Loading...
505 BEACH AVE (81 5th ST) -MISC PERMIT Jc, o `�s1 CITY OF ATLANTIC BEACH F J� b(�7' 800 SEMINOLE ROAD ! J .. X ATLANTIC BEACH, FL 32233 INSPECTION PHONE LINE 247-5814 .0S1l9 ELECTRICAL PERMIT MUST CALL BY 4PM FOR NEXT DAY INSPECTION: 247-5814 JOB INFORMATION: Job ID: 15-RADD-2763 Job Type: RESIDENTIAL ADDITION Description: GARAGE AND INTERIOR REMODEL Estimated Value: $30,000.00 Issue Date: 1/21/2016 Expiration Date: 7/19/2016 PROPERTY ADDRESS: Address: 81 5TH ST RE Number: 170151-0000 PROPERTY OWNER: Name: HOLMES, HARRIET E Address: 81 5TH ST GENERAL CONTRACTOR INFORMATION: Name: Inc, Surfside Homes LOUIS Address: 108 Osprey Cove LN Phone: 904-534-3904 FEES: ENG REV RESIDENTIAL BLD $100.00 PLAN CHECK FEES $100.00 UTIL REV RESIDENTIAL BLDG $50.00 BUILDING PERMIT FEE $200.00 STATE DCA SURCHARGE $3.00 STATE DBPR SURCHARGE $3.00 Total Payments: $456.00 RDIIT IS : I'I'ROVED ONLY IN ACCORDANCE WITH A1.1. CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA ',E�: A nING CODES. ,_s,,0),;,r City of Atlantic Beach ,p'j`' ' .. Building Department APPLICATION NUMBER J,4,,) ;--.. .. 800 Seminole Road (To be assigned by the Building Department.) ^ �' Atlantic Beach, Florida 32233 5445 /�.. O�� 1'.) r �" ..ac.) 763 Phone(904)247-5826 Fax(904)247-5845 -',1,.2..1_0-/ E-mail: building-dept@coab.us Date routed: //®/` City web-site: http://www coab us APPLICATION REVIEW AND TRACKING FORM Property Addr- s: Fl 6---7-64" c De. . • 'lent review r required Yes No �: . ..� Applicant:a/it •=a6 NMI �F a i. &Zoos.. Project:?:)e _ /11 T£4&d e ropem,_j�nistrator Public U — • •- Safety - _ Fire Services Review fee $ Dept Signature Other Agency Review or Permit Required Review or Receipt of Permit Verified By Date Florida Dept. of Environmental Protection Florida Dept. of Transportation St. Johns River Water Management DistrictEll Army Corps of Engineers -- -- — Division of Hotels and Restaurants IIIIIIIIIIIII Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: I 'Approved. Lki Denied. (Circle one.) Comments: JcG AgeaLil BUILDING PLANNING & ZONING Reviewed by: t Date: 1 TREE ADMIN. ______ �I Second Review: MEI IC A pproved as revised. UDenied. PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: � : Date: / I op' FIRE SERVICES Third Review: LJApproved as revised. Denied. Comments: Reviewed by: Date: ed 07/27/10 r rilrA;r;.., City of Atlantic Beach APPLICATION NUMBER Building Department (To be assigned by the Building Department.) j :r ,sl 800 Seminole Road /1`�� `" Atlantic Beach, Florida 32233-5445 '.'0)763 tj • v Phone(904)247-5826 - Fax(904)247-5845 `f..0;; g%• E-mail: building-dept@coab.us Date routed: // Z City web-site: http://www.coab.us / APPLICATION REVIEW AND TRACKING FORM Property Addr- s: F1 6-1-7i" S-J De . ient review required Yes No Applicant:405C cc-7/3tr).E., Eraii • : :.• _� inistrator Project: Cie — /`--4Tcje/Q e r: I Public tr_, U Review fee $ Dept Signature Other Agency Review or Permit Required Review or Receipt of Permit Verified By Date Florida Dept. of Environmental Protection - Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: — — APPLICATION STATUS Reviewing Department First Review: I 'Approved. I (Denied. (Circle one.) Comments: BUILDING PLANNING & ZONING Reviewed by: Date: TREE ADMIN. Second Review: I Approved as revised. I (Denied. PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: I 'Approved as revised. I 'Denied. Comments: Reviewed by: Date: Revised 07/27/10 s. ►,y,: City of Atlantic Beach i.__ ;(7: IVSD �r. .I_. APPLICATION NUMBER ,•,/ Building Department o be assigned by the Building Department.) _-_ �r 800 Seminole Road NOV 0 2015 ,I.� - Atlantic Beach, Florida 32233-5445 7 63 Phone(904)247-5826 • Fax(904) 247-51_15,(7: // 25 / -...1.011 9r E-mail: building-dept@coab.us 12-1._-_--------__________ Date routed: City web-site: http://www coab.us i APPLICATION REVIEW AND TRACKING FORM Property Addr ss: 449/ 5n. sr De.actment review required Yes No 4: . .... Applicant: fcc-7136 Wz mE, • .401Mfo. Tr-P -a i inistrator Project: 0 At.-4 — /11TCI'll 7. A . , _ Public U . . Safety Fire Services Review fee $ 2r- Dept Signature )*•-••"\ Other Agency Review or Permit Required Review or Receipt ______ Date Permit Verified By Date Florida Dept. of Environmental Protection Florida Dept. of Transportation St. Johns River Water Management District Army Corps of Engineers — Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: __APPLI ATION STATUS Reviewing Department First Review: Approved. I (Denied. (Circle one.) Comments: BUILDING PLANNING & ZONING Reviewed by: Date: I2 J Z t r TREE ADMIN. -- -- ((( Second Review: I 'Approved as revised. I 'Denied. AO P".!%. *V• _ Comments: "PUBLIC UTILITIES TY Reviewed by: Date: FIRE SERVICES Third Review: LApproved as revised. I 'Denied. Comments: Reviewed by: Date: svised 07/27/10 rA:ij:; . City of Atlantic Beach APPLICATION NUMBER _ Building Department � 800 Seminole Road RE (To be assigned by the Building Department.) r� jE�EINTED r Atlantic Beach, Florida 32233-5445 /�-�� � .+�7/_ 2 Phone(904)247-5826 Fax(904)2 7-5845-v $ 0 2015 tG.J .•,4(_r_no E-mail: building-dept@coab.us // 5 /` �' Date routed: City web-site: http://www coab.us BY: APPLICATION REVIEW AND TRACKING FORM Property Addr- s: / De• . ' ent review required Yes s No 4111M1110 Applicant:4•0J% • /TIE `PI- ning &Zo ••. Tr-- _.I inistrator Project: — /11 T-je,d e Publicf • Safety Fire Services Review fee $ Dept Signature Other Agency Review or Permit Required Review or Receipt of Permit Verified By Date Florida Dept. of Environmental Protection Florida Dept. of Transportation St. Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: roved. I (Denied. (Circle one.) Comments: BUILDING Jee 1,114,40( 4 /#� PLANNING & ZONING Reviewed by: A Date:jA741 j f TREE ADMIN. — — �`� � Second Review: I 'Approved as revised. 110 Denied. PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: FIRE SERVICES Third Review: LApproved as revised. 'Denied. Comments: Reviewed by: Date: .vised 07/27/10 BUILDING PERMIT APPLICATION CITY OF ATLANTIC BEACH OFFICE COPY 800 Seminole Road,Atlantic Beach, FL 32233 Office (904)247-5826 Fax(904) 247-5845 Job Address: 1 1 6 r1 Jt1,2_ r Permit Number:75 -P na.''�-7L.� Legal Description Parcel# Floor Area of Sq.Ft. Sq.Ft Valuation of Work$ Proposed Work heated/cooled a i 50 0 non-heated/cooled 301 000 Class of Work(circle one): New Addition Alteration Repair Move Demolition pool/spa window/door Use of existing/proposed structure(s)(circle one): Commercial Residential If an existing structure,is a fire sprinkler system installed? (Circle one): - tip N /A Florida Product Approval# rc- For multiple products use product approval form Describe in detail the type of work to be performed: NfiWil 6 t°`a 1.9.- ' 1k41-Q.a V1 ©U , t ,e aLijoi ow MGIC , Property Owner Information: , Name: ( I.,1 ' ►i;r fq I Address: 1 ► - La lti.12_, City MertliOnkrarMornt a_ Step 1 ip ,ii .L Phone MIK* • E-Mail or Fax#(Optional) ►1 o e ,t la Sa l ee i1 . Hyo 3 " . h/1- Contractor Information: CONTRACTOR EMAIL ADDRESS: lou 1S sa hQ}1 oat Cplme.ar -, he.t Company Name: 1 Q�S`1 ',k_ ►1 L 1 1� Qual' in: A en : 1.0 Ul S' didt, '1 • Address: 10S eT7 �� ► City �►0 V rtt. MI tate VL Zip .P 40 Office Phone Job Site/Conta t ber 'j?)4_9)1 Dy, Fax# State Certification/Registration# CDC, 0 4 0 cmto Architect Name&Phone# _ ,QRIO-Ad ('0(d u _ q . Engineer's Name&Phone# 1.-J t h % • • LOU 1S i-1l 0 �6iOU S- 3 Fee Simple Title Holder Name and Address f e ��Y1,t, ?-4171'11 L� I(� 0 l� 1 � n� Bonding Company Name and Address 1J 4 Jai . � 'wU' Mortgage Lender Name and Address /4 A Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. This permit becomes null and void if work is not commenced within six(6)months, or if construction or work is suspended or abandoned for a period of six(6)months at any time after work is commenced. I understand that separate permits must be secured for Electrical Work,Plumbing,Signs, Wells,Pools,Furnaces,Boilers,Heaters, Tanks and Air Conditioners,etc. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. I hereby certify that I have read and examined this a plication and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other federal,state, or local law regulating construction or the performance of construction. Z.Signature of Owner &A6-(2.144' / Signature of Contractor Print Name N.S4..Yii. SP1131:61 ✓ Print Name Lo 1S E T I e p Before me Before me this 2S Dayofd---—— —— �► ��/ this Zs Da of .- _.•'� """• / I "'' GRANT GARRETSON `/� ,,yp 1'% GRANT bli GAR• --1 fFlorida .•�►" �e'. I Notary Public-State of (� 1-3,,,,‘:;0'4;;,k,„ - `� Notary Public-State of Florida 1t ''= Commission•FF 2371 ;—_ Coinmissiott N FF 237122 Not. y P he I ,, N. ary Pu.�� ‘,„:_..:-.....-„l', My Comm.Expires Jun 3,2019 i -;. My Comm.Expires Jun 3,2019 .,Fa„ Bpm throuppi Bonded through National Notary Assn. 1 National Assn. .d• De Parte '� FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION '- Division of Water Resource Management Coastal Construction Control Line Program 8032032 DU c. 2600 Blair Stone Road,M.S.3522 Permit No. - "° Tallahassee,FL 32399-2400 Phone:(850)245-7669 0° FIELD PERMIT PURSUANT TO SECTION 161.053 OR 161.052,FLORIDA STATUTES FINDINGS OF FACT AND CONCLUSION OF LAW:The request for a field permit was considered by the staff designee of the Department of Environmental Protection and found to be in compliance with the requirements of Chapter 62B-33,Florida Administrative Code(F.A.C.). Approval is specifically limited to the activity in the stated location and by the project description,approved plans(if any),attached standard conditions,and any special conditions stated below pursuant to Paragraph 161.053(5),Florida Statutes(F.S.).This permit may be suspended or revoked in accordance with Section 62-4.100,F.A.C. PROJECT LOCATION: 81 5th Street, Atlantic Beach, Duval County. 675' to 725' north of R-51 Second line of construction. PROJECT DESCRIPTION: Construction of elevated deck attached to east face of existing dwelling. Six inch post support is authorized (7 total) 24" concrete footers are authorized for deck support (7 total) SPECIAL PERMIT CONDITIONS:The permit is valid only after all applicable federal,state,and local permits are obtained and does not authorize contravention of local setback requirements or zoning or building codes.This permit and public notice shall be posted on the site immediately upon issuance and shall remain posted along with local approval until the completion of any activity authorized by this permit.Other special conditions of this permit include: 1. Roofing and additional lighting is not authorized. 