AGENDA ITEM: Park and Mealy Water Line Replacement, Bid No. 0304-2
SUBMITTED BY: Donna Kaluzniak, CEP, Utility Directol~~
DATE: December 8, 2003
BACKGROUND: This project is to replace an old 2-inch undersized water main with a 6-inch
water main on Park and Mealy Streets. Also included is an additive alternate to extend the water
main down Dutton Island Road West from Mealy Street and connect to the existing water main
near George Street.
Bids were advertised, and six contractors met prequalification requirements. Five contractors
attended the mandato re-bid meetin ,and 3 contractors submitted bids on December 3, 2003:
ADB Utility Gruhn May, Inc. R & B Contracting
Contractors
Total Base Bid, $103,866.44 $93,612.21 $118,733.05
including 10%
contin enc
Additive Alternate, $24,297.70 $17,876.10 $12,771.00
including 10%
contin enc
Total Bid $128,1b4.14 $111,488.31 $131,504.05
During the bid analysis, mathematical errors were found and corrected in R & B's bid. The values
above represent the corrected bid amount. The low bidder for the project is Gruhn May, Inc.
BUDGET: A total of $139,000 was budgeted for water line replacements on ParkJMealy
($100,000) and on Renault {$39,000). The work on Renault will only require a few service
connections, as field verification by staff determined the existing mains are 6 and 8-inch diameter
instead of 2-inch diameter. Including the additive alternate in the Park/Mealy project is highly
recommended, as it would allow the water line to be looped into the existing main on Dutton
Island Road West, as opposed to having a "dead-end" line ending on Mealy Road.
RECOMMENDATION: Award the contract for the Park and Mealy Water Line Replacement,
Bid No. 0304-2, including the Additive Alternate, to Gruhn May, Inc. in the amount of
$111,488.31.
ATTACHMENTS: 1. Bid Tabulation Form
2. Bid analysis
REVIEWED BY CITY MANAGER:
CITY OF ATLANTIC BEACH ~~
PARK 8- MEALY STREET WATER LINE REPLACEMENT PROJECT
December 3, 2003
Bid #0304-2
3:00 PM
Required Documents ADB
CONTRACTING Gruhn-May
Incor orated R & B
Contractin
Submission in Tri licate X X X
Ori final Insurance Certificate X X X
Bid Bond 5% X X X
Si ned Co of Document Re uirements Checklist X X X
Com leted W-9 Form X X X
Sworn Statement on Public Entit Crimes X X X
Dru Free Work lace Certification X X X
Documentation of Recei t of An Addenda X X X
,.
Base Bid Items 1-12 $94,424.04 $85,102.01 $108,025.50
Ten Percent 10% Contin enc of Subtotal $9,442.40 $8,510.20 $10,802.55
Total Base Bid Plus 10%Contin enc $103,866.44 $93,612.21 $118,828.05
~;~,, ,. ~ =;~~ .:; ~ ~ t ~,.
Total Additive Alternate Bid #1 Church Road Portion Items 1-6 $22,088.82 $16,251.00 $10,685.00
Ten Percent 10% Contin enc of Subtotal $2,208.88 $1,625.10 $1,068.50
Total Additive Alternate Bid #1 Plus 10% Contin enc $24,297.70 $17,876.10 $11,753.50
Bid Award based on Deparment Analysis and Commission Approval
~, a
~n
z r~
~z
ao
~~
`_~ ,;
N ~
N
o~
o~
~W
BID ANALYSIS
PARK & MEALY WATER LINE REPLACEMENT PROJECT
CITY BID #0304-2
Item
# Base Bid Items _ _ Qty. Units ADB Utilit
Unit
Cost y Contractors
Extended
Cost Gruhn May Inc.
Extended
Unit Cost Cost R&B Contracting
Unit Extended
Cost Cost
1. Mobilization_ __ __ 1 LS _ __$500.00 _______ $500.00 $3,800.00 $3,800.00 $15,500.00 $15,500.00
2. Maintenance of Traffic 1 LS _
$1,500.00 $1,500.00 $730.00 $730.00 $1,700.00 $1,700.00
3. Site Work _ 1 LS $2,500.00 $2,500.00 $2,825.00 $2,825.00 $3,300.00 $3,300.00
4.
Furnish and Install PVC and Ductile Iron Water Main
--
-
----- --- -- _.
