350 OCEAN BLVD - TRUSSES • Providence Homes OFFICE COPY
(-11r--)
Site Information
CELLAR RESIDENCE REVISION
Structural Engineer of Record !�
Derek B.Murray BP# �ESi!� �U3�7 `lililliPP'
PE No.71457 DATE 3 / I / P
4745 Sutton Park Court,Suite 402 SIGNED Tru ego use
Jacksonville,FL 32224
WIND LOADING(Cd=1.6) ROOF LOADING (Cd=1.25) FLOOR LOADING (Cd = 1.00)
MWFRS TCLL 20 psf TCLL 40 psf
130MPH (3 second gust)\ASCE 7-10 TCDL 7 psf TCDL 17 psf
Enclosed Structure(0.18) BOLL 0 psf+ NCLL 10 psf BCLL 0 psf
Exposure D BCDL 5 psf BCDL 5 psf
Occupancy Category II(Res)
FBC 2017 RES\TPI 2014
This Package inlcudes 65 truss designs with individual date of design
NO JOB ID TRS ID DATE NO JOB ID TRS ID DATE NO JOB ID TRS ID DATE
1 72128 B01 2/16/2018 29 72128 FGE05 2/16/2018 57 72128 T11A 2/16/2018
2 72128 F01 2/16/2018 30 72128 G E01 2/16/2018 58 72128 112 2/16/2018
3 72128 FO1A 2/16/2018 31 72128 GE02 2/16/2018 59 72128 11311 2/16/2018
4 72128 FO1G 2/16/2018 32 72128 GE03 2/16/2018 60 72128 T13M 2/16/2018
5 72128 F02 2/16/2018 33 72128 G E05 2/16/2018 61 72128 T16 2/16/2018
6 72128 FO2A 2/16/2018 34 72128 HJO5Z 2/16/2018 62 72128 T17 2/16/2018
7 72128 FO2AT 2/16/2018 35 72128 HJO7 2/16/2018 63 72128 118 2/16/2018
8 72128 FO2B 2/16/2018 36 72128 J01Z 2/16/2018 64 72128 ' 119 2/16/2018
9 72128 FO2T 2/16/2018 37 72128 JO2M 2/16/2018 65 72128 T20 2/16/2018
10 72128 F03 2/16/2018 38 72128 J03 2/16/2018
11 72128 F04 2/16/2018 39 72128 J03Z 2/16/2018
12 72128 F05 2/16/2018 40 72128 J05 2/16/2018
13 72128 F06 2/16/2018 41 72128 J05Z 2/16/2018
14 72128 F07 2/16/2018 42 72128 J07 2/16/2018
15 • 72128 FOIA 2/16/2018 43 72128 JO7M 2/16/2018
16 72128 FO8A 2/16/2018 44 72128 J08 2/16/2018
17 72128 F09 2/16/2018 45 72128 J09 2/16/2018
18 72128 FO9T 2/16/2018 46 72128 J10 2/16/2018
19 72128 F10 2/16/2018 47 72128 J11 2/16/2018
20 72128 F11 2/16/2018 48 . 72128 PB01 2/16/2018
21 72128 F12 2/16/2018 49 72128 104 2/16/2018
22 72128 F12T 2/16/2018 50 72128 105 2/16/2018
23 72128 F13 2/16/2018 51 72128 106 2/16/2018
24 72128 FG01 2/16/2018 52 72128 107 2/16/2018
25 72128 FG E01 2/16/2018 53 72128 108 2/16/2018
26 72128 FG E02 2/16/2018 54 72128 109 2/16/2018
27 72128 FG E03 2/16/2018 55 72128 T10 2/16/2018
28 72128 FGE04 2/16/2018 56 72128 T11 2/16/2018
•'•�CEfy ' IAA..
Apex Technology is a ficticious name owned by Jax Apex Technology,Inc.,a Florida Corporation. Florida `?• � S'••• A- ..
Engineer Business No.7547-4745 Sutton Park Court,Suite 402 Jacksonville,FL 32224(904)821-
5200 • •\ No 7 ••
AFIV\ 457
The seal on this index sheet indicates acceptance of professional engineering responsibility solely for the. • \ •�
APEX Truss Design Drawings listed above and attached.The suitability and use of each drawingfor any z 7V .
parbcualr building is the responsibility of the Building Designer,per ANSI/TPI 1-2002 Section 2 ; p: s * =
•::ir .;
With my seal affixed to this sheet,I hereby certify that this serves as an index sheet in conformance with �!'1•
�
Rule 61G15-23.002(2)and 61G15-31.003 of the Florida Board of Professional Engineers �j° • O P`•••••44/$
M
V1-°NALEN4 00
Job#72128 BEARING INFORMATION
WOODTRUSS
QTY SPAN DESCRIPTION BRG# REACTION UPLIFT
1 06'05"08 FG01 MONO 0.00/12 Pitch 2-Ply 1 1669.48 0.00
2 1669.48 0.00
2 06'10"08 GE01 GABL 4.00/12 Pitch 1 -Ply 1 315.50 133.00
2 250.11 124.00
1 30'03"00 GE02 GABL 8.00/12 Pitch 1 -Ply 1 299.17 149.00
2 1876.04 1587.00
1 30'03"00 GE03 GABL 8.00/12 Pitch 1 -Ply 1 301.87 31.00
2 1160.13 885.00
3 764.07 576.00
1 1911"00 GE05 GABL 8.00/12 Pitch 1 -Ply 1 312.81 105.00
2 1269.81 1144.00
2 06'11"06 HJO5Z HIP_JACK 4.24/12 Pitch 1 -Ply 1 220.42 304.00
2 125.32 116.00
3 33.32 0.00
2 09'09"05 HJO7 HIP_JACK 2.12/12 Pitch 1 -Ply 1 304.70 101.00
2 338.85 115.00
3 -19.33 0.00
2 01'00"00 J01Z JACK 6.00/12 Pitch 1 -Ply 1 280.88 222.00
2 15.00 0.00
3 483.19 135.00
6 01'06"00 JO2M MONO 8.00/12 Pitch 1 -Ply 1 99.17 20.00
2 34.45 30.00
4 03'00"00 J03 JACK 3.00/12 Pitch 1 -Ply 1 270.00 178.00
2 35.30 10.00
3 40.10 30.00
2 03'00"00 J03Z JACK 6.00/12 Pitch 1 -Ply 1 263.01 215.00
2 45.00 0.00
3 113.54 49.00
4 05'00"00 J05 JACK 3.00/12 Pitch 1 -Ply 1 314.20 180.00
2 62.40 0.00
3 99.87 67.00
14 05100"00 J05Z EJACK 6.00/12 Pitch 1 -Ply 1 311.95 262.00
2 75.00 0.00
3 114.07 40.00
4 07'00"00 J07 EJACK 3.00/12 Pitch 1 -Ply 1 370.20 192.00
2 91.93 0.00
3 153.12 101.00
9 06'10"08 JO7M MONO 4.00/12 Pitch 1 -Ply 1 368.71 143.00
2 196.90 102.00
1 02'06"00 J08 JACK 6.00/12 Pitch 1 -Ply 1 118.17 29.00
2 35.24 0.00
3 63.18 52.00
1 04'06"00 J09 JACK 6.00/12 Pitch 1 -Ply 1 182.25 44.00
2 64.17 0.00
3 114.23 89.00
1 02'00"00 J10 JACK 6.00/12 Pitch 1 -Ply 1 251.06 202.00
2 30.00 0.00
3 258.27 71.00
1 04'00"00 J11 JACK 6.00/12 Pitch 1 -Ply 1 285.39 236.00
2 60.00 0.00
Page 1 of 4
Job#72128 BEARING INFORMATION
QTY SPAN DESCRIPTION BRG# REACTION UPLIFT
3 86.39 36.00
8 03'02"06 PB01 SPEC 8.00/12 Pitch 1 -Ply 1 17.02 22.00
2 132.36 107.00
3 16.98 22.00
1 34'07"00 T04 HIPS 6.00/12 Pitch 1 -Ply 1 2324.27 785.00
2 2324.27 785.00
1 34'07"00 T05 HIPS 6.00/12 Pitch 1 -Ply 1 1257.99 538.00
2 1257.99 538.00
1 34'07"00 TO6 HIPS 6.00/12 Pitch 1 -Ply 1 1351.10 534.00
2 1351.55 534.00
1 34'07"00 T07 HIPS 6.00/12 Pitch 1-Ply 1 1420.93 531.00
2 1421.72 531.00
1 34'07"00 T08 HIPS 6.00/12 Pitch 1 -Ply 1 1325.61 527.00
2 1343.71 527.00
1 34'07"00 T09 HIPS 6.00/12 Pitch 1 -Ply 1 1344.45 375.00
2 1344.87 375.00
1 36'01"00 T10 HIPS 6.00/12 Pitch 1 -Ply 1 1304.76 358.00
2 1382.55 376.00
1 36'01"00 T11 SPEC 6.00/12 Pitch 1-Ply 1 1292.88 361.00
2 1394.44 386.00
1 34'07"00 T11A COMN 6.00/12 Pitch 1 -Ply 1 1218.07 347.00
2 1348.49 382.00
1 34'07"00 T12 COMN 6.00/12 Pitch 3-Ply 1 11681.19 6829.00
2 11642.41 6914.00
10 30'03"00 T13H SPEC 8.00/12 Pitch 1 -Ply 1 1231.35 720.00
2 1246.80 724.00
7 30'03"00 T13M SPEC 8.00/12 Pitch 1 -Ply 1 1369.50 786.00
2 1251.15 698.00
1 19'11"00 T16 COMN 8.00/12 Pitch 3-Ply 1 6213.45 3771.00
2 7331.45 4424.00
1 1911"00 117 COMN 8.00/12 Pitch 1 -Ply 1 665.47 448.00
2 665.47 448.00
2 09'10"08 T18 HIPM 3.00/12 Pitch 1 -Ply 1 636.51 283.00
2 858.87 326.00
2 0910"08 119 HIPM 3.00/12 Pitch 1 -Ply 1 456.94 216.00
2 302.47 115.00
8 09'10"08 T20 MONO 3.00/12 Pitch 1 -Ply 1 456.78 215.00
2 299.02 145.00
WOODFLOOR
QTY SPAN DESCRIPTION BRG# REACTION UPLIFT
13 20'10"00 F01 SY42 0.00/12 Pitch 1 -Ply 1 861.98 0.00
2 868.74 0.00
3 22'04"00 FO1A SY42 0.00/12 Pitch 1 -Ply 1 1139.28 0.00
2 835.94 0.00
1 2010"00 FO1G SY42 0.00/12 Pitch 1 -Ply 1 1180.99 0.00
2 1132.26 0.00
3 24'11"00 F02 SY42 0.00/12 Pitch 1 -Ply 1 1055.10 0.00
2 1021.68 0.00
3 24'11"00 FO2A SY42 0.00/12 Pitch 1 -Ply 1 957.37 0.00
Page 2 of 4
Job#72128 BEARING INFORMATION
QTY SPAN DESCRIPTION BRG# REACTION UPLIFT
2 1128.76 0.00
2 24'11"00 F02AT SY42 0.00/12 Pitch 1 -Ply 1 1426.79 0.00
2 1355.09 0.00
1 24'11"00 F02B SY42 0.00/12 Pitch 1 -Ply 1 1196.09 0.00
2 1084.69 0.00
1 24'11"00 F02T SY42 0.00/12 Pitch 1 -Ply 1 1548.03 0.00
2 1226.75 0.00
1 03'07"00 F03 SY42 0.00/12 Pitch 1 -Ply 1 992.63 0.00
2 600.53 0.00
1 10'09"07 F04 SY42 0.00/12 Pitch 1 -Ply 1 445.92 0.00
2 445.92 0.00
1 24'06"07 F05 SY42 0.00/12 Pitch 1 -Ply 1 1003.88 0.00
2 1015.12 0.00
1 19'09"08 F06 SY42 0.00/12 Pitch 1 -Ply 1 808.55 0.00
2 808.55 0.00
1 26'08"00 F07 SY42 0.00/12 Pitch 1 -Ply 1 786.89 0.00
2 1213.82 0.00
3 254.79 0.00
1 28'02"00 F07A SY42 0.00/12 Pitch 1 -Ply 1 1291.18 0.00
2 1181.88 0.00
3 255.92 0.00
5 21'03"08 F08A SY42 0.00/12 Pitch 1 -Ply 1 1140.18 0.00
2 1402.04 0.00
10 19'09"08 F09 SY42 0.00/12 Pitch 1 -Ply 1 795.36 0.00
2 1426.85 0.00
1 19'09"08 F09T SY42 0.00/12 Pitch 1 -Ply 1 857.97 0.00
2 1500.74 0.00
2 19'09"08 F10 SY42 0.00/12 Pitch 1 -Ply 1 551.38 0.00
2 880.57 0.00
3 220.20 0.00
2 19'11"00 F11 SY42 0.00/12 Pitch 1 -Ply 1 552.44 0.00
2 881.10 0.00
3 228.62 0.00
14 15'00"08 F12 SY42 0.00/12 Pitch 1 -Ply 1 614.60 0.00
2 617.40 0.00
2 15'00"08 F12T SY42 0.00/12 Pitch 1 -Ply 1 641.14 0.00
2 644.86 0.00
1 15'03"00 F13 SY42 0.00/12 Pitch 1 -Ply 1 620.83 0.00
2 620.83 0.00
1 20'09"08 FGE01 SY42GABL 0.00/12 Pitch 1 -Ply 1 45.28 0.00
2 1654.50 0.00
1 24'11"00 FGE02 SY42GABL 0.00/12 Pitch 1 -Ply 1 55.28 0.00
2 1985.49 0.00
1 04'08"15 FGE03 SY42GABL 0.00/12 Pitch 1 -Ply 1 560.09 0.00
1 15'03"00 FGE04 SY42GABL 0.00/12 Pitch 1 -Ply 1 1182.41 0.00
2 59.26 0.00
1 13'05"00 FGE05 SY42GABL 0.00/12 Pitch 1 -Ply 1 55.39 0.00
2 1034.72 0.00
Page 3 of 4
Job#72128 BEARING INFORMATION
Total of Trusses 182
Maximun Height 11'11"11
Page 4 of 4
1. PERMANENT BRACING IS ALWAYS REQUIRED AND MUST BE PROVIDED BY THE BUILDING DESIGNER OR ENGINEER OF RECORD. PERMANENT
BRACING INCLUDES TOP CHORD BRACING, BOTTOM CHORD BRACING, COMPRESSION WEB MEMBER BRACING AND GABLE END LATERAL BRACING.
2. RECIEPT, STORAGE, ERECTION, FIELD INSTALLATION AND FIELD ASSEMBLY IS THE RESPONSIBILITY OF THE CONTRACTOR. IN THE ABSENCE OF
SPECIFIC BRACING REQUIREMENTS, THE CONTRACTOR SHALL ENSURE THAT THE TRUSSES ARE BRACED IN ACCORDANCE WITH BCSI-03.
3. NEVER EXCEED THE DESIGN LOADING SHOWN AND NEVER STACK MATERIALS ON INADEQUATELY BRACED TRUSSES.
4. PROVIDE COPIES OF THE TRUSS DESIGN TO THE BUILDING DESIGNER, ERECTION SUPERVISOR, PROPERTY OWNER AND ALL OTHER INTERESTED
PARTIES.
5. TOP CHORDS MUST BE SHEATHED OR PURLINS PROVIDED AT SPACING SHOWN ON DESIGN. BUILDING DESIGNER OR ENGINEER OF RECORD
REQUIRED TO PROVIDE THIS-SEE NOTE 1 ABOVE.
6. BOTTOM CHORDS REQUIRE RIGID CEILING OR CONTINUOUS LATERAL BRACING AT SPACING NOTED ON TRUSS PROFILE. BUILDING DESIGNER OR
ENGINEER OF RECORD REQUIRED TO PROVIDE THIS- SEE NOTE 1 ABOVE.
7. TRUSS TO TOP PLATE AND ALL OTHER CONNECTIONS NOT SHOWN ARE THE RESPONSIBILITY OF THE BUILDING DESIGNER.
8. DO NOT CUT OR ALTER TRUSS MEMBERS OR PLATE WITHOUT PRIOR APPROVAL OF A PROFESSIONAL ENGINEER. FOR TRUSS REPAIR DRAWINGS,
EMAIL REPAIR REQUEST TO CUSTOMERSERVICE@TRUEHOUSE.COM. EMAIL SHOULD CONTAIN LOT NUMBER, SUBDIVISION, TRUSS NUMBER, SPECIFIC
SCOPE OF REPAIR, AND CONTRACTOR CONTACT INFO.
4 x 5
3n8
SYMBOL INDICATES REQUIRED
LATERAL BRACING. PERMANENT
SYMBOL AND TEXT INDICATES 4 x 5 4 x 5 LATERAL BRACING IS THE INDICATES LOCATION WHERE
REQUIRED SIZE AND LOACTION OF RESPONSIBILITY OF THE BUILDING BEARINGS(SUPPORTS)OCCUR.
TRUSS PLATE. PLATE TEETH MUSTDESIGNER. ALL BEARINGS ARE CONSIDERED
BE FULLY EMBEDDED INTO -` TO BE NO 2 SYP(UNO).
LUMBER AND PLATES MAY NOT BE
CUT OR ALTERED. - "
3 x 8
/ 2 x4 4 x 5 li%1411 GENERAL NOTES AND DETAILS
8-11-15
\A no
DIMINSIONS ARE SHOWN IN FEET-INCHES-SIXTEENTHS. 61)
APEX TECHNOLOGY ISA FICTITIOUS NAME OWNED BY JAX APEX TECHNOLOGY INC.,A FLORIDA CORPORATION FBPE CA NO.7547-4745 SUTTON PARK COURT,STE.402 T�rueHouse
JACKSONVILLE,FL 32224-904.821.5200 11-%I' GX
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF APEX TECHNOLOGY AND IS TO BE USED ONLY IN CONJUNCTION WITH TRUSSES DESIGNED BY APEX
TECHNOLOGY.
GABLE TRUSS WEB
GABLE TRUSS WEB 2x6 NO 2 SYP "L" BRACE 2x6 NO 2 SYP "T" BRACE
FASTENED TO GABLE WEB EN FASTENED TO GABLE WEB
_1i W/.131" x 22" AT 6" O.C. Y W/.131" x 22" AT 6" O.C.
1,
SECTION A-A SECTION A-A
OPTION 1 OPTION 1
(9' 8" - 12' 0") (9' 8" - 12' 0")
2x4 NO 2 SYP "L" BRACE GABLE TRUSS WEB 2x4 NO 2 SYP "T" BRACE
GABLE TRUSS WEB FASTENED TO GABLE WEB FASTENED TO GABLE WEB
W/.131" x 22" AT 6" O.C. Raj W/.131" x 22" AT 6" O.C.
M_1A �1
SECTION B-B SECTION B-B
OPTION 2 OPTION 2
a_ (3' 8" - 9' 7") (3' 8" - 9' 7")
1-
Zr,
Ii
1 * VERTICAL WEBS 3' 8" OR
� LESS DO NOT REQUIRE CONNECTION BETWEEN BOTTOM CHORD OF
GABLE BRACES GABLE END TRUSS AND WALL, AS WELL AS THE
DESIGN AND SPECIFICATION OF PERMANENT
1
A A BRACING OF THE ROOF SYSTEM IS THE
- 1 B 1 : .. RESPONSIBILITY OF THE BUILDING DESIGNER.
1 1
1 1
1 t Ill
GABLE END BRACING DETAIL
bk (.0
114
ilf*/\no
CONTINUOUS BEARING UNLESS NOTED OTHERWISE
APEX TECHNOLOGY IS A FICTITIOUS NAME OWNED BY JAX APEX TECHNOLOGY INC.,A FLORIDA CORPORATION FBPE CA NO.7547-4745 SUTTON PARK COURT,STE.402 T�ueHouse
JACKSONVILLE,FL 32224-904 821 5200
I-11- GX
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF APEX TECHNOLOGY AND IS TO BE USED ONLY IN CONJUNCTION WITH TRUSSES DESIGNED BY APEX
TECHNOLOGY.
(3).131" x 3" TOE-NAILS @ TOP & BOTTOM
CHORD CONNECTION. (NAILS THROUGH
t BACK SIDE OF GIRDER INTO END GRAIN OF
JACK TRUSS ARE NOT ALLOWED)
JACK
JACK (3).131" x 3" TOE-NAILS @ TOP & BOTTOM
CHORD CONNECTION FOR CORNER JACK.
SOME CORNER JACKS MAY REQUIRE
z SIMPSON LS30 IN LIEU OF TOE-NAILS.
a JACK REFER TO SHOP DRAWINGS.
I-
z
w
2 r\
U w_ JACK
Q J
d d
O p - (2).131" x 3" TOE-NAILS @ TOP & BOTTOM
a w \`� JACK CHORD CONNECTION.
_ CC O_ Y Y
U 0
Q Q
5 g
"HJ" GIRDER
VARIES/ /
TYPICAL HIP SET NAILING DETAIL
r
TH
APEX TECHNOLOGY IS A FICTITIOUS NAME OWNED BY JAX APEX TECHNOLOGY INC.,A FLORIDA CORPORATION FBPE CA NO.7547-4745 SUTTON PARK COURT,STE.402 Tr.ueHo use
JACKSONVILLE,FL 32224-904.821.5200 am‘r- X
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF APEX TECHNOLOGY AND IS TO BE USED ONLY IN CONJUNCTION WITH TRUSSES DESIGNED BY APEX
TECHNOLOGY.
24" TYP 1 iii Hi IN
Y
t9 X N N X X COMMON TRUSSES
- @ 24" O.C.
A
0
z
W J MAX 12"OVERHANG UNLESS
< DESIGNED BY OTHERS _
CO
< p VALLEY SET e0 0 l� '� 24" O.C.
O U \ 1
:'. (:N)) / -LL \
N m \ I 1
I , ` 1 I
CC
• COMMON TRUSSES
44-101=
@ 24" O.C.
_________)/---6
COMMON I KUSSES (a 2' 0.u. PARTIAL TRUSS LAYOUT
4.
2x4 NO 2 SYP NAILER ROOF SHEATHING OR PURLINS.
FASTEN VALLEY ASTENED TO EACH COMMON IF DECKING IS NOT INSTALLED BELOW
TRUSS TO NAILER TRUSS W/(2).131"x 2 ' VALLEY TRUSSES, PULINS MUST BE
W/.131"x 2z" INSTALLED FOR TOP CHORD BRACING.
@ 6" O.C. SEE INDIVIDUAL TRUSS PROFILE FOR
PURLIN AND SPACING.
1,1-IAFIELD BEVEL VALLEY
Apr-
OQ�'NRpO TRUSS BOTTOM CHORD
•N Ss1 FASTEN VALLEY TRUSS PI CH TCH COMMON TRUSS
• f TO EACH COMMON TRUSS
W/(2).131"x 21'
VALLEY TRUSS FRAMING DETAIL
ROOF SHEATHING 1' p
, OQ GNO
• S(2) T
..,,,
H if*/\A no
........
APEX TECHNOLOGY ISA FICTITIOUS NAME OWNED BY JAX APEX TECHNOLOGY INC.,A FLORIDA CORPORATION FBPE CA NO.7547-4745 SUTTON PARK COURT,STE.402 1'�ueHouse
JACKSONVILLE,FL 32224-904.821.5200
1-%1' X
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF APEX TECHNOLOGY AND IS TO BE USED ONLY IN CONJUNCTION WITH TRUSSES DESIGNED BY APEX
TECHNOLOGY.
Ni
'IGGYBACK TRUSS
6"x 8"x z"PLYWOOD(oris'OSB)GUSSET
APPLIED TO EACH FACE SPACED 48"O.C.
i FASTEN WITH(4)8d COMMON INTO EACH
CHORD FROM EACH SIDE(TOTAL 16 NAILS).
MAXIMUM PURLIN SPACING 36"O.C.
REFER TO INDIVIDUAL BASE TRUSS DESIGN
FOR ACTUAL TOP CHORD PURLIN SPACING.
fl 1 94
m kin
T i iii 'P1' �% 44 ••
PIGGYBACK TRUSS 0 Q
'L-4
i
ATTACH PURLIN TO TOP CHORD OF BASE TRUSS
EACH BASE TRUSS WITH(2).131"x 2z"
R
(o
OPTION 1
MAXIMUM PURLIN SPACING 24"O.C. TO 'v�'2p4
REFER TO INDIVIDUAL BASE TRUSS DESIGN (/�Fq NO
FOR ACTUAL TOP CHORD PURLIN SPACING. , CFwj 0 F 1 0
1:3S1-PSC
� O
1.11\ 0
\_ '
WO
BASE TRUSS
ATTACH PIGGY BACK TO EACH PURLIN FOR PIGGY BACK TRUSSES WITH SPANS LESS THAN 12'SCAB
WITH(2).131"x 2i' MAY BE OMMITED PROVIDED THAT THE ROOF SHEATHING IS PIGGYBACK TRUSS CONNECTION DETAIL
ATTACH PURLIN TO TOP CHORD OF * CONTINUOUS OVER JOINT(SHEATHING TO OVERLAP A MINIMUM
EACH BASE TRUSS WITH(2).131"x 22" OF 12"OVER JOINT).
OPTION 2 (r0 if*I\A no
.......
APEX TECHNOLOGY ISA FICTITIOUS NAME OWNED BY JAX APEX TECHNOLOGY INC.,A FLORIDA CORPORATION FBPE CA NO.7547-4745 SUTTON PARK COURT,STE.402 T�rueHouse
JACKSONVILLE,FL 32224-904.821.5200 ImitIr GX
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF APEX TECHNOLOGY AND IS TO BE USED ONLY IN CONJUNCTION WITH TRUSSES DESIGNED BY APEX
TECHNOLOGY.
36" MAXIMUM FLAT
TOP CHORD SPAN
FASTEN SCABS TO CONTINUOUS 2x4 NO 2
SYP RIDGE BEAM W/(2).131"x 22"
OR 2�.4
2x4 NO 2 SYP BLOCKING BETWEEN CAPS q'/// JP�O2S
FASTENED W/(2).131"x 22"AT EACH END ';� N/M(4k pp,7scq
07
61,4
t4i�`�V,P . C�AON ?„ /FO
Kass
(1)PURLIN AT MIDSPAN OF
BASE TRUSS ACH TRUSS TOP CHORD
WITH (2).131"x 24"
/\ /\
CONVENTIONAL FRAMED PIGGYBACK DETAIL
r
TI..T
fit/\A no
APEX TECHNOLOGY ISA FICTITIOUS NAME OWNED BY JAX APEX TECHNOLOGY INC.,A FLORIDA CORPORATION FBPE CA NO.7547-4745 SUTTON PARK COURT,STE.402 1 .ueHouse
JACKSONVILLE,FL 32224-904.821.5200
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF APEX TECHNOLOGY AND IS TO BE USED ONLY IN CONJUNCTION WITH TRUSSES DESIGNED BY APEX
• TECHNOLOGY.
REQUIRED FASTENERS
ROOF TRUSS HANGER SUPPORTING GIRDER GIRDER BOTTOM CHORD REACTION UPLIFT
GIRDER TRUSS
ONE PLY TRUSSES
LUS26 1 PLY 2x6 746 v 746 (4) 0.148"x 1-1/2" (4)0.148" x 3"
HTU26 1 PLY 2x6 1823 691 v (20) 0.148" x 1-1/2" (14) 0.148"x 1-1/2"
HTU26 2 PLY 2x6 2604 987 (20) 0.148" x 3" (14)0.148" x 1-1/2"
HTU28 2 PLY 2x8 3167 945 (26)0.148"x 3" (14)0.148" x 1-1/2"
TWO PLY TRUSSES
HTU26-2 2 PLY 2x6 2940 1273 (20) 0.148" x 3" (14) 0.148" x 3"
HGUS26-2 2 PLY 2x6 4393 1810 (20) 0.148" x 3" (8)0.148" x 3"
HGUS28-2 2 PLY 2x8 6266 2717 (36) 0.148"x 3" (12)0.148"x 3"
THREE PLY TRUSSES
HGUS26-3 2 PLY 2x6 4393 1810 (20)0. ___L ./14;84/11/7"....7.x 3" (8)0.148" x 3"
HGUS28-3 2 PLY 2x6 6266 2717 (36)0.148" x 3" (12) 0.148"x 3"
em I�
1,11111111111111INN ���
!1.!- -
114
exai� r.%14
ff .''� � ' / $11104
%iii
fr
4f
Y V LUS 1-PLY CONNECTION
HTU 2-PLY CONNECTION 1/2" MAX GAP HTU 1-PLY CONNECTION 1/2" MAX GAP
ROOF TRUSS CONNECTOR SPECIFICATIONS
r
TI..I
) fro
APEX TECHNOLOGY IS A FICTITIOUS NAME OWNED BY JAX APEX TECHNOLOGY INC.,A FLORIDA CORPORATION FBPE CA NO.7547-4745 SUTTON PARK COURT.STE.402 T�ueHo use
JACKSONVILLE,FL 32224-904.821.5200 .1"" X
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF APEX TECHNOLOGY AND IS TO BE USED ONLY IN CONJUNCTION WITH TRUSSES DESIGNED BY APEX
TECHNOLOGY.
< < _
1
N- N ■I. N , -RI
1110TE 2 r
I r ii
OTE 2 OTE 2
OTE 1 , 111
NOTE 1
N ■En N MN
-I - ' -I 11-37
111 [ 1i" r L3--1
1-4 1742-PLY 3-1/2" WIDE BEAM 3-PLY 5-1/4" WIDE BEAM 4-PLY 7" WIDE BEAM 2-PLY 7" WIDE BEAM
ASSEMBLY ASSEMBLY ASSEMBLY ASSEMBLY
FASTENER TYPE 0.131"x 3"NAIL FASTENER TYPE 0.131"x 3"NAIL FASTENER TYPE 0.25"x 6"SDS FASTENER TYPE 0.25"x 6"SDS
SCREW SCREW
NUMBER OF ROWS 3 ROWS NUMBER OF ROWS 2 ROWS NUMBER OF ROWS 2 ROWS NUMBER OF ROWS 2 ROWS
REQUIRED FASTENER SIDES ONE SIDE REQUIRED FASTENER SIDES TWO SIDES REQUIRED FASTENER SIDES TWO SIDES REQUIRED FASTENER SIDES TWO SIDES
FASTENER ON CENTER FASTENER ON CENTER FASTENER ON CENTER FASTENER ON CENTER
SPACING PER SIDE 6"O.C. SPACING PER SIDE 6"O.C. SPACING PER SIDE 12"O.C. SPACING PER SIDE 12"O.C.
MINIMUM BEAM DEPTH 11-7/8" MINIMUM BEAM DEPTH 11-7/8" MINIMUM BEAM DEPTH 11-7/8" MINIMUM BEAM DEPTH 11-7/8"
BEAM NOTES
1. IF 3 ROWS OF FASTENERS ARE REQUIRED,PLACE MIDDLE ROW
SPACING OF FASTENERS AT THE CENTER OF THE BEAM DEPTH.
2. IF FASTENERS ARE REQUIRED ON BOTH SIDES,STAGGER ROWS
SUCH THAT FASTENERS FALL HALF WAY BETWEEN FASTENER
I I
I I
I I
SPACING ON THE FIRST SIDE.REFER TO FIGURE 1.
3. STRUCTURAL ENGINEERING BEAM PLY FASTENER SCHEDULE
TAKES PRECEDENCE OVER THIS SPECIFICATION.
