Loading...
1889 BEACH AVE - ROOF -6' 'P. CITY OF ATLANTIC BEACH .-. r^ - > 800 SEMINOLE ROAD �� zs' ATLANTIC BEACH, FL 32233 '4.1-0.71 �? INSPECTION PHONE LINE 247-5814 ROOF NON SHINGLE - MUST CALL BY 4PM FOR NEXT DAY INSPECTION: 247-5814 PERMIT INFORMATION: PERMIT NO: ROOF17-0044 Description: TILE ROOF Estimated Value: 55900 Issue Date: 11/28/2017 Expiration Date: 5/27/2018 PROPERTY ADDRESS: Address: 1889 BEACH AVE RE Number: 169686 0000 PROPERTY OWNER: Name: BISBANO DOMINICK TRUST Address: 1889 BEACH AVE ATLANTIC BEACH, FL 32233-5938 GENERAL CONTRACTOR INFORMATION: Name: Address: , Phone: Name: STONEBRIDGE CONSTRUCTION Address: 12550 AGATITE RD 6956 PHILLIPS PARKWAY DR N JACKSONVILLE JACKSONVILLE, FL 32258 Phone: PERMIT INFORMATION: Please see attached conditions of approval. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOU PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. * A notice of Commencement is only required for work exceeding an estimated value of $2,500. For HVAC work, a Notice of Commencement is only required when HVAC work exceeds and estimated value of$7,500. S�'yri City of Atlantic Beach APPLICATION NUMBER �, , •2 Building Department (To be assigned by the Building Department.) ,t " 800 Seminole Road. ROC? 17 - 0°44 .• Atlantic Beach, Florida 32233-5445 Phone(904)247-5826 • Fax(904)247-5845 ,Ji*t jr E-mail: building-dept@coab.us Date routed: I ( / if 7 City web-site: http://www.coab.us APPLICATION REVIEW AND TRACKING FORM Property Address: I P9 t, EAC(- VC— Dep_art_ment review required Yes No Building__, g,it C —Panning &ZoningApplicant: ,-_._, (On;S� 06 C— G,u� I Tree Administrator Project: H L E ROOF- Public Works Public Utilities Public Safety Fire Services Review fee $ Dept Signature Review or Receipt Other Agency Review or Permit Required Date of Permit Verified By Florida Dept. of Environmental Protection Florida Dept. of Transportation / St. Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: Approved. Nbenied. ❑Not applicable (Circle one.) Comments: BUILDING �/►� PLANNING &ZONING Reviewed by: / ► 1)/- Date: //3-1 7 TREE ADMIN. Second Review: ❑Approved as revised. CDenied. ❑Not applicable PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: (Approved as revised. ❑Denied. ❑Not applicable Comments: Reviewed by: Date: Revised 05/19/2017 i?S�Ai`Jr�rs CITY OF ATLANTIC BEACH it1 800 Seminole Road Atlantic Beach,Florida 32233 s1 one Tele h (904)247-5800 -r P FAX(904)247-5845 -1'1•0'319 REVISION REQUEST SHEET OR CORRECTIONS TO REVIEW COMMENT Date: /'-/G /7 Received by: Resubmitted: Permit Number: /20..,g/2-60 cri ooF ( 7 -004 4— Original Plans Examiner: o'I,)4 Project Name: ,L'is& Project Address: /9'g f.3ea.C, Contractor: S-{v„Qbh�o�,a_ Cr-As v'I Sexy. Contact Name: ,C Vic-4 Contact Phone : ?Qv- S--6 y,,s8 Contact e-mail: ,br;c..n -94=v,eb(\ bui)4. cow, Revision/Plan Check/Permit Fee(s)Due: $ SC). 0 C) Description of Proposed Revision to Existing Permit: Additional Increase in Building Value: $ Additional S.F. Site Plan Revised: Public W/U Approval: By signing below. I(print name) /3/e.1,4 \Lk -_ affirm that the above revision is inclusive of the proposed changes. Signature of Co ctor/Agent(Contractor must sign it increase in valuation) Date Office Use only. Date: // 2- 2 -/-7 Approved: X Rejected: Notified by:— Plan Review Comments: Department review required Yes No Building � g&Zoning Tree Administrator Plans Examiner Public Works I /- .7- 3-17 Public Utilities -- -Public Safety Date Created 4/13/16 Rev.l Fire Services :; ` Building Permit Application City of Atlantic Beach 800 Seminole Road,Atlantic Beach, FL 32233 Phone: (904) 247-5826 Fax: (904) 247-5845 Job Address: `a Oq %am% (IA.