2. All work shall meet all local codes. STANDARD PERMIT CONDITIONS:The Permittee shall comply with the attached standard field permit conditions. APPLICANT INFORMATION:I hereby certify that I am either:(1 a)the owner of the subject property or(1 b)I have the owner's consent to secure this permit on the owner's behalf;and that(2)I shall obtain any applicable licenses or permits which may be required by federal,state,county,or municipal law prior to commencement of the authorized work;(3) knowle ge th -pe—authorized work is what!:ques q;and(4)I accept responsibility for compliance withallpermitconditions.� Applicant's Signaturey� WNV Date 11 ''7/ LO 15 Telephone No.( 1g -049 J I Applicant's Printed Name ( 1 I Address_ to 04rty Coo e P B ft_022.. _ If applicant is an agent: /( ) Printed name of property owner Property owner's address Property owner's telephone no. DEPARTMENT FINAL ACTION AND FILING AND ACKNOWLEDGMENT:This field permit is approved on behalf of the Department of Environmental Protection by the undersigned staff designee,and filed on this date,pursuant to section 120.52,F.S.,with the undersigned designated Deputy Clerk,receipt of which is hereby acknowledged. t, Trey J. Hatch 111/17/2015 Staff Designee/y puty Clerk Printed Name ofDesignee/Deputy Clerk Date EXPIRATION DATE: 5/17/2016 (Emergency permits issued pursuant to Section 62B-33.014,F.A.C.,are valid for no more than ninety days and other field permits are valid for no more than 12 months. The staff designee may specify a shorter time limit.) EMERGENCY PERMIT: DYES a NO Approved plans are attached: []YES NO Permit No. - POST PERMIT AND PUBLIC NOTICE CONSPICUOUSLY ON THE SITE PUBLIC NOTICE The foregoing constitutes final agency action.Any person whose substantial interests are affected by any decision made by the Department on the Field Permit has a right to request an administrative hearing in accordance with the provisions of Sections 120.569 and 120.57,F.S. The request for an administrative hearing must comply with the provisions of Rule 28-106.201,F.A.C.,and must be received by the Department(at the address given below)within twenty-one(21)days from the date of this notice. When the Department receives an adequate and timely filed request for hearing,the Department will request the assignment of an administrative law judge.Once the administrative law judge is requested,the Division of Administrative Hearings will have jurisdiction over the formal proceeding and the Department(as the referring agency)will take no further action with respect to the proceeding except as a party litigant. Section 120.54(5)(b)4,F.S.,and Rule 28-106.201(2),F.A.C.,explain that the following items must be included in a petition for a formal administrative hearing (a) The name and address of each agency affected and each agency's file or identification number,if known; (b) The name,address,any e-mail address,any facsimile number, and telephone number of the petitioner,if the petitioner is not represented by an attorney or a qualified representative; the name, address, and telephone number of the petitioner's representative,if any,which shall be the address for service purposes during the course of the proceedings;and an explanation of how the petitioner's substantial interests will be affected by the agency determination; (c) A statement of when and how the petitioner received notice of the agency decision; (d) A statement of all issues of material fact disputed by the petitioner,or a statement that there are no disputed facts; (e) A concise statement of the ultimate facts alleged,including a statement of the specific facts that the petitioner contends warrant reversal or modification of the Department's action; (f) A statement of the specific rules or statutes the petitioner contends require reversal or modification of the Department's action, including an explanation of how the alleged facts relate to the specific rules or statutes;and (g) A statement of the relief sought by the petitioner,stating precisely the action that the petitioner wants the Department to take with respect to its action. A person may request an extension of time to petition for an administrative hearing.The person filing the request for extension must do so within the time limits for filing a petition described above. The request must state why an extension of time is needed.The Department will grant an extension only when good cause is shown. If a petition or a request for time extension is filed,further order of the Department becomes necessary to effectuate this Field Permit.Accordingly, the Department's final action maybe different from the position taken in this notice.Actions undertaken by any person under this permit,pending the lapse of time allowed for the filing of such a request for hearing,may be subject to modification,removal,or restoration. Failure to petition within the allowed time frame constitutes waiver of any right that a person has to request a hearing under Section 120.57,F.S., and to participate as a party to the proceeding.If a legally sufficient petition for hearing is not timely received,this notice constitutes final agency action. When this order becomes final and is filed with the Department Clerk,any party to the order has the right to seek judicial review under Section 120.57, F.S., and Rule 9.030(b)1(c)and 9.110,Florida Rules of Appellate Procedure. A notice of appeal must be filed within thirty(30)days with both the Department Clerk(see address below)and with the appropriate district court of appeal.The notice filed with the district court must be accompanied by the filing fee specified in Section 35.33(3),F.S.Any subsequent intervention will be only by the approval of the presiding )fficer on motion filed under Rules 28-5.207 or 60Q-2.010,F.A.C. All requests for hearings are to be filed with the Department at the following address: Florida Department of Environmental Protection Office of General Counsel Department Clerk 3900 Commonwealth Boulevard Mail Station 35 Tallahassee,Florida 32399-3000 Permit No. - STANDARD FIELD PERMIT CONDITIONS The following conditions shall apply to FIELD PERMITS(unless waived by DEP or modified by special permit condition).In the event of a conflict between a field permit condition and a special permit condition,the special condition shall prevail. 1) The permittee shall carry out the construction or activity for which the permit was granted in accordance with the plans and specifications that were approved by DEP as part of the permit.Any deviation there from shall be grounds for suspension of the work and revocation of the permit pursuant to Section 120.60(7),F.S.,and may result in assessment of civil fines or issuance of an order to alter or remove the unauthorized structure,or both.No other construction or activities shall be conducted.No modifications to project size,location,or structural design are authorized.A copy of the permit shall be conspicuously displayed at the project site. 2) The permittee shall conduct the construction or activity authorized under the permit using extreme care to prevent any adverse impacts to the beach and dune system,marine turtles and their nests and habitats,or adjacent property and structures. 3) The permittee shall allow any duly authorized member of the staff to enter upon the premises associated with the project authorized by the permit for the purpose of ascertaining compliance with the terms of the permit and with the rules of DEP,until all construction or activities authorized or required in the permit have been completed and the project accepted by DEP. 4) The permittee shall hold and save the State of Florida,DEP,its officers and employees,harmless from any damage(no matter how occasioned and no matter what the amount)to persons or property that might result from the construction or activity authorized under the permit and from any and all claims and judgments resulting from such damage. 5) The permittee shall allow DEP to use all submitted records,notes,monitoring data,and other information relating to construction or any activity under the permit for any purpose it may deem necessary or convenient,except where such use is otherwise specifically forbidden by law. 6) Construction traffic shall not operate and building materials shall not be stored on vegetated areas seaward of the control line,unless specifically authorized by the permit.If(in the opinion of DEP staff)this requirement is not being met,positive control measures shall be provided by the permittee at the direction of DEP staff.Such measures may include temporary fencing,designated access roads, adjustment of construction sequence,or otherrequirements. 7) The permittee shall not disturb existing beach and dune topography and vegetation except as expressly authorized in the permit. Before the project is considered complete,any disturbed topography or vegetation shall be restored(as prescribed in the permit)with suitable fill material or revegetated with appropriate beach and dune vegetation. 8) The fill material shall be obtained from a source landward of the control line and shall consist of sand which is similar to that already on the site in both grain size and coloration.This fill material shall be free of construction debris,rocks,or other foreign matter.A sample of the sand shall be provided to the staff representative of the Bureau of Beaches and Coastal Systems during the preconstruction conference. 9) If surplus sand fill results from any approved excavation seaward of the CCCL,such material shall be distributed seaward of the CCCL on the site,as directed by DEP staff(unless otherwise specifically authorized by the permit). 10) Any native salt-resistant vegetation destroyed during construction shall be replaced with plants of the same species or,by authorization of DEP,with other native salt-resistant vegetation suitable for beach and dune stabilization.Unless otherwise specifically authorized by the staff,all plants installed in beach and coastal areas(whether to replace vegetation displaced,damaged, or destroyed during construction or otherwise)shall be of species indigenous to Florida beaches and dunes(i.e.,sea oats,sea grape, saw palmetto,panic grass,salt meadow hay cord grass,seashore salt grass,and railroad vine). 11) All topographic restoration and revegetation work is subject to approval and acceptance by DEP staff. 12) If not specifically authorized elsewhere in this permit,no operation,transportation,or storage of equipment or materials is authorized seaward of the dune crest or rigid coastal structure during the marine turtle-nesting season.The marine turtle-nesting season is May 1 through October 31 in all counties(except Brevard,Indian River,St.Lucie,Martin,Palm Beach and Broward counties where marine turtle nesting occurs during the period of March 1 through October31). 