4. BEAMS WITH LARGE POINT LOADS REQUIRE ADDITIONAL
FASTENERS.SEE STRUCTURAL ENGINEERING FOR MORE
INFORMATION.
z OF SPACING
FIGURE 1
TOP VIEW OF BEAM
REQUIRED SPACING IF FASTENERS ARE REQUIRED ON EACH FACE OF BEAM BEAM PLY TO PLY FASTENER SPECIFICATIONS
(11r0
APEX TECHNOLOGY ISA FICTITIOUS NAME OWNED BY JAX APEX TECHNOLOGY INC.,A FLORIDA CORPORATION FBPE CA NO.7547-4745 SUTTON PARK COURT,STE.402 T�rueHo use
JACKSONVILLE,FL 32224-904.821.5200
Pg\r" X
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF APEX TECHNOLOGY AND IS TO BE USED ONLY IN CONJUNCTION WITH TRUSSES DESIGNED BY APEX
• TECHNOLOGY.
(2)10d TOP NAILS
// PER STRAP --riz-- (2)10TOP NAILS
"ER S STRAP
1 I \ \ \ \
1 / (1)10d FACE NAIL (1)10d FACE NAIL
/-PER STRAP -ER STRAP
V N \ NN \
A
(3)10d STRAIGHT \ (3)10d STRAIGHT \
AILS PER SIDE AILS PER SIDE
I \
, I
/ lir 4
/ 1 f THA422 / 7.11THA422 \
--- -DEPTH AND PLIES VARY
FLOOR TRUSS TO BEAM FLOOR TRUSS TO ROOF GIRDER
'%/
(2)10d TOP NAILS /
lir
PER STRA'
L (1)10d FACE NAIL
ER STRAP \
(3)10d STRAIGHT
41 i AILS PER SIDE
THA422 Al
. THA422 CONNECTOR DETAIL
r
FLOOR TRUSS TO FLOOR TRUSS TH AW\A no,
APEX TECHNOLOGY IS A FICTITIOUS NAME OWNED BY JAX APEX TECHNOLOGY INC.,A FLORIDA CORPORATION FBPE CA NO.7547-4745 SUTTON PARK COURT,STE.402 T�.ueHouse
JACKSONVILLE,FL 32224-904.821.5200
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF APEX TECHNOLOGY AND IS TO BE USED ONLY IN CONJUNCTION WITH TRUSSES DESIGNED BY APEX
TECHNOLOGY.
TO MINIMIZE VIBRATION COMMON TO ALL SHALLOW FRAMING
SYSTEMS, 2x6 "STRONGBACKS" SHOULD BE LOCATED EVERY 8 TO
10 FEET ALONG A FLOOR TRUSS.
STRONGBACK MAY BE POSITIONED DIRECTLY UNDER THE TOP CHORD OR DIRECTLY ABOVE THE BOTTOM
CHORD. SECURELY FASTEN TO THE TRUSS USING ANY OF THE METHODS ILLUSTRATED BELOW.
i
=_Nts\ V \ / / N
X -/. \ ,/— —
If
ATTACH TO VERTICAL ATTACH TO VERTICAL ATTACH 2x4 VERTICAL TO FACE
WEB WITH (3)12. WEB WITH (3)12. •F TRUSS. FASTEN TO TOP
COMMON WIRE NAILS. COMMON WIRE NAILS. AND BOTTOM CHORD WITH (2)12d
COMMON IN EACH CHORD.
;\ X / \ / v \ / 44\ _
f M.
R R \\\\\ \\\\\ \\ \ LOCKING
s s s .ss s .s
\ TRUSSES TYPICAL SPLICE 48" 2x6 AS REQUIRED
`-BEARING WALL
THE STRONGBACKS SHOULD EITHER BE SECURED TO ADJACENT PARTITION WALLS OR ALTERNATE"X"
BRIDGING SHOULD BE USED TO TERMINATE THE BRACING MEMBERS. IF SPLICING IS NECESSARY, USE FLOOR TRUSS STRONG BACKS
A 4'-0"LONG SCAB CENTERED OVER THE SPLICE AND JOIN WITH (12)12d NAILS EQUALLY SPACED.
ALTERNATE METHOD OF SPLICING:
OVERLAP STRONGBACK MEMBERS A MINIMUM OF 4'-0"AND FASTEN WITH (12)12d COMMON WIRE NAILS
(4)STAGGERED AND EQUALLY SPACED. (TO BE USED ONLY WHEN STRONGBACK IS NOT ALIGNED WITH Aif*/\A no,
VERTICAL)
APEX TECHNOLOGY ISA FICTITIOUS NAME OWNED BY JAX APEX TECHNOLOGY INC.,A FLORIDA CORPORATION FBPE CA NO.7547-4745 SUTTON PARK COURT,STE.402
JACKSONVILLE,FL 32224-904.821.5200
I"\l— G X
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF APEX TECHNOLOGY AND IS TO BE USED ONLY IN CONJUNCTION WITH TRUSSES DESIGNED BY APEX ueHo use
• TECHNOLOGY.
72128 Ply:2 SEQN:32216/T23/FLOO
Cellar Residence Qty: 1 FROM: DRW:
B01 Wgt:0.0 lbs ... / ... 02/16/2018
T
10,1"2
A LI V777B
j 2411" j
Loading Criteria(psr) Wind Criteria Snow Criteria(Pg,Pf in PSF) Def/CSI Criteria A Maximum Reactions(lbs),or'=PLF
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 15.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.356 10.19 746 36a 5572 /- I- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.577 10.19 618 26(1. 3667 /- /- /- /- /33.5
BCDL: 0.00 Category:NA Snow Duration:NA HORZ(LL): 0.000 - - B /8589
Des Ld: 55.00 EXP:NA HORZ(TL):0.000 - - A Min Brg Width Req= 2.9
NCBCLL:0.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:1.5 B Min Brg Width Req= -
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.000 Bearings A&B Fcperp=565psi.
Load Duration:1.00 BCDL:NA psf Max BC CSI: 0.000
Spacing:24.0" MWFRS Parallel Dist:NA Max Web CSI:0.000 Maximum Axial Forces Per Ply(lbs)
C&C Dist a:NA ft Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
I:NA GCpi:NA A-B 0 0 A-B 0 0
Wind Duration:NA VIEW Ver:17.02.02.1208.20
Lumber
Floor Joist Header:1.750"x20.0"2.0E Microllam LVL
2.0E Microllam LVL design properties based on ICC
ES ESR-1387.
Nailnote
Nail Schedule:0.131"x3",min.nails
Member : Rows @_. "o.c.(Each Row)
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
"""Warning:Fastening of plies required***
Special Loads
-----(Lumber Dur.Fac.=1.00/Plate Dur.Fac=1.00)
PLT:From 26 plf at 0.00 to 26 pif at 13.46
PLT:From 8 plf at 13.46 to 8 ph at 24.92
PLB: 869 lb Conc.Load at 1.48,2.81,4.15,5.48
6.81,8.15,9.48,10.81,12.15,13.48,14.81,16.15
21.48
PLB: 836 lb Conc.Load at 17.48,18.81,20.15
PLB:1132 lb Conc.Load at 22.48
PLB: 446 lb Conc.Load at 23.81
Additional Notes
Deflection meets U360 live and L/265 total load.
Creep increase factor for dead load is 1.50.
The overall height of this truss excluding overhang is
1-8-0.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(111'11) /�
2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use PE Michael
G83g Kozlowski Jeffrey
E No.58544on De
No. 71 57 PE No.Ii80e49Rowland
• 72128 Ply:1 SEQN:32213/T57/SY42
Cellar Residence Qty: 13 FROM: DRW:
F01 Wgt:110.6 lbs ... / ... 02/16/2018
I 10'6" I 12'11"8 I 20'10"
I
10'6" 75"8 7'10"8
I--2'6"-"I
g (TYP)
1 1 E-2'6"12--I-2'6"12-I-.-2'6"12-I I-2'6"12-I-2'6'12--I
W=3X4
1111.5X3 =4X5 1111.5X3 3X3 1111.5X3 m3X3[11) 1111.5X3 =3X8 1111.5X3
A B C D E F G H 1 J
T e R.' _ T2
io
1I-tr 010'1.2
1% P 0 N M L K
=3X8 =3X8 W=H0310 =3X3 1111.5X3 =3X8 =4X4
A 20'10" j
Loading Criteria(est) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in Ioc Udefl L!# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.303 E 814 360 Q 862 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.753 E 484 247 K 869 /- /- /- /- /-
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.044 B - - 0 Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.077 B - - K Min Brg Width Req= -
NCBCLL:10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor.2.0 Bearing Q Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.667
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.675 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:No Max Web CSI:0.502 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 1 0 F-G 0 -2149
I:NA GCpi:NA Plate Type(s): B-C 0-2139 G-H 0 -2149
Wind Duration:NA WAVE,HS VIEW Ver.17.02.02.1208.20 C-D 0-2139 H-I 0 -2149
Lumber End Vertical Attachment D-E 0-2777 I-J 0 0
Top chord 4x2 SP SS:T2 4x2 SP#2: Attach notched end vertical(s)to next end vertical E-F 0-2781
Bot chord 4x2 SP SS using(3)qty.10d box or(0.128"x3"min)gun nails,or
Webs 4x2 SP#3 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire Maximum Bot Chord Forces Per Ply(lbs)
staples,through wide face;or(3)qty.16-Gauge,1" Chords Tens.Comp. Chords Tens. Comp.
Special Loads Crown(minimum),1-1/2"length wire staples on each
-(Lumber Dur.Fac.=1.00 narrow face. Q-P 1236 0 N-M 2781 01.00/Plate Dur.Fac.=1.00) P-O 2662 0 M-L 2778 0
TC:From 76 plf at 0.12 to 76 plf at 20.83 Additional From 7 plf at 0.00 to 7 pH at 20.83 Notes O-N 2662 0 L-K 1284 0
TC: 18 lb Conc.Load at 20.83 +2x6 continuous strongback.See detail
STRBRIBR1014 for bracing and bridging Maximum Web Forces Per Ply(lbs)
Plate Shift Table recommendations. Webs Tens.Comp. Webs Tens. Comp.
JT Plate Chord JT Plate Chord Truss must be installed as shown with top chord up. R-Q 0 -8 N-E 0 -161
No Size Shift Bite No Size Shift Bite The overall height of this truss excluding overhang is A-Q 0 -79 M-F 146 -22
[11] 3X3 1.25 L 1.25 1-8-0. Q-B 0-1453 F-L 0 -859
Purlins B-P 1053 0 H-L 34 -198
In lieu of structural panels or rigid ceiling use purlins C-P 0 -175 L-I 1010 0
to laterally brace chords as follows: P-D 0 -610 I-K 0 -1489
Chord Spacing(in oc) Start(ft) End(ft) D-N 402 -95 J-K 0 -99
TC 24 0.25 20.83
BC 120 0.25 20.83
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Hangers/Ties
(J)Hanger Support Required,by others
Deflection
Max JT VERT DEFL:LL:0.30"DL:0.49".See detail
DEFLCAMB1014 for camber recommendations.
NOTES:
Nr- 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(11.-14) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer %f*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo u se Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:32192/T53/SY42
Cellar Residence Qty: 3 FROM: DRW:
F01A Wgt:121.8 lbs ... / ... 02/16/2018
12'0"814'5"8 22'4"
f' 12,0"8 I 2'5" I T10"8
H 1'5"--II--2'6"--I 2'6"12--{--2'6"12----I 2'6"12--{ I--2'6"12-I-2'6"12--I
(TYP)
=3X3 =3X8 =3X3 =3X3[13]W=3X4 =3X8
A B C D E F G H I J K
T T s T2 -
9.4 }�
1 T_
1 / \.. f19 t10'12
S 'R Q P 0 N M L T
=3X4 --3X4[4] =3X8 W=H0310 =3X3 =3X8 =4X4
F-1'6" * 20'10" -i
F' 22'4" H
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.267 F 923 360 R 1139 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.737 F 512 246 L 836 /- /- /- /- /-
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.038 A - - R Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL): 0.071 A - - L Min Brg Width Req= -
NCBCLL: 10.00 Mean Height:NA ft Code I Misc Criteria Creep Factor:2.0 Bearing R Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.571
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.770 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:No Max Web CSI: 0.515 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 0 -14 F-G 0 -2694
I:NA GCpi:NA Plate Type(s): B-C 196 0 G-H 0 -2102
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.20 C-D 0 -2000 H-I 0 -2102
Lumber End Vertical Attachment D-E 0 -2000 I-J 0 -2102
Top chord 4x2 SP SS:T2 4x2 SP#2: Attach notched end vertical(s)to next end vertical E-F 0-2689 J-K 0 0
Bot chord 4x2 SP#1 :B2 4x2 SP SS: using(3)qty.10d box or(0.128"x3"min)gun nails,or
Webs 4x2 SP#3 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire Maximum Bot Chord Forces Per Ply(lbs)
staples,through wide face;or(3)qty.16-Gauge,1" Chords Tens.Comp. Chords Tens. Comp.
Special Loads Crown(minimum),1-1/2"length wire staples on each
narrow face. S-R 0 -173 O-N 2694 0
(Lumber Dur.Fac.=1.00/Plate Dur.Fac.=1.00) R-Q 1080 0 N-M 2691 0
TC:From 76 plf at 0.12 to 76 plf at 22.33 Additional Notes Q-P 2543 0 M-L 1259 0
BC:From 7 plf at 0.00 to 7 plf at 22.33 P-O 2543 0
TC: 135 lb Conc.Load at 0.12 +2x6 continuous strongback.See detail
STRBRIBR1014 for bracing and bridging
Plating Notes recommendations. Maximum Web Forces Per Ply(lbs)
All plates are 1.5X3 except as noted. Truss must be installed as shown with top chord up. Webs Tens.Comp. Webs Tens. Comp.
Plate Shift Table The overall height of this truss excluding overhang is S-A 0 -122 E-0 447 -58
1-8-0. S-B 256 0 O-F 0 -173
JT Plate Chord JT Plate Chord T-S 0 -55 N-G 134 34
No Size Shift Bite No Size Shift Bite
[4] 3X4 1.25 L 1.25 [13] 3X3 1.25 L 1.25 B-R 0 -356 G-M 0 811
R-C 0 -1433 I-M 27 -204
Purlins C-Q 1082 0 M-J 984 0
In lieu of structural panels or rigid ceiling use purlins D-Q 0 -183 J-L 0 -1460
to laterally brace chords as follows: Q E 0 -641 K-L 0 81
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.12 22.33
BC 120 0.00 22.33
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Hangers I Ties
(J)Hanger Support Required,by others
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(IT'FI) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer 1q*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use Michael B Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
•
72128 Ply:1 SEQN:32207/T60/SY42
Cellar Residence Qty: 1 FROM: DRW:
FO1G Wgt:147.0 lbs ... / ... 02/16/2018
10'4"8 F111'10" I 20'10"
10'4"8 1'5 8 9'
2'6"--II 1 3„1I
(TYP)
III5X7(R) 1113X4(R) =5X5 1113X4[23]
III3X4[1] =5X5 1114X5(R) W=3X4 1114X5 1114X5(R) W=3X4 1115X7(R)
A B C D E F G H I J K L M
T she y 11 T1
io • -Ft P- ../-\
/ \.../\ .
\ /-\ / \ AN\E-t
,_
I = 1,10'1"2
-'X W V U T S R Q P O N
=4X5w4X5[4] w4X4[6] 1113X4[8][8] =3X3 1111.5X3=3X4[16] =4X5[21)
W=H0310(I)
r 20'10" 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.309 G 799 360 X 1181 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.649 G 515 247 N 1132 /- /- /- /- /-
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.052 N - - X Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.080 N - - N Min Brg Width Req= -
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearing X Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.913
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.903 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.609 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 0 -11 G-H 0 -4783
I:NA GCpi:NA Plate Type(s): B-C 0 -1782 H-I 0 -4216
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.20 C-D 0 -3227 I-J 0 -3161
Lumber Hangers/Ties D-E 0 -4359 J-K 0 -3161
E-F 0 -4359 K-L 0 -1797
Top chord 4x2 SP#1 :T1 4x2 SP SS: (J)Hanger Support Required,by others F-G 0 -4777 L-M 0 0
:T2 4x2 SP#2:
Bot chord 4x2 SP SS Deflection
Webs 4x2 SP#3Max JT VERT DEFL:LL:0.31"DL:0.34".See detail Maximum Bot Chord Forces Per Ply(lbs)
DEFLCAMB1014 for camber recommendations. Chords Tens.Comp. Chords Tens. Comp.
Special Loads
(Lumber Dur.Fac.=1.00/Plate Dur.Fac.=1.00) End Vertical Attachment X-W 956 0 S-R 4783 0
TC:From 76 plf at 0.12 to 76 plf at 20.83 W-V 2591 0 R-0 4774 0
BC: 7 plf at 0.00 to 7 plf at 20.83 Attach notched end vertical(s)to next end vertical V-U 3861 0 Q-P 3729 0
BC:From60lb Conc.Loadtat 9.90to using(3)qty.10d box or(0.128"x3"min)gun nails,or U-T 4796 0 P-O 2571 0
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire T-S 4796 0 O-N 1010 0
Plating Notes staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each
All plates are 4X4 except as noted. narrow face. Maximum Web Forces Per Ply(lbs)
(I)-plates so marked were sized using 0% Webs Tens.Comp. Webs Tens. Comp.
Fabrication Tolerance, 0 degrees Rotational Additional Notes
Tolerance,and/or zero Positioning Tolerance. +2x6 continuous strongback.See detail Y-X 55 0 S-G 4 131
STRBRIBR1014 for bracing and bridging A-X 0 -106 R-H 218 0
Plate Shift Table recommendations. X-B 0 -1465 H-Q 0 -863
JT Plate Chord JT Plate Chord Truss must be installed as shown with top chord up. 8-W 1280 0 Q-I 755 0
No Size Shift Bite No Size Shift Bite W-C 0-1252 I-P 0 -881
[1] 3X4 0 2.50 [4] 4X5 2.75 L 1.25 The overall height of this truss excluding overhang is C-V 986 0 P-K 914 0
[6] 4X4 2.25 L 1.25 [8] 3X4 1.75 L 1.25 180. V-D 0 -982 K-O 0 -1198
[16] 3X4 2.75 R 1.25 [21] 4X5 2.75 R 1.25 D-U 772 0 O-L 1219 0
[23] 3X4 0 2.50 U-F 0 -676 L-N 0 -1484
F-S 39 -29 M-N 0 -36
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.25 20.83
BC 120 0.25 20.83
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(1111'.14) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer Jg*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
TrueHouse Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:32260/T3/SY42
Cellar Residence Qty: 3 FROM: DRW:
F02 Wgt:140.0 lbs ... / ... 02/16/2018
11'7"8I 13'3"8 I 24'11"
IH
11'7"8 1'8" 1178
P 2,6„---i PI
(TYP)
1111.5X3
1111.5X3=4X4[3] =4X4 W=3X4 =4X4 E4X4[24]
A B C D E F G H I J K L M
co
T sus AB •/•` / \ /�`/�`/�. `/`/n`-/ \ / `LN 10'1"2
1 -AA Z Y X W V U T S R Q P 0-
-=-4X5 E4X4[4] 1113X4[6][6] W=H0310 1111.5X3 1113X4[21][21] E4X4[23] =4X5
111 1.5X3
j 24'11" A
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl!CSI Criteria A Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.331 U 885 360 AA 1055 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.714 U 560 293 0 1022 /- /- /- /- /3.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.053 0 - - AA Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.084 0 - - 0 Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings AA&0 Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.391
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.645 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.500 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 1 0 G-H 0 -3850
I:NA GCpi:NA Plate Type(s): B-C 0-1469 H-I 0 -3850
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.15 C-D 0-2601 I-J 0 -3388
Lumber End Vertical Attachment D-E 0-3396 J-K 0 -2589
E-F 0-3853 K-L 0 -1453
Top chord 4x2 SP SS Attach notched end vertical(s)to next end vertical F-G 0-3991 L-M 1 0
Bot chord 4x2 SP SS using(3)qty.10d box or(0.128"x3"min)gun nails,or
Webs 4x2 SP#3 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1" Maximum Bot Chord Forces Per Ply(lbs)
Special Loads Crown(minimum),1-1/2"length wire staples on each Chords Tens.Comp. Chords Tens. Comp.
-----(Lumber Dur.Fac.=1.00/Plate Dur.Fac.=1.00) narrow face.
TC:From 94 plf at 0.13 to 94 plf at 2.13 AA Z 809 0 U-T 3991 0
TC:From 76 plf at 2.13 to 76 plf at 24.79 Additional Notes Z-Y 2114 0 T-S 3990 0
BC:From 7 plf at 0.00 to 7 plf at 24.92 +2x6 continuous strongback.See detail Y-X 3074 0 S-R 3698 0
STRBRIBR1014 for bracing and bridging X-W 3704 0 R-Q 3064 0
Plating Notes recommendations. W-V 3990 0 Q-P 2100 0
All plates are 3X3 except as noted. Truss must be installed as shown with top chord up. V-U 3990 0 P-0 791 0
Plate Shift Table The overall height of this truss excluding overhang is
1-8-0. Maximum Web Forces Per Ply(lbs)
JT Plate Chord JT Plate Chord Webs Tens.Comp. Webs Tens. Comp.
No Size Shift Bite No Size Shift Bite
[3] 4X4 1.75 L 1.25 [4] 4X4 2.25 L 1.25 AB-AA 0 6 T-G 173 153
[6] 3X4 1.75 L 1.25 [21] 3X4 1.75 R 1.25 A-AA 0 -42 G-S 83 -445
[23] 4X4 2.25 R 1.25 [24] 4X4 1.75 R 1.25 AA-B 0-1285 S-I 364 0
B-Z 1048 0 I-R 0 -493
Purlins Z-C 0 -1025 R-J 514 0
In lieu of structural panels or rigid ceiling use purlins C-Y 772 0 J-Q 0 -755
to laterally brace chords as follows: Y-D 0 -751 Q-K 775 0
Chord Spacing(in oc) Start(ft) End(ft) D-X 511 0 K-P 0 -1028
TC 24 0.25 24.67 X-E 0 -490 P-L 1051 0
BC 120 0.25 24.67 E-W 360 0 L-O 0 -1257
Apply purlins to any chords above or below fillers W-F 89 -440 M-O 0 -32
at 24"OC unless shown otherwise above. F-U 170 -156 O-N 0 -5
Deflection
Max JT VERT DEFL:LL:0.33"DL:0.45".See detail
DEFLCAMB1014 for camber recommendations.
NOTES:
H.
1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(111'
H 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
■ LTO ■�e Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
�,(�,j-j �,( PE No.60839 PE No.58544 PE No.71457 PE No.77693
•
72128 Ply.1 SEAN:32263/T12/SY42
Cellar Residence Qty: 3 FROM: DRW:
FO2A Wgt:135.8 lbs ... / ... 02/16/2018
10'6"I112'0"8 1 24'11"
I
10'6" 1'6"8 12'10"8
I^2.6"
3 (TYP)
I I I-2'6"12-I-2.6"12-4--2'6"12,{ I---2'6"12-i-I---76"12-}--76"12-}--76"12-I 2'3"12-I
=3X4
3X8 .3X4 W=3X4 ===3X8 m 3X3
A B C D E F G H I J K L
Oa
TI 3 V- / ` - / -:if" 1+ . ` •
/ M
1 � - 010'1"2
=3X8 a 3X8151 =3X3[7] =3X3[10] m3X8[15] 3X8 1113X3
W=H0310
1 277" 1 74"-I
I 24'11" 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DeflICSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.312 E 849 360 U 957 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.692 F 534 265 0 1129 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.047 B - - U Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.075 0 - - 0 Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor.2.0 Bearings U&0 Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.888
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.969 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MW FRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI:0.568 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 1 0 G-H 0 -3246
I:NA GCpi:NA Plate Type(s): B-C 0 -2344 H-I 0 -2319
Wind Duration:NA WAVE,HS VIEW Ver.17.02.02.1208.15 C-D 0 -2344 I-J 0 -2319
Lumber End Vertical Attachment D-E 0 -3246 J-K 124 0
Top chord 4x2 SP#2 Attach notched end vertical(s)to next end vertical F- 0 -3253 K-L 124 0
G
Bot chord 4x2 SP#1:B2 4x2 SP#2: using(3)qty.10d box or(0.128"x3"min)gun nails,or F-G 0 -3246
Webs 4x2 SP#3 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1" Maximum Bot Chord Forces Per Ply(lbs)
Special Loads Crown(minimum),1-1/2"length wire staples on each Chords Tens.Comp. Chords Tens. Comp.
-(Lumber Dur.Fac.=1.00/Plate Dur.Fac.=1.00) narrow face.
TC:From 94 plf at 0.13 to 94 plf at 2.25 U-T 1352 0 Q-P 2956 0
TC:From 76 Oat 2.25 to 76 pff at 24.79 Additional Notes T-S 2971 0 P-O 1312 0
BC:From 7 plf at 0.00 to 7 plf at 24.92 +2x6 continuous strongback.See detail S-R 3253 0 O-N 0 -1
STRBRIBR1014 for bracing and bridging R-Q 2956 0
Plating Notes recommendations.
All plates are 1.5X3 except as noted. Truss must be installed as shown with top chord up. Maximum Web Forces Per Ply(lbs)
The overall height of this truss excluding overhang is Webs Tens.Comp. Webs Tens. Comp.
Plate Shift Table 1-8-0.
JT Plate Chord JT Plate Chord V-U 0 -9 R-H 567 0
No Size Shift Bite No Size Shift Bite A-U 0 99 H-P 0 755
[5] 3X8 3.50 L 1.25 [7] 3X3 1.25 R 1.25 U-B 0-1589 I-P 0 194
[10] 3X3 1.25 L 1.25 [15] 3X8 3.50 R 1.25 B-T 1157 0 P-J 1193 0
C-T 0 -181 J-O 0 -1553
Purlins T-D 0 -732 K-O 0 -227
In lieu of structural panels or rigid ceiling use purlins D-S 528 25 O-L 0 147
to laterally brace chords as follows: S-E 0 -197 L-N 9 0
Chord Spacing(in oc) Start(ft) End(ft) F-R 0 -208 M-N 2 0
TC 24 0.25 24.79
BC 120 0.25 24.92
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(11'1-1) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:32266/T48/SY42 •
Cellar Residence Qty: 2 FROM: DRW:
FO2AT Wgt:155.4 lbs ... / ... 02/16/2018
10'4"8 122" 24'11"
II
10'4"8 I 1'9"8 I 12'9"
P
)-2'3"12-{
126" �3H -H 1-I
(TYP)
W=3X4
5X5[3] =4X5 w3X3[7] =3X3 =4X4 =4X4 =4X4 =4X5[24] =3X3
ie ADA B C D E F G H I J K T2 L M NO
T _ A
(1)10'1"2
w4X5C =X5[4] =4X4[6] 24X4[9] 1113X4[11][11] 1114 5W()V 1114X5(R) =3X4 =X4 .4 5R[23] .4'Xa
4X6 1113X3
W=H0310
r 227" 1 2'4"--{
[- 2411" -{
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.417 F 635 360 AC 1427 /- /- /- /- /5.5
BOLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.751 F 456 265 0 1355 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.070 B - - AC Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL): 0.097 B - - 0 Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings AC&Q Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.668
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.923 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI:0.729 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 1 0 H-I 0 -4127
I:NA GCpi:NA Plate Type(s): B-C 0 -2071 I-J 0 -4127
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.15 C-D 0 -3747 J-K 0 -2987
Lumber End Vertical Attachment D-E 0 -4785 K-L 0 -1650
Top chord 4x2 SP SS:T2 4x2 SP#1: Attach notched end vertical(s)to next end vertical F-F 0 -5060 L-M 127 0
Bot chord 4x2 SP SS:B2 4x2 SP#1: using(3) 0.128"x3"min F-G 0-5060 M-N 127 0
qty.10d box or( )gun nails,or
G-H 0-5048
Webs 4x2 SP#3 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1"
Special Loads Crown(minimum),1-1/2"length wire staples on each Maximum Bot Chord Forces Per Ply(lbs)
narrow face. Chords Tens.Comp. Chords Tens. Comp.
Dur.Fac.=1.00/Plate Dur.Fac.=1.00)
TC:From 94 plf at 0.13 to 94 plf at 2.71 Additional Notes AC-AB 1107 0 V-U 4614 0
TC:From 76 plf at 2.71 to 76 plf at 4.75 AB-AA 3018 0 U-T 3629 0
TC:From 201 plf at 4.75 to 201 plf at 10.25 +2x6 continuous strongback.See detail
TC:From 76 plf at 10.25 to 76 plf at 24.79 STRBRIBR1014 for bracing and bridging AA-Y 4473 0 T-S 3629 0
BC:From 7 plf at 0.00 to 7 plf at 24.92 recommendations. Z-Y 0 0 S-R 2398 0
Truss must be installed as shown with top chord up. Y-X 5131 0 R-Q 887 0
Plating Notes X-W 5060 0 Q-P 0 -1
All plates are 1.5X3 except as noted. The overall height of this truss excluding overhang is W-V 4614 0
1-8-0.
Plate Shift Table Maximum Web Forces Per Ply(lbs)
JT Plate Chord JT Plate Chord Webs Tens.Comp. Webs Tens. Comp.
No Size Shift Bite No Size Shift Bite
[3] 5X5 2.25 L 1.25 [4] 5X5 2.75 L 1.25 AD-AC 0 -6 W-H 922 -84
[6] 4X4 2.50 L 1.25 [7] 3X3 1.75 L 1.25 A-AC 0 -46 H-U 0 -784
[9] 4X4 2.50 L 2.75 [11] 3X4 1.25 R 2.75 AC-B 0 -1759 U-J 778 0
[23] 4X5 2.75 R 1.25 [24] 4X5 2.25 R 1.25 B-AB 1530 0 J-S 0 -1024
AB-C 0 -1503 S-K 945 0
Purlins C-AA 1157 0 K-R 0 -1198
In lieu of structural panels or rigid ceiling use purlins AA-D 0 -1152 R-L 1222 0
to laterally brace chords as follows: D-Y 496 0 L-Q 0 -1415
Chord Spacing(in oc) Start(ft) End(ft) Y-E 0 -550 M-Q 0 -188
TC 24 0.25 24.79 E-X 459 -413 Q-N 0 -150
BC 120 0.25 24.92
Apply purlins to any chords above or below fillers X-F 146 -191 N-P 15 0
at 24"OC unless shown otherwise above. G-W 0 -382 O-P 4 0
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(911'11) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer 7q*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru House Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
• 72128 Ply:1 SEQN:32269/T26/SY42
Cellar Residence Qty: 1 FROM: DRW:
F02B Wgt:140.0 lbs ... / ... 02/16/2018
1178II 13'3"8 I 24'11"
117"8 1'8" 1178
�I I---(TYPE{ ISI
111.5X3
111.5X3m4X5[3] -4X4 W=3X4 m4X4 =4X4[24]
ABA B C D E F G H 1 J K L MI
10. - r. ., N
is zo.
-to ./ \ / \•/ \ / /+' i.
.4\ /\/\ 7 \.7 N
AA Z Y X W V U T S R Q P or
=4X5 =4X4[4] =4X4 W=H0310 81.5X3 -4X4 m4X4(23] =4X5
111.5X3
1 24'11" 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DefVCSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.348 F 842 360 AA 1196 /_ /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.858 F 485 293 0 1085 /- /- /- /- /3.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.055 B - - AA Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.096 B - - 0 Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings AA&0 Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.531
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.800 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI:0.579 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber. A-B 1 0 G-H 0 -4260
I:NA GCpi:NA Plate Type(s): B-C 0-1691 H-I 0 -4260
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.15 C-D 0-2996 I-J 0 -3693
Lumber End Vertical Attachment D-E 0-3893 J-K 0 -2793
Top chord 4x2 SP SS Attach notched end vertical(s)to next end vertical F-F 0-4480 K- -1555
M 1
Bot chord 4x2 SP SS using(3)qty.10d box or(0.128"x3"min)gun nails,or F-G 0-4480 L-M 1 0
Webs 4x2 SP#3 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1" Maximum Bot Chord Forces Per Ply(lbs)
Special Loads Crown(minimum),1-1/2"length wire staples on each Chords Tens.Comp. Chords Tens. Comp.