`,V\\M vse_ 2. .0"\\``Permit Number: V 00 4 1 7 0 0 // 9 Legal Description �- do- E. t_ ,�mv,tt_jpC \ \11,. '\ RE# \ � -6066 Valuation of Work(Replacement Cost)$ iAbb• uU Heated/Cooled SF c-Y2d9 Non-Heated/Cooled \1\\CI • Class of Work(Circle one): New Addition Alteration Repair Move Demo Pool Window/Door • Use of existing/proposed structure(s) (Circle one): Commercial Residential • If an existing structure,is a fire sprinkler system installed?(Circle one): Yes No N/A • Submit a Tree Removal Permit Application if any trees are to be removed or Affidavit of No Tree Removal Describe in detail the type of work to be performed: _ t ( LE-__ i\(-- C=- Florida Product Approval#-. • V\ ),'‘....bviNct for multiple products use product approval form Propert Owner Informtion Name: C(�\n1V30.6Vg.721U\NAddr�j s :\'\ 1*► t w l_�fQ. City t-t�A.\C State VL Zip O Iho Phone arall E-Mail Owner or Agent(If Agent, Power of Attorney or Agency Letter Required) Contractor Information .(� Name of Co an :S. ._♦ v, 1 L,. t L:4ki , i en 12_..1�v • Qualifying Agent: v� 001 (-•�1 Address\ V'V � ►�. t y ��(.`(� . City jt . >♦ . ♦ \ State _ TZIp 436 Office Phone • ( . U At.D Job Site/Contact Numb r I1. �• 190- SLQ State Certification/Registration# (‘e�t3OCA1k E-Mails Qh1 &.� . • % \ct Q. \S3V t ,tY\ Architect Name& Phone# Engineer's Name&Phone# Workers Compensation Exempt/Insurer/Lease Employees/Expiration Date Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulationg construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING,SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS,TANKS,and AIR CONDITIONERS,etc. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE REC• : DINGY* ' ► OT CE OF COMMENCEMENT. ' .0 '....111r9-7 ' -7.-4.,-)--0 �L •- - -- -Signature of Owner or Agent including Contr tor) `-.____.__ _ _ __ ____!]r•°ature of Contractor) MM���� Signed and sworn to or affirmed)before me this day of Signed and sworn to(or affirm d)beforrejne thiSy-ri''<�day of bets , AIWA , by 1�ect*\\lM1 NS IC1C. bOub lr,(-NM ,by ` it nOst iti1 _ CirtrAS//a_k t(VALitiw tratakt) (Signature of Notary) (Signature of Notary) _ "Y'°°4s;. DANIELLE N !COLE E9 26NO3 `' ! •o `":°"'' DANIELLE NIC �c MY COh4MISStON#FF963415 rersonally Known OR c: �' OLE ENNIS []Personally Kno rf +: .--17.;. MY_OIMMISSION#FF963415 f I tt:` EXPIRES FeSruary 22,2020 [ 1 Produced Identificatio ; s' l ]Produced i cats i )q,�,'�,_ -?o;:,; • EXPIRES February 22.2020 Type of Identification: Type of Identificatiorr. - ��� 4IY' •t,vl,;:.,c,n' EACH rl1C BtiER°''� �LA� �1N°FL 32_1001 jej .Y" 41-00 s to iG . ; sY�„y v - 01 Al-All �� 69 6Yb�p4 u b� 5 04 ebuil� Site s: 2(3'7-6636 62 6636 st°°ebC -- s A The FL#su itldxes dnie>>e kBisba° approval l iA 3201 A Yh°pe. o�etc all techn' gOO�l�AO AVe l )% �V%Ci c Ikome° the tiie r Thank kt#: . 109$each °�Sf°r e �►iQ Mike• Y idir ire Address• 9686 p000 SeC�;ces t;°�i�stth the 5ie4S Cc" / B i of. gev'ew• %690.00 6 C;d,e Cost' terns;ostaease high bg °�this 800 sem 93 4• 5t°°eb vfact'' ti°�'s 0'i ess• e�s�°�'5 Atlantic E ��`ts' the tea, a plica ;s oat ull. eSs aim Ofc (904) ` O�C� core °s vvitir o a f°t to ngth'c vvi�a�°tee 1Vf Fax (904) 2 CTl ob�it2 ste�ba cats°o sbea • ted be a44 co1. 