Loading...
Exh 4DAGIrNDA ITIrM #-1D JULY 25, 2005 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Purchase of Effluent Pump for Wastewater Plant #2 SUBMITTED BY: Donna Kaluzniak, Utility Director/ DATE: July 13, 2005 BACKGROUND: The two large effluent pumps at Wastewater Plant #2 (739 Renault Drive) are designed to pump the entire flow of up to 1.9 million gallons per day of treated wastewater to the St. Johns River. One of the pumps has been experiencing some temporary malfunctions. Due to the critical nature of these pumps, it is staff's recommendation to purchase a new replacement pump and install it, then rebuild the existing pump for use as a spare. At this time we have no spare pump, and lack of pumping capability for even a few hours could result in a sizeable spill and potential fines from DEP. The pump is a Fairbanks Morse 2-stage vertical turbine pump, and the sole source vendor for municipal sales in Florida is Sanders Company, Inc. The cost of the pump is $16,315. BUDGET: Funds are available in the Sewer Fund in the miscellaneous professional services account number 410-5508-535-3100, and will be transferred to the equipment account in the same fund. RECOMMENDATION: Authorize staff to purchase the Effluent Pump for Wastewater Plant #2 from the sole vendor, Sanders Company, Inc., in the amount of $16,315. ATTACHMENTS: 1. Quote from Sanders Company, Inc. dated 7/12/05. REVIEWED BY CITY MANAGER: ~~ 07/12/2005 07:37 7722203098 SANDERS COMPANI' AGENDA ITEM #4D JULY 25, 2005 SANbERS COMPANY, TP~C. ~~ 2$16 Southeast Monroe Street Stuart, Florida 3499T Telephone 772.220.2900 Facsimile: 772.220.3088 Toll Free :800.247.0880 E-Mail:::anderscompany.com PROPOSAL To: Donna Ka/uzniak Dire+ctnr of 1Jtflibes Re: Atlani7c Beach July 1~ 2005 VYEARE PLEASED TO QUOTE 7NE FOLLOWING.• 1 ea. Fairbanks Morse mode! 14D 2-stage veri7cal turbine pump ramplete with IS'-0"long, 12"Range column, 2 3/,t 6"stainless steel lines haft ,tfr-.1/2"X ,12" discharge head, ,ga/vanize+d basket stainer, staiMe.~s steel ~ pump shaft with packing. CONpi'Tl'ONS OFSERVICE: 2400 gpm C~ 170'tdh (Primary) 2000 gpm cr i82 tdh (Secondary) *NOTF.• PRICEODESNOTINCLUDEMOTOR OR INSTALLATION. Delrvery.• X2 - I4 weeks TOTAL PRICE.• X16,315,00 plus tax ifapp/icab/e Accepted by p~ ~ Hugh G uncan/ao Sanders Company, Inc, offers these materials and/or services on our :standard terms and conditions which is NET THIRTY (30) DAYS from an invoice or at start-up whichevcr occurs first, contingenfi upon continuing c7-tdit approval. No other nwterials c~ndlor services are includcd other than those specifically listed above. NO material may b e returned without prior approval chd if gaprPY¢I i~ pl'WItPrd A -'~tgck~ng charge will apply Prices are FOB factory with freight allowed to jobsite.