Loading...
28 Forrestal Cir - TEST C_ V_ INSPECTIONS REQUIRED FOR PERMITS To verify compliance with building codes,inspection of the work authorized at various points of the construction are required.The following inspections are typically for residential projects, Power Pole Date: Initial: Date: Initial: ma Pooll r7 C`�- Piers ty Underground Plumbing &Bonding nepool and deck steel is in place but before if is covered. Underground Electric Foundation/Footing Swimming Pool final Slab Additional Inspections may apply to your project,if your project Retaining Wall Footing contains these elements. Rough Electric Formed Columns/Beams Rough Plumbing/Top Out When forms and reinforcing steel, anchor bolts, sleeves, and inserts; and all Rough Mechanical electrical,plumbing,and mechanical work is in place,but before concrete is placed. `When all rough electric,plumbing,mechanical are complete but before any work is Structural Steel covered up. `When all structural steel members are in place and all connections are complete,but House Wrap before such work is covered or concealed. ?j Tie-down Framing Connections ( Wall Sheathing Rough Framing Permit Type Roof Sheathing �r' Roofing In Progress. Insulation Ceiling Insulation Wall Exterior Lath Permit No. Scratch Coat 1'� 6-S 5 Job Address E_E_t4 "When all wallboard�Jsln place but before joints are taped and finished. Contractor Early Power tt POST THIS CARD WITH PERMITS IN FRONT OF BUILDING "When all gas piping is complete and wallboard is installed but before gas is attached to Inspection Line:904-247-5814Previous Day any appliance.All outlets must be capped and pipe pressurized at a minimum of 15 lbs. Must Call By 4PM Previous Day Building Department Fire Department Final Plumbing Phone:904-247-5826 Phone:904-630-4789 Final Electrical Fax:904-247-5845 Fax:904-630-4203 . Final HVAC Public Works/Public utilities Final Building Phone:904-247-5834 CC Final Fax:904-247-5843 "When all construction work including electrical,plumbing,and mechanical,exterlor finish Construction Hours per City Code grading,required paving,and landscaping are complete and the building is ready for 7 am 7 pm Weekdays occupancy but before being occupied. 9 am-7 pm Weekends