1 %ease s if the secif/c a4 ei*kstivgt°st N• apEXp°s�,e P.66,t°0 veCi4' syste be site spode the tile t°°f syke p�a�e' Co C►cle° Ia60115 t °$e sure t° receive the °�wiU t a ustmeot 0033 ca�cu 2. tbat�t ca- oof iostaUvicnos°se tial•Ylease s Section 150 1s°tb�s • bt and Res ael file C°°f• the FBC Manu 3' A 30ft•ge'g the F to s for the 0000°f le Fit tie: es °g301 ore aoa fasteeet the reQete ao Clay Vite nsitirtat or adh postatWt hviio C°e Set ap4licatwos, Q• %%otida�'t of adheskv moctar-se NOCova,• n Revie�1er Alike 3on 1�Spectes °r I c h $uildO Atlantic oad0 33 54.45 City Sezniz'ole R VI, 32'''' Atlantic to n90 B 24�5$$5 Fa0°40247 CITY OF ATLANTIC BEACH - j 800 SEMINOLE ROAD ATLANTIC BEACH,FL 32233 (904)247-5800 BUILDING DEPARTMENT REVIEW COMMENTS Date: 11.3.2017 Permit#: ROOF17-0044 Site Address: 1889 Beach Ave Site 6956 Phillips Pkwy Dr. N.,JAX Review: 1 Address: RE#: 169686-0000 Phone: 262.6636 Email: danielle(a stonebridgebuilt.com_ Applicant: Stonebridge Const. Services Homeowner: Dominick Bisbano,618.4511 CORRECTION COMMENTS: 1. Please submit 2 copies of the manufacturer's installation instructions for the tile roof system. If the system has multiple applications please high light the steps pertaining to only the site specific application used for this address. 2. Be sure to include the existing roof sheathing thickness dimensions on this home to show that it can receive the tile roof system. 3. Also this roof installation will take place in an Exposure D wind zone. Mean roof height of 30ft. Height and Exposure Adjustment Coefficient is 1.66,to be applied to Table R301.2(2) of the FBC-Residential. Please submit calculations to verify the attachment procedure and fasteners for the tile roof. 4. Installation shall meet the requirements of the FBC Section 1507.3,the FRSA/TRI Florida High Wind Concrete and Clay Tile Installation Manual, 5th Edition and,for mortar-set or adhesive-set applications,the mortar or adhesive manufacturer's Product Approval. Mike Jones Building Inspector/Plan Reviewer City Of Atlantic Beach 800 Seminole Road Atlantic Beach, FL 32233-5445 Ofc (904) 247-5844 Fax (904) 247-5845 1 Jones, Mike To: danielle@stonebridgebuilt.com Cc: Arlington, Daniel; Mackey, Grace; Gindlesperger,Toni; Johnston, Jennifer Subject: Follow up to recent email; 1889 Beach Ave, Atlantic Beach, Mike Jones The FL#submitted shall be a whole number or a decimal number. Please choose the correct number from the FP approval website. Also in your reply to my review comments choose the exact style/profile of tile to be used and be sure all technical information resubmitted pertains to the install of that tile choice. Thanks, Mike Jones Building Inspector/Plan Reviewer City Of Atlantic Beach 800 Seminole Road Atlantic Beach, FL 32233-5445 Ofc (904) 247-5844 Fax (904) 247-5845 1 jk U4 „,-;:4 \11\ s` CITY OF ATLANTIC BEACH �Y �s 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 (904)247-5800 ' ail=>'" BUILDING DEPARTMENT REVIEW COMMENTS Date: 11.3.2017 Permit#: ROOF17-0044 Site Address: 1889 Beach Ave Site 6956 Phillips Pkwy Dr. N.,JAX Review: 1 Address: RE#: 169686-0000 Phone: 262.6636 Email: danielle�stonebridgebuilt.com_ Applicant: Stonebridge Const. Services Homeowner: Dominick Bisbano,618.4511 CORRECTION COMMENTS: 1. P , :se submit 2 copies of the manufacturers installation instructions for the tile roo system. If the system has multiple applications please high light the steps pertaining to only the site specific application used for this address. 2. Be sure to include the existing roof sheathing thickness dimensions on this home to show that it can receive the tile roof system. 