--
a. 6"diameter DR 25 PVC
_ 1,173
LF _
_ _$17.02 --
$19,964.46
$17.02 --
$19,964.46
$14.50
$17,008.50
b. 6"diameter ductile iron ___ 50 LF $25.00 $1,250.00 $45.60 $2,280.00 $18.50 $925.00
5. Furnish and Install Fittings:
a. 6" Tapping Saddle 3 EA $1,110.00 $3,330.00 $1,220.00 $3,660.00 $2,100.00 $6,300.00
b. 2' 45-degree elbows 12 EA $51.00 $612.00 $12.30 $147.60 $70.00 __
$840.00
c. 6" 45-degree elbows __ 20 EA $217.00 $4,340.00 $219.40 $4,388.00 $315.00 $6,300.00
d. 6" 90-degree elbows __ 2 EA $221.00 $442.00 $223.30 $446.60 $320.00 $640.00
e. 2" x 6" reducers 1 EA $181.00 $181.00 _
$172.60 $172.60 $205.00 $205.00
f. 6" tees 3 EA _ $295.00 $885.00 $277.90 $833.70 $400.00 $1,200.00
g. 6" flange set 3 EA $63.00 $189.00 $14.95 $44.85 $160.00 _
$480.00
6. Furnish and Install Gate Valve and Box: __ _
a. 6" gate valve with box 5 EA $613.00 $3,065.00 $719.40 $3,597.00 $650.00 $3,250.00
7. Furnish and Install Bacteriological Sample Point Assembly 3 EA $200.00 $600.00 $178.00 $534.00 $225.00 $675.00
8. Furnish and Install Water Service Connection
a. 2" line with double service condition ___ 29 EA $767.02 $22,243.58 $574.00 $16,646.00 $550.00 $15,950.00
9. Abandon In-Place Existing Water Mains 1 LS $250.00 $250.00 $630.00 $630.00 $2,300.00 $2,300.00
10. Asphalt (Milling and Repaving) 1,864 SY $10.50 __
$19,572.00 $9.30 $17,335.20 $13.00 $24,232.00
a. Adjust structural height on grates 2 EA $250.00 $500.00 $675.00 $1,350.00 $1,100.00 $2,200.00
b. Adjust structural height on valve box __ 2 EA $150.00 $300.00 $525.00 $1,050.00 $110.00 $220.00
c. Adjust structural height on manhole 5 EA $2,000.00 $10,000.00 _
$675.00 $3,375.00 $275.00 $1,375.00
11. Grassing _
a. Sodding 150 SY $6.00 $900.00 $3.06 $459.00 $7.00 $1,050.00
_ b. Seeding 150 SY $2.00 $300.00 $1.22 $183.00 $2.50 $375.00
12. Quality Control Testing 1 LS _$_1,000.00 ___
$1,000.00 $650.00 $650.00 $1,950.00 __
$1,950.00
___ ____ Total Base Bid (Items 1-12): $94,424.04 $85,102.01 _
$107,975.50
___ Ten Percent (10%) Contingency of Subtotal: $9,442.40 _ $8,510.20 _ _ $10,797.55
Total Base Bid Plus 10% Contingency: $103,866.44 _ _ __
$93,612.21 _ _ __
$118,773.05
,~
,~ ~dt
~oo~~~~y`~~
~~~
BID ANALYSIS
PARK 8 MEALY WATER LINE REPLACEMENT PROJECT
CITY BID #0304-2
Additive Alternate #1
Church Road Portion
_ _ADB Utilit y C_ ontractors Gruhn M_ay, Inc. R8~B_C_ontracting _
Item
# _
Bid Items
Qty.
Units Unit
Cost Extended
Cost
Unit Cost Extended
Cost Unit
Cost Extended
Cost
1. Furnish and Install PVC Water Main _ _ _
a. 6" diameter DR 25 PVC 620 LF $17.02 $10,552.40 $15.02 $9,312.40 $10.50 $6,510.00
2. Furnish and Install Fittings _
a. 6" 90-degree elbows 1 EA $221.00 $221.00 $378.30 $378.30 $320.00 $320.00
3. Furnish and Install Gate Valve and Box and Fire Hydrant Assembly _
a. 6" gate valve with box 1 EA $613.00 $613.00 $613.40 $613.40 $650.00 $650.00
b. Furnish and install fire hydrant assembly 1 EA $2,135.40 $2,135.40 $2,447.90 $2,447.90 $1,950.00 $1,950.00
4. Furnish and Install Water Service Connection
a. 2" line with double service connection 1 EA $767.02 $767.02 $674.00 $674.00 $550.00 $550.00
5. Asphalt (milling and paving) 300 SF $10.50 $3,150.00 $4.10 $1,230.00 $1.20 $360.00
6. Concrete replacement 60 SF $45.00 $2,700.00 $11.50 $690.00 $5.75 $345.00
7. Testing 1 LS $1,200.00 $1,200.00 $625.00 $625.00 $225.00 $225.00
8. Maintenance of Traffic 1 LS $750.00 $750.00 $280.00 $280.00 $70.0.00 $700.00
Total Additive Alternate Bid #1 (Items 1-8): $22,088.82 $16,251.00 $11,610.00
Ten Percent (10%) Contingency of Subtotal: $2,208.88 $1,625.10 $1,161.00
_
Total Additive Alternate Bid #1 Items 1-8): $24,297.70 $17,876.10 $12,771.00
~~,~,~