AGENDA ITEM: Rehabilitation of Sludge Tanks at Wastewater Treatment Plant #2
Bid No. 0304-3
SUBMITTED BY: Donna Kaluzniak, CEP, Utility Director
DATE: December 8, 2003
BACKGROUND: This project is to rehabilitate two existing metal sludge digestion tanks at
Wastewater Treatment Plant No. 2. This will include repairs and coating of the tanks, and
replacement of the aeration equipment inside the tanks. An additive alternate to modify decant
piping and install manways was included in the bid request.
Bids were advertised, and three contractors were prequalified and attended the mandatory pre-bid
meeting and site visit. Three contractors submitted bids on December 3, 2003:
Gruhn May, Inc. Meadors Construction
Com any Worth Contracting
Base Bid, including $85,745.00 $120,236.60 $93,940.00
10% contin enc
Additive Alternate, $56,141.80 $16,548.40 $16,500.00
including 10%
contin enc
During the bid analysis, mathematical errors were found and corrected in Worth Contracting's
bid. The values above represent the corrected bid amount. Including the additive alternate causes
all bids to be over budget, therefore the additive alternate work will not be awarded. The low
bidder for the base bid was Crruhn May, Inc.
BUDGET: A total of $100,040 was budgeted for this work in the Sewer Fund in account
number 410-5508-535-6300.
RECOMMENDATION: Award the contract for Rehabilitation of Sludge Tanks at Wastewater
Plant No. 2, Bid No. 0304-3, to Grului May, Inc. for the base bid only, in the amount of
$85,745.00.
ATTACHMENTS: 1. Bid Tabulation Form
2. Bid Analysis
REVIEWED BY CITY MANAGER: __~~
CITY OF ATLANTIC BEACH
REHABILITATION OF SLUDGE TANKS AT WASTEWATER TREATMENT PLANT #2
December 3, 2003
Bid #0304-3
3:00 PM
Required Documents Gruhn-May
Incor orated Meadors
Construction Worth
Contractin
Submission in Tri licate X X X
Ori final Insurance Certificate X X X
Bid Bond 5°k X X X
Si ned Co of Document Re uirements Checklist X X X
Com leted W-9 Form X X X
Sworn Statement on Public Entit Crimes X X X
Dru Free Work lace Certification X X X
Documentation of Recei t of An Addenda X X X
.:,;
.~ , ~.,
t ~,,_ ..
u
1. Removal of Slud a/Debris from Tanks 1 8 2
Tank 1 $5,200.00 $16,901.00 $5,000.00
Tank 2 $5,200.00 $11,566.00 $5,000.00
2. Tank Re air 8 Coatin ,Com late
Tank 1 $17,875.00 $24,234.00 $19,000.00
Tank 2 $14,625.00 $18,717.00 $19,000.00
3. Re lace Aeration E ui ment, Com lete
Tank 1 $18,727.50 $20,466.00 $18,700.00
Tank 2 $16,322.50 $17,422.00 $18,700.00
~, :.
°. ;- .:
Subtotal Items 1-3 $77,950.00 $109,306.00 $85,400.00
Ten Percent 10% Contin enc $7,795.00 $10,930.60 $8,540.00
Total Base Bid items 1-3 lus 10% Contin enc $85,745.00 $120,236.60 $93,940.00
ADDITIVE ALTERNATE
1. Provide Manwa sin Tanks $11,559.60 $1,675.00 $2,000.00
2. Modif Decant Pi in Tank 1 $19,739.20 $5,847.00 $5,500.00
3. Modif Decante Pi in Tank 2 $19,739.20 $5,847.00 $5,500.00
Ten Percent 10% Contin enc of Additive Alternate $5,103.80 $1,336.90 $1,300.00
Total Additive Alternate lus 10%Contin enc $56,141.80 $14,705.90 $14,300.00
TOTAL BASE BID AND ADDITIVE ALTERNATE, INCLUDING CONTINGENCIES $141,886.80 $134,942.50 $108,240.00
Bid Award based on Deparment Analysis and Commission Approval
~, a
~n
z9
~~
..~
1J
° 7
N "'."
O
A ~
n
BID ANALYSIS -CITY BID #0304-3
REHABILITATION OF SLUDGE TANKS AT WASTEWATER TREATMENT PLANT #2
Item
# Base Bid Items Qty. Units
-- - __ _ Gru
Unit
__ Cost _ hn May
Extended
_ Cost_ Meadors
Extended
Unit Cost _ Cost Worth
Unit Extended
_Cost _ C_ o_st_
---
1. -----
ge/Debris from Tanks 1 & 2
f
Slu
d
Removal o __ __ __ _ __ _ _ _ _ _ __ _
_ _
_
_
_
A. Tank 1 1 LS_ $5,200.00 _ $5,200.00 $16,901.00 $16,901.00 _ $5,000.00 _ $5,000.00
__ B. Tank2 1 LS $5,200.00 ___$_5_,200.00 $11,566.00 $11,566.00 __$5,000.00 $5,00__0_.0.0_
2 Tank Repair and Coating, Complete _ _
A. Tank 1 1 LS $17,875.00 $17,875.00 $24,234.00 $24,234.00 $19,000.00 $19,000.00
B. Tank 2 1 LS $14,625.00 _$_1.4,625.00 $18,717.00 $18,717.00 $19,000.00 $19_,_0_00_ .00
3. Replace Aeration Equipment, Complete
A. Tank 1 ~ 1 LS $18,727.50 $18,727.50 $20,466.00 $20,466.00 $18,700.00 $18,700.00
B. Tank 2 1 LS $16,322.50 $16,322.50 $17,422.00 $17,422.00 $18,700.00 $18,700.00
Sub-Total (items 1-3) $77,950.00 $109,306.00 _ $85,400.00
_
Ten Percent (10%) Contingency of Subtotal _ _ _ $7,795.00 $10,930.60 $8,540.00
Total Base Bid (items 1-3) plus 10% Contingency $85,745.00 $120,236.60 $93,940.00
Additive Alternate
1. Provide Manways in Tanks 2 EA $5,779.80 $11,559.60 $1,675.00 $3,350.00 $2,000.00 $4,000.00
2. Modify Decant Piping, Tank 1 1 LS $19,739.20 $19,739.20 $5,847.00 $5,847.00 $5,500.00 $5,500.00
_
3. Modify Decant Piping, Tank 2 1 LS $19,739.20 $19,739.20 $5,847.00 $5,847.00 $5,500.00 $5,500.00
-- -
Sub-Total (items 1-3)
$51,038.00
- _ --
15,044.00
15,000.00
Ten Percent (10%) Contingency of Subtotal _ $5,103.80 $1,504.40 $1,500.00
Total Additive Alternatve (items 1-3) plus 10% Contingency $56,141.80 $16,548.40 $16,500.00
Total Base Bid & Additive Alternate, Incl. Contingencies $141,886.80 $136,785.00 $110,440_00
---
- - - --- ---
----_ _ ,__
--
- _
----- --_--
-- __ -- --
- ---
------- a
- ---- z
I
N
'~ N
O
O
F
a
C17
A
n