3. Also this roof installation will take place in an Exposure D wind zone. Mean roof height of 30ft. Height and Exposure Adjustment Coefficient is 1.66,to be applied to Table R301.2(2) of the FBC-Residential. Please submit calculations to verify the attachment procedure and fasteners for the tile roof. Installation shall meet the requirements of the FBC Section 1507.3,the FRSA/TRI • orida High Wind Concrete and Clay Tile Installation Manual, 5th Edition and,fol mo -set or adhesive-set applications, the mortar or adhesive manufacture '-sfoduct Approva . d- Mike Jones Building Inspector/Plan Reviewer City Of Atlantic Beach 800 Seminole Road Atlantic Beach, FL 32233-5445 Ofc (904) 247-5844 Fax (904) 247-5845 1 twOriltShiPt P*5•41"41 ......,....,, ,...,„_ Jkl . ;7—Su:WIWI 14/LOOLIN rriN TITC"hr°c1 WICLIIIIIWO Arf • JO Zs Oa" p 344r14 toot.; .._ --1-7-4"r...-4r...- •""4""".77-"*""7,7-,..v....41. -71 plaid,*ilirupn.ad utli iPpont 4 Jo Nei% r sr .)Pe in z... 6,6 6 6 I -ltI ter N„ck MI AIL/pg / 44. 4"4"CUSA1r) , ":410:- /CTPV-ZZir.;' :WO - -51- Efigt.)-. -, l•• :rdelbs / t ./..._.4, i 41 KiNsd4 i onzifttiewon AA i isrgrlivesMnruibi%djul03101 NUIA044) AIN()' , . . ..,_,.. „.._.„WV.,,,,,,,L,I0,••..........,e......emer.....................•,,,,n*Wan.4 ,• r • 11P61034% t/ - ...." MAO ill44 10 MO snip uognspila aqo nr41.1.1414.10111103 Jo*X1,9014,1 JOA I P 00011.101ra oN wi --!elk aumPkalai Op 0 1 !AK)ii0 011/0 1VAtio Idr.OD Lin , Atitirgy3 ._, , - ValPPV xbitto incisru vpitioti Du to KI 4 LOVIZ431 MOM% :mum 9:14"leakd soLg‘ we leo p 4 1141t„ d Asailood (ukit160 IIIIIII0 ii UI W 0 %Al";'trisoig/qxZ)'OE IL .101PaS ul Pic"'laid le ha.44,141 + 4--- "14:a 3i2o a ot• IJOI411,1 SUIIROUOJ OW kirfrollt.K1 IWO," AAIUN 4. WOW". CI :011 weA ort 3tiotPlatal - - , --' eifiMPPV :AWN :NAAR 3%4 inks quanuncep IMO JO sa39ou 1110qqA wok+ astrAho 44 papallpos,illsousfm woo Avo irwou p Nog op Rpm Lwitud jai squyst l , t4 aki • - - felt xmxid —. . . . _ :vourpv Juseld slitautivaldial aqi JO tion-wirpipt3,ip JO/OW,1111111/Ou uotard Amp warm pew Now ON*el .-or4 isowdap2 . ._. _ .. s punts si waranuiv VW . r" -It1/4) "‘ " 1 tr)Vrin 'OCT iniki -IN 41/1000101. - InrMa -Vs:1M\Va372:tp9S) 'AN '.41 C‘r,n1,44,Lk 101,\\WA-irtrikkilA malppy i - '... N..‘4 Tr4‘'). "4$47,-; UPJFk.. ICA t.c .k.isq;) " PtilicKDISZ:1‘S-300121K0 :MOWN _ -.. . ...... ,....i...,,,,a.e...,,.. I NPU".01 Ue.04P PO uPlotisPI lidui!S 00.1 luatismodin NI In yin ul P4Aalip*„ouum) MF"ANN-4!TART° -In ickmiti%ow vovr,„, Its,‘-‘36.. 141/4-41..i.mincli clvectviii;a...An ow -v ) -r.uruszio-mit ,yaiiii .1.4..,.....4,,,,,s,uogdu),..K. mow° smv -V6, ‘431:10g lATIVIA1)4 1irt‘LbK \call'al\ pair.ogam su.N ‘41.14:tid in Vt%ler\ Qq cl.‘ \AA __... '1/414105-0 1PAIMNIONI, "3143: .4; -. -to ra--wful 3u149 40304414.,ugniiit.oula idyl INA IN i ,-.% ikiiii40).40 13110...4 topt4 pAtri*I toctimaupNu! tui wimp aqi•Oitiorts mom aist Jo LI c u041,"civil% ouiftiolle ui Pa °4 ta-b3I'14 1141'Imithk"MI VS"14 Ill" 114 -II44,•111/1141 IIIV ha uweipiprigatai pulIPAPPON ou iurdomo.,)iCirK 11 an%ei / / 00- LI d 0 93f # ± 1,(.ii ad VACqk JO Cw10.3 - . 1Zracn gialinto% 11,41°IPA vat Wan-k... .fro NM Ilv4131141313N3Iiiiitit i i 1 i ) 1, 1 , Io /TRI5th EDITION REVISED a. O U HIP AND. RIDGE INSTALLATION L1J General - The following recommendations are only for products approved by the Florida Building Code r FBC; and tested C..) according to SSTD-I I via third party independent FBC approved laboratories.They will determine the wind upllift Invitations 11_ of the various hip and ridge attachment methods or by installation methods currently recognized in the High Velocity Hurricane Zone (HVHZ)section of the FBC. There are three basic attachment methods of the hip and ridge tiles: mechani- O cal attachment. adhesive-set and mortar--set attachment systems. The minimum head lap when installing hip and ridge tiles is 2" unless restricted by product design. Any exposed fasteners should be covered with a UV resistant sealant. Field Tile Cuts at Hip or Ridge - All cut field tiles adjacent to a h;p or ridge shall be attached to the Cap Sheet and or the adjacent tile with an approved adhesive, mortar or mechanical fasteners and adhesive. t. 0 The following table outlines the different parameters for the hip and ridge attachment options. See Drawing FHW-13. ego W (� i� Field Tile Structural Member Trim Tile y tv InAttachment Support Attachment Attachment Weatherblocking Finish = a o -- Uz -.. Foam Mechanical Foam Coating - Q 0 4• Mechanical Metal or Foam Foam 1m t`- Z H _ Mortar Mortar ri Q O Mortar plastic Foam Foam '� Foam _�� Coating 0 0 o o I-• 0 + Q Mortar Mortar Foam ccan Coating e50u. Q Foam Mortar w Mortar f- FN- H Wood H-BracketFoam Coating ra Q " W Mechanical _ g _ , 2 Straps with Flexible Dry O W •• Adhesive — -- —-- a w 5. a m Mortar Mortar F- W z W MortarrFoataMortar Mortar Mortar Mortar Mortar 0 Cl) W i .. CC W 'E Hip and Ridge Attachment-Choose one of the following. ment, Mortar can be used as a structural att nment. Place a full bed of pre-bagged mortar under the entire • Metal Member • Set member in plastic cement or tile Each tile must be fully embedded into the mortar. compatible sealant. Fasten 6" on center on each side of The field tile secured to the underlayment along with the metal flange with minimum 1-1/4'ring shank roofing the mortar on each trim tile creates the structural bond. nails. If mechanical attachment of the member is not used. The entire cavity under the trim tile should be filled with install the member with Foam per the manufacturer's approved mortar. instructions. Starter Tiles -All starter tiles must be secured at both ends • Plastic Member - Install the member with Foam per of the tile either with mechanical fasteners. mortar and/or the manufacturer's instructions. adhesive. • Wood Member - Fasten !8" on center with four #8 When the field tile is installed with foam or mortar. the screws per metal strap or H-bracket. Each attachment starter tile may be installed with an approved r=iortar point shall have two fasteners on each side of the wood member. The fasteners shall be spaced evenly on the If using a structural member choose one of the following. metal strap or H-Bracket with the attachment holes parallel to the hip or ridge. The Straps and H-Brackets • Metal Member - Place foam under starter tile per All materials must be manufacturer's recommendations or secure the head of shall be a minimum of 26 gauge compatible with each other. If mechanical attachment of the tile w,th one #8 screw and apply adhesive in the gap the wood member is not used, install the member with between the structural support and the tile.The member Foam per the manufacturer's Instructions. may need to be cantilevered to provide a base for the adhesive. The starter tile must make contact with the • Mortar When using Foam or Mortar field tile attach- adhesive. See manufacturer's recommendations. COPYRIGHT • FRSA"TILE ROOFING INSTITUTE Ap, ' 201? 