Loading...
1777 Maritime Oak Dr early power releaseEARLY POWER AGREEMENT & RELEASE CITY OF ATLANTIC BEACH Electric power is requested now under the conditions and terms of this fully executed Agreement & Release Job Address: — Permit No. Service Type (Circle One): Overhead nder9!round We, the undersigned General Contractor and Electrician, understand and agree: 1. "Early Power" is urely for our construction convenience, it is not required by Codes and does not Substitute for Final Mpections or the C/O (Certificate of Occupancy atmust be issued before occupa—, and as such is at the discretion of the Building Official. 2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough inspections must have prior Approval, including meter base connections. 3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of the earl electric service. Such action is expressly prohibited and penalized by The City of Atlantic Beach Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric service after a twenty-four hour notice. 4. ',Early Power" release authority is the Electrician and/or the Contractor and must not occur before: a' Equ ipment, devices and fixtures are installed (or blanked off) safely. b ans compTetewith breakers and cover, and (labeling required at final inspection). c Service connection and grounding is complete. a� The electric system has safely passed through electrical check. e. Meter can is permanentl marked with address. f. Temporary address nuNers displayed (Permanent numbers are required for C/O). 5. This fully completed form is to be submitted to the Building Department by hand, mail or fax. 6. Future such Agreements will not be accepted from those who violate any one of the above items. CONTRACTOR DATE PRINT NAME ELECTRICIAN C-trl L DATE_' � I PRINT NAME 800 Seminole Road, Atlantic Beach FL 32233 Phone. (904)247-5826 Fax: (904)247-5845 http://"-A,.coab.us revised 0 1 30 09