INSPECTIONS REQUIRED FOR PERMITS
To verify compliance with building codes,inspection of the work authorized at various points of the construction are required.The following
inspections are typically for residential projects,
Power Pole
Date: Initial: Date: Initial:
ma
Pooll
r7 C`�-
Piers ty
Underground Plumbing &Bonding
nepool and deck steel is in place but before if is covered.
Underground Electric
Foundation/Footing Swimming Pool final
Slab Additional Inspections may apply to your project,if your project
Retaining Wall Footing contains these elements.
Rough Electric Formed Columns/Beams
Rough Plumbing/Top Out When forms and reinforcing steel, anchor bolts, sleeves, and inserts; and all
Rough Mechanical electrical,plumbing,and mechanical work is in place,but before concrete is placed.
`When all rough electric,plumbing,mechanical are complete but before any work is Structural Steel
covered up.
`When all structural steel members are in place and all connections are complete,but
House Wrap before such work is covered or concealed.
?j Tie-down Framing Connections
( Wall Sheathing
Rough Framing Permit Type
Roof Sheathing �r'
Roofing In Progress.
Insulation Ceiling
Insulation Wall
Exterior Lath Permit No.
Scratch Coat
1'� 6-S 5 Job Address
E_E_t4
"When all wallboard�Jsln place but before joints are taped and finished.
Contractor
Early Power
tt POST THIS CARD WITH PERMITS
IN FRONT OF BUILDING
"When all gas piping is complete and wallboard is installed but before gas is attached to Inspection Line:904-247-5814Previous
Day
any appliance.All outlets must be capped and pipe pressurized at a minimum of 15 lbs.
Must Call By 4PM Previous Day
Building Department Fire Department
Final Plumbing Phone:904-247-5826 Phone:904-630-4789
Final Electrical Fax:904-247-5845 Fax:904-630-4203
.
Final HVAC Public Works/Public utilities
Final Building Phone:904-247-5834
CC Final Fax:904-247-5843
"When all construction work including electrical,plumbing,and mechanical,exterlor finish Construction Hours per City Code
grading,required paving,and landscaping are complete and the building is ready for 7 am 7 pm Weekdays
occupancy but before being occupied. 9 am-7 pm Weekends