Exh 8CAGENDA ITEM #8C AUGUST 8, 2005 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Status Report -Sidewalk Status Report • SUBMITTED BY: Rick Carper, P.E., Public Works Director ~ G DATE: July 29, 2005 BACKGROUND: Staff was requested by the Commission to provide a status of funds available for potential construction of proposed sidewalk extensions on Royal Palms Drive and Sailfish Drive. There are two accounts to draw on for this proposal: Account Number Project Title Budget /Current Balance 001-5002-541-6300 Sidewalks New (PW0503) $61,500/ $51,884 Streets 130-5002-541-6300 Sidewalk Replacements $50,000! $32,669 (Gas Tax) PW 0505 Current Year: The Commission previously approved construction of new sidewalks on Sandpiper Lane, West 3`~ Street, and Main Street (West 9th Street to Levy Road). Location Status Bud et Cost Sandpiper Lane Construction Com lete $17,000 $9,616.00 R.L. Lawrence West 3"~ Street Desi n Com lete $13,000 $30,000 est. Main St W Stn to Lev Deferred $46,000 *N/A Staff expects the West 3`d Street Invitation to Bid to be advertised Sunday, July 31St. The Main Street sidewalk has been deferred to study constructing a Bicycle Path instead. ~At Commission direction, remaining New Sidewalks Funds (after West 3`~ Street) are to be reallocated to constructing a Bicycle Path • on West Plaza Road. FY 2006: The top three new sidewalk projects (after Main Street) based on Staff prioritization of proposed locations are Francis Road (Jackson Rd to Simmons Rd) - 58 points, Sailfish Drive (1/2 block south of Cavalla Rd to Atlantic Blvd) - 55 points, and Royal Palms Drive (Cavalla Rd to Atlantic Blvd) - 55 points. Location Estimated Cost Francis Road $26,900 Sailfish Drive $19,800 Royal Palms Drive $44,400 AGENDA ITEM #8C AUGUST 8, 2005 Staff Concerns: Cost increases for construction; driven strongly by increase in the cost of concrete, have the potential for exceeding the authorized budget for planned improvements. For example, the unit price for concrete for the Phase 1 Plaza Road Ped Path was $26/Square Yard (SY) (July 2004). The most recent project bid by Public Works had a unit price of $50/SY (June 2005). RECOMMENDATION: Because of concerns for cost increases, Staff recommends not authorizing any additional sidewalk projects until the West 3~d Street project has been bid and contracted. It is possible to begin in-house design of the proposed sidewalk projects, to allow for detailed cost estimates and for construction in the next fiscal year. BUDGET: Current Year: $51,884 remains in the 001-5002-541-6300 Account (PW Streets, Improvements Other Than Buildings Account) for new sidewalks. $32,669 remains in the 130-5002-541- 6300 Account (Gas Tax, Improvements Other Than Buildings Account) for sidewalk replacement. FY 2006: $90,800 for the three new sidewalks is included on the optional project list for Commission input during the budget review. $50,000 is requested in the Gas Tax Fund for sidewalk replacement. REVIEWED BY CITY MANAGER: