — r - — $0II, uiW JEA TECO Orlando FPC Tallahassee Jax Beach Ft. Pierce Lakeland Ocala FP&L Gainesville Kissimmee Vero Beach I Large Business - Wal-mart, Publix 60,000 KWH- 150 KW $8 N v $6 �4,iii 5,110 m47111113 $3,767 $3,970 $3,976 $4,339 $4,482 I in $4 VI 53 3Q• $3 47 $3 49. — — $2 — — JI I EA Orlando TECO FP&L Tallahassee Ft. Pierce Jax Beach FPC Ocala Lakeland Gainesville Kissimmee Vero Beach 05/05/97JXBCHCM1.WK4 ELECTRICAL SERVICE TO ATLANTIC BEACH • 2 Substations • 3 Distribution Feeders • Overhead and Underground Service JEA SERVICE RELIABILITY TO ATLANTIC BEACH Momentary Outages 6 per year Average Extended Interruptions 1.3 per year Average Outage Duration 13 minutes ' (S93� WONOERWoOU RO HANNAH PARK . 9,. 9 cc ,., , T ks © m 1 w -J N , J. . z = w o�, •(‘- c; c, 12 w U r A, < BUCCANEER w TRAILER C"11T v v PARK r /3 Z cD v O 0 Z 73 COUNTRY CLUB LANE 5TH ST > O pp cr H . C189 E- 0 C152 E- �� THE PLAZA c o c� c O C-73 6 3 ° m y h z U ie C to © d (6T 564 — � : �� 1 1C "ir cS:k.( ) © a , 4Y r5UBSTATION DETAIL ‘• )4, NEPTUNE i553 i561 562 NEPTUNE ® Ki 564 25 KV � I ' Ii 565 - - � JEA COASTAL RELIABILITY IMPROVEMENT PROJECT • Replace Transformers Higher insulation level Stainless steel lids • Replace Fuse Switches Higher insulation level • Replace Lightning Arresters Higher insulation level Newer technology • Replace Equipment Brackets New fiberglass construction with higher insulation level • Miscellaneous System Improvements Replace bad poles Check and repair bad connections Check and replace bad conductor ATLANTIC BEACH OVERHEAD TO UNDERGROUND SCOPE OF WORK JEA Atlantic Beach Install new conduit and transformer pads (by Atlantic Beach, estimate) $ 175,000 Install new underground cable and transformers (by JEA) $ 190,000 Remove existing OH facilities and install new lights (by JEA) $ 92,000 JEA credit for avoided cost on coastal upgrade project and system betterment improvements $ 237,000 ($ 237,000) Conversion of services to underground, including new meter cans (by Atlantic Beach, estimate based on $1000/service) $ 350,000 JEA to pull new secondary cables to the new UG meters $ 40,000 Total Cost Estimates $ 277,000 $ 570,000 • .1,111t..... ;_111.......111r/lIZ OW* . A • 00•Adiriiraretallglerri . '/ irt* wpit4 ,-10-!-r-mi- --"`'-:i:1111"11.111‘11-1M11111141" �+ ."ir,.....a.V.:igio �glldI���� �Iti�rt ��a 1I�1� 'Ialenlaii s�ro V � l �n....)11111.0 ....r.wiril� MI—al"01900110110d ��q WO �;�.�.: SII�010/110 ,� cam.ailli"Willialliglikairkellii.n 1311711WIVIIMOMISIII,ii �► 'ill ' ir��;�. % .,,. �' �;V"aro ."4 0. `' lla,. 1. ���►� .. r lli ....5 0f ..-