Exh 8DAGRNDA ITI;NI #8D DECCiVIBirR 12, ~00~ CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Budget Modification for Ped Paths SUBMITTED BY: Rick Carper, P.E., Public Works Director~~. DATE: December 1, 2005 " BACKGROUND: The Fiscal Year 2005 City Budget contained funds for the construction of the Plaza Drive Phase 2, (Parkside Drive to Seminole Road) and Seminole Road (Garden Lane to Oceanforest Drive N.) Ped Paths. These funds were not rolled over to the new Fiscal year because it was intended that they would be encumbered when the FY 06 budget was submitted. The Plaza Drive project was bid as an Additive Alternate to the 5 Points Intersection Improvements and was not awarded because of excessive cost. The Seminole Road project was bid separately, and because of rising construction cost estimates, the project was split into two phases (Garden Lane to Oceanwalk Drive S. and Oceanwalk Drive S. to Ocean Forest Drive N.), in hopes of having sufficient funds for at least one phase. The project was not awarded because all bids exceeded the available ` " budget. Because the funds for both projects were not encumbered or rolled over, the money was returned to the General Fund and 112 Cent Sales Tax Fund as shown below. Account Number Project Title End of Year Balance 001-5002-541-6300 Ped Path -Plaza Road $72,850 General Fund -Streets Ph 2 PW0504 131-5002-541-6300 Seminole Ped Path $58,101 1/2 Cent Sales Tax PW0404 Total: $131,951 Staff is proposing to re-obligate a portion of these funds for construction of ` Plaza Drive Phase 2, (Parkside Drive to Seminole Road), including directly contracting for the bridge -estimated cost $30,000, and Seminole Road Phase 1 {Garden Lane to Oceanwalk Drive S.) -estimated cost $62,000, using the City's Annual Concrete Repair Contractor (Gruhn May). The total cost of these two projects is estimated to be $92,000 (see attached spreadsheet). RECOMMENDATION: Approve a budget modification to transfer $58,000 from the %Z Cent Sales Tax Fund and $4,000 from the General Fund to PW0404 - Seminole Road Ped Path to allow for completion of Phase 1 (Garden Lane to Oceanwalk Drive S.), and to also approve the transfer of $30,000 from the General Fund for Projects PW0504 -Plaza Drive Phase 2 Ped Path. As an Additive Alternate to the Seminole Road project, the . Commission may wish to fund Phase 2 (Oceanwalk Drive S. and Oceanforest Drive N). This would require approximately $60,000 ` ~ additional from the General Fund. ATTACHMENTS; Cost Estimate /Comparison Spreadsheet BUDGET: There are no funds budgeted in FY 2006 for these projects. REVIEWED BY CITY MANAGER• r1G1;NDA ITIJNI #3D DECI;MBIJR 12, 2005 Bikepath Cost Comparison Estimate Bikepath Segment Length Concrete Cost Cost 1 Foot Concrete Quantity Unit Price Actual Construction Costs (LF) (SY} (31SY) MaypoR Road to 3650 3000 $154,400.00 $42.30 $26.00 Parkside Drivo (Welding - FY 2004) West Pfaza Bikepath 500 421 $24,676.00 $49.35 $37.00 (Hager- under construction) West 3rd Sidewalk 585 260 $23, 795.00 $40.68 $22.50 (Hager- andor construction) Costs to construct from FY 2005 Bids (lowest bid shown) Seminole Road (Hager) Garden Lane 1700 1243 $118,235.75 $69.55 $45.00 to OceanWalk Drive S. OceanWalk Drive 1000 1237 $100,133.50 $100.13 $45.00 to Oceanforest Drive 5 Points Additive Alternate #1 ( Callaway} Parkside Drive to 500 42i $77,000.00 NA Seminole Road Lump Sum bid, amount inGudes $25,000 bridge allowance. Costs to construct using City Concrete Contractor Gruhn May Parkside Drive to 474 421 $18,94S.00 $39.97 $45.00 Seminole Road Fonn & Pour only , Does not include earthwork, landscape trimming. Bridge {City Contract) 311,000.00 Total $29,945.00 Garcien Lane to OceanWalk Drive S. 1550 1243 $55,926.00 $36.06 $45.00 Fonn & Pour only, Does not include earthwork, landscape trimming. Remove existing sidewalk 35,500.00 $9 Total $61,426.00 Total Cost $91,371.00 Additional Bike path OceanWalk Drive S. 1000 1237 $55,674.00 $55.67 $45.00 to Oceanforest Drive Form & Pour only, Does not include earthwork, landscape trimming. Remove existing sidewalk $3,700.00 $9.00 Total $59,374.00 Overall Total Cost $150,745.00 12/512005 BikePathCostComparison.xls