5th EDITION REVISED � �r � . /TRI - = r • Plastic Member Place foam under starter tile per support to tile junction to act as a weather block and is manufacturer's recommendations. applied prior to the attachment of the hip and ridge tile. Install foam to seal all voids between the field tile and • Wood Member - Place foam under starter tile per the structural support. Care should be taken to ensure manufacturers recommendations or drill a hole in the all areas are sealed with adhesive to prevent water lower third of the starter tile and secure with a mechanical entry.Apply a polyurethane compatible coating to protect fastener into the wood member a minimum of I', seal the foam from UV exposure. the head of the fastener with a UV resistant sealant. Adhesive may be used in lieu of a fastener as long as the • Flexible Self Adhered Membrane - This system can wood member has been cantilevered to provide a base be used with a wood structural support.The flexible self for the adhesive. The gap between the structural sup- adhered membrane is applied in a continuous or step port and the tile must make contact with the adhesive. fashion sealing to both sides of the adjoining field tile a Sec manufacturer's recommendations. minimum of 2' prior to the mechanical attachment of - the trim tile to the wood structural support. The flexible Miter or point up the hip starter tile to match the intersecting flashing may be visible. but should not extend onto the p eaves. field tile beyond the outside edges of trim tile After the Starter Tile - Install the next tile centering over Rake/Gable - Choose one of the following. the structural support andior the starter tile. Continue in same manner working from the lowest point toward the • Rake Tile - Cut and install first rake tile the exposed highest point of the roof. At intersecting junctions ti.e hip, length of first course of field tile with factory finish of ridge,ridge'gable. ridge valley),cut tile to form a solid fit and rake tile towards the cave.Fasten rake tile with a minimum ensure the first and the last hip:'ridge tile is securely fastened. two I Od nails and/or of sufficient length to penetrate the Any exposed fasteners shall be sealed with a UV resistant framing a minimum of 3i4'. Abut each succeeding rake sealant. Foam must come in contact with the bottom of the tile to the nose of the field tile above and maintain a con- tile and structural support member. stant head lap. Weather Blocking -Hip and ridge tiles need to have weather •blocking. Choose one of the following. See drawing FHW-13 Mortar Finish Place mortar bed along roof edge. Point smooth to a straight edge finish. for more details. • Mortar - Pre-bagged or job-site mix is used to weather Wall Abutments-It may be necessary to remove lugs from block the longitudinal edges of the hip and ridge tiles and the field tile and or install batten extenders at wall flashing provide aesthetics. A full bed of mortar ;s placed along for proper positonrng of cut field tiles. For mechanically the longitudinal edges of the hip and ridge tile either attached tile systems, tiles installed at wall abutment shall be during the application of the hip and ridge tiles or may attached with an adhesive. The adhesive shall be installed to be packed in after the hip and ridge tiles are installed and the underlayment or the tile below next to the tile being the adhesive has cured. Install mortar to seal all voids installed to meet the required uplift. Cut the tile to fit within between the field tile and the hip'ridge tile. Care should I"of the base of finished wall Point-up mortar is optional be taken to ensure enough mortar is used. The mortar should create a wedge to keep the mortar from dislodging Plumbing Stacks/Soil Stacks -Choose one of the following. from under the hip ridge and the field tile junction. Ensure areas are sealed to prevent water entry. After ' • Pre-formed Soil Flashing (with returns) - A lead skirt the mortar is packed into place.then point up mortar to flashing or flexible flashing with minimum 18' x 18" base the desired finish. shall be used This flashing shall be woven in with the tile coursing. See Drawing FHW-07 • Foam - Is used to weather block the entire cavity of the adjoining planes of field tile to the sides of the structural • Standard Flashing - Cut tic to fit close to plumbing support.This system uses foam as the weather blocking. stack, fill void with mortar and point to finish. There is no mortar placed along the longitudinal edges of the hip and ridge tile. Foam is placed where the field Coatings - (Optional) Sealer may be applied to exposed tile abuts the structural support. A bead of foam is mortar. Color coordinated paint may be applied to metal placed parallel to the hip and/or ridge and the structural flashings. COPYRIGHT ' FRSATIL.F ROOFING INSTITUTE %girl 2012 $2 /TRI 5th EDITION REVISED Tile Replacement/Damaged Tile - Break out and replace roof slopes greater than 7' x 12 or hip cuts only, mechanical damaged roof tile. Do not disturb underlayment Repair fastening may be required. underlayment if necessary. The lugs of the tile may need to be removed to position tile. Apply adhesive per adhesive Clean Up - Remove all broken tile, debris and excess tile manufacturer's recommendations. Immediately set replace- from roof. ment the in position assuring proper contact. Miscellaneous Recommendations - Instructions shall be Small Valley and Hip Cuts - Elevate nose end of tile in given to all parties involved cautioning against traffic of any course above small cut vie. Apply adhesive per adhesive kind on finished roof. Damage to roof tiles and'or sub-roof manufacturer's recommendations. Immediately set tile in may result. course above,r a position which assures proper contact. For 4 ett it1 a+ 45 ( NOTE Drawings are for illustrative purposes and do not — reflect all methods of installations. Please refer to written text. COPYRIGHT • FRSAITILE ROOFING INSTITUTE April 2012 Appendix A ,4-' J --. 1 ce O Y V' V` V' Cr, M N r� tp j.O Q 'D O a' CO N N .O O O O Q (^4 .D .fl V c0 M f\ •D 'D ./1 0'` rel rn rn rn r 'D r, co o'..1 O cr. CO M V', ,C) CO O• o N rn V 0' O+ — M V1 .a (X) OC) -- N — en M M M M M M M M I V' — V' V- V'i V V V' Lr) ul Ln ul — Lel al in ul 1.r.) Lil .D •O .D 1 O O O O O rn .D V' r,- .D V' p V' .O in' O M .O V" t\ .O V p — N O t\ O N Let V' N — L. N O O O O — N M V .D O CO D N rn v- Let so r. COCO V .O CO Q` — N M V- Ln .O 110 L. f0 — M M M M M rn M M M M — M M 'Cr I V' V' T V' V' V V' — 't V" V" V' ul ul ul ul ul Ln 0 0 h; E i D. _ 0 _ e4. f Qui CU I o CO CO co CO C — CO O r. .'l I p Grl V- Os. Ln .so CO Ln ,�. v N i ( p v rn cO M In 4D CO Ln M — u g _ CI- N. .O .0 .C) .O N. O' O' -- — r' d N. r•.1 V- t" r� CO CT CU — rV en a, N. O, — ri .1ui '.0 r. CO Cr O en ry rad $ a, -- N N N N N N N M M M ,_ — M en fn M r— M e- of V' 'Sr , — M 'C' 'R C' 'Q' V' V' Q' .S :Jl /�� V sr 4l H C ' C c rt /� V N1 S: b w•h • CI 1 w J -0 0 r- t\ N. r, r, N- V- V' — O -0 0 Cn in COIN N N O' O• •O M ID 0 O' •D O• M M M M O n V- j N0 o-T: L 0 .O rn M M Vul' l .D NM ul- CO COCD 0 O CO CD V ul .O N- CC) 0 '0 - .0 O' CD N M M n4— ',t' -0 ',V 4 0 13 W — N (NI N N N r`! N N N N N — N M rn rn rn rn M ret en rn O) -w rn rn M M ? V' V' C' ? V' W r } u_ ro a a a c N H- V) . V) t N O (A D r-- — M Ln V' M N CO 7 O O ~ N N C O CO CO co CtO n D N — N M p en CO Q r4 — O n -r O a �_ p v C '. � O O O O — ry M V- V' .n to Ln 'O co!O• O O — r`N rn M t/1 0 N rn rt Let .D n N CO Q' 1 (I) Z W D > — N N N N N N N N N N 3 N N N',;N M M M M M M > — M M M M M M M M M M I Pn O JIL v_ u u p 2 CO U Vf N N C Q . 