13) If not specifically authorized elsewhere in this permit,no temporary lighting of the construction area is authorized at any time during the marine turtle-nesting season and no additional permanent exterior lighting is authorized. l4) This permit has been issued to a specified property owner and is not valid for any other person. IEP form 73-122(Updated6-25-2015) 1/18/, i Gmail-Sabatier Residence G1 II Roger Russell <rhrresdes@gmail.com> Sabatier Residence 2 messages Roger Russell <rhrresdes@gmail.com> Fri, Sep 4, 2015 at 7:52 PM To: Trey Hatch DEP <trey.hatch@dep.state.fl.us> AIM Reprographics sent Sabatier plans for review by you for field permit. If you have any questions please feel free to contact me. Thanks Roger Russell, RHRRESDES@GMAIL.COM Hatch, Trey <Trey.Hatch@dep.state.fl.us> Tue, Nov 17, 2015 at 2:56 PM To: Roger Russell <rhrresdes@gmail.com> Roger, I could find nothing showing that I sent you a permit. Attached is the permit you requested, Please fill out the "Applicant Information"section and return to via E- mail. Please remember the permit is not valid until I receive the signed permit. Have a great day Trey J. Hatch FDEP CCCL Program (904) 655-1765 From: Roger Russell [mailto:rhrresdes@gmail.com] Sent: Friday, September 04, 2015 7:52 PM To: Hatch, Trey Subject: Sabatier Residence AIM Reprographics sent Sabatier plans for review by you for field permit. If you have any questions please feel free to contact me. Thanks Roger Russell, RHRRESDES@GMAIL.COM https://mail.googl e.com/mail/u/1/?ui=2&i k=ad09038390&vi ew=pt&search=i nbox&th=14f9ac62ba4a0af2&si m 1=14f9ac62ba4a0af2&si m 1=15117052103b8b03 1/2 LJG Engineering, Inc . Principal Engineer: Louis Gabriel PE 419 Sophia Terrace Saint Augustine, Fl . 32095 Ph # (904) 982 1935 12/ 3 / 2015 Mr. Mike Jones Building Inspector/ Plan Reviewer City of Atlantic Beach Subject : Remodeling to 81 5th St. , Atlantic Beach, Fl . Dear Mr. Jones; The subject remodeling method of compliance is going to be compliance method 301 . 1 . 1 "Prescriptive Compliance Method" of FBC 2014 Existing Structures and so all repairs, alterations, will comply with the requirements stated in chapter 4 of FBC-2014 Existing Structures . Sincerely, nnunn . G . 101111. 6 • ` %" OFFICECOPY 3g4 $ou is . Gab�rie1, gE • ,k = -°? Q`s STATE OF� • 0R1OP .4: fEc t5 f V E s DEC 4 2015 } OFFICE COPY oapart 1.6' �s FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Division of Water Resource Management Coastal Construction Control Line Program 8032032D U 2600 Blair Stone Road,M.S.3522 Permit No. - ° Tallahassee,FL 32399-2400 ,e Phone:(850)245-7669 4'antal of FIELD PERMIT PURSUANT TO SECTION 161.053 OR 161.052,FLORIDA STATUTES FINDINGS OF FACT AND CONCLUSION OF LAW:The request for a field permit was considered by the staff designee of the Department of Environmental Protection and found to be in compliance with the requirements of Chapter 62B-33,Florida Administrative Code(F.A.C.). Approval is specifically limited to the activity in the stated location and by the project description,approved plans(if any),attached standard conditions,and any special conditions stated below pursuant to Paragraph 161.053(5),Florida Statutes(F.S.).This permit may be suspended or revoked in accordance with Section 62-4.100,F.A.C. PROJECT LOCATION: 81 5th Street, Atlantic Beach, Duval County. 675' to 725' north of R-51 Second line of construction. PROJECT DESCRIPTION: Construction of elevated deck attached to east face of existing dwelling. Six inch post support is authorized (7 total) 24" concrete footers are authorized for deck support (7 total) SPECIAL PERMIT CONDITIONS:The permit is valid only after all applicable federal,state,and local permits are obtained and does not authorize contravention of local setback requirements or zoning or building codes.This permit and public notice shall be posted on the site immediately upon issuance and shall remain posted along with local approval until the completion of any activity authorized by this permit.Other special conditions of this permit include: 1. Roofing and additional lighting is not authorized. 2. All work shall meet all local codes. STANDARD PERMIT CONDITIONS:The Permittee shall comply with the attached standard field permit conditions. APPLICANT INFORMATION:I hereby certify that I am either:(1 a)the owner of the subject property or(l b)I have the owner's consent to secure this permit on the owner's behalf;and that(2)I shall obtain any applicable licenses or permits which may be required by federal,state,county,or municipal law prior to commencement of the authorized work;(3) knoowlle ge th _pe-authorized work is what I r ues ;and(4)I accept responsibility for compliance514,5_-011.0 with all permit conditions. Applicant's Signature ✓K. JVI WL1{I Date i I '`1 es �1y Telephone No.(q O' `) :O 11.g Applicant's Printed Name r'/l7 Ate! Address to $ os re CQ Q 1.14, P t B Ft, p22. If applicant is an agent: /( ) Printed name ofproperty owner Property owner's address Property owner's telephone no. DEPARTMENT FINAL ACTION AND FILING AND ACKNOWLEDGMENT:This field permit is approved on behalf of the Department of Environmental Protection by the undersigned staff designee,and filed on this date,pursuant to section 120.52,F.S.,with the undersigned designated Deputy Clerk,receipt of which is hereby acknowledged. t�i2 /Trey J. Hatch 11/17/2015 Staff Designee/ pu) Clerk Printed Name of Designee/Deputy Clerk Date EXPIRATION DATE: 5/17/2016 (Emergency permits issued pursuant to Section 62B-33.014,F.A.C.,are valid for no more than ninety days and other field permits are valid for no more than 12 months. The staff designee may specify a shorter time limit.) EMERGENCY PERMIT: EYES D NO Approved plans are attached: C]YES ri NO 1 Permit No. - POST PERMIT AND PUBLIC NOTICE CONSPICUOUSLY ON THE SITE PUBLIC NOTICE The foregoing constitutes final agency action.Any person whose substantial interests are affected by any decision made by the Department on the Field Permit has a right to request an administrative hearing in accordance with the provisions of Sections 120.569 and 120.57,F.S. The request for an administrative hearing must comply with the provisions of Rule 28-106.201,F.A.C.,and must be received by the Department(at the address given below)within twenty-one(21)days from the date of this notice. When the Department receives an adequate and timely filed request for hearing,the Department will request the assignment of an administrative law judge.Once the administrative law judge is requested,the Division of Administrative Hearings will have jurisdiction over the formal proceeding and the Department(as the referring agency)will take no further action with respect to the proceeding except as a party litigant. Section 120.54(5)(b)4,F.S.,and Rule 28-106.201(2),F.A.C.,explain that the following items must be included in a petition for a formal administrative hearing (a) The name and address of each agency affected and each agency's file or identification number,if known; (b) The name, address,any e-mail address,any facsimile number, and telephone number of the petitioner,if the petitioner is not represented by an attorney or a qualified representative; the name, address, and telephone number of the petitioner's representative,if any,which shall be the address for service purposes during the course of the proceedings;and an explanation of how the petitioner's substantial interests will be affected by the agency determination; (c) A statement of when and how the petitioner received notice of the agency decision; (d) A statement of all issues of material fact disputed by the petitioner,or a statement that there are no disputed facts; (e) A concise statement of the ultimate facts alleged,including a statement of the specific facts that the petitioner contends warrant reversal or modification of the Department's action; (f) A statement of the specific rules or statutes the petitioner contends require reversal or modification of the Department's action, including an explanation of how the alleged facts relate to the specific rules or statutes;and (g) A statement of the relief sought by the petitioner,stating precisely the action that the petitioner wants the Department to take with respect to its action. A person may request an extension of time to petition for an administrative hearing.The person filing the request for extension must do so within the time limits for filing a petition described above. The request must state why an extension of time is needed. The Department will grant an extension only when good cause is shown. If a petition or a request for time extension is filed,further order of the Department becomes necessary to effectuate this Field Permit.Accordingly, the Department's final action may be different from the position taken in this notice.Actions undertaken by any person under this permit,pending the lapse of time allowed for the filing of such a request for hearing,may be subject to modification,removal,or restoration. Failure to petition within the allowed time frame constitutes waiver of any right that a person has to request a hearing under Section 120.57,F.S., and to participate as a party to the proceeding.If a legally sufficient petition for hearing is not timely received,this notice constitutes final agency action. When this order becomes final and is filed with the Department Clerk,any party to the order has the right to seek judicial review under Section 120.57,F.S., and Rule 9.030(b)1(c)and 9.110,Florida Rules of Appellate Procedure.A notice of appeal must be filed within thirty(30)days with both the Department Clerk(see address below)and with the appropriate district court of appeal.The notice filed with the district court must be accompanied by the filing fee specified in Section 35.33(3),F.S.Any subsequent intervention will be only by the approval of the presiding officer on motion filed under Rules 28-5.207 or 60Q-2.010,F.A.C. All requests for hearings are to be filed with the Department at the following address: Florida Department of Environmental Protection Office of General Counsel Department Clerk 3900 Commonwealth Boulevard Mail Station 35 Tallahassee,Florida 32399-3000 Permit No. - STANDARD FIELD PERMIT CONDITIONS The following conditions shall apply to FIELD PERMITS(unless waived by DEP or modified by special permit condition).In the event of a conflict between a field permit condition and a special permit condition,the special condition shall prevail. 1) The permittee shall carry out the construction or activity for which the permit was granted in accordance with the plans and specifications that were approved by DEP as part of the permit.Any deviation there from shall be grounds for suspension of the work and revocation of the permit pursuant to Section 120.60(7),F.S.,and may result in assessment of civil fines or issuance of an order to alter or remove the unauthorized structure,or both.No other construction or activities shall be conducted.No modifications to project size,location,or structural design are authorized.A copy of the permit shall be conspicuously displayed at the project site. 2) The permittee shall conduct the construction or activity authorized under the permit using extreme care to prevent any adverse impacts to the beach and dune system,marine turtles and their nests and habitats,or adjacent property and structures. 3) The permittee shall allow any duly authorized member of the staff to enter upon the premises associated with the project authorized by the permit for the purpose of ascertaining compliance with the terms of the permit and with the rules of DEP,until all construction or activities authorized or required in the permit have been completed and the project accepted by DEP. 4) The permittee shall hold and save the State of Florida,DEP,its officers and employees,harmless from any damage(no matter how occasioned and no matter what the amount)to persons or property that might result from the construction or activity authorized under the permit and from any and all claims and judgments resulting from such damage. 5) The permittee shall allow DEP to use all submitted records,notes,monitoring data,and other information relating to construction or any activity under the permit for any purpose it may deem necessary or convenient,except where such use is otherwise specifically forbidden by law. 6) Construction traffic shall not operate and building materials shall not be stored on vegetated areas seaward of the control line,unless specifically authorized by the permit.If(in the opinion of DEP staff)this requirement is not being met,positive control measures shall be provided by the permittee at the direction of DEP staff.Such measures may include temporary fencing,designated access roads, adjustment of construction sequence,or otherrequirements. 7) The permittee shall not disturb existing beach and dune topography and vegetation except as expressly authorized in the permit. Before the project is considered complete,any disturbed topography or vegetation shall be restored(as prescribed in the permit)with suitable fill material or revegetated with appropriate beach and dune vegetation. 8) The fill material shall be obtained from a source landward of the control line and shall consist of sand which is similar to that already on the site in both grain size and coloration.This fill material shall be free of construction debris,rocks,or other foreign matter.A sample of the sand shall be provided to the staff representative of the Bureau of Beaches and Coastal Systems during the preconstruction conference. 9) If surplus sand fill results from any approved excavation seaward of the CCCL,such material shall be distributed seaward of the CCCL on the site,as directed by DEP staff(unless otherwise specifically authorized by the permit). 10) Any native salt-resistant vegetation destroyed during construction shall be replaced with plants of the same species or,by authorization of DEP,with other native salt-resistant vegetation suitable for beach and dune stabilization.Unless otherwise specifically authorized by the staff,all plants installed in beach and coastal areas(whether to replace vegetation displaced,damaged, or destroyed during construction or otherwise)shall be of species indigenous to Florida beaches and dunes(i.e.,sea oats,sea grape, saw palmetto,panic grass,salt meadow hay cord grass,seashore salt grass,and railroad vine). 11) All topographic restoration and revegetation work is subject to approval and acceptance by DEP staff. 12) If not specifically authorized elsewhere in this permit,no operation,transportation,or storage of equipment or materials is authorized seaward of the dune crest or rigid coastal structure during the marine turtle-nesting season.The marine turtle-nesting season is May 1 through October 31 in all counties(except Brevard,Indian River,St.Lucie,Martin,Palm Beach and Broward counties where marine turtle nesting occurs during the period of March 1 through October31). 13) If not specifically authorized elsewhere in this permit,no temporary lighting of the construction area is authorized at any time during the marine turtle-nesting season and no additional permanent exterior lighting is authorized. l4) This permit has been issued to a specified property owner and is not valid for any other person. SEP form 73-122(Updated6-25-2015) 1/18/ i Gmail-Sabatier Residence G • �� i Roger Russell <rhrresdes@gmail.com> Sabatier Residence 2 messages Roger Russell <rhrresdes@gmail.com> Fri, Sep 4, 2015 at 7:52 PM To: Trey Hatch DEP <trey.hatch@dep.state.fl.us> AIM Reprographics sent Sabatier plans for review by you for field permit. If you have any questions please feel free to contact me. Thanks Roger Russell, RHRRESDES@GMAILCOM -------- ---- Hatch, Trey <Trey.Hatch@dep.state.fl.us> Tue, Nov 17, 2015 at 2:56 PM To: Roger Russell <rhrresdes@gmail.com> Roger, I could find nothing showing that I sent you a permit. Attached is the permit you requested, Please fill out the "Applicant Information"section and return to via E- mail. Please remember the permit is not valid until I receive the signed permit. Have a great day Trey J. Hatch FDEP CCCL Program (904) 655-1765 From: Roger Russell [ma ilto:rhrresdes@gmail.com] Sent: Friday, September 04, 2015 7:52 PM To: Hatch, Trey Subject: Sabatier Residence AIM Reprographics sent Sabatier plans for review by you for field permit. If you have any questions please feel free to contact me. Thanks Roger Russell, RHRRESDES@GMAILCOM https_//maiI.google.corn/mail/u/1/?ui=28ik=ado9038390&view=pt&search=inbox&th=14f9ac62ba4aoaf2&siml=14f9ac62ba4aoaf2&sim 1=15117052103b8b03 1/2 � J' J N_;\ 800 Seminole Road A,,. J JOE COPY Atlantic Beach,Florida 32233 J r Telephone(904)247-5800 THIS PLAN MUST BE FAX(904)247-5805 �_.— ON Jos:TF. FOR 1, '''N Constructio 1 ite Managemen ' - • Compliance A construction site management plan conforming to Atlantic Beach City Code Sec 6-18 has been approved as a part of this building permit. The Construction site management plan was approved based upon the following information. 1. Parking plan–parking plan showing how site will be accessed and all onsite and abutting street parking areas. 2. 3. Location of construction trailers, loading/unloading area and material storage area. 4. Location of chemical toilet area.(chemical toilets must be kept out of City right-of-way and not further than 15 feet from structure under construction) 5. Location of dumpster. Dumpster must be from an approved waste company (in accordance with Chapter 16 City Code) as of 2009 the permitted dumpsters are Advanced Disposal,Realco Recycling, and Shappells. Dumpsters will have tarp covers or rigid covers on windy days. Dumpsters must be removed prior to issuance of Certificate of Occupancy. 6. Traffic control plan, showing access with dimensions,area to be stabilized, narrative on phasing of construction with adequate parking and delivery of materials. 7. Site cleanliness. Contractor must have the entire construction site cleaned by Friday of each week. This means removal of scrap lumber, concrete remnants and other such construction debris including cans, metal,plastic and paper. 8. Erosion and Sediment Control. Contractor must maintain all elements of the approved Erosion& Sediment Control Plan(silt fence, catch basin filters, etc.) until sod or other stabilization has been placed and approved by Public Works. 9. Other activities,where special conditions are identified by the Building Official. Failure to comply with the Construction Site Management Ordinance may result in a Stop Work Order being issued in accordance with City Code Sec. 6-17 (3) Revised 5/2009 r j �,yf TREE & VEGETATION AFFIDAVIT iti. „ rA Qty of Atlantic Beach Department of Community Development - = Planning &Zoning Division 800 Seminole Fuad Atlantic Beach, FL 32233 J,tl (P)904 247-5800 (F)904 904 247-5845 I rj ?..ATh-4.763 SECTION I -APPLICANT INFORMATION r owner(s) P Legal Authorized Agent* • NAMEOFAPPUCANT .4ov;3 SASA iWR, NAMEOFCOMPANY 5t-) SL©E 1-1011E-S )A) L ADDRESS OF COMPANY )DK os ple.E.y Go✓E GA47E ,,,,_ - ✓EDleA PL _2.0ta. PHONE CELL 534396.0. EMAIL /00,s.Soly ;7Cod}- ne-1-- COMPACTOR CERTIFICATION -CONTRACTORCER11FICATION NUMBER 'SG 04 Ur‘.„7 - ATH BUSINIT;TAX FFCBPT NUMBER SECTION ll -SITE INFORMATION 5l1-1±1 ADDFESS OF PRDPERTY S J 541s '-rGer if an addresshasnot been assgned to thisproperty,contact theABBuilding Department at (904)247-5826 to request an address LEGAL DESCHIPITON LOT BLOCK SUBDIVISION REAL ESI ATE NUMBER /70)5) _ 0000 LOT OR PARCEL SIZE SOFT AC FESDENTIAL COMMERCIAL OTHER(931 CIFY) M il I affirm that I have reviewed the provisons of Chapter 23, ”Rotection of Trees and Native Vegetation" of the Municipal Code of Ordinances for the Oty of Atlantic Beach, FL and/or I have participated in a pre-application meeting with the Administrator of those regulations Subsequently, I affirm that no regulated trees and no regulated vegetation will be damaged,destroyed and/or removed from theabove-described or adjacent propertiesin conjunction with thisproject. SI JI {DWNB - SIGNATURE C>FOWNER Sgned and sworn before me on this/() day of ✓ 2,015— ,by State of Ff v ract �-oi i,S S -L-)0...t) 4).V' County of bJ L)(LQ Identification verified: V L ') � rT C Oath sworn: r No - gb...&.. 7:,......,b_dh.„6...h....dh-di_awdb.,0 „ilegig / I i p1,,, PVe,i ELLEN R.THIGPEN 6 Notary Sgnature ( =� 4,.`-<-,--s°. 4,.`-<-,--s Notary Public-State of Florida •% rs '''171 J ZONING REVIEW COMMENTS =� S f City of Atlantic Beach Building and Zoning Department 800 Seminole Road Atlantic Beach, Florida 32233-5445 Phone: (904)270-1605 Fax: (904)247-5845 Email: dreeves@coab.us Date: 12/7/15 Permit: 15-RADD-2763 Applicant: Surfside Homes Review: 1st Address: 108 Osprey Cove Ln, Ponte Vedra Beach, FL 322082 Site Address: 81 5th Street Phone: (904) 534-3904 RE#: 170151-0000 Email: louissabatier@comcast.net Correction Comments 1. Tree Removal: Please submit a Tree Removal Permit Application if any trees are to be removed. If no trees are to be removed,then please fill out an Affidavit of No Tree Removal. Both forms are available on the city website under "Planning and Zoning" and at City Hall. Also please be aware that codes have recently changed. If you are unsure about how the new codes effect your project, please submit a Tree Removal Permit and staff can then determine if it is necessary. Derek W. Reeves Planner dreeves@coab.us 0`\