Exh 4CAGENDA ITEM #4C SEPTEMBER 12, ?005 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Proposed Rejection of Bids for Seminole Road Multipurpose Lane (Bid No. 0405-24) SUBMITTED BY: Rick Carper, P.E., Public Works DirectorL DATE: August 25, 2005 BACKGROUND: The bid opening for the Seminole Road Multipurpose Lane Project occurred on August 24th, 2005. Two bids were received out of three pre-qualified bidders. Because of increases in construction prices, the Seminole Road project. had been broken into two phases, (Phase 1 -Garden Lane to Oceanwalk Drive, and Phase 2 - Oceanwalk Drive to OceanForest Drive) in hopes of building at least one portion this year. The totals for Phase 1 and Phase 2 for both bids were substantially over the budgeted amount. The low bid received would have . allowed allow construction of either Phase 1 or Phase 2 of this project, but that Contractor requested that the bid be withdrawn. Current year bike path funding (total remaining - $131,452.74) was intended to fund both the Seminole Road Bike Path and Plaza Road Bike Path (Ph 2 - Norhtside Drive to 5 Points). The low bid prices for Seminole were $118,235.75 (Ph 1) and $100,133.50 (Ph 2). The bid price by the awardee (Callaway Contracting) for Plaza Road Ph 2, as an Additive Alternate for the 5 Points Intersection Improvement Project, was $77,000 (included $25,000 allowance for bridge). As a metric for comparing recent construction price increases, the unit price per square yard paid for concrete for Plaza Drive was $26. The average unit price for all bikepath and sidewalk projects bid this month was $42.44, a 63% increase in unit price. The cost for mobilization on a linear foot of project basis went from 1 % of bid price for the Plaza Drive Ph 1 path to 7% and 12% of laid for Seminole. BUDGET: This project is funded from the Half Cent Sales Tax Account 131-5002- 541-6300 (PW0404) -current balance $58,602.74, and Streets Account 001- 5002-541-6300 (PW0505), current balance $72,850.00. RECOMMENDATION: Staff recommends rejecting all bids for this project. Because of the significant quantity of concrete work (including Seminole Road Bike Path, Plaza Road Bike Path (Ph 2), West Plaza Bike Path, West 3`~ Street Sidewalk) ready for construction and the quantity planned for construction in the upcoming budget year, Staff is evaluating other alternatives for accomplishing these projects at lower costs. ATTACHMENTS: Bid Tabulation REVIEWED BY CITY MANAGER: a v ~. a m co a O v m v w m m a n 0 ~' 0 D .a O G N -~ a ~ a -+ -' c ~ ~ o s o ° ~ o a ° ~' ~ ~~ a o o a d ~ ~ N as ~ ~ w ~ ~ ~ ~ ~ m ~ ~ 5 ~ o _ . ~ . ~ ( ~ rt Q. ~ ~. a ~ ~ N ~ m 0 ~ ~ a0i _ m ~ m ~ c ~ m N m N Di n: a '"' ~ d. ~ n ^~ .- ,; m a ,... ._., °, a ~ O . ~ ~ o _ ~ ~_ ~~ ~ ~ n A a d o -~, ~ ~ cn a ~' m ~ ~ n w ~ ~ ~ n D a~i ~ ~ co .. . _ 0] O N N C ~a O ~' D ! ~ ~ ~ Q. ~ ~ ~ rt N .,, Q . ~. ~ N (~!! C. O N N N c m ~ °i ~ m ~ ~ ~ N ~ ;, _ ~ ~ c Q O •~ rt e-r ~ ~ a d 0 0 -„ n 0 ~, 0 n 0 ~x x x x x x x x ~~c ~ N ~ ~ y, '~ ~ ~ W N N O O O C -~ O O IJ !D ~ N ~1 -~ O ..a O O N ~ O ~ t0 V1 ~1 N N W A tJ~ ..i N W W O ~D N W W Cfl W ~h Cn O ~ (WJ1 O W ~ tJ~ (7 ? O ~ 3~ ~ x x x x x x x x w e~ ~ ~ v- f+ W ~ ~ ~ a rC if O ,~ tD ~ W l r^ A ~ 01 ~ 00 O) t0 'J O V .Wa ~ ,~ CA71 C1 O O O ~ i O w CJt O O O O O O O O O O O O O O O O O O O O O Oo a 0 A O w N A m Z 0 r rn O~ D ~~ ~ ~ o ~ c -^ N~~ ~~~ c -• a~~ U,O~ m~ D 2 -o m n sooz `z~ u~IIia~ia~s ~r# w3si ~au~~~