-(Lumber Dur.Fac.=1.00/Plate Dur.Fac.=1.00) narrow face.
TC:From 94 plf at 0.13 to 94 plf at 13.46 AA Z 0 U-T 4480 0
TC:From 76 plf at 13.46 to 76 plf at 24.79 Additional Notes Z-Y 2442 0 T-S 4478 0
BC:From 7 plf at 0.00 to 7 plf at 24.92 +2x6 continuous strongback.See detail Y-X 3537 0 S-R 4051 0
STRBRIBR1014 for bracing and bridging X-W 4237 0 R-Q 3320 0
Plating Notes recommendations. W-V 4482 0 Q-P 2253 0
All plates are 3X3 except as noted. Truss must be installed as shown with top chord up. V-U 4482 0 P-O 842 0
Plate Shift Table
The-overall height of this truss excluding overhang is Maximum Web Forces Per Ply(lbs)
JT Plate Chord JT Plate Chord Webs Tens.Comp. Webs Tens. Comp.
No Size Shift Bite No Size Shift Bite AB-AA 0 -6 T-G 225 -101
[3] 4X5 2.25 L 1.25 [4] 4X4 2.50 L 1.25
[23] 4X4 2.25 R 1.25 [24] 4X4 1.75 R 1.25 A-AA 0 -39 G-S 0 -568
AA-B 0-1470 S-I 455 0
Purlins B-Z 1216 0 I-R 0 -568
In lieu of structural panels or rigid ceiling use purlins Z-C 0-1193 R-J 593 0
to laterally brace chords as follows: C-Y 880 0 J-Q 0 -837
Chord Spacing(in oc) Start(ft) End(ft) Y-D 0 -859 Q-K 857 0
TC 24 0.25 24.67 D-X 564 0 K-P 0 -1108
BC 120 0.25 24.67 X-E 0 -546 P-L 1132 0
Apply purlins to any chords above or below fillers E-W 344 0 L-O 0 -1338
at 24"OC unless shown otherwise above. W-F 137 -391 M-O 0 -32
Deflection F-U 118 -209 O-N 0 -5
Max JT VERT DEFL:LL:0.35"DL:0.59".See detail
DEFLCAMB1014 for camber recommendations.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(P1.11r)
2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /q*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo u se Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEAN:24911/T19/SY42
Cellar Residence Qty: 1 FROM: DRW:
FO2T Wgt:168.0 lbs ... / ... 02/16/2018
11'7"813'3"8 24'11"
I
11.7"8 I 1'8" I 117"8 I
I I H-2'6"-.-II aI
(TYP)
W=3X4
1111.5X3=5X7 =4X5[5] =3X8 1114X5(R) 1114X5(R) =5X5 =4X4[26] =5X5 III1.5X3
AFA B C D E F G H I J K L M N 0
T =8 _ i -LP
Y/ W i-- �- _ _/ �/ 10'1"2
1 lit AE AD AC AB AA Z Y X 1114X5 w V = �! T S R 0
T
4X5[2] =5X5[4] =4X5[6] =5X7 W=H0310 1114x154X5[19][19J 4X =4X4[25] 1114X5[27][27] =4X5
1 24'11" 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udef IA Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.467 G 626 360 AE 1548 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.828 G 452 293 0 1227 /- /- /- /- /3.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.074 B - - AE Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL): 0.103 B - - Q Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings AE&Q Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.645
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.736 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:No Max Web CSI:0.806 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 1 0 H-I 0 -5510
I:NA GCpi:NA Plate Type(s): B-C 0-2269 I-J 0 -5514
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.15 C-D 0-4132 J-K 0 0
Lumber Deflection D-E 0-5454 J-L 0 -4366
E-F 0-5464 L-M 0 -3257
Top chord 4x2 SP SS:T2 4x2 SP#1: Max JT VERT DEFL:LL:0.47"DL:0.40".See detail F-G 0 -6227 M-N 0 -1784
Bot chord 4x2 SP SS DEFLCAMB1014 for camber recommendations. G-H 0 -6117 N-O 1 0
Webs 4x2 SP#3
End Vertical Attachment
Special Loads Attach notched end vertical(s)to next end vertical Maximum Bot Chord Forces Per Ply(lbs)
(Lumber Dur.Fac.=1.00/Plate Dur.Fac.=1.00) using(3)qty.10d box or(0.128"x3"min)gun nails,or Chords Tens.Comp. Chords Tens. Comp.
TC:From 94 plf at 0.13 to 94 plf at 2.71 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
AE-AD 1203 0 X-W 6117 0
TC:From 76 plf at 2.71 to 76 plf at 4.75 staples,through wide face;or(3)qty.16-Gauge,1" AD-AC 3321 0 W-V 6106 0
TC:From 201 plf at 4.75 to 201 plf at 10.25 Crown(minimum),1-1/2"length wire staples on each
TC:From 76 plf at 10.25 to 76 plf at 24.79 narrow face. AC-AA 4932 0 V-U 4934 0
BC:From 7 plf at 0.00 to 7 plf at 24.92 AB-AA 0 0 U-T 4933 0
Additional Notes AA-Z 6114 0 T-S 3887 0
Plating Notes +2x6 continuous strongback.See detail Z-Y 6125 0 S-R 2599 0
All plates are 4X4 except as noted. STRBRIBR1014 for bracing and bridging Y-X 6125 0 R-Q 956 0
recommendations.
Plate Shift Table Truss must be installed as shown with top chord up. Maximum Web Forces Per Ply(lbs)
JT Plate Chord JT Plate Chord The overall height of this truss excluding overhang is Webs Tens.Comp. Webs Tens. Comp.
No Size Shift Bite No Size Shift Bite 1-8-0
[2] 4X5 2.75 L 1.25 [4] 5X5 3.00 L 1.25 AF-AE 0 -7 W-H 406 -147
[5] 4X5 2.00 L 1.25 [6] 4X5 3.00 L 1.25 A-AE 0 -48 H-V 0 -1067
[19] 4X5 2.25 R 2.75 [25] 4X4 2.25 R 1.25 AE-B 0 -1911 V-J 926 0
[26] 4X4 1.75 R 1.25 [27] 4X5 2.25 R 1.50 B-AD 1693 0 J-T 0 -900
AD-C 0-1670 T-L 760 0
Purlins C-AC 1289 0 L-S 0 -1002
In lieu of structural panels or rigid ceiling use purlins AC-D 0 -1269 S-M 1043 0
to laterally brace chords as follows: D-AA 829 0 M-R 0 -1295
Chord Spacing(in oc) Start(ft) End(ft) AA-F 0-1020 R-N 1313 0
TC 24 0.25 24.67 F-Z 462 -72 N-Q 0 -1520
BC 120 0.25 24.67
Apply purlins to any chords above or below fillers Z-G 477 -470 O-Q 0 32
at 24"OC unless shown otherwise above. G-X 184 -360 Q-P 0 -5
NOTES:
It- 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(TH 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
TrueHouse PE No.Michael
60839 G Kozlowski
0391owski
Jeffrey
rNo. 8544son pE No.71457y APE No.7 69311
• 72128 Ply:1 SEAN.24884/T17/SY42
Cellar Residence Qty: 1 FROM: DRW:
F03 Wgt:36.4 lbs ... / ... 02/16/2018
1,7"8I 2'7"8 I 3'7"
1'7'8 1' 11"8
1'3"---I
F31 I--9"4-1
1114X5(R)
1113X4[1] 1113XA84(R) 1114X5 D
7- ---
�. I/1
il I I�
EA-,:,...1,3-:.-,, illik 10'1"2
EZ H 11115X3 1113X4(R )[6] E �.
=3X4 1111.5X3
1 3'7" 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in Ioc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.024 B 999 360 H 993 /- /- /- /- /3.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.051 B 999 240 E 601 /- /- /- /- /-
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.019 B - - H Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.030 B - - E Min Brg Width Req= -
NCBCLL:10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearing H Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.492
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.260 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI:0.421 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 0 -19 C-13 0 -434
I:NA GCpi:NA Plate Type(s): B-C 0 -459
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15
Lumber Hangers/Ties Maximum Bot Chord Forces Per Ply(lbs)
Top chord 4x2 SP SS Simpson Construction Hardware is specified based Chords Tens.Comp. Chords Tens. Comp.
Bot chord 4x2 SP SS on the most current information provided by Simpson H-G 466 0 F-E 0 0
Webs 4x2 SP#3 Strong-Tie.Please refer to the most recent Simpson G-F 459 0
Strong-Tie catalog for additional information.
Special Loads Recommended hanger connections are based on
-(Lumber Dur.Fac.=1.00/Plate Dur.Fac.=1.00) manufacturer tested capacities and calculations. Maximum Web Forces Per Ply(lbs)
TC:From 38 plf at 0.12 to 38 plf at 3.58 Conditions may exist that require different Webs Tens.Comp. Webs Tens. Comp.
BC:From 3 plf at 0.00 to 3 plf at 3.58 connections than indicated.Refer to manufacturer I-H 80 -2 C-F 0 -597
TC:1004 lb Conc.Load at 1.06 publication for additional information.
A-H 0 -481 F-D 885 0
TC: 446 lb Conc.Load at 2.40
Bearing at location x=3'4" ,y=10'1"2 uses the following H-B 0 -692 D-E 0 -662
Plate Shift Table support conditions:3'4" B-G 22 -162
Bearing E (3'4",10'1"2)THA422
JT Plate Chord JT Plate Chord Supporting Member:(1)4x2 SP SS
No Size Shift Bite No Size Shift Bite (2)0.162"x3.5"nails into supporting
[1] 3X4 0 2.50 [6] 3X4 1.25 L 1.25 member,
(4)0.162"x3.5"nails in flange and
Purlins (6)0.148"x3"nails into supported
In lieu of structural panels or rigid ceiling use purlins member.
to laterally brace chords as follows: Additional Notes
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.25 3.58 Truss must be installed as shown with top chord up.
BC 40 0.25 3.58 The overall height of this truss excluding overhang is
Apply purlins to any chords above or below fillers 1-8-0
at 24"OC unless shown otherwise above.
End Vertical Attachment
Attach notched end vertical(s)to next end vertical
using(3)qty.10d box or(0.128"x3"min)gun nails,or
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each
narrow face.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(111'14) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer ig*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo u se PE No.80 39 owski PE No.58544 n PE No.71457)/ PE No.7 69311
72128 Ply:1 SEQN:24873/T2/SY42 .
Cellar Residence Qty: 1 FROM: DRW:
F04 Wgt:61.6 lbs ... / ... 02/16/2018
5'3" I 6'3" I 10'9"7
5'3" 1' 4'6"7
I-2'6" I 2'6"12-I I--- 1'10"3---I
(TYP)
III 1A5X3 . - C3 III 1 X3 III 105X3 =1X3 III 1.5X3
IN
r 1 010'1"2
3X3 =3X3 mH X3 =33
j 10'9"7 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl!CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.047 C 999 360 J 446 /- /- /- /- /-
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.107 C 999 240 G 446 /- /- /- /- /-
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.008 B - - J Min Brg Width Req= -
Des Ld: 62.00 EXP:NA HORZ(TL):0.015 B - - G Min Brg Width Req= -
NCBCLL:10.00 Mean Height:NA ft Code I Misc Criteria Creep Factor:2.0
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.411 Maximum Top Chord Forces Per Ply(lbs)
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.350 Chords Tens.Comp. Chords Tens. Comp.
Spacing:16.0" MW FRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.199 A-B 0 0 D-E 0 -779
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: B-C 0 -780 E-F 0 0
I:NA GCpi:NA Plate Type(s): C-D 0 -784
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15
Lumber Maximum Bot Chord Forces Per Ply(lbs)
Top chord 4x2 SP#2 Chords Tens.Comp. Chords Tens. Comp.
Bot chord 4x2 SP#2 J-I 599 0 H-G 597 0
Webs 4x2 SP#3
I-H 784 0
Purlins
In lieu of structural panels or rigid ceiling use purlins Maximum Web Forces Per Ply(lbs)
to laterally brace chords as follows: Webs Tens.Comp. Webs Tens. Comp.
Chord Spacing(in oc) Start(ft) End(ft) A-J 0 78 D-H 0 136
TC 24 0.00 10.79
BC 120 0.00 10.79 J-B 0 -694 H-E 288 0
Apply purlins to any chords above or below fillers B-I 257 0 E-G 0 -693
at 24"OC unless shown otherwise above. I-C 0 -100 F-G 0 -84
Hangers I Ties
(J)Hanger Support Required,by others
Additional Notes
See detail STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
The overall height of this truss excluding overhang is
1-8-0.
NOTES:
1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
611H) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
TrueHouse PE No.160 39lowski PE No.58544Arneson
o5854gson P6 No Murray7457PE No.Russell
•
72128 Ply:1 SEQN:24874/T21/SY42
Cellar Residence Qty: 1 FROM: DRW:
F05 Wgt:137.2 lbs ... / ... 02/16/2018
I 11'6" 12'10"151 24'6"7
I
11'6" 1'4 15 117"8
---2'6"--1 r i
(TYP)
1111.5X3
1111.5X3w4X4[2] =4X4 W=3X4 1113X4(R)[21] w4X4[23]
A B C D E J K L M
+\ F G H I //`
_\ /\ \-\.7/-\ 7 \ /
10'1"2
AA Z Y X W V U T S R Q P 0"
m3X4 =4X4[3] 1113X4(R)[5] W=H0310 1111.5X3 113X4(R)[20] m4X4[22] =4X5
1111.5X3
1 24'6"7 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.384 U 759 360 AA 1004 /_ /_ /_ /_ /_
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.807 U 489 291 0 1015 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.063 B - - AA Min Brg Width Req= -
Des Ld: 62.00 EXP:NA HORZ(TL): 0.098 B - - 0 Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearing 0 Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.629
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.916 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.496 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 0 0 G-H 0 -3807
I:NA GCpi:NA Plate Type(s): B-C 0-1507 H-I 0 -3807
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.15 C-D 0 -2615 I-J 0 -3356
Lumber End Vertical Attachment D-E 0 -3387 J-K 0 -2568
E-F 0 -3821 K-L 0 -1443
Top chord 4x2 SP#2 Attach notched end vertical(s)to next end vertical F-G 0-3943 L-M 1 0
Bot chord 4x2 SP#1 using(3)qty.10d box or(0.128"x3"min)gun nails,or
Webs 4x2 SP#3 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1" Maximum Bot Chord Forces Per Ply(lbs)
Plating Notes Crown(minimum),1-1/2"length wire staples on each Chords Tens.Comp. Chords Tens. Comp.
All plates are 3X3 except as noted. narrow face.
AA-Z 859 0 U-T 3943 0
Plate Shift Table Additional Notes Z-Y 2141 0 T-S 3943 0
+2x6 continuous strop back.See detail Y-X 3077 0 5-R 3661 0
JT Plate Chord JT Plate Chord STRBRIBR1014 for bracingand bridging X-W 3684 0 R-Q 3038 0
No Size Shift Bite No Size Shift Bite 9 9
[2] 4X4 1.75 L 1.25 [3] 4X4 2.25 L 1.25 recommendations. W-V 3943 0 Q-P 2085 0
[5] 3X4 1.75 L 1.25 [20] 3X4 1.75 R 1.25 Truss must be installed as shown with top chord up. V-U 3943 0 P-O 786 0
[21] 3X4 S 1.50 [22] 4X4 2.25 R 1.25 The overall height of this truss excluding overhang is
[23] 4X4 1.75 R 1.25 1-8-0. Maximum Web Forces Per Ply(lbs)
Webs Tens.Comp. Webs Tens. Comp.
