Loading...
168 MAGNOLIA ST - DESTRUCTIVE INSPECTION In City of Jacksonville PERMIT NO. j Planning and Development o` �� irt / l Building Inspection Division 4cirsoNvo- .' OFFICE USE ONLY Application for: Approved by: Destructive Roofing-In-Progress Inspection Date Approved: ROOFING-IN-PROGRESS INSPECTIONS A Roofing-In-Progress Inspection is a required inspection per the Florida Building Code—Existing Building (FBC-EB). The purpose of the inspection is to confirm any required deck nailing has been completed and proper installation of a secondary water barrier as required by Rule 9B-0475. This required inspection was not requested by the contractor prior to completing the shingle installation for the above referenced permit, and now a Destructive Roofing-In- Progress inspection must be performed by removing certain portions of shingles and/or underlayment to insure compliance with state law. Not complying with this requirement could affect your insurance coverage for storm damage. Owner Affirmation I understand that the contractor, for the reason listed below, was unable to acquire a Passed Roofing-in-progress Inspection. I also understand the Destructive Roof in Progress Inspection will require the Contractor to remove and replace shingles and/or underlayment as required by the City of Jacksonville Building Inspection Division to verify work is in compliance with all state and local codes. Before me this CA day ofM,..11-I%in the County of Duval,State of Florida, has personally appeared 50,1 k.\VQc herein by // r ,...,. himself/herself and affirms all statements and declarations herein are true and Signed: a( j • TORRES acc`�(ate_ i • :,,^4` ;ISSiON ���e� ner cJSl. u.Not- \1. �a�lu'Z aV:i: +''-c•SepteaWHr 13 2019 Notary Public at Large,State of ck ,County of 0VJ1 c,�, 0071 o+aa Fkm.4�Na01,60'rire mwr Personally known ,or Produced Identification ✓ ID Type: V-Z)� Contractor Affirmation Company: C—c)vn ' Sc \))tx Q5-q.c.5 0vai-cs-S Address of Project: ((0 c.s. /lAcr.`i,\r'101/4 : t if\k`aA\1.C. Requested By: C•:. CtA (okC.4 — BOJ-k-s �A.D Reason for Request:-"T'1S(-)Qr--k rA ,CJ ft-0 F SckuUQd (rx--F R— I, l),--C:x 1 `"Qp- - , understand City of Jacksonville Building Inspection Division procedures as outlined in Bulletin G-04-08. I also understand the Destructive Roofing-in-progress inspection is not part of those procedures and is an exception to the procedure. In addition, I understand that any non-code compliant work identified during this inspection may result in the assessment of additional re-inspection fees. Signed: 11,i) c> a- - �A_, ?..f _ Date: \ 1 0 - ` $ An Approved Copy of this Application Must be On-Site at Time of Destructive Roofing-In-progress Inspection