4 r Co p — - - O' h N Q Ln O Cn co Q M V' N Q al M CO M m O r\ O Q — CO 'D P CI' V' O E 0 _. CL, o6 cO CO CO 0) O' CO — — ry i' N M V' ul 'O r\ r` W CO O' Y .O CO O' O O — N N M V' o y 0 der N N N N — e i N N N N rV rV (V rV rV N rV N an M M M M M M 2 y CC U OC p .D .D .O .O M O V' — 'D O p O — O O' .D N r, V C7D M o Q — o O, .O M O' 7 CO M O a w ,r rn Ln Ln Ln Lr1 .O N t� CCI W O• O• O — — N M M V V' L/'l III fn M sf' n ul .D N N Ci0 Co O' , ly. y'^j V;. i(..Ili — N N; N N N N N N N N N N N N N N N N N hC 0 rS w ). i U tl 0 a M rn M M CT ul O• V' co N A N — O.11-- N W N O — ul Q .D .D rl — N. N CO N .O O' t v fV rn en en en en V V ul vl O N O N. t`I CO (Jr: 0' O Q — — N O' O — N N ri M V t- V L. = N H — N el r•J N — — N N N N N N N N N d C Q — d q '0 0 w f �' Ce m t Ce w L co U I N c _v U CT L = Ln t_ tt = u> L- = Lr) b12 0 Q IC ZN Cr — O Ln O M O V s CL — ON N M C ul U V+ - NO N M u1I; D a O Al od O X O d O = CC 0 f X X X C oc H w w w 3ZL° 4° I 0 w - v 5th EDITION REVISED /TRI TABLE 3 Mechanical Roof Tile Resistance Values (ft-lbf) For Field Tile Deck Method ( Fastener Attachment. Low 1 Medium High Thickness 1 Type Description i I SS. IC 25.2 } 25.2 35.5 Nail 2 SS. IC ! 38.1 38. I 44.3 Direct 2RS i 39.1 36.1 28.6 Deck 2 RS 4' HL 50.3 43 0 33.I_ I No. 8 39 1 33.2 28.7 15'32 Screw 2 No. 8 50.2 55.5 51.3 1 SS. IC 27.5 27.5 29.4 Nail 2 SS. I C 37.6 37.6 47.2 Batten 2 RS 24.6 36.4 26.8 I No. 8 i 25.6 30.1 25 5 Screw 2 No. 8 , 36.1 41.9 37.I 19,'321 DDI Mkt Nail 1 2 RS 46.4 45.5 41.2 55 = Smooth Shank Nail or Screw Shank RS = Ring Shank C = Clip HL = Head Lap For Uplift Resistance Values for Foam Adhesives, see TRI Technical Bulletin 2012-100. which is available for download at www.Tileroofing.org For mean roof heights over 60 ft, engineering calculations must be submitted for permitting. ....4*414,,,:. ......................1.0).........j 'C m 140 (63) a x ta 150 (67) ASCE 7-2010 WIND MAP 160 (72) FOR EXPOSURE CI 170 (76) NN,N ,..........1) 180 (80) ft .J 180 (80) COPYRIGHT , FRSATILE ROOFING INSTITUTE April 2012 /TRI 5th EDITION REVISED WALL FLASHINGS FHW-05 Preformed Metals i i c CL i Q 1 °PTT t s 0P-toy NOTE THE FLASHING DIMENSIONS SHOWN ABOVE MAY VARY IN ACCORDANCE WITH THE BUILDING CODE.LOCAL BUILDER AND.OR SUB-CONTRACTOR PRACTICE AND LOCAL WEATHER CONDITIONS AL_FLASHING MUST BE DESIGNED AND INS CALLED TO HE Y:E rHERTIGHT WHERE SPECIAL CONDITIONS EXIST.IT MAY BE NECESSARY TO INCREASE THE WIDTH OF THE PAN FLASHING IN ALL CASES FLASH,NG SHAt L BE DESIGNED"0 ADEOUAT.LY CIRECT WATER BACK ONTO THE TILES COPYRIGHT FRSA'TILE ROOFING INSTITUTE April 2012 4 . 5th EDITION REVISED /TRI 27 _ STANDARD CURB MOUNTED FHW-06 Skylights. Chimneys, Etc. ! AATTFNS OPTAL > INSTALL IN COMPLIANCE WITH REGULAR FLASHING iNSTALLATrON PROCEDURES FOR SELF CURBING OR PREFABRICATED SKYLIGHTS,REFER TO SKYLIGHT tD MANUFACTURERS INSTALLATION INSTRUCTIONS Ct. X— 03 The drawings are for illustrative purposes only Crowing shown depicts the application of all tile pro' c' finless otherwise rioted it would apply to either concrete or day tiles. COPYRIGHT i FRSATILE ROOFING INSTITUTE Aprr 2012 28 /TRI 5th EDITION REVISED PIPES, TURBINES, VENTS, ETC. Roof Penetrations FHW-07 FLEXIBLE TILE 1 '''''''--- (LASHING PLUMBING STACK, FORMED TO SHAPE OF TILE ,0..44,114 . ••0/1P. '/� f- _/ \ THREE SIEDGES ES ON I CO i C �---� BATTENS OPTIONAL n. a Q I_,--- PIPE FLASHING �I __�,�-� CRIMP EDGES ON _ THREE SIDES ----- �2--� ! �--MAKE WATERTIGHT ___ --� I SEAL BETWEEN PIPE 1 ' PENETRATION AND I UNDERLAYMENT Drow'ng shover depicts the application of oll tie profiles. Uniess otherwise noted :t would apply to either corcrete or cloy ides. COPYRIGHT FRSA:TILE ROOFING INSTITUTE Apr: 2012