Loading...
1834 OCEAN GROVE DR - SOLAR SYSTEM �r.iiit � CITY OF ATLANTIC BEACH �` . ) 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 "�0;3 0 INSPECTION PHONE LINE 247-5814 ELECTRICAL SOLAR PANEL - MUST CALL BY 4PM FOR NEXT DAY INSPECTION: 247-5814 PERMIT INFORMATION: PERMIT NO: RESO17-0050 Description: SOLAR PHOTOVOLTAIC SYSTEM Estimated Value: 0 Issue Date: 12/15/2017 Expiration Date: 6/13/2018 PROPERTY ADDRESS: Address: 1834 OCEAN GROVE DR RE Number: 169625 0000 PROPERTY OWNER: Name: WATERS ANGELA M Address: 1834 OCEAN GROVE DR ATLANTIC BEACH, FL 32233-5843 GENERAL CONTRACTOR INFORMATION: Name: Address: , Phone: Name: LSCI Inc., DBA Sun-Tec Solar Energy Address: 4625 E. Bay Dr. #305 Clearwater, FL 33764 Phone: PERMIT INFORMATION: Please see attached conditions of approval. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOU PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. * A notice of Commencement is only required for work exceeding an estimated value of $2,500. For HVAC work, a Notice of Commencement is only required when HVAC work exceeds and estimated value of$7,500. 01..lvik, City of Atlantic Beach APPLICATION NUMBER Js s� Building Department (To be assigned by the Building Department.) r 800 Seminole Road ��CCC Jo Atlantic Beach, Florida 32233 5445 • l � Phone(904)247 5826 Fax(904)247 5845\amortE-mail: building-dept@coab.us Date routed: I City web-site: http://www.coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: I i10 4 Illic.,e_c, Denartment review required Ye No Building) V Applicant: L S C ` l Q_ a inirig&Zoning I ree Administrator Project: S L.{\R pk-o-t-c)V OL A c C Public Works Public Utilities S LI ST ern Public Safety Fire Services Review fee $ Dept Signature SU(N l So1c r &eV/ Other Agency Review or Permit Required Review or Receipt Date of Permit Verified By Florida Dept. of Environmental Protection B o t e r Florida Dept. of Transportation St. Johns River Water Management District ---7.1—,Q Army Corps of Engineers r Division of Hotels and Restaurants G t L Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: pproved. ['Denied. ❑Not applicable (Circle one.) Comments: BUILDIN s. PLANNING & ZONING Reviewed by: 1/Y1 Date:/4: TREE ADMIN. Second Review: A roved as revised. Denied. ❑ pp ❑ Not applicable PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: ❑Approved as revised. ['Denied. ❑Not applicable Comments: Reviewed by: Date: Revised 05/19/2017 (6 J)iN City of Atlantic Beach APPLICATION NUMBER �� ' Building Department (To be assigned by the Building Department.) r - .-.v 800 Seminole Road _ �C ,, Atlantic Beach, Florida 32233-5445 • — C�h�� Phone(904)247-5826 • Fax(904)247-5845 �a;t �� E-mail: building-dept@coab.us Date routed: 1 City web-site: http://www.coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: 12 3 4- Eaec '-1 G 0 ye Department review required Yes No !-uildinq_) Applicant: L S 1 Ito ---6-ening &Zoning's-N., - • . _ or" Project: c,L R(2.., -t-eTc3\f o(.,[A 6C_ Public Works Public Utilities S LtS C ern Public Safety Fire Services Review fee $ Dept Signature S U n•` le- C � Review or Receipt Sokr 6Q I Other Agency Review or Permit Required of Permit Verified By Date Florida Dept. of Environmental Protection B o L t e Florida Dept. of Transportation St.Johns River Water Management District 1 ,Q_ Army Corps of Engineers r Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco i Other: APPLICATION STATUS Reviewing Department First Review: Approved. I (Denied. ❑Not applicable (Circle one.) Comments: BUILDING PLANNING &ZONING Reviewed by/'- �� Date: ( 2 - II - 17 TREE ADMIN. Second Review: Approved as revised. ❑Denied. ❑Not applicable PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: ❑Approved as revised. ❑Denied. ❑Not applicable Comments: Reviewed by: Date: Revised 05/19/2017 %t Building Permit Application OFFICE COPY ,, A 1s7'.) - , , City of Atlantic Beach \ 800 Seminole Road,Atlantic Beach, FL 32233 '4+'7;:i19'• Phone: (904) 247-5826 Fax: (904) 247-5845 e ' Job Address: 1834 Ocean Grove Dr. Permit Number: ' `e-S° '7 ` 0OJv Legal Description 20-20 09-2S-29E Ocean Grove unit no 2 lot 31 RE# 169625-0000 Valuation of Work(Replacement Cost)$28,996.00 Heated/Cooled SF Non-Heated/Cooled • Class of Work(Circle one): New Addition Alteration Repair Move Demo Pool Window/Door • Use of existing/proposed structure(s)(Circle one): Commercial Residential • If an existing structure,is a fire sprinkler system installed?(Circle one): Yes No N/A • Submit a Tree Removal Permit Application if any trees are to be removed or Affidavit of No Tree Removal Describe in detail the type of work to be performed: Install solar photovoltaic system i Florida Product Approval# for multiple products use product approval form Property Owner Information Name: Angela Waters _ Address: 1834 Ocean Grove Dr. City Atlantic Beach State FL Zip 32233 Phone 904-249-8679 E-Mail Owner or Agent(If Agent, Power of Attorney or Agency Letter Required) Contractor Information Name of Company: Lscl:Inc. Qualifying Agent: Raymond Mead Address 4625 East Bay Dr.#305 City Clearwater State FL Zip 33764 Office Phone 727-571-4141 Job Site/Contact Number 727-571-4141 State Certification/Registration# CVC056656 E-Mail Permits©suntecsolarenergy.com Architect Name&Phone# Engineer's Name&Phone# John Alger 800-929-3919 Workers Compensation _ Exempt/Insurer/Lease Employees/Expiration Date Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulationg construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING,SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS,TANKS,and AIR CONDITIONERS,etc. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws reeulating construction and zonine. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TOO: A IN FINANCING, CON d T WITH YOUR LENDER OR AN ATTORNEY BEFORE RE •R►ING YOUR NOTIC I ' O MENCEMENT. , --- .. / (Signa.1 re of Owner or Agent cl ing Contractor) (Signature of Contractor) �• ned a d swor to(or affir d)b,f. e t i I day of Signed and sworn to(or affirmed)before me this- day of 'a1 t , .1/. r I 0411__ � , dC/7 , by Ili 16 _211-4-.,-6-6_deL2_____ ;;► ••. swats'• ,' ,`_• HMURA (Signature of Notary) MY COMMISSION#GG051419 '•?;.,, EXPIRES December 20,2020 r Notary Public State of Florida Personally /Personal) Known OR ,'py • WANDA CORTES [ ] Known OR [tel Y . My Commission GG 138238 'roduced Identification [ ]Produced Identificatior9 14;;-0,104" Expires 08/20/2021 Type of Identification: Type of Identification: • OFFICE COPY Permit Number /2 eS 0 / 7 — 60 co . i' i i Parcel ID Number /eci 626%.0000 NOTICE OF COMMENCEMENT State of Florida i I it-,.;l:,\ Si, ;. ,r-CR r.:._140,.`. i -I C.ERr;F:r:,7h.ft County of Pinellas ' THE UNDERSIGNED hereby gives notice that improvements will be made to certain real property, and in accordance with Section 713.13 of the Florida Statutes,the following information is provided in this NOTICE OF COMMENCEMENT. 1.Description of property(legal description):ap-go Oct-9,5-;)..61E 3Cetit-,7 G/ZoUE Uh.1 j m7 2. � 31 a)Street(job)Address: /'g2.4 ()Cp,4N) GROVE j)12 41-/Ar-f I c , fM l) r t-L 32133 ,.SzL73;. . 2.General description of improvements: ..)-1,5-40,..1‘ 5o Aa_ 19M4000 ITotiC ,,r, , 3.Owner Information or Lessee information if the Lessee contracted for the improvement: i ; a)Name and address: Anc e,I4 in 1,4,4t,/,4 ,)' 1%3L-1 OceegAJE- Ort- A-tJGt #kd Bectd,, FL ,e2 3.. SELI= b)Name and address of fee simgie titleholder(if different than Owner listed above) c)Interest in property: Qii Contractor Information ctkri)C\ a)Name and address: LSCI,Inc 4625 East Bay Dr.,Ste.305,Clearwater, FL 33764 b)Telephone No.: 727-571-4141 . . . Fax No.: (optional) 727-540-0804 .Surety(if applicable,a copy of the payment bond is attached) a)Name and address: ,00A b)Telephone No.: - c)Amount of Bond: $ 6.Lender a)Name and address: /1-1A- : b)Telephone No.: 7.Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by Section.. 713.13(1)(a)7.,Florida Statutes: a)Name and address: /d/A' b)Telephone No.: Fax No.: (optional) . 8.a.In addition to himself or herself,Owner designates of to receive a copy of the Lienor's Notice as provided in Section 713.13(1)(b),Flori a Statutes. b)Phone Number of Person or entity designated by Owner: 4,' 9.Expiration date of notice of commencement(the expiration date may not be before the completion of construction and final payment to the contractor,but will be 1 year from the date of recording unless a different date is specified): ,20 WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART I,SECTION 713.13,FLORIDA STATUTES,AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTO-,EY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Und-r p: 1 ty of perjury,I declar' �-t I ave read the foregoing notice of commencement a .that the facts stated therein are true to the best of my: k . le.!� ,nd belief.r � ��' �lv. 4 At 4,v a - 0 7 S (Si..:tore of Owne 'r Lessee,or Owners or Lessee's 'uthorized Officer/Director/Partner/Manager) 'rint Name and Provide Signa tory'sTitle/Office) The forgoing l �Ls as Cw-Ji' j7 (type of authority,e.g.officer,trustee,attorney in fact)' for J` ,as (Name of Person) (type of authority,...e.g.officer,trustee,attorney in fact) for (name of party on behalf of whom instrument was executed). Personally Known ❑ Produced ID t� Tvoe of ID Of Notary Signature /r�'� Doc#2017278095,OR BK 18209 Page 302, o Number Pages: 1 I - Recorded 12/06/2017 10:34AM, I ‘A` • THANG H PHU RONNIE FUSSELL CLERK CIRCUIT COURT DUVAL I rr � ; : : MY COMMISSION M FF976883 COUNTY ? .:N,,f$ RECORDING $10.00 .ri d:�` EXPIRES March 29,2020 `(407)3118-0153 FbriciallotaryS,rvca.00m i 6.4KW Grid Interactive Photovoltaic System System Summary Provided by Sun-Tec Project: Waters, Angela Verdiseno,Inc.,its subsidiaries,officers,directors,employees and its suppliers specifically disclaim any implied warranties or representations that the information contained in this document ('Document')is complete or error-free.This Document is not provided as an engineering service and Verdiseno,Inc.is not an engineering firm.This Document is provided as an aid to those involved in the potential purchase or installation of a PV system,and is meant to facilitate the production of a final PV system design("Design')by a qualified professional.This document does not contain enough information to fully represent a system design and should not be relied upon to perform an installation.If you require a Design that has been produced or approved by a qualified engineer,please be advised that you will need to hire a qualified engineer to produce or approve the needed Design and related documents.Please refer to the Terms and Conditions page at solardesigntool.com for the full Terms and Conditions agreement. 1. System Summary 1.1. System Data 1.1.1. Summary Location Info Project Site 1834 Ocean Grove Dr,Atlantic Beach,FL 32233 Climate Data Source Location Atlantic Beach,FL 32233 United States Latitude 30°20'N Longitude 81°24'W Design Low Temperature 27°F(-3°C) Design High Temperature 93°F(34°C) Electrical Characteristics Summary Inverter SB 5.0-1SP-US-40 Module Q-Cells Q.PEAK BLK-G4.1 290(290W) Number of Modules 22 Array Circuits 1 string of 12,1 string of 10 STC power of array 6,380W PTC power of array 5,877W(1) Array Vmp 384V,320V Array Voc 470V,392V Array Vmp at design high temp. 325V,271V Array Voc at design low temp. 507V,423V Array max.power current 9.07A,9.07A Array short circuit current 9.63A,9.63A CEC power output 5,000W(1) Max AC output current 24A First-Year PV Watts Prod.Estimate 8,636kWhr 1.PTC rating calculated using 45°C as the NOCT(Nominal Cell Operating Temperature) Components Bill of Materials Category Make Model Number Ref Qty Unit Qty/Unit Description Module Q-Cells Q.PEAK BLK-G4.1 290 PM1-22 22 pieces 1 Q-Cells Q.PEAK BLK-G4.1 290 290W,60 cells, Monocrystalline Silicon Inverter SMA SB 5.0-1SP-US-40 11 1 piece 1 SMA SB 5.0-1SP-US-40 5000W Inverter Square D D222NRB,2-Pole,60A, 240VAC,or Disconnect Square D D222NRB SW1 1 piece 1 equivalent Wiring GEN-10-AWG-PV-WIRE-CU WR1 100 feet 1 10 AWG PV Wire,Copper(Positive and Negative) Wiring GEN-6-AWG-BARE-CU WR1 50 feet 1 6 AWG Bare,Copper(Ground) Wiring GEN-10-AWG-THWN-2-CU- WR2 3 110 feet 1 10 AWG THWN-2,Copper,Red(Line 2 and RD Positive) GEN-10-AWG-THWN-2-CU- 10 AWG THWN-2,Copper,Black(Line 1 and Wiring WR2-3 110 feet 1 BLK Negative) G EN-10-AWG-THWN-2-CU- WiringGR WR2-4 120 feet 1 10 AWG THWN-2,Copper,Green(Ground) Wiring WH 10 AWG THWN-2 CU WR3-4 20 feet 1 10 AWG THWN-2,Copper,White(Neutral) Wiring RDEN-6 AWG THWN•2 CU WR4 10 feet 1 6 AWG THWN-2,Copper,Red(Line 2) G EN-6-AWG-THWN-2-CU- Wiring BLK WR4 10 feet 1 6 AWG THWN-2,Copper,Black(Line 1) Wireway GEN FLEXIBLE STEEL WW1-2 100 feet 1 FMC Conduit,0.5 dia. 0_5DIA Wireway GEN-PVC-80-0_5DIA WW3 10 feet 1 PVC_80 Conduit,0.5 dia. Wireway GEN-PVC-80-0_75DIA WW4 10 feet 1 PVC_80 Conduit,0.75 dia. OCPD Generic Manufacturer GEN-FU-30A-240VAC F1-2 2 pieces 1 Fuse,30A,240VAC Soladeck 0783-3R-2ER6,with 2 terminal Transition Box Soladeck 0783-3R-2ER6 JB1-2 2 pieces 1 blocks,or equivalent 1.2. Array Layout \ '4 , *1' ' .010,..„,44000iiir IL _. x r't 4- lir I 3c `i 4aa l u s l a yR� 4 I � iq3aa Zi;� � : - . 11 11111111t.,' 1 ii .. , ,. Y . _._ . , ,,, � . 5- ,:. -, Nisi i-,; '' ''''''''',--, 11P11: ji �+> } i 1 J' 1 Goole. i y Imagery @2017 1.2.1. South Installation Area Installation area length 21.22ft Installation area width 17.61ft Slope 4/12(18.4°) Installation area azimuth 176.2°(SE) Configured Layout Column spacing lin Row spacing 1 in Module orientation portrait Distance between tilted racks 1 in Tilt angle of modules 0° Clearance at left 3.31in Clearance at right 3.31 in Clearance at top 6.32in Clearance at bottom Oft Total number of modules 12 Total number of rows 3 Layout length 13.37ft Layout width 16.38ft Area of array 215.71ft' Max.Values for Installation Area Max no.of modules 12 Maximum no.of rows 3 Max no.of modules in a row 5 Maximum row length 13.37ft Maximum column length 16.38ft Area if layout full 220.01 ft' 21.22ft RIDGE >. 11 2.92ft A . ti 1111w N: • i t i W v EAVE 1.2.2.West Installation Area Installation area length 42.75ft Installation area width 19ft Slope 4/12(18.4°) Installation area azimuth 267°(SW) Configured Layout Column spacing lin Row spacing lin Module orientation portrait Distance between tilted racks lin Tilt angle of modules 0° Clearance at left 1.57in Clearance at right 1.57in Clearance at top 3.86in Clearance at bottom Oft Total number of modules 10 Total number of rows 3 Layout length 20.1ft Layout width 16.38ft Area of array 179.76ft' Max.Values for Installation Area Max no.of modules 10 Maximum no.of rows 3 Max no.of modules in a row 6 Maximum row length 20.1ft Maximum column length 16.38ft Area if layout full 183.09ft' < i 42.75ft A ls 12.05ft Oti rye• 0. Ai A •ALL 1, EAVE 2. System Design Calculations Report (Non-Code) 2.1. PV Source Circuit Voltage Range Test This test confirms that the voltage of the PV Source Circuit will always remain within the DC input voltage window of the system's inverter, microinverters,or power optimizers. 2.1.1.(12)Q.PEAK BLK-G4.1 290(290W)In series Section Properties Validation Tests Description (12)Q.PEAK BLK-G4.1 290(290W) The minimum Vmp must exceed the minimum PASS in series input voltage of the connected device Connected Device SB 5.0-1 SP-US-40 Connected Device Type Inverter 325.44V>100V=true Design Low Temp. -3°C The maximum Voc must not exceed the max input PASS Design High Temp. 34°C voltage of the connected device Module Q.PEAK BLK-G4.1 290(290W) 507.24V<600V=true Module Vmp 31.96V Module Voc 39.19V Inverter Min.Input Voltage 100V Inverter Max.Input Voltage 600V Mounting Method Flush Roof Mount Temp.Coefficient Voc -0.11V/C Voltage Loss Due to Degradation 0.0 derate Voltage Loss Due to Tolerance 0.0 derate Inverter Min.Voltage Increase Due 0.0 to High Temperatures Calculations A. String Voc at Low Temperature 507.24V The module Voc(39.19V)will increase to 42.27V at the design low temperature(-3°C). (-3°C-25°C)X-0.11V/C+39.19V=42.27V The total Voc for the string is 507.24V. 42.27V X 12=507.24V B. String Vmp at High Temperature 325.44V Estimated cell temperature equals the design high temperature(34°C) plus 35°C(the estimated difference between ambient temperatures and the cell temperature for a flush roof mount). 34°C+35°C=69°C The module Vmp(31.96V)will drop to 27.12V at the design high temperature(34°C). (69°C-25°C)X-0.11V/C+31.96V=27.12V The total Vmp for the string is 325.44V. 27.12V X 12=325.44V 2.1.2.(10)Q.PEAK BLK-G4.1 290(290W)In series Section Properties Validation Tests Description (10)Q.PEAK BLK-G4.1 290(290W) The minimum Vmp must exceed the minimum PASS in series input voltage of the connected device Connected Device SB 5.0-1 SP-US-40 271.2V>100y=true Connected Device Type Inverter Design Low Temp. -3°C The maximum Voc must not exceed the max input PASS Design High Temp. 34°C voltage of the connected device Module Q.PEAK BLK-G4.1 290(290W) 422.7V<600V=true Module Vmp 31.96V Module Voc 39.19V Inverter Min.Input Voltage 100V Inverter Max.Input Voltage 600V Mounting Method Flush Roof Mount Temp.Coefficient Voc -0.11 V/C Voltage Loss Due to Degradation 0.0 derate Voltage Loss Due to Tolerance 0.0 derate Inverter Min.Voltage Increase Due 0.0 to High Temperatures Calculations A. String Voc at Low Temperature 422.7V The module Voc(39.19V)will increase to 42.27V at the design low temperature(-3°C). (-3°C-25°C)X-0.11V/C+39.19V=42.27V The total Voc for the string is 422.7V. 42.27V X 10=422.7V B. String Vmp at High Temperature 271.2V Estimated cell temperature equals the design high temperature(34°C) plus 35°C(the estimated difference between ambient temperatures and the cell temperature for a flush roof mount). 34°C+35°C=69°C The module Vmp(31.96V)will drop to 27.12V at the design high temperature(34°C). (69°C-25°C)X-0.11V/C+31.96V=27.12V The total Vmp for the string is 271.2V. 27.12V X 10=271.2V 3. NEC Code Compliance Report 3.1. Maximum System Voltage Test 3.1.1.SMA Inverter w122 Q-Cells Q.PEAK BLK-G4.1 290(290W)s May Properties NEC Code Validation Tests Array Type String Inverter Array PV Source Circuit maximum Voc must not exceed PASS. System Description SMA inverter w/22 0-Cells Q.PEAK 600V BLK-G4.1 290(290W)s 507.24V<600V=true Module Q.PEAK BLK-G4.1 290(290W) , Highest number of modules in series 12 in a PV Source Circuit Design Low Temp. -3°C Module Voc 39.19V Temp.Coefficient Voc -0.11 V/C NEC Code Calculations A. Maximum Voltage of PV Source Circuit 507.24V NEC Article 690.7 requires that if the PV module manufacturer provides a temperature coefficient of open-circuit voltage,it must be used to calculate the PV arrays maximum system voltage.It includes an information note recommending the use of the ASHRAE Extreme Annual Mean Minimum Design Dry Bulb Temperature'as the design low temperature.Using these values,the module Voc(39.19V)will increase to 42.27V at the design low temperature(-3°C). (-3°C-25°C)X-0.11V/C+39.19V=42.27V The total Voc for the string is 507.24V. 42.27V X 12=507.24V 3.1.2.SMA Inverter w/22 Q-Cells Q.PEAK BLK44.1290(290W)s Array Properties NEC Code Validation Tests Array Type String Inverter Array PV Source Circuit maximum Voc must not exceed PASS System Description SMA inverter w/22 Q-Cells Q.PEAK 600V BLK-G4.1 290(290W)s 507.24V<600V=true Module Q.PEAK BLK-G4.1 290(290W) Highest number of modules in series 12 in a PV Source Circuit Design Low Temp. -3°C Module Voc 39.19V Temp.Coefficient Voc -0.11V/C NEC Code Calculations A. Maximum Voltage of PV Source Circuit 507.24V NEC Article 690.7 requires that if the PV module manufacturer provides a temperature coefficient of open-circuit voltage,it must be used to calculate the PV array's maximum system voltage.It includes an information note recommending the use of the ASHRAE'Extreme Annual Mean Minimum Design Dry Bulb Temperature'as the design low temperature.Using these values,the module Voc(39.19V)will increase to 42.27V at the design low temperature(-3°C). (-3°C-25°C)X-0.11V/C+39.19V=42.27V The total Voc for the string is 507.24V. 42.27V X 12=507.24V 3.2.Wire, Conduit, and OCPD Code Compliance Validation 3.2.1.#1: PV Source Circuit:Series String Output to Transition Box Circuit Section Properties NEC Code Validation Tests Conductor 10 AWG PV Wire,Copper System must meet requirements for not having PASS Equipment Ground Conductor(EGC) 6 AWG Bare,Copper series fuse OCPD(s) N/A Raceway Free Air Conditions of Use ampacity must be greater than PASS Lowest Terminal Temperature 75°C or equal to the Continuous Current Rating 39.05A>=12.04A=true Maximum Wire Temperature 56°C Power Source Description String of 12 Q.PEAK BLK-G4.1 290 Base Ampacity must be at least 125%of PASS (290W)PV modules Continuous Current Current 9.63A 55A>15.05A=true Voltage 383.52V Module Series Fuse Rating 20A 4. Base conductor ampacity at the terminal PASS Total Number of Series Strings 2 temperature rating must exceed 125%of the Continuous Current. NEC Code Calculations 50A>=12.04A X 1.25 =true EGC must meet NEC requirements for minimum PASS A. Continuous Current 12.04A size The continuous current for this PV source circuit is equal to the short 6 AWG>=12 AWG=true circuit current of the PV module(9.63A)multiplied by 1.25 EGC must meet NEC requirements for physical PASS' 9.63A X 1.25=12.04A 6' protection B. Base Ampacity 55A 6 AWG>=6 AWG=true Base ampacity(30°C)for a copper conductor with 90°C insulation in free air is 55A. C. Conditions of Use Ampacity 39.05A The temperature factor for 90°C insulation at 56°C is 0.71. The fill factor for conductors in free air is 1. The ampacity derated for Conditions of Use is the product of the Base Ampacity(55A)multiplied by the temperature factor(0.71)and by the conduit fill factor(1). 55A X 0.71 X 1 =39.05A D. Ampacity at Terminal Rating 50A The lowest terminal temperature rating for this segment is 75°C. The base ampacity of this conductor at 75°C is 50A. E. Minimum Required EGC Size 12 AWG The smallest EGC size allowed by Table 250.122 is 12 AWG. According to Article 690.45(A),it is not necessary to increase EGC when conductors are oversized for voltage drop considerations if the circuits are PV source circuits. 3.2.2.#2: PV Source Circuit:Transition Box to Inverter Circuit Section Properties F. Minimum Recommended Conduit Size 0.5"dia. Conductor 10 AWG THWN-2,Copper The total area of all conductors is 0.0633in2.With a maximum fill rate of Equipment Ground Conductor(EGC) 10 AWG THWN-2,Copper 0.4,the recommended conduit diameter is 0.5. OCPD(s) N/A Qty Description Size Type Area Total Area Raceway 0.5"dia.Flexible Steel 2 Conductor 10 AWG THWN-2 0.0211in2 0.0422in2 Lowest Terminal Temperature 60°C Rating 1 Equipment Ground 10 AWG THWN-2 0.0211in2 0.0211in2 Maximum Wire Temperature 54°C 3 0.0633in2 Power Source Description String of 12 Q.PEAK BLK-G4.1 290 0.0633in2 10.4=0.1582in2(Corresponding to a diameter of 0.5") (290W)PV modules ( po 9 Current 383.5 NEC Code Validation Tests .63A Voltage 383.52V Module Series Fuse Rating 20A System must meet requirements for not having PASS Total Number of Series Strings 2 series fuse NEC Code Calculations Conditions of Use ampacity must be greater than PASS or equal to the Continuous Current A. Continuous Current 12.04A 28.4A>=12.04A=true The continuous current for this PV source circuit is equal to the short Base Ampacity must be at least 125%of PASS circuit current of the PV module(9.63A)multiplied by 1.25 Continuous Current 9.63A X 1.25=12.04A 40A>15.05A=true B. Base Ampacity 40A 4 Base conductor ampacity at the terminal PASS_ temperature rating must exceed 125%of the Base ampacity(30°C)for a copper conductor with 90°C insulation in Continuous Current. conduit is 40A. 30A>=12.04A X 1.25 =true C. Conditions of Use Ampacity 28.4A EGC must meet NEC requirements for minimum PASS The temperature factor for 90°C insulation at 56°C is 0.71. size The fill factor for a conduit that has 2 wires is 1. 10 AWG>=12 AWG=true The ampacity derated for Conditions of Use is the product of the Base Conduit must meet NEC recommendation for PASS Ampacity(40A)multiplied by the temperature factor(0.71)and by the 6. conduit fill factor(1). minimum size 40A X 0.71 X 1 =28.4A 0.5in.>=0.5in.=true D. Ampacity at Terminal Rating 30A The lowest terminal temperature rating for this segment is 60°C. The base ampacity of this conductor at 60°C is 30A. E. Minimum Required EGC Size 12 AWG The smallest EGC size allowed by Table 250.122 is 12 AWG. According to Article 690.45(A),it is not necessary to increase EGC when conductors are oversized for voltage drop considerations if the circuits are PV source circuits. 3.2.3.#3: Inverter Output: Inverter to Utility Disconnect Circuit Section Properties H. Minimum Recommended Conduit Size 0.5"dia. Conductor 10 AWG THWN-2,Copper The total area of all conductors is 0.0844in2.With a maximum fill rate of Equipment Ground Conductor(EGC) 10 AWG THWN-2,Copper 0.4,the recommended conduit diameter is 0.5. OCPD(s) N/A Qty Description -Size Type Area Total Area Raceway 0.5"dia.PVC-80 Lowest Terminal Temperature 60°C 2 Conductor 10 AWG THWN-2 0.0211in2 0.0422in2 Rating 1 Neutral 10 AWG THWN-2 0.0211in' 0.0211in2 Maximum Wire Temperature 34°C 1 Equipment Ground 10 AWG THWN-2 0.0211in2 0.0211in2 Power Source Description SMA SB 5.0-1SP-US-40 5000W Inverter 4 0.0844in2 Current 24A 0.0844in2/0.4=0.211 int(Corresponding to a diameter of 0.5") Voltage 240V Inverter Max OCPD rating 50A NEC Code Validation Tests NEC Code Calculations OCPD rating must be at least 125%of Continuous PASS Current A. Continuous Current 24A 30A>=24A X 1.25=true Equipment maximum rated output current is 2 X 9.63A=24A Conditions of Use ampacity must be greater than PASS OCPD rating,or rating of next smaller OCPD B. Base Ampacity 40A 38.4A>=30A(OCPD Rating)=true Base ampacity(30°C)for a copper conductor with 90°C insulation in OCPD rating must not exceed NEC max OCPD PASS conduit is 40A. rating for conductor 30A(OCPD Rating)<=30A =true C. Conditions of Use Ampacity 38.4A 4. Conditions of Use ampacity must be greater than PASS The temperature factor for 90°C insulation at 34°C is 0.96. or equal to the Continuous Current The fill factor for a conduit that has 2 wires is 1. 38.4A>=24A=true The ampacity derated for Conditions of Use is the product of the Base Ampacity(40A)multiplied by the temperature factor(0.96)and by the Base Ampacity must be at least 125%of PASS conduit fill factor(1). Continuous Current 40A X 0.96 X1=38.4A 40A>30A=true D. Ampacity at Terminal Rating 30A 6. Base conductor ampacity at the terminal PASS temperature rating must exceed 125%of the The lowest terminal temperature rating for this segment is 60°C. Continuous Current. The base ampacity of this conductor at 60°C is 30A. 30A>=24A X 1.25 =true E. Minimum Allowed OCPD Rating 30A EGC must meet NEC requirements for minimum PASS size NEC Code requires that the OCPD be rated for no less than 1.25 times 10 AWG>=10 AWG=true the Continuous Current of the circuit. 24A X 1.25=30A 8. Conduit must meet NEC recommendation for PASS minimum size F. Maximum Allowed OCPD Rating 30A 0.5in.>=0.5in.=true NEC Article 240.4(D)requires that OCPD rating not exceed 30A when protecting a Copper 10 AWG conductor. G. Minimum Required EGC Size 10 AWG The smallest EGC size allowed by Table 250.122 is 10 AWG. 3.2A 04: Utility Disconnect Output: Utility Disconnect to Point of Connection Circuit Section Properties G. Minimum Recommended Conduit Size 0.75"dia. Conductor 6 AWG THWN-2,Copper The total area of all conductors is 0.1436in2.With a maximum fill rate of Equipment Ground Conductor(EGC) 10 AWG THWN-2,Copper 0.4,the recommended conduit diameter is 0.75. OCPD(s) 30A X 2 Qty Description Size Type Area Total Area Raceway 0.75"dia.PVC 80 2 Conductor 6 AWG THWN-2 0.0507in2 0.1014in2 Lowest Terminal Temperature 75°C Rating 1 Neutral 10AWG THWN-2 0.0211in2 0.0211in2 Maximum Wire Temperature 34°C 1 Equipment Ground 10 AWG THWN-2 0.0211in2 0.0211in2 Power Source Description SMA SB 5.0-1SP-US-40 5000W 4 0.1436in2 Inverter — Current 24A 0.1436in2 10.4=0.359in2(Corresponding to a diameter of 0.75") Voltage 240V NEC Code Validation Tests NEC Code Calculations OCPD rating must be at least 125%of Continuous PASS A. Continuous Current 24A Current 30A>=24A X 1.25=true Equipment maximum rated output current is 2 X 9.63A=24A Conditions of Use ampacity must be greater than PASS B. Base Ampacity 75A OCPD rating,or rating of next smaller OCPD Base ampacity(30°C)for a copper conductor with 90°C insulation in 72A>=30A(OCPD Rating)=true conduit is 75A. Conditions of Use ampacity must be greater than PASS or equal to the Continuous Current C. Conditions of Use Ampacity 72A 72A>=24A=true The temperature factor for 90°C insulation at 34°C is 0.96. Base Ampacity must be at least 125%of PASS The fill factor for a conduit that has 2 wires is 1. Continuous Current The ampacity derated for Conditions of Use is the product of the Base 75A>30A=true Ampacity(75A)multiplied by the temperature factor(0.96)and by the conduit fill factor(1). Base conductor ampacity at the terminal PASS 75A X 0.96 X 1 =72A temperature rating must exceed 125%of the Continuous Current. D. Ampacity at Terminal Rating 65A 65A>=24A X 1.25 =true The lowest terminal temperature rating for this segment is 75°C. 6. EGC must meet NEC requirements for minimum PASS The base ampacity of this conductor at 75°C is 65A. size 10 AWG>=10 AWG=true E. Minimum Allowed OCPD Rating 30A NEC Code requires that the OCPD be rated for no less than 1.25 times Conduit must meet NEC recommendation for PASS the Continuous Current of the circuit. minimum size 24A X 1.25=30A 0.75in.>=0.75in.=true F. Minimum Required EGC Size 6 AWG Where conductors are oversized,the EGC must be oversized by the same rate.Table 250.122,gives a minimum EGC size of 10 AWG. Multiplied by the oversize rate,this yields 26.24kcmil corresponding to 6 AWG. (26.24kcmil/10.38kcmil)X 10.38kcmil=26.24kcmil t � Sunfiplus® The intelligent pitched roo mounting system • • V V The SolarWorld Sunfix plus pitched roof mounting system is optimized for simple and efficient installation of SolarWorld Sunmodule panels.The Sunfix plus system offers many value-added improvements enabling trouble free assembly. For flush mounting to pitched roofs Multiple roofing applications: composition shingle,standing metal seam, flat or curved concrete tile Supports high wind and snow loads Pre-assembled hardware designed for fast and easy installation Preset rail lengths simplify planning and reduce material cut-off Professional Engineer reviewed and approved (CA. 2010 Building Code, ASCE 7-05& 2009 International Building Code) Top clamps available for other modules (40 mm - 50 mm frames) SOLARWORLD MAD \ftwoo/ solarworld.com We turn sunlight into power. t � Sunfix"7plus® The intelligent pitched roof mounting system TECHNICAL SPECIFICATIONS FEATURES Load rating 170 mph wind at 50 psf snow ■ Pre-assembled module'top-clamp'hardware Array area weight 0.42 lb/ft2 r:R Top clamp with retainer stays in place during installation Roof pitch 7°to 45° ■ No field drilling of rails is required Orientation Portrait or landscape-flush to roof NO Splice bar with insertion stop-allows thermal expansion Rail lengths 1,2,3,and 4 module widths s L-foot needed on only one side near rail splice bar Top clamps M8 stainless steel-Torx T40 drive d Wire management stainless steel cable S-clips Top clamp installation Channel nut design 15 ftlbs torque Anodized aluminum components resists oxidation affects Top clamp colors Silver or black Compatible with approved WEEB grounding devices Splice bar Aluminum,fastener free installation All components and custom rail lengths in bulk quantities Extruded material 6005-T5 aluminum alloy Improved attachment spans and load ratings Aluminum finish Clear or black anodized a 10-year limited warranty COMPONENTS Sunfix plus rail(2 required)-2 modules=82",3 modules s 122", i L-foot with dual adjustment slots&mating serrations 4 modules=162" +� T-bolt M8 x 20 stainless steel with serrated flange nut 3 Top clamp for 31 mm frame M8 bolt t3 Rail splice ground jumper WEEB 8.0 pre-assembled with bolts y Channel nut with bolt positioning retainer Rail-equipment ground WEEB-lug 8.0 with bolt assembly es End clamp aluminum spacer 31 mm Roof attachment/flashing-Quick Mount PVm(silver or black) J:1 Rail splice bar;joins rails together as r ROOF MOUNTING OPTIONS 11111111411100. Composition shingle Flat tile S-Tile Standing seam clamp SW-01-6060US 04-2013 Sunfix"pIus® SO LARWORLD FLUSH ROOFMOUNTING INSTALLATION GUIDE REAL VALUE August 2014 BEFORE YOU BEGIN Consult the Authority Havinglurisdiction(AHJ)for wind,snow,and seismic design loads,as well as other considerations. Ensure that the installation is performed by a licensed solar PV installation professional. Verify that roof is sound and capable of supporting the additional load of the PV array within local climatic condi- tions.Look for signs of weak or low laying roof surfaces and inner structure which may need repair or leveling. ® Consult Sunfix plus span charts for allowable rail spans and cantilever lengths. ® Comply with the solar panel's installation manual for approved attachment locations and methods. M Comply with all local,state,and federal codes. M Comply with all roofing manufacturer's warranties. M Use only Sunfix plus parts supplied by SolarWorld. M The information within this guide is subject to change without notice. TOOLS NEEDED © _ M 13 mm socket 11 M 7/16 inch socket M Torx 740 drive bit M Torque wrench (0-30 ft-lb) M Safety equipment 0 M Chalk line v //It���C 0 0 Sunfix plus Rail © `O O Top-Clamp Assembly O End Spacer 0 ®Rail Splice Bar 0 L-Bracket ©T-Bolt and Nut Assembly 0 OO Rail Splice Bonding Jumper Assembly ®Rail Grounding Lug Assembly 0 Roof Attachment(Quick Mount PV shown) solarworld.com 1. INSTALL ROOF ATTACHMENTS AND L-BRACKET T-Head N T-Bolt and Nut 1.1. Snap a chalk line to ensure attachments and rail will be in line and Assembly square to roof. ilia L Bracket TIP:To ensure the arrayis square to the roof,snapa second line Long Side of q L-Bracket perpendicular to the line snapped in Step 1.1. 1.2. Install roof attachments and flashings per manufacturer's instruction Figure 1.3 manual. 1.3. Pre-assemble T-bolt and nut assembly®on the long side of the T-Bolt and Nut L-Bracket Assembly L-bracket®with the T head on the outside as shown in Figure 1.3. -4111101—rs Preassemble loosely,with anti-seize compound on threads. Short Side 1.4. Attach short side of pre-assembled L-bracket to roof attachment®per Roof ofL-Bracket 1� attachment instruction manual.Quick Mount PV shown in Figure 1.4. Attachment (Quick Mount PV Shown) 2. INSTALL RAILS Figure 1.4 2.1. Insert T-head of bolt(now connected to L-bracket)into the channel on the long side of the Sunfix plus rail t®,as shown in Figure 2.1. Sunfix, Rail Nut T-Bolt and 2.2. Hand tighten nut.As tightening occurs,the T-head will lock Nut Assembly perpendicular to the rail.Verify T-head is in this position,as shown in Figure 2.2. T-Head ���MI/�////��.1 L-Bracket (Unlocked 2.3. Repeat Steps 2.1 and 2.2 for all attachments.Adjust and level rail up and Position) down and side to side as necessary.Tighten nut to a torque of 12 ft-lbs. Figure 2.1 3. INSTALL RAIL SPLICES AND RACKING BONDING/GROUNDING (AS REQUIRED) Sunfix T-Bok and plus Rail Nut Assembly 3.1. To connect rail sections,Sunfix plus utilizes a loose fitting,fastener-free I Nut rail splice bar Oto allow for transfer of load and thermal expansion/ contraction.To install,insert the rail splice bar into the rails until the T-Head ��/� L-Bracket ri;1,/1 raised index touches the rail end,as shown in Figure 3.1. (Lockedi ; iually �11�� g tion;visually verify) 3.2. For rail-to-rail electrical continuity(bonding),a rail splice bonding jumper assembly OO is used.To install,insert assembly's T-bolts into the Figure 2.2 channel on the long side of rail and secure,similar to Steps 2.1 and 2.2.Be sure to allow slack in jumper to allow for thermal expansion.Refer to Figure 3.2.Tighten to 12 ft lbs using general purpose anti-seize compound. Sunfix plus Rail 3.3. At the end of each row attach the rail grounding lug assembly®similar / " to steps 2.1 and 2.2.Be sure to install rail grounding lug assembly parallel to rail,ensuring the teeth of the grounding WEEB firmly"bite" Rail Splice Bar into rail.Torque rail-connecting bolt to 12 ft-lbs using general purpose 1 Raised Index anti-seize compound.After inserting grounding wire,torque ground- Figure 3.1 connecting bolt to 7 ft-lbs.Refer to Figure 3.3. Sunfix plus Rail Connecting Grounding Sunfix plus Rail Rail End Bolt WEEB Rail Splice Bonding Jumper Assembly ......._____ (Allow Slack) .wytt Ground Connecting Bolt �_ ? ___ MAO 'ij1 i Rail Grounding Long Side Long Side Channel Figure 3.3 Lug Assembly Channel Figure 3.2 2 SUNFIX PLUS FLUSH ROOF MOUNTING INSTALLATION GUIDE 4. MODULE INSTALLATION Top-Clamp Clamping ® Assembly TIP:Consider wire management and solar panel grounding before installing Washer \ .7r.el solar panels.Wire management spaced at 12"along the rail is suggested. Wire management that is UV resistant,rated for climate,and has a 25-year Grounding WEEB-DPF service life is appropriate. (optional) Channel Nut 1_ Plastic Guide 4.1. If top hat style WEEB DPF(part#EC0534) is to be used,pre-assemble into top-clamp assembly OO,as shown in Figure 4.1a. Note that not every Figure 4.la top-clamp assembly needs a WEEB. Follow the WEEB layout diagrams in Figure 4.1b. o O O Even ° Number 4.2.To install top-clamp assembly, hold top-clamp assembly by the plastic of Solar taps above channel nut as shown in Figure 4.2. Q ° Panels Odd 4.3. Insert top-clamp assembly into the rail's short side channel about " • ® 0 OO Number %, • O O O of Solar from the rail end.To lock,sit bottom of plastic guide against the bottom Panels of the channel,and twist 1/4 turn clockwise to lock top-clamp assembly Odenotesplacestoinstall WEER-DPF into the channel (plastic taps will be perpendicular to rail). Refer to Figure 4.1b Figures 4.3 and 4.6. Repeat Steps 4.2 and 4.3 for the second rail.(Each solar panel will be attached to two rails.) Asia. 4.4.From the end of the rail, measure the width of the solar panel, plus about 5".(These additional 5"will ensure that the top-clamp assemblies Iry do not interfere with module placement.) Repeat for second rail. Refer to Figure 4.6. N )wl 9 Plastic Tabs 1p4.0 4.5. Measure and mark 1 'A"from the end of rail.Lay solar panel against rail (between the clamps).Align the edge of the solar panel with this Channel Nut Figure 4.2 1 1/4"mark.Verify the manufacturer's approved solar panel attachment locations are being met. Refer to Figure 4.6. Top-Clampembly ®�® Q Drop 4.6.Keeping the solar panel still and the plastic tabs perpendicular to the Assembly n rail,slide the four top-clamp assemblies to the solar panel.Be sure the Plastic Tabs '''''""Zr ®clock1/4 clockwise top-clamp assembly's plastic tabs are flush with the edge ofthe solar Ni to lock a -� Plastic Guide panel.Refer to Figure 4.6. C�- � 10 4.7. At the row end,insert end spacers©between the top clamp assembly's Short Side Channel washer and Sunfix plus rail,as shown in Figure 4.7.Tighten these outer Sunfix plus Rail top-clamp assemblies to 15 ft-lbs using general purpose anti-seize Figure 4.3 compound,or if using WEEBs,tighten to manufacturers specifications (EC0534 WEEB DPF requires 12 ft-lbs). h--Solar Panel Width—.1 4.8.Continue to lay solar panels in place,bringing them flush to the plastic �—�• tabs,and tightening the top-clamp assemblies—similar to Step 4.7. ♦ 111....1 4. (Revealing a %"gap between solar panels.) Insert the end spacer at the -t€--M,.INEMO!= Samp 11111111111111 end of the row as in Step 4.7.Be sure solar panel edge is greater than 1" Assernbh Flush to from rail end/splice,as shown in Figure 4.8. Solar Panel Edge Keeping Plastic Tabs ■ j Perpendicular to Rail ...... .■..■. 3/8"(Ref.) 1'Minimum Top-Clamp .11111....Assembly Washer Top-Clamp .\ Top-Clamp 4111 Assembly _ Solar Panel End Spacer Assembly Solar P 7 -- -- Sunfix lus ■■�■.■� ---- Solar Panel Frame III Panel Rail End ' =... . —4n WEEB DPF I11= Sunfix _ = 1/2" Iffh""' ■ . .,■.■■■ (Optional) I plus Rail �� End - 1S"1.— -='---' Solar Panel Width Plus S" Sunfix plus Rail Rail Splice Figure 4.8 Figure 4.7 Figure 4.6 SUNFIX PLUS FLUSH ROOF MOUNTING INSTALLATION GUIDE 3 5. MAINTENANCE 5.1. Visually verify that no wires are in close proximity to the roof or sharp edges. 5.2. Visually inspect the solar panels for signs of damage to the glass or frame,or for signs of shifting. 5.3. Visually inspect all hardware connection points for loose or missing parts. 6. NOTES 6.1. System System Wattage Date Installed 6.2.Modules Number of Modules Module Wattage Module Model 6.3. Inverter Number of Inverters Inverter(s)Make&Model Inverter Serial Number(s) 6.4.Installer Installation Company Installer's Phone Number Installer's Email 6.5. Racking Racking Type Sunfix plus Attachment Type 6.6.Warranty Modules Racking 10 years Inverter 6.7.Notes Please register system at:solarworld.com/Register 4 SUNFIX PLUS FLUSH ROOF MOUNTING INSTALLATION GUIDE sw-04-5122us08-2o14 Sunfix® Plus 2 Top Clamp Hardware Selector Guide The Sunfix Plus 2 Top Clamp roof mounting system is compatible with SolarWorld Sunmodules as well as other PV modules with a frame thickness of 40, 42, 45, 46 and 50 mm. Make every solar installation the best it can be by starting with the right hardware.The Sunfix Plus 2 Top Clamp hardware for'end-clamp'and'mid-clamp' bolt assemblies is illustrated below. Determine the M8 T-Bolt(length)and End Spacer (height) requirements by selecting the appropriate item numbers,based on PV frame height,in the Top Clamp Selection table.The M8 Flange Nut and Clamping Washer are universal fits every top clamp bolt assembly,and are listed separately in the Common Parts table.All Sunfix Plus 2 Top Clamp hardware components are ordered as individual items in package increments of 100 pieces. For installation compatibility,PV modules should be listed to UL1703 and conform to the following criteria: Weight not to exceed 46.7 Ibs(21.2 kg) Clamping surface not to exceed 1.38"width Dimensions not to exceed 39.41"W x 65.94" L Area not to exceed 18 ft2 M8 flange nut(EC0496) Clamping washer(SA5079) �r' Z End spacer(see table)alum. r T-bolt M8(see table) End-Clamp Assembly 8,- M8 flange nut(EC0496) 41111110.4--- Clamping washer(SA5079) (z.......- ) ,. T-bolt M8(see table) Mid-Clamp Assembly lel' Sunfix Plus 2 Top Clamp Selection PV Frame Top Clamp T-Bolt M8 End Clamp-Spacer Height(mm)" Item no. Description Item no. Description 40.00 SH0015 M8 x 60 mm SA5190 Spacer-39.5 mm 42.00 SH0005 M8 x 65 mm SA5099 Spacer-41.5 mm 45.00 SH0005 M8 x 65 m m SA5104 Spacer-44.5 mm 46.00 SH0005 M8 x 65 mm SK5115 Spacer-45.5 mm 50.00 SH0006 M8 x 70 mm SK5222 Spacer-49.5 mm 'Standard tolerance on PV frame height not to exceed+/-0.25 mm. Swtfix® Plus 2 Top Clamp Hardware Selector Guide Accessory PV module grounding,as shown as the WEEB-'DPF'option below, is available for PV 04-- M8 flange nut(EC0496) module frames that fit within the dimensional guidelines of acceptable frame cross-sections Clamping washer(SA5079) listed by(Wiley) Burndy Corp. Please review the particular PV module MFR's installation instructions for any restrictions pertaining to WEEB"DPF"(option) allowable grounding devices or minimum top clamping surface area requirements.Refer to the Sunfix Plus 2 installation instructions for WEEB placement locations for even or odd T-bolt M8(see table) numbers of PV modules in a row. 0.375 in. Typ. • - 0.875 in. Min. Mid Clamp Bolt End Cap - Assy WEEB 'DPF' (Assembled) ..-- , .-----./ First Module I Next Module uri Ix'plus ait NOTE: item no. Description m Fasteners are grade A2 stainless steel. EC0496 M8 flange nut SA5079 Clamping washer m Top clamps require 1S ft-lbs(20 nm)applied torque. Accessory Items T-bolts feature a directional slot indicating Item no. Description proper installation when slot is parallel to EC0534 WEEB DPF module frame. Array total qty T-bolt clamp assembly End clamp spacer of PV modules PV-one row PV-two rows PV-one row PV-two rows 8 i 18 20 4 8 10 22 24 4 8 12 26 28 4 8 14 30 32 4 8 ' ' 16 1, 34 36 4 8 1 i ,. 18 i 38 40 4 8 2°---1 42 44 4 8SOLARWORLD 0 22 46 48 4 8 N __L_ a 24 1 50 52 4 8 3 P 800-947-6527 1 P 800-94-SOLAR solarworld.com RSTC Enterprises Inc 2214 Heimstead Road Eau Claire, WI 54703 S LADECK 715-830-9997 Outdoor Pass thru enclosure: Model - 0786-3R 5 Asphalt/Cedar Roof Systems For AC or DC current ETL Listed and labeled to UL standards Report#3125796 CRT-001b Revised March 2012 s • • UL50 Type 3R, 11 Edition Electrical equipment enclosures o_ • CSA C22.2 # 94-M91 special purpose enclosures (2006) !)� r + OW 4-7 1 Basic specifications Material - 18 Gauge G 90 Steel Base/Cover •, Process - Seamless draw (stamped) Flashing- 15" x 15" '-44,44111411. Height- 2.625" Cavity- 8" x 9" x 2.5" (162 Cubic inches) Finish- Powder coat(1100 hours salt spray) SOLADECK 0786-3R5 Assembly: • Cavity Base and cover punched for matched assembly • Base Flashing pre-punched for roof deck mounting • Cavity Base- (5) predetermined dimples for fittings or conduit Base plate: • 16 gauge galvanized steel • • • • Fastened to base flashing with toggle fastening system • Finish— Powder coat(1100 hours salt spray) • (5) Roof deck knockouts • ;' • Knockout sizes—(3).5", (1).75" and (1)1" 112 • Rail - 7" slotted 35mmP;'' Ground—Installed with steel stud and star nut • • (5) Position for wire size 14—6 ' Strain Relief Clip—Aluminum riveted installation Hardware pack: `. 7- 1" Truss head screws 4- .5" 8-32 thread cutting screws 4- Bonded seal washers#10 2— 10-32 1/2" Steel studs 2— 10-32 318" steel star nuts With 2 circuit ACass thru kit -Foam gasket seal p 1 —Installation instructions Kit Part # 01612 *** Kit sold separately E-Mount I QMSE THIS EDGE TOWARDS ROOF RIDGE NO DESCRIPTION QTY. r 1 FLASHING.9"X 12'X.040".5052.MILL 1 2 ()BLOCK,CLASSIC,A360.1 CAST AL,MILL 1 HANGER BOLT,PLAIN CENTER.5/16"x 6", 3 18-8 5S 1 4 WASHER,SEALING, 5/16'ID X 3/4"OD, 1 EPDM BONDED SS RACKING COMPONENTS 5 NLT,HEX,5/16 18.UNC-28, I8-8 SS 2 NOT INCLUDED 6 WASHER.FLAT, 19/64"ID x 7/8"OD x I/8" 1 EPDM �j 7 WASHER.FENDER.5/16"IDXI"OD. 18-8SS 1 CO F== _ i Al ;1 8 WASHER,SPLIT-LOCK,5/16'ID, 18-8 SS I 1 a•l IT1� ll 1;1'1 CO 1 ] 1� '1 { 1 O 11 \O 1 CI - , O NI 1 ID ., .. -wetJCOi III ! Quick Mount PV Il LL QMSE: QMPV E-MOUNT AVAILABLE IN MILL,AND BRONZE ANODIZED FINISHES. u",,"ot"ERcf11EN•Ec'nfu. SIZE DRAWN BY RAD REV 004EN90rA Am IN ITCHES �] I1ANCE1 A DATE 3/26/2014 2 E6Acnar.Ai.:,ie 1.rOr�lYr Y0 COWMAN '.41./....,.., AGE 0ECIMA� •Id IEI+Oru..� COM YEL I.MI 0.104...:I IN SOU EIOYNir OIOUIr kW,.h co rrMti01,..r�rA..111 OR E. tiH,SC,,,6 0e 4,• \E M��Uu'"Y+Mr'1E.n...0.0r.Or OW.ErOUM h..wp..tED IKIE,IACE a ciu AS 1171 SI_AIE ') 'AfiGre 09$64 14EE'i :I 5 4 3 2 I Lag pull-out(withdrawal)capacities(lbs)in typical lumber. Lag Bolt Specifications Specific Graver 5/18"shat per 3"ttxead deptn I 5116"shalt per 1"thread depth Douglas Fe Larch ' 50 I 798 286 Douglas Fir South 48 705 235 Engelmann Spruce Lodgepole Pmt(MSR 1650r 8 higher) 46 # 705 235 Hem Fr .43 ! 636 212 'Hem.FirINoMl .46 1 705 235 Southern Pure 55 I 921 307 I Spruce Pine Fur 12 615 205 1 SpnubaPine.Fir 1E of 2 million pa and higher grades of MSR and MELTL 50 Toe 286 Sources:American Wood Council,NDS 2005,Table 11.2 A,11.3.2 A Notes: 1 i Thread must be embedded in a rafter or other structural root member 2)See NOS Table 11.5.1C for required edge distances. Quick Mount PV RESPECT THE ROOF BI 7.2.3-26 Mar-2014,Rev 3 E-Mount Installation Instructions Installation Tools Required:tape measure,roofing bar,chalk line,stud finder,caulking gun,sealant compatible with roofing materials, drill with 7/32"long-style bit,drill or impact gun with 1/2"deep socket. WARNING:Quick Mount PV products are NOT designed for and should NOT be used to anchor fall protection equipment. 4. . - .. .z �: _0,0._ 3rd course a f 2nd course '' rhe . • r4'' ti} f A;i p iy to ;y \titt !!;,,,-.:-!,,, t st course Locate,choose,and mark centers of rafters to be Carefully lift composition roof shingle with roofing Insert flashing between 1st and 2nd course.Slide mounted. Select the courses of shingles where bar,just above placement of mount.Remove nails up so top edge of flashing is at least 3/4"higher mounts will be placed. as required. See"Proper Flashing Placement"on than the drip edge of the 3rd course and lower next page. flashing edge is above the drip edge of 1st course. Mark center for drilling. c ;. 7course „ , ^d. 1-..,. V ,. . ti dl iJ d ;-: a��x , Using drill with 7/32'bit,drill pilot hole into roof Clean off any sawdust,and fill hole with sealant Slide flashing into position. Prepare hanger bolt and rafter,taking care to drill square to the roof. compatible with roofing materials. with hex nut and sealing washer.Insert into hole Do not use mount as a drill guide.Drill should be and drive hanger bolt until QBlock stops rotating 'long style bit;aka'aircraft extension bit'to drill a easily.Do NOT over torque. 3"deep hole into rafter. 7 8 You are now ready for the rack of your • choice. Follow all the directions of the rack manufacturer as well as the �+�, module manufacturer. i,4,5".4..;„-1,-;.-4...' All roofing manufacturers' written .4 ' , instructions must also be followed by anyone modifying a roof system. 'it%I ' ''i Consult the roof manufacturer's specs s s =' and Instructions prior to touching b ' br `r the roof. Insert EPDM rubber washer over hanger bolt into Using the rack kit hardware, secure the racking block. (L-foot) to the mount using torque specs from racking manufacturer.If racking manufacturer does not specify torque setting,tighten to 13 ft.-lbs. BI 7.2.3-26 Mar-2014,Rev 3 r Reference and Tips Proper Flashing Placement Flashing positioned too tow. Nails not removed Keyway allows water entry. • — — 717=121/1, • r _ • sem.. { r.�._ ! ! i I 1 I i I I f 2nd course Moisture/debrf1 accumulation can I4,>, ' cause early shingle degradation, O INCORRECT Position Correct Position Acceptable Position No shingle cutting required if shingle cutting is required,a Ei' gap between block and shingle Is recommended. Additional tips and information for installing mounts: • See Quick Tips videos on nail removal, bolt prep, and more at: http://www.quickmountpv.com/support/videos.html • It is not necessary or advisable to use nails or other fasteners to secure the perimeter of the flashing. • The E-Mount is made to work with standard and high-definition composition/asphalt and wood shingle roofs with 5"to 5-5/8" courses. If the exposed surface of the course exceeds this measure- ment you may need to use our Classic Shake Mount instead. • Depending on the season and climate, size and location of seal tabs, and quality of the shingles, the seal tabs that adhere the shingle courses together may not effectively seal the shingles to the flashings.If this is the case, simply add several quarter-sized dabs of manufacturer accepted sealant or asphalt roofing cement, meeting ASTM D 4586 Type II, between the flashing and the shingle above. • Mounts should not be installed in areas of the roof susceptible to ice damming.Water ponding un- der the shingles can reach the bolt penetration. • Take care not to damage the roofing material while working on the roof. Removing stone granules and deforming the shingles in any way can shorten the lifespan of the roofing.The value of the solar array is directly affected by the condition of the roof it is attached to. BI 7.2.3-26 Mar-2014,Rev 3 r ' Quick Mount PVA RESPECT THE ROOF 925-478-8269 • www.quickmountpv.com • info@quickmountpv.com 2700 Mitchell Dr.,Bldg 2 • Walnut Creek,CA 94598 ®2013 by Quick Mount PV.All rights reserved. MNICAL GeOCel Setting the Standards DATA ° 00t � PROFESSIONAL t t GRADE POLYURETHANE SEALANT 1. PRODUCT NAME: Grade:Gun grade consistency 3300-Professional Grade Polyurethane Sealant Primer.Not required on most surfaces 2. MANUFACTURER: Packaging: 10.1 fl.oz. cartridges Geocel Products Group A Business Unit of Colors:White. gray, limestone. The Sherwin-Williams Company bronze, medium bronze,tan, aluminum gray, black,and ("Geocel Products Group") redwood tan Cleve'and,OH 44115 Application Standards: Meets Phone:(800)348-7615 ASTM C 920 Type S.Grade NS.Class Fax: (800)348-7009 25. Use NT,A. M.0,and 0; Meets www.GeocelUSA.com Federal Specification TT-S-0230 C. 3. PRODUCT DESCRIPTION: " " Type II.Class A; Meets Canadian Specification CAN/CGSB-19.13-M87 3300'n Professional Grade Class 2 Non-sag.Class 25, Class M. Polyurethane Sealant is a single 2 . r I component,high performance Limitations: ,. polyurethane sealant that withstands IacFES•ONAL. •Do not apply over damp or extreme weather conditions and cures ' "t"'E"E • contaminated surfaces to a flexible weatherproof seal. ages'.'" •Do not apply to absorptive P surfaces such as marble, Product Benefits: •Withstands extreme weather conditions limestone.or granite without prior •Meets ASTM C 920 +r testing for discoloration or staining •Moisture cure •Flexible ion 4. INSTALLATION: •Minimal shrinkage Joint Design:The width of the joint •Non-sag formula should be a minimum of 4 times the •Primeness adhesion on most surfaces anticipated movement.In joints up to •Paintable.non-corrosive 1/2"wide.the depth of the sealant •Contains no TDI(toluene diisocyanate) should be equal to the width,but not less than 1/4". In joints wider than Basic Uses:3300 Sealant can be1/2",the depth should be maintained used in roofing applications such as at 5/8". Lap shear joints should have a concrete roofing tile.clay roofing tile, a width of at least twice the anticipated metal roofing. Kynar 500"coated movement. metal.and composition shingles. _ %,' Surface Preparation:Joints to Other applications include building receive sealant must be sound. lath paper repair,gutters. HVAC. Adheres To: Masonry.ceramics,wood, flashing, skylights,roofing seams. smooth, uniform in dimensions,and steel,Kynar 500'.aluminum,asphalt free from defects and foreign material. roofing projections.termination shingles,buildingpaper, BUR.concrete. They must be clean,dry,and free of points,and vents. g p p frost and all contaminants.such as fiberglass,and other common building substrates. curing compounds,sealers (waterproofing), coatings.etc.Sealant MERE t5 A DIFFERENCE ti �•„ Wff It,.. ,8, ,....,.._., •.___......• • • . . . .. _ . . . . a r;t; 1 FIGURE 2+ FRCURE 3 ________ Proper Depth Control Joints without Bond Breaker Joints with Bond Breaker POLYURETHANE • • • • • • • • • The effects on the sealant with and without bond breakers are illustrated in Figures Two and Three. SILICONE iiiiiii0i.i10ialiiiiiillii Kynar 500 ,s a registered trademark of Arkema Inc. adhesion should be tested on each VAPOR/PARTICULATE RESPIRATOR failure,and as your sole remedy,we different substrate prior to caulking.To MAY BE EFFECTIVE.Follow directions will either replace the product at no test adhesion,apply a sealant bead for respirator use.Wear the respirator for cost or refund the original purchase and allow to cure thoroughly.Then pull the whole time until all vapors are gone. price for that portion of product that one end of the bead to test adhesive If you have any breathing problems strength. during use,LEAVE THE AREA and get tfails to perform in accordance with Joint Backing:Joint depth should not fresh air. If problems remain or happenassociated limited withanbo a Labor t costs exceed 5/8°.An open cell backer rod later, IMMEIATELY call a doctor-If ot associated with labor are not should be used to control joint depth. available get emergency medical included.THIS LIMITED In shallow joints,a bond breaker tape treatment. Have the label with you. WARRANTY IS IN LIEU OF ALL should be installed to prevent Adequate ventilation required when OTHER WARRANTIES,EXPRESS three-point contact. sanding or abrading the dried film.If OR IMPLIED,INCLUDING Elongation:881% adequate ventilation cannot be provided MERCHANTABILITY,WHICH ARE Tack Frei 3 hours wear an approved particulate respirator ALL DISCLAIMED AND/OR Cure:F1 day (NIOSH approved).Follow respirator LIMITED IN DURATION TO THE manufacturer's directions for respirator EXTENT PERMITTED BY LAW.WE Service Temperature: use.IRRITATES SKIN AND EYES.Avoid SHALL NOT BE LIABLE FOR -20°F to 150°F(-29°C to 66°C) contact with eyes and skin. In case of INDIRECT.SPECIAL, INCIDENTAL Application Temperature: eye contact,flush immediately with OR CONSEQUENTIAL DAMAGES -20°F to 150°F(-29°C to 66°C) plenty of water for 15 minutes (INCLUDING LOST PROFITS) and call a doctor-If not available get FROM ANY CAUSE WHATSOEVER Application and Tooling:Apply with emergency medical treatment. In case of AND SUCH DAMAGES ARE conventional caulking equipment. Fill skin contact,wash thoroughly with soap EXPRESSLY EXCLUDED. Some joints from the back to prevent voids and water. Clothes contaminated by a states do not allow the exclusion or and air pockets. If application spill should be removed and laundered. limitation of incidental or temperature is below 40°F(5°C), Keep container closed when not in use. consequential damages or how long precautions should be taken to ensure Reacts with water in closed container to an implied warranty lasts,so the the substrates are completely dry and produce pressure which may cause above limitation or exclusion may frost free.Immediately after application, container to burst. Do not transfer nota I to you.This limited tooling is recommended to ensure firm, apply full contact with the joint sides. contents to other containers for storage. warranty gives you specific legal First Aid:In case of eye contact,flush rights,and you may also have other Cleaning:Remove 3300 Sealant from thoroughly with large amounts of water. rights which vary from state to gun and tools before it cures.This may Get medical attention if irritation state. be done by scraping and use of persists. If swallowed,call Poison solvents such as Xylol. Follow Control Center,hospital emergency 7. MAINTENANCE: manufacturer's instructions for safe room,or physician immediately. If sealant is damaged and the bond use.Cured materials may be removed DELAYED EFFECTS FROM LONG is intact,cut out the damaged area by cutting with sharp tools or TERM OVEREXPOSURE.Abrading or and recaulk.No primer is required. sandpapering. sanding of the dry film may release If the bond has been affected. Storage and Shelf Life:Unopened crystalline silica which has been shown remove the sealant,clean and containers should be protected from to cause lung damage and cancer under prepare the joint in accordance heat,moisture,and direct sun. Do not long term exposure. with the instructions under open containers until all preparatory Warning:This product contains "Surface Preparation,"and recaulk. work has been completed. Material in chemicals known to the state of unopened containers is usable for up California to cause cancer and birth 8. TECHNICAL SERVICES: to 1 year when stored at 75°F(25°C). defects or other reproductive harm.DO Geocel Products Group Cautions: CONTAINS NOT TAKE INTERNALLY. KEEP OUT.OF representatives throughout the U.S. ALIPHATIC POLYISOCYANATE THE REACH OF CHILDREN. are available to provide technical HEXAMETHYLENE DIISOCYANATE. assistance.Geocel Products AROMATIC POLYISOCYANATE Group's in-house technical staff POLYMETHYLENE POLYPHENYL 5. AVAILABIUTY AND COST: and laboratory facilities are ISOCYANATE. METHYLENEDIPHENYL Available from various lumber yards, equipped to respond to specific DIISOCYANATE.CRYSTALLINE SILICA hardware stores,home centers, requests for further information and/or applications testing. VAPOR HARMFUL.Gives off harmful construction material and industrial vapor of solvents and isocyanates. DO distributors.Cost and further NOT USE IF YOU HAVE CHRONIC technical data are available from your n*Ofit!K.R rILWU (LONG-TERM)LUNG OR BREATHING local Geocel Products Group Per 10.1 fl.ca.Cartridge PROBLEMS.OR IF YOU HAVE EVER representative or from our office. Joint Size Linear Feet HAD A REACTION TO ISOCYANATES. 1/4"x 1/4" 24.1 USE ONLY WITH ADEQUATE 1/4"x 3/8" 16.0 VENTILATION.A POSITIVE PRESSURE 6. UNITED WARRANTY: 1/4"x 1/2" 12.0 AIR SUPPLIED RESPIRATOR(NIOSH If when applied according to label 1/2"x 3/8" 8.4 approved)SHOULD BE WORN TO directions this product fails to 1/2"x 1/2" 6.0 PREVENT EXPOSURE. IF perform in accordance with its 3/4"x 1/2" 4.0 UNAVAILABLE,AN APPROPRIATE published literature,upon For additional Inforrnah PROPERLY FITTED APPROVED NIOSH satisfactory evidence of product the product spec sheet�' located at www.GeocelUSA.com. GeOCelCleveland,OH 44115 (800)348-7615•Fax(800)348-7009 A.tul4 Arad Tb,'Sherwin awv F'tn.g're Sto•uiora' ISO www.GeoceIUSA.com mas+Uripolhr5trrwr�Wflwxncfnnq,14 703300 6114 '■ I s m SOLARSTANDARDi � 1.3 ■■ MOUNT INSTALLATION GUIDE ; PAGE ,, ��/"' WEEBLUG TERMINAL TORQUE, f .4'.r'/'/ Single Use Only Install Conductor and • torque to the following: 6-14 AWG:5ft-lbs a Y ONE LUG PER • OF MODULES: .• 'f ° ' WEEBLUG CONDUCTOR-UNIRAC P/N 008002S: Only one lug • , of modules is •u -•. _� ee Page or additi • [u. equired for % ��,�,�'' Apply Anti Seize and insert a bolt in the aluminum rail and through the clearance e n joints. - 1"" � hole in the stainless steel flat washer. Place the stainless steel flat washer on the bolt, ;;{• „i oriented so the dimples will contact the aluminum rail.Place the lug portion on the f bolt and stainless steel flat washer.Install stainless steel flat washer,lock washer and ,,t...{{{ nut.Tighten the nut until the dimples are completely embedded into the rail and lug. `� / �r TORQUE VALUE 10 ft lbs.(See Note on PG.A)of O �'' ' .=4 See product data sheet for more details,Model No.WEEB-LUG-6.7 GROUNDING LUG MOUNTING DETAILS: Star Washer is 4014 • I Details are provided for both the WEEB and Ilsco products.The WEEBLug has a Single Use Only grounding symbol located on the lug assembly.The Ilsco lug has a green colored / set screw for grounding indication purposes. Installation must be in accordance ' with NFPA NEC 70,however the electrical designer of record should refer to the •0 latest revision of NEC for actual grounding conductor cable size. TERMINAL TORQUE, Required if not using approved integrated grounding microinveters Install Conductor and i torque to the following: 44. 4-6 AWG:35in-lbs 0, , 4Sb 8 AWG:25 in-lbs 10-14 AWG:20 in-lbs ILSCO LAY-IN LUG CONDUCTOR-UNIRAC P/N 008009P:Alternate Grounding Lug GROUND LUG BOLT SIZE DRILL SIZE -Drill,deburr hole and bolt thru both rail walls per table. WEEBLug 1/4" N/A-Place in Top SM Rail Slot TORQUE VALUE 5 ft tbs.(See Note on PG.A) I15C0 Lug #10-32 7/32" See ILSCO product data sheet for more details,Model No.GBL-4DBT. • Torque value depends on conductor size. NOTE:ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION • See product data sheet for torque value. - NOTI E OF COMMENCEMENT State of ______LCounty of Tax Folio No. I 69 (02- B - OOO C`? To Whom It May Concern: The undersigned hereby informs you that improvements will be made to certain real property, and in accordance with Section 713 of the Florida Statutes,the following information is stated in this NOTICE OF COMMENCEMENT. Legal Description of property being improved: Zp--Z.0 09- Z S - Z-9e A a _ W Q- D pL iVel Z. LO i MI Address of property being improved: 1 U _T-41\-Q /Y� 4 ) /�,,J1,L( General description of improvements: �j 9 caner: I,.. -4, ' / . I1 A n. L 4 .1 Address: b /moi .S1. ��.f �� 0 Owner's interest telb M site of the improvement: Fee Simple Titlehold- if other than owner): � ^u".,1, Q„ Name: f A. Contractor: A%. 1 J�j 4 ,l vVl— _ �"- t 1 �(2S 5 © .S—' ���%� Address: ti �- � 3 Telephone No.: Fax No: Surety(if any) Address: Amount of Bond$ Telephone No: Fax No: Name and address of any person making a loan for the construction of the improvements Name: Address: Phone No: Fax No: ' Name of person within the State of Florida, other than himself, designated by owner upon whom notices or other documents may be served: Name: Address: , Telephone No: Fax No: In addition to himself, owner designates the following person to receive a copy of the Lienor's Notice as provided in Section 713.06(2)(b),Florida Statues. (Fill in at Owner's option) Name: Address: Telephone No: Fax No: Expiration date of Notice of Commencement(the expiration date is one (1)year from the date of recording unless a different date is specified): THIS SPACE FOR RECORDER'S USE ONLY OWNS• Signed: /1 Date: f / Z Doc#2017293554,OR BK 18230 Page 514, Before me this f I d(yof iIV-� in the County f Duv ,State Number Pages:1 Of Florida,has p:Ironally appeared 71'51 Recorded 12/21/2017 04:45 PM, Personally Known: C/ 6 or RONNIE FUSSELL CLERK CIRCUIT COURT DUVAL Produced Identification: 1, A COUNTY .c.. et RECORDING $10.00 Votary Public: Gk.- ( ___ VIy commission expires: ,---'' ''''''''''''' —' -'----•-3--_+ A NNED "�'' TONI GINULESF'ERGER 1 KAT. MYEXPIRES:COMMISSION#FF 924551' I :%:^' �- , Bended Thru NotaryOcPutob,Or Z.. '