Purlins
In lieu of structural panels or rigid ceiling use purlins A-AA 0 32 G-S 84 425
to laterally brace chords as follows: AA-B 0-1290 S-I 348 0
Chord Spacing(in oc) Start(ft) End(ft) B-Z 1029 0 I-R 0 -484
TC 24 0.00 24.29 Z-C 0 -1006 R-J 506 0
BC 120 0.00 24.29 C-Y 753 0 J-Q 0 -746
Apply purlins to any chords above or below fillers Y-D 0 -733 Q-K 767 0
at 24"OC unless shown otherwise above. D-X 493 0 K-P 0 -1019
Hangers l Ties X-E 0 -472 P-L 1042 0
E-W 338 0 L-O 0 -1249
(J)Hanger Support Required,by others W-F 99 -410 M-O 0 -32
F-U 171 -164 O-N 0 -5
Deflection T-G 179 -156
Max JT VERT DEFL:LL:0.38"DL:0.48".See detail
DEFLCAMB1014 for camber recommendations.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(Irk) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
TrueHouse PE No.Michael
08381owski
Jeffrey
No 58544son P6 No.714579 PE No.Russell
69311
72128 Ply:1 SEQN:32234/T31/SY42 •
Cellar Residence Qty: 1 FROM: DRW:
F06 Wgt:107.8 lbs ... / ... 02/16/2018
10'6"F11'9"81 19'9"8
, „ I 1'3"88I 8' 'i
106
I I—--2 - -2 - - 1 - -- +' ��2'6"12—'.I 1 I
'6" '6"122'6" 22'6"12 2'6"12
(TYP)
III 1.5X3
III1.5X3 =4X5 1111.5X3 =3X3 1111.5X3 =3X3 W=3X4 =4X5 1111.5X3
A B C D E F GH I J
T 3a SJ ...„„„..........„::- _
-_K
Tp-
1 10'1"2
l'IR
0'1"2
R Q P O N M L 4
=3X8 =3X8 W=H0310 1111.5X3 =3X8 =3X8
3X3
r 19'9"8 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TOLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.242 E 955 360 R 809 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.511 E 670 240 L 809 /- /- /- /- /3.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.039 B - - R Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL): 0.060 B - - L Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings R&L Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.783
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.968 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.452 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 1 0 F-G 0 -1949
I:NA GCpi:NA Plate Type(s): B-C 0 -1962 G-H 0 -1949
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.20 C-D 0 -1962 H-I 0 -1949
Lumber D-E 0 -2451 I-J 1 0
Top chord 4x2 SP#2 E-F 0 -2454
Bot chord 4x2 SP#2
Webs 4x2 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Purlins
R-Q 1149 0 O-N 2454 0
In lieu of structural panels or rigid ceiling use purlins Q-P 2402 0 N-M 2451 0
to laterally brace chords as follows: P-O 2402 0 M-L 1144 0
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.25 19.54
BC 120 0.25 19.54 Maximum Web Forces Per Ply(lbs)
Apply purlins to any chords above or below fillers Webs Tens.Comp. Webs Tens. Comp.
at 24"OC unless shown otherwise above.
S-R 0 -8 N-F 123 -30
Deflection A-R 0 -79 F-M 0 -676
Max JT VERT DEFL:LL:0.24"DL:0.33".See detail R-B 0 -1350 H-M 0 -205
DEFLCAMB1014 for camber recommendations. B-Q 950 0 M-I 940 0
C-Q 0 -178 1-L 0 -1345
End Vertical Attachment Q-D 0 -514 J-L 0 -80
Attach notched end vertical(s)to next end vertical D-O 289 -147 L-K 0 -8
using(3)qty.10d box or(0.128"x3"min)gun nails,or O-E 18 -100
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each
narrow face.
Additional Notes
+2x6 continuous strongback.See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
The overall height of this truss excluding overhang is
1-8-0.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(11'14) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /�
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
TrueHouse PE No.Michael
60839 G Kozlowski
0 391owski
Jeffrey
58544son
Eurra
PE No.Derek B71457y PE No.Adam K7 69311
APEX
- 72128 Ply:1 SEQN:32238/T13/SY42
Cellar Residence Qty: 1 FROM: DRW:
F07 Wgt:147.0 lbs ... / ... 02/16/2018
I- 26 8
I 10'6" (11'10"I 22'4" 123'9"8�I 210 8
10'6" 1'4" 10'6" 1 5 8
I- 2'6"--I
(TYP)
i I I--26'.12-f-2'6"12-f--2'6"12-I f-2'6"12,i--2'6"12-F-2'6"12-f--2'6"12,{
-4X5 =3X3 =3X3[10] W=3X4 =4X5 -3X3 =3X3
A B C D E F GH I J K L M
T Y
io Li t/"\r N
_- n2 (010.1"2
QIX W V U T S "R O P O
=3X8 4X5[5] -3X3 W=H0310 =3X8 =3X8 =3X4
1 19792 1- 7.0"4 1
I 268" I
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefi U# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.235 E 990 360 X 787 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.521 E 637 240 R 1214 /- /- /- /- /3.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.037 B - - 0 255 /- /- /- /- /3.5
Des Ld: 62.00 EXP:NA HORZ(TL): 0.057 B - - X Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 R Min Brg Width Req= 1.5
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.798 0 Min Brg Width Req= 1.5
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.818 Bearings X,R,&0 Fcperp=565psi.
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.483
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
I:NA GCpi:NA Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.20 A-B 1 0 G-H 0 -1734
Lumber Additional Notes B-C 0-1892 H-I 0 -1734
Top chord 4x2 SP#2 +2x6 continuous strongback.See detail D-E 0-1298 I-J 472 0
Bot chord 4x2 SP#1:B2 4x2 SP#2: STRBRIBR1014 for bracing and bridging D-E 0 -2298 J-K 472 0
Webs 4x2 SP#3 recommendations. E-F 0 -2299 K-L 98 228
F-G 0 -1734 L-M 1 0
Plating Notes Truss must be installed as shown with top chord up.
All plates are 1.5X3 except as noted. The overall height of this truss excluding overhang is Maximum Bot Chord Forces Per Ply(lbs)
1-8-0. Chords Tens.Comp. Chords Tens. Comp.
Plate Shift Table
X-W 1114 0 S-R 891 0
JT Plate Chord JT Plate Chord W-V 2294 0 R-Q 227 -101
No Size Shift Bite No Size Shift Bite V-U 2299 0 Q-P 228 98
[5] 4X5 2.25 L 1.25 [10] 3X3 1.25 L 1.25 U-T 2296 0 P-O 229 96
Purlins T-S 2296 0
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows: Maximum Web Forces Per Ply(lbs)
Chord Spacing(in oc) Start(ft) End(ft) Webs Tens.Comp. Webs Tens. Comp.
TC 24 0.25 26.42
BC 120 0.25 26.42 Y-X 0 -8 H-S 0 -204
Apply purlins to any chords above or below fillers A-X 0 -79 S-I 1014 0
at 24"OC unless shown otherwise above. X-B 0 -1310 I-R 0 -1397
B-W 907 0 J-R 0 -196
Deflection C-W 0 -176 R-K 0 -552
Max JT VERT DEFL:LL:0.23"DL:0.32".See detail W-D 0 -470 K-Q 91 0
DEFLCAMB1014 for camber recommendations. D-V 242 -203 P-L 15 -71
V-E 23 -86 L-O 112 -270
End Vertical Attachment U-F 151 -16 M-O 0 -101
Attach notched end vertical(s)to next end vertical F-S 0 -751 0-N 0 -9
using(3)qty.10d box or(0.128"x3"min)gun nails,or
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each
narrow face.
NOTES:
1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
ilicH) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /g*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
TrueHouse PE No Michael
60 KozGlowski rey P No 58544son
PE PE No.Murray1457Adam K
No.7776ggll
Derek BAPEX
72128 Ply:1 SEQN:32272/T15/SY42 •
Cellar Residence Qty: 1 FROM: DRW:
F07A Wgt:154.0 lbs ... / ... 02/16/2018
I 282" I
12'0"8 13.4" 23'10" 25'3"8 2'10"8
12'0"8 11'3"8 I 10'6" 11'5"8
I-1E-2'6"-{-2'6"12
(TYP) -I--rs"1 2'6"12-}-2V12-I I--z•s"1 2'6"12-I-2'6"12--I---2'6"12--I---2's"12-{
W=3X4
3X3[3] =3X8 =3X3 =3X3 =3X8 =3X3 =3X3
A B C D E F G H I J K L M N
.. \`�•o
T _
1 L AB / "...././..-
` / \r R7 .` / - �F 7,-3
10.1"2
AA -Z Y X W V U T R Q P
=4X5 w4X4[4] =3X8 W=3X8 =3X3 =3X8 W=3X4 E3X8 =3X4
F-1'6" 1 19'7"12 1 7'0"4 i
I 28'2"
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.188 F 999 360 Z 1291 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.483 F 716 240 S 1182 /- /- /- /- /3.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.027 A - - P 256 /- /- /- /- /3.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.047 A - - Z Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 S Min Brg Width Req= 1.5
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.829 P Min Brg Width Req= 1.5
BCDL:NA sf TPI Std: 2014 Max BC CSI: 0.831 Bearings Z,S,&P Fcperp=565psi.
Load Duration:1.00 P
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.514
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
I:NA GCpi:NA Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15 A-B 0 -31 H-I 0 -1619
Lumber End Vertical Attachment B-C 418 0 I-J 0 -1619
C-D 0 -1603 J-K 468 0
Top chord 4x2 SP#2 Attach notched end vertical(s)to next end vertical D-E 0 -1603 K-L 468 0
Bot chord 4x2 SP#2:82 4x2 SP#1: using(3)qty.10d box or(0.128"x3"min)gun nails,or E-F 0 -2096 L-M 95 -231
Webs 4x2 SP#3 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire F-G 0 -2099 M-N 1 0
staples,through wide face;or(3)qty.16-Gauge,1"
Special Loads Crown(minimum),1-1/2"length wire staples on each G-H 0-1619
(Lumber Dur.Fac.=0.90/Plate Dur.Fac.=0.90) narrow face.
TC:From 76 plf at 0.12 to 76 plf at 28.04 Maximum Bot Chord Forces Per Ply(lbs)
BC:From 7 plf at 0.00 to 7 plf at 28.17 Additional Notes Chords Tens.Comp. Chords Tens. Comp.
TC: 343 lb Conc.Load at 0.12 +2x6 continuous strongback.See detail
STRBRIBR1014 for bracing and bridging AA-Z 0 -379 U-T 835 0
Plating Notes recommendations. Z-Y 797 -3 T-S 835 0
All plates are 1.5X3 except as noted. Truss must be installed as shown with top chord up. Y-X 2037 0 S-R 230 98
X-W 2037 0 R-Q 231 -95
Plate Shift Table The overall height of this truss excluding overhang is W-V 2099 0 0-P 232 -93
1-8-0. V-U 2096 0
JT Plate Chord JT Plate Chord
No Size Shift Bite No Size Shift Bite
[3] 3X3 1.25 R 1.25 [4] 4X4 1.25 L 1.25 Maximum Web Forces Per Ply(lbs)
Webs Tens.Comp. Webs Tens. Comp.
Purlins
In lieu of structural panels or rigid ceiling use purlins AA-A 0 -264 G-U 0 673
to laterally brace chords as follows: AA-B 559 0 I-U 0 212
Chord Spacing(in oc) Start(ft) End(ft) AB-AA 0 -120 U-J 948 0
TC 24 0.12 27.92 B-Z 0 -561 J-S 0 -1325
BC 120 0.00 27.92 Z-C 0 -1327 K-S 0 -196
Apply purlins to any chords above or below fillers C-Y 972 0 S-L 0 -550
at 24"OC unless shown otherwise above. D-Y 0 -184 L-R 90 0
Y-E 0 -538 Q-M 16 -70
E-W 310 -134 M-P 109 -273
W-F 23 -103 N-P 0 -100
V-G 133 -36 P-O 0 -9
NOTES:
f' 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
1 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc,Florida Corporation. Florida Engineer /it\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
" 72128 Ply:1 SEQN:32252/T59/SY42
Cellar Residence Qty: 5 FROM: DRW:
FO8A Wgt:121.8 lbs .. / ... 02/16/2018
9'6"8 10'8"l'"
0 8" I 21'3"8
9'6"8 1'1"8 10'7"8
I-,-1'5"-1 76"--1-2'6"12-}.-2'6"12-{ 2'6"12-I-•-2'6"12- I 2'6"12-H r"1
(TYP)
=3X3 =4X5 =3X3 W=3X4=3X3 -4X5
A B C D E F G H I J K
T T - _L 3.
1 1 U / ` /- i://0000 / ` 10'1"2
T S R Q P O N AirO
=3X4 =3X4 =3X8 =3X3 =4X5[16] =3X8
W=H0310
I-1'6" j 1978 1
21'3"8
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DeflICSI Criteria A Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc LJdefl LJ# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.209 F 999 360 S 1140 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.472 F 673 240 M 1402 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.029 M - - S Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.048 M - - M Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings S&M Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.670
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.900 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:No Max Web CSI:0.452 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 0 -18 F-G 0 -2208
I:NA GCpi:NA Plate Type(s): B-C 246 0 G-H 0 -2208
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.20 C-D 0-1686 H-I 0 -1791
Lumber End Vertical Attachment D-E 0-1686 I-J 0 -1791
Top chord 4x2 SP#2 Attach notched end vertical(s)to next end vertical E-F 0 -2209 J-K 100 0
Bot chord 4x2 SP#2 using(3)qty.10d box or(0.128"x3"min)gun nails,or
Webs 4x2 SP#3 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire Maximum Bot Chord Forces Per Ply(lbs)
staples,through wide face;or(3)qty.16-Gauge,1" Chords Tens.Comp. Chords Tens. Comp.
Special Loads Crown(minimum),1-1/2"length wire staples on each
--(Lumber Dur.Fac.=1.00/Plate Dur.Fac.=1.00) narrow face. T-S 0 -213 P-0 2195 0
S-R 872 0 O-N 2195 0
TC:From 76 plf at 0.12 to 76 plf at 21.04 R- 2206 0 N-M 1014 0
Additional Notes Q
BC:From 7 plf at 0.00 to 7 plf at 21.29 Q Q 2206 0
TC: 196 lb Conc.Load at 0.12 +2x6 continuous strongback.See detail
BC: 615 lb Conc.Load at 21.17 STRBRIBR1014 for bracing and bridging
recommendations. Maximum Web Forces Per Ply(lbs)
Plating Notes Truss must be installed as shown with top chord up. Webs Tens.Comp. Webs Tens. Comp.
All plates are 1.5X3 except as noted. The overall height of this truss excluding overhang is T-A 0 -153 F-P 33 -43
Plate Shift Table 1-8-0. T-B 314 0 P-H 15 0
JT Plate Chord JT Plate Chord U-T 0 69 H-N 0 472
No Size Shift Bite No Size Shift Bite B-S 0 -409 I-N 0 178
[16] 4X5 2.25 R 1.25 S-C 0-1313 N-J 907 0
C-R 950 0 J-M 0 -1309
Purlins D-R 0 -173 K-M 0 -199
In lieu of structural panels or rigid ceiling use purlins R-E 0 -608 M-L 83 512
to laterally brace chords as follows: E-Q 76 0
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.12 20.92
BC 120 0.00 20.92
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Deflection
Max JT VERT DEFL:LL:0.21"DL:0.26".See detail
DEFLCAMB1014 for camber recommendations.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this buss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
611H) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /1*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tr u eHo u se Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEAN:32249/T32/SY42 •
Cellar Residence Qty: 10 FROM: DRW:
F09 Wgt:112.0 lbs ... / ... 02/16/2018
10'6" I 11'8"I 19'9"8
10,6" 1'2" 8'1"8
I--2,6"--1--- ---I--2'6"12 -}-2'6"12 I 2'6"12---{ I-2'6"12,I 2'6"12, g,g
{ Y 1
(TYP)
=4X5 =3X3 W=3X4 =3X3 =4X5
A B C D EF G H I J
T ;.a
S .
_\ --1- _ • K 3.
tio
I ci)10'1.2
'fR 0 P 0 N M L[
=3X8 =3X8 W=H0310 =3X8 =3X8
=3X3
i 19'9"8 i
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.212 F 999 360 R 795 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.445 F 700 240 L 1427 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.032 B - - R Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL): 0.050 B - - L Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings R&L Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.507
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.631 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.450 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 1 0 F-G 0 -2367
I:NA GCpi:NA Plate Type(s): B-C 0-1918 G-H 0 -1859
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.20 C-D 0-1918 H-I 0 -1859
Lumber Additional Notes D-E 0-2365 I-J 100 0
E-F 0 -2365
Top chord 4x2 SP#1 +2x6 continuous strongback.See detail
Bot chord 4x2 SP#1 STRBRIBR1014 for bracing and bridging
Webs 4x2 SP#3 recommendations. Maximum Bot Chord Forces Per Ply(lbs)
Truss must be installed as shown with top chord up.
Special Loads Chords Tens.Comp. Chords Tens. Comp.
(Lumber Dur.Fac.=1.00/Plate Dur.Fac.=1.00) The overall height of this truss excluding overhang is R-Q 1127 0 O-N 2367 0
TC:From 76 plf at 0.12 to 76 plf at 19.54 1-8-0. Q-P 2337 0 N-M 2364 0
BC:From 7 plf at 0.00 to 7 plf at 19.79 P-O 2337 0 M-L 1049 0
BC: 615 lb Conc.Load at 19.67
Maximum Web Forces Per Ply(lbs)
Plating Notes Webs Tens.Comp. Webs Tens. Comp.
All plates are 1.5X3 except as noted. S-R 0 -8 N-G 67 0
Purlins A-R 0 -79 G-M 0 -590
R-B 0 -1324 H-M 0 -168
In lieu of structural panels or rigid ceiling use purlins
B-Q 924 0 M-I 945 0
to laterally brace chords as follows: C-Q 0 -178 I-L 0 -1350
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.25 19.42 Q-D 0 -489 J-L 0 -199
BC 120 0.25 19.42 D-O 52 0 L-K 83 -512
Apply purlins to any chords above or below fillers O-F 20 -47
at 24"OC unless shown otherwise above.
Deflection
Max JT VERT DEFL:LL:0.21"DL:0.24".See detail
DEFLCAMB1014 for camber recommendations.
End Vertical Attachment
Attach notched end vertical(s)to next end vertical
using(3)qty.10d box or(0.128"x3"min)gun nails,or
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each
narrow face.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(41) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /q*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell APE X
PE No.60839 PE No.58544 PE No.71457 PE No.77693
• 72128 Ply:1 SEQN:32242/T46/SY42
Cellar Residence Qty: 1 FROM: DRW:
F09T Wgt:112.0 lbs ... / ... 02/16/2018
10'6" I 11'8"I 19'9"8
I
10'6" 12" 8'1"8
r'i--2'6"--I 2'6"12--F---2'6"12,I 26"12
(TYP) 1--2 6"12--1.--2'6"12--{ "
=4X5 =3X3 W=3X4 =3X3 =3X8
A B C D E F G HI J
T 3 Sr _ T
I 10'1"2
11R Q P 0 N M Lr T
w 3X8 w 3X8 W=H0310 L----3X8 w 3X8
=3X3
r 1998 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.226 F 999 360 R 858 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.518 F 618 240 L 1501 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.034 B - - R Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL): 0.056 B - - L Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings R 8 L Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.611
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.714 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:No Max Web CSI:0.520 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 1 0 F-G 0 -2703
I:NA GCpi:NA Plate Type(s): B-C 0-2124 G-H 0 -2103
Wind Duration:NA WAVE,HS VIEW Ver:17.02.02.1208.20 C-D 0-2124 H-I 0 -2103
Lumber End Vertical Attachment D-E 0 -2700 I-J 100 0
Top chord 4x2 SP#1 Attach notched end vertical(s)to next end vertical
E-F 0 -2700
Bot chord 4x2 SP#1 using(3)qty.10d box or(0.128"x3"min)gun nails,or
Webs 4x2 SP#3 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire Maximum Bot Chord Forces Per Ply(lbs)
staples,through wide face;or(3)qty.16-Gauge,1" Chords Tens.Comp. Chords Tens. Comp.
Special Loads Crown(minimum),1-1/2"length wire staples on each
narrow face. R-Q 1228 0 O-N 2703 0
-----(Lumber Dur.Fac.=1.00/Plate Dur.Fac.=1.00) 0-P 2645 0 N-M 2700 0
TC:From 76 plf at 0.12 to 76 plf at 6.83 Additional Notes P-O 2645 0 M-L 1168 0
TC:From 94 plf at 6.83 to 94 plf at 14.42
TC:From 76 plf at 14.42 to 76 plf at 19.54 +2x6 continuous strongback.See detail
BC:From 7 plf at 0.00 to 7 plf at 19.79 STRBRIBR1014 for bracing and bridging Maximum Web Forces Per Ply(lbs)
BC: 615 lb Conc.Load at 19.67 recommendations. Webs Tens.Comp. Webs Tens. Comp.
Plating Notes Truss must be installed as shown with top chord up. S-R 0 -8 N-G 74 0
All plates are 1.5X3 except as noted. The overall height of this truss excluding overhang is A-R 0 -79 G-M 0 -697
1-8-0. R-B 0 -1444 H-M 0 -190
Purlins B-Q 1045 0 M-I 1091 0
In lieu of structural panels or rigid ceiling use purlins C-Q 0 -178 I-L 0 -1490
to laterally brace chords as follows: Q-D 0 -608 J-L 0 -199
Chord Spacing(in oc) Start(ft) End(ft) D-O 84 0 L-K 83 -512
TC 24 0.25 19.42 O-F 0 -70
BC 120 0.25 19.42
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Deflection
Max JT VERT DEFL:LL:0.23"DL:0.32".See detail
DEFLCAMB1014 for camber recommendations.
NOTES:
IC 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(1111'14) 2.Apex Technology is a fictitious name owned by Jan Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:24875/T18/SY42
Cellar Residence Qty: 2 FROM: DRW:
F10 Wgt:112.5 lbs ... / ... 02/16/2018
7'6" 8'6" 16'4"8 17'4"0 19'9"8
F 7,6" I 1' I T10"8 I 1' I-
2'5" -I
I I~2'6"—.-I--2'6"12—1--2'0"12 H I~2'6"12--I--2'6"12--I--2'6"12—I I--2'1"4-H
(TYP)
=3X4 =3X3 =3X4 =3X3 =3X3
A B C D E F G H I J
18 T7 _
1 •0000000000000000,_ 1>oeoo•ooe'
(fl 10.1"2
'S R Q P N M - L `I'
=4X5 =4X5 =3X3[9] =4X5 =3X3 1113X3
r 13'8"4 I 6'1"4 1
F'" 19'9"8 - - --1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.074 D 999 360 S 551 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.167 D 999 240 0 881 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.013 B - - L 220 /- /- /- /- /5.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.020 B - - S Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 0 Min Brg Width Req= 1.5
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.319 L Min Brg Width Req= 1.5
BCDL:NA sf TPI Std: 2014 Max BC CSI: 0.416 Bearings S,0,&L Fcperp=565psi.
Load Duration:1.00 P
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.262
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
I:NA GCpi:NA Plate Type(s):
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15 A-B 1 0 F-G 224 0
Lumber Additional Notes B C 0 -1118 G-H 224 0
C-D 0-1118 H-I 2 -175
Top chord 4x2 SP#1 +2x6 continuous strongback.See detail D-E 0-1103 I-J 2 -170
Bot chord 4x2 SP#1 STRBRIBR1014 for bracing and bridging E-F 0 -1095
Webs 4x2 SP#3 recommendations.
Truss must be installed as shown with top chord up.
Plating Notes Maximum Bot Chord Forces Per Ply(lbs)
All plates are 1.5X3 except as noted. The overall height of this truss excluding overhang is Chords Tens.Comp. Chords Tens. Comp.
1-8-0.
Plate Shift Table S-R 729 0 O-N 175 -3
JT Plate Chord JT Plate Chord R-Q 1106 0 N-M 175 -2
Q
No Size Shift Bite No Size Shift Bite P 1103 0 M-L 0 1
[9] 3X3 1.25 L 1.25 P-O 660 0
Purlins Maximum Web Forces Per Ply(lbs)
In lieu of structural panels or rigid ceiling use purlins Webs Tens.Comp. Webs Tens. Comp.
to laterally brace chords as follows:
T-S 0 -8 F-O 0 -900
Chord Spacing(in oc) Start(ft) End(ft) A T-S 0 80 G-O 0 -216
TC 24 0.25 19.54
BC 120 0.25 19.54 S-B 0 -857 O-H 0 -361
Apply purlins to any chords above or below fillers B-R 453 0 H-N 50 -1
at 24"OC unless shown otherwise above. C-R 0 -210 I-M 0 -125
R-D 155 -132 M-J 214 -2
End Vertical Attachment D-Q 11 -101 J-L 0 -197
Attach notched end vertical(s)to next end vertical E-P 0 -215 L-K 0 -14
using(3)qty.10d box or(0.128"x3"min)gun nails,or P-F 550 0
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each
narrow face.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(111.*H 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
• 72128 Ply:1 SEQN:24876/T9/SY42
Cellar Residence Qty: 2 FROM: DRW:
Flt Wgt:112.8 lbs ... / ... 02/16/2018
7'6" I 8'6"I 16'4"8 117'4_"$ 19'11" H
I7'6" 1' 7'10"8 1I
' 2'6"8
R.
r i--2'6"--j--2'6"12—}--2,0"12 H I---2,6"12--I--2612--I-.—2,6"12--{ H 2712 H
(TYP)
=3X4 =3X3 =3X4 =3X3 3X3
A B C D E F G H I J
T 38 T _ z, K
Ico
10'1"2
'S R Q P N M r*L
=4X5 -4X5 =3X3[9] =4X5 =3X3 1113X3
i" 13'8"4 1 6712 i
I- 19'11"
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.074 D 999 360 5 552 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.168 D 999 240 0 881 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.013 B - - L 229 /- /- /- /- /5.5
Des Ld: 62.00 EXP:NA HORZ(TL): 0.020 B - - S Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 0 Min Brg Width Req= 1.5
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.318 L Mm Brg Width Req= 1.5
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.415 Bearings S,0,&L Fcperp=565psi.
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.261
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
I:NA GCpi:NA Plate Type(s):
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15 A-B 1 0 F-G 221 0
Lumber Additional Notes B-C 0 -1121 G-H 221 0
C-D 0 -1121 H-I 0 -190
Top chord 4x2 SP#1 +2x6 continuous strongback.See detail D-E 0-1109 I-J 0 -185
Bot chord 4x2 SP#1 STRBRIBR1014 for bracing and bridging E-F 0-1101
Webs 4x2 SP#3 recommendations.
PlatingNotes Truss must be installed as shown with top chord up.
Maximum Bot Chord Forces Per Ply(lbs)
All plates are 1.5X3 except as noted. The overall height of this truss excluding overhang is Chords Tens.Comp. Chords Tens. Comp.
1-8-0.
Plate Shift Table S-R 731 0 O-N 190 0
R-Q 1111 0 N-M 190 0
JT Plate Chord JT Plate Chord Q-P 1109 0 M-L 0 -1
No Size Shift Bite No Size Shift Bite P-O 668 0
[9] 3X3 1.25 L 1.25
Purlins Maximum Web Forces Per Ply(lbs)
In lieu of structural panels or rigid ceiling use purlins Webs Tens.Comp. Webs Tens. Comp.
to laterally brace chords as follows: T-S 0 -8 F-O 0 -900
Chord Spacing(in oc) Start(ft) End(ft) A-S 0 -80 G-O 0 -215
TC 24 0.25 19.67
BC 120 0.25 19.67 S-B 0 -859 O-H 0 -367
Apply purlins to any chords above or below fillers B-R 455 0 H-N 53 0
at 24"OC unless shown otherwise above. C-R 0 -210 I-M 0 -131
R-D 154 -134 M-J 228 0
End Vertical Attachment D-Q 11 -101 J-L 0 -204
Attach notched end vertical(s)to next end vertical E-P 0 -214 L-K 0 -14
using(3)qty.10d box or(0.128"x3"min)gun nails,or P-F 549 0
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each
narrow face.
NOTES:
f' 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(1111'14) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru House Michael 0 Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEAN:24877/T25/SY42 '
Cellar Residence Qty: 14 FROM: DRW:
F12 Wgt:86.8 lbs ... / ... 02/16/2018
8'2" I 9'8" I 15'0"8
8'2" 1'6" 5'4"8
5"
2'6" I 2'6"12 I 2'6"12-{ I-2'6"12---I ( {
(TYP)
3X4[5]
1114X5 =3X3 1111.5X3 =3X3 1111.5X3 =3X4 1111.5X3
AB C D E F G H 1 T
TI ( 1 _ y( - `J ". 0 11'6"2
0.
I.
1 - _ i 10'1"2
0 N M L
=3X4 =4X5 1111.5X3 =3X3[11] =4X5
r 15'0"8 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.144 F 999 360 A 615 /- /- /- /- /3.0
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.338 F 758 240 K 617 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL):-0.021 0 - - A Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.037 0 - - K Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:NA ft Code I Misc Criteria Creep Factor:2.0 Bearing A is a rigid surface.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.627 Bearing K Fcperp=565psi.
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.829
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.310 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
I:NA GCpi:NA Plate Type(s): A-B 0 0 E-F 0 -1378
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15 B-C 16 0 F-G 0 -1377
Lumber Additional Notes C-D 36 0 G-H 0 -1368
Top chord 4x2 SP#2 +2x6 continuous strongback.See detail
D-E 0 -1378 H-I 1 0
Bot chord 4x2 SP#2 STRBRIBR1014 for bracing and bridging
Webs 4x2 SP#3 recommendations. Maximum Bot Chord Forces Per Ply(lbs)
Plate Shift Table
Truss must be installed as shown with top chord up. Chords Tens.Comp. Chords Tens. Comp.
JT Plate Chord JT Plate Chord The overall height of this truss excluding overhang is 0-N 917 0 M-L 1377 0
No Size Shift Bite No Size Shift Bite 1-8-0. N-M 1380 0 L-K 840 0
[5] 3X4 2.25 L 1.25 [11] 3X3 1.25 L 1.25
Maximum Web Forces Per Ply(lbs)
Purlins Webs Tens.Comp. Webs Tens. Comp.
In lieu of structural panels or rigid ceiling use purlins O-B 562 0 G-L 0 -236
to laterally brace chords as follows: O-D 0 -1082 L-H 623 0
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -0.29 14.50 D-N 538 0 H-K 0 -987
BC 120 0.00 14.50 E-N 0 -234 I-K 0 -83
Apply purlins to any chords above or below fillers N-F 134 -1% K-J 0 -8
at 24"OC unless shown otherwise above. F-M 7 -108
Deflection
Max JT VERT DEFL:LL:0.14"DL:0.21".See detail
DEFLCAMB1014 for camber recommendations.
End Vertical Attachment
Attach notched end vertical(s)to next end vertical
using(3)qty.10d box or(0.128"x3"min)gun nails,or
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each
narrow face.
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation. �
(1.'11) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /g-
/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Derek BAPEX
TrueHouse PE No.Michael
60839 G Kozlowski
0391owski FE No.58544son
o58544son PE No. Murray7457PE No.Russell
" 72128 Ply:1 SEAN:32275/T16/SY42
Cellar Residence Qty: 2 FROM: DRW:
F12T Wgt:86.8 lbs ... / ... 02/16/2018
I82" I 98" � 150 8
8'2" 1'6 5'4"8
5,
- {-_2'6"--{-2'6"12-I--2'6"12-] I---2'6"12--I {
(TYP)
3X4[5]
1114X5 3X3 III1.5X3 =3X3 1111.5X3 =3X4 1111.5X3
AB C D E F G H
T 1, - - 1 - ---" 3 8 T 11'6"2
in co
1 1 010'1"2
0 N M L
-_-,--
E3X4 =4X5 1111.5X3 =3X4 =4X5
A- 15'0"8 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.149 F 999 360 A 841 /_ /_ /_ /_ /3.0
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.370 F 707 240 K 645 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL):-0.022 0 - - A Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.039 0 - - K Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearing A is a rigid surface.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.801 Bearing K Fcperp=565psi.
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.774
Spacing:16.0" MW FRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI:0.327 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
I:NA GCpi:NA Plate Type(s): A-B 0 0 E-F 0 -1475
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15 B-C 17 0 F-G 0 -1479
Lumber End Vertical Attachment C-D 37 0 G-H 0 -1469
Top chord 4x2 SP#2 Attach notched end vertical(s)to next end vertical D-E 0-1475 H-I 1 0
Bot chord 4x2 SP#1 using(3)qty.10d box or(0.128"x3"min)gun nails,or
Webs 4x2 SP#3 (5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire Maximum Bot Chord Forces Per Ply(lbs)
staples,through wide face;or(3)qty.16-Gauge,1" Chords Tens.Comp. Chords Tens. Comp.
Special Loads Crown(minimum),1-1/2"length wire staples on each 0-N 965 0 M-L 1479 0
--(Lumber Dur.Fac.=1.00/Plate Dur.Fac:1.00) narrow face.
TC:From 76 plf at 0.00 to 76 plf at 6.08 N-M 1483 0 L-K 886 0
TC:From 94 plf at 6.08 to 94 plf at 9.08 Additional Notes
TC:From 76 plf at 9.08 to 76 plf at 14.92 +2x6 continuous strongback.See detail Maximum Web Forces Per Ply(lbs)
BC:From 7 plf at 0.29 to 7 plf at 15.04 STRBRIBR1014 for bracing and bridging Webs Tens.Comp. Webs Tens. Comp.
recommendations.
Plate Shift Table O-B 590 0 G-L 0 -252
Truss must be installed as shown with top chord up. O-D 0-1138 L-H 687 0
JT Plate Chord JT Plate Chord The overall height of this truss excluding overhang is D-N 595 0 H-K 0 -1042
No Size Shift Bite No Size Shift Bite 1-8-0.
[5] 3X4 2.25 L 1.25 E-N 0 -252 I-K 0 -84
N-F 127 -203 K-J 0 -A
Purlins F-M 0 -134
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -0.29 14.50
BC 120 0.00 14.50
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Deflection
Max JT VERT DEFL:LL:0.15"DL:0.24".See detail
DEFLCAMB1014 for camber recommendations.
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(11-11) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /lf*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo u se E Noel GO K3oozlowski
Jeffrey
No.58544son
o58544son PE No. Murray7457APE No.7769311
72128 Ply:1 SEQN:24878/T20/SY42 •
Cellar Residence Qty: 1 FROM: DRW:
F13 Wgt:85.4 lbs ... / ... 02/16/2018
8' I 9'10"8 I 15'3"
8' 1'10'8 5'4"8
I' 2'6" I 2'6"12 I 2'612--I H-2'6"12-- {
(TYP)
1111.5X3 =3X4 1111.5X3 =3X3 1111.5X3 =3X4 1111.5X3
A B C D E F G
1-'8 N-r- - - � � �H
1 10'1"2
M L K J I O
=4X5 =4X5 1111.5X3 =3X4 =4X5
I 15'3" 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl!CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.151 K 999 360 M 621 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.379 K 681 240 I 621 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.027 B - - M Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL): 0.049 B - - I Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings M&I Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.664
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.890 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.308 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:12(0)/10(0) Mfg Specified Camber: A-B 1 0 D-E 0 -1397
I:NA GCpi:NA Plate Type(s): B-C 0-1359 E-F 0 -1387
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15 C-D 0-1359 F-G 1 0
Lumber
Top chord 4x2 SP#2 Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 4x2 SP#2 Chords Tens.Comp. Chords Tens. Comp.
Webs 4x2 SP#3
M-L 841 0 K-J 1397 0
Purlins L-K 1400 0 J-I 845 0
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows: Maximum Web Forces Per Ply(lbs)
Chord Spacing(in oc) Start(ft) End(ft) Webs Tens.Comp. Webs Tens. Comp.
TC 24 0.25 15.00
BC 120 0.25 15l00 N-M 0 -8 D-K 11 -102 Apply purlins to any chords above or below fillers A-M 0 -81 E-J 0 -250
at 24"OC unless shown otherwise above. M-B 0 -989 J-F 646 0
B-L 604 0 F-I 0 -994
Deflection C-L 0 -245 G-I 0 -84
Max JT VERT DEFL:LL:0.15"DL:0.24".See detail L-D 95 -238 I-H 0 -8
DEFLCAMB1014 for camber recommendations.
End Vertical Attachment
Attach notched end vertical(s)to next end vertical
using(3)qty.10d box or(0.128"x3"min)gun nails,or
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each
narrow face.
Additional Notes
+2x6 continuous strongback.See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
The overall height of this truss excluding overhang is
1-8-0.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
61}{ 2.Apex Technology is a fictitious name owned by Jan Apex Technology Inc.,Florida Corporation. Florida Engineer %f*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
• 72128 Ply:2 SEQN:24888/T14/MONO
Cellar Residence Qty: 1 FROM: DRW:
FG01 Wgt:89.6 lbs ... / ... 02/16/2018
3'2"12 6'5"8
I
3'2"12 I 3'2"12
III X4
A=5X5 =5X5 C
T ' iriLii= .,
W1
I. ■.
I - • 010'1"2
Fes_ =� D
m6/8(**)
1113X4(**) 1113X4(**)
1 6,5„8 1
3'2"12 3'2"12
3'2"12 6'5"8
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.015 B 999 360 F 1669 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.046 B 999 240 D 1669 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.001 A - - F Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.003 A - - D Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings F&D Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.157
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.086 Maximum Top Chord Forces Per Ply(lbs)
Spacing:24.0" MWFRS Parallel Dist:NA Rep Factors Used:No Max Web CSI: 0.568 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:30(0)/10(0) Mfg Specified Camber: A-B 0-1118 B-C 0 -1118
I:NA GCpi:NA Plate Type(s):
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15 Maximum Bot Chord Forces Per Ply(lbs)
Lumber Additional Notes Chords Tens.Comp. Chords Tens. Comp.
Top chord 2x6 SP SS Dense Truss must be installed as shown with top chord up. F-E 11 0 E-ID 11 0
Bot chord 2x4 SP#2 The overall height of this truss excluding overhang is
Webs 2x4 SP#3:W1 2x4 SP#2: 1-8-0.
Maximum Web Forces Per Ply(lbs)
Nailnote Webs Tens.Comp. Webs Tens. Comp.
Nail Schedule:0.131"x3",min.nails A-F 0 -816 E-C 1192 0
Top Chord:1 Row @ 5.00"o.c. A-E 1192 0 C-D 0 -816
Bot Chord:1 Row @12.00"o.c. B-E 0 -891
Webs :1 Row @ 4"o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
(Lumber Dur.Fac.=1.00/Plate Dur.Fac.=1.00)
TC:From 507 plf at 0.00 to 507 plf at 6.46
BC:From 10 plf at 0.00 to 10 plf at 6.46
Plating Notes
(")3 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.00 6.46
BC 77 0.00 6.46
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
The TC of this truss shall be braced with attached
spans at 24"oc in lieu of structural sheathing.
NOTES:
It 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(1111'14) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:32184/T56/SY42 •
Cellar Residence Qty: 1 FROM: DRW:
FGE01 Wgt:114.8 lbs Page 1 of 2 ... / ... 02/16/2018
1'2"8
1'4"H
(TYP)
W=3X4
AB C D E F G H I J K L M N 0 P Q R
I _B ALJ - - - - - - - - - - - - - -...s
i" / J
1 I/ � �.���/ ./�./�/ )‹ .<1 /'-'\//-',--'-''T
10 1"2
AK AJ Al AH AG AF AE AD AC AB AA Z Y X W V U 1113X3
1113X3 W=3X4
r 209"8 i
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs),or`=PLF
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.000 P 999 360 AK 45 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.000 P 999 240 T' 81 /- /- /- /- /244
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.000 R - - AK Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA -- HORZ(TL):0.001 R - - T Min Brg Width Req= -
NCBCLL:W.00 Mean Height:NA ft Code I Misc Criteria Creep Factor:2.0 Bearings AK&AK Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.070
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.013 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.025 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:30(0)/10(0) Mfg Specified Camber: A-B 0 0 J-K 0 0
I:NA GCpi:NA Plate Type(s): B-C 0 0 K-L 0 0
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.20 C-D 0 0 L-M 0 0
Lumber Additional Notes D-E 0 0 M-N 0 0
E-F 0 O N-O 0 0
Top chord 4x2 SP#2 See detail STRBRIBR1014 for bracing and bridging F-G 0 0 O-P 0 0
Bot chord 4x2 SP#2 recommendations.
Webs 4x2 SP#3
G-H 0 0 P-Q 0 0
Truss must be installed as shown with top chord up. H-I 0 0 Q-R 0 0
Bracing The overall height of this truss excluding overhang is I-J 0 0
Sheathing is required for any longitudinal(drag) 1-8-0.
forces.All connections to be designed by the building Maximum Bot Chord Forces Per Ply(lbs)
designer. Chords Tens.Comp. Chords Tens. Comp.
Fasten rated sheathing to one face of this frame. AK-AJ 0 0 AB-AA 0 0
Plating Notes AJ-Al 0 0 AA-Z 0 0
Al-AH 0 0 Z-Y 0 0
All plates are 1.5X3 except as noted. AH-AG 0 0 Y-X 0 0
Purlins AG-AF 0 0 X-W 0 0
AF-AE 0 0 W-V 0 0
In lieu of structural panels or rigid ceiling use purlins AE-AD 0 0 V-U 0 0
to laterally brace chords as follows: AD-AC 0 0 U-T 0 0
Chord Spacing(in oc) Start(ft) End(ft) AC-AB 0 0
TC 24 0.25 20.54
BC 120 0.25 20.54
Apply purlins to any chords above or below fillers Maximum Web Forces Per Ply(lbs)
at 24"OC unless shown otherwise above. Webs Tens.Comp. Webs Tens. Comp.
End Vertical Attachment AL-AK 0 -6 R-T 0 -12
Attach notched end vertical(s)to next end vertical A-AK 0 36 T-S 0 5
using(3)qty.10d box or(0.128"x3"min)gun nails,or
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire Maximum Gable Forces Per Ply(lbs)
staples,through wide face;or(3)qty.16-Gauge,1" Gables Tens.Comp. Gables Tens. Comp.
Crown(minimum),1-1/2"length wire staples on each
narrow face. B-AJ 0 -102 K-AA 0 -101
C-Al 0 -102 L-Z 0 -101
D-AH 0 -101 M-Y 0 -101
E-AG 0 -101 N-X 0 -102
F-AF 0 -101 O-W 0 -101
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(1.'14) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer %ir*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use PE No.Michael
08391owski Pt No.58544son
o58544son PE No.71457y PE No.77769311
• 72128 Ply:1 SEQN:32184/T56/SY42
Cellar Residence Qty: 1 FROM: DRW:
FGE01 Wgt:114.8 lbs Page 2 of 2 ... / ... 02/16/2018
G-AE 0 -101 P-V 0 -105
H-AC 0 -101 Q-U 0 -83
J-AB 0 -101
NOTES:
Nr
6111) 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include SCSI 1-03,
should be used in conjunction with the architectural plans during installation.
2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo u se Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEAN:24880/T51/SY42 •
Cellar Residence Qty: 1 FROM: DRW:
FGE02 Wgt:134.4 lbs Page 1 of 2 ... / ... 02/16/2018
1'5"8 I 1'4"
(TYP)
W=3X4
A BCD E F G H I J K L M N 0 P 0 R S T U
T 3r AR__ - - - - - - - - r . - - - - V
� T p _
1 -- - ,o,z
Ai � iii 'W 7
1113X3 AP AO AN AM AL AK AJ Al AH AG AF AE AD AC AB AA Z V X
W=3X4 1113X3
1 24'11" 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Def/CSI Criteria ♦Maximum Reactions(lbs),or'=PLF
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.000 B 999 360 AQ 55 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.000 B 999 277 W'81 /- /- /- /- /293
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.000 U - - AG Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL):0.001 U - - W Min Brg Width Req= -
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings AQ&AQ Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.091
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.014 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.025 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:30(0)/10(0) Mfg Specified Camber: A-B 0 0 K-L 0 0
I:NA GCpi:NA Plate Type(s): B-C 0 0 L-M 0 0
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15 C-D 0 0 M-N 0 0
Lumber Additional Notes D-E 0 0 N-0 0 0
Top chord 4x2 SP#2 See detail STRBRIBR1014 for bracing and bridging F-F 0 0 O-P 0 0
Bot chord 4x2 SP#2 recommendations. F-G 0 0 P-Q 0 0
Webs 4x2 SP#3 G-H 0 0 Q-R 0 0
Truss must be installed as shown with top chord up. H-I 0 0 R-S 0 0
Bracing The overall height of this truss excluding overhang is I-J 0 0 S-T 0 0
Sheathing is required for any longitudinal(drag) 1-8-0. J-K 0 0 T-U 0 0
forces.All connections to be designed by the building
designer. Maximum Bot Chord Forces Per Ply(lbs)
Fasten rated sheathing to one face of this frame. Chords Tens.Comp. Chords Tens. Comp.
Plating Notes AQ-AP 0 0 AG-AF 0 0
AP-AO 0 0 AF-AE 0 0
All plates are 1.5X3 except as noted. AO-AN 0 0 AE-AD 0 0
Purlins AN-AM 0 0 AD-AC 0 0
AM-AL 0 0 AC-AB 0 0
In lieu of structural panels or rigid ceiling use purlins AL-AK 0 0 AB-AA 0 0
to laterally brace chords as follows: AK-AJ 0 0 AA-Z 0 0
Chord Spacing(in oc) Start(ft) End(ft)
AJ-Al 0 0 Z-Y 0 0
TC 24 0.25 24.67 AI-AH 0 0 Y-X 0 0
BC 120 0.25 24.67
Apply purlins to any chords above or below fillers AH-AG 0 0 X-W 0 0
at 24"OC unless shown otherwise above.
End Vertical Attachment Maximum Web Forces Per Ply(lbs)
Webs Tens.Comp. Webs Tens. Comp.
Attach notched end vertical(s)to next end vertical
using(3)qty.10d box or(0.128"x3"min)gun nails,or AR-AQ 0 7 U-W 0 5
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire A-AG 0 -45 W-V 0 -6
staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each Maximum Gable Forces Per Ply(lbs)
narrow face. Gables Tens.Comp. Gables Tens. Comp.
B-AP 0 -114 K-AF 0 -101
C-AO 0 -98 M-AE 0 -101
D-AN 0 -102 N-AD 0 -101
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(111'11) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer %
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
• 72128 Ply:1 SEQN:24880/T51/SY42
Cellar Residence Qty: 1 FROM: DRW:
FGE02 Wgt:134.4 lbs Page 2 of 2 ... / ... 02/16/2018
E-AM 0 -101 O-AC 0 -101
F-AL 0 -101 P-AB 0 -101
G-AK 0 -101 Q-AA 0 -102
H-AJ 0 -101 R-Z 0 -100
I-Al 0 -101 S-Y 0 -105
J-AH 0 -101 T-X 0 -81
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(11-1.{) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHouse Michael G Kozlowski Jeffrey P Ameson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:24881/T4/SY42 '
Cellar Residence Qty: 1 FROM: DRW:
FGE03 Wgt:33.6 lbs ... / ... 02/16/2018
1,5„8 I 1,4„-H
(TYP)
A B C D E
Ti i. ...mm....... ..—...uhF I
1 .. • • ■ ■■ Alk 10'1"2
III 3X3 H III 3X3
h 4'8"15 H
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs),or'=PLF
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.000 B 999 360 G" 118 /- /- /- /- /57.0
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.001 B 999 240 G Min Brg Width Req= -
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.001 E - - Bearing K Fcperp=565psi.
Des Ld: 62.00 EXP:NA HORZ(TL): 0.002 E - -
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Maximum Top Chord Forces Per Ply(lbs)
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.135 Chords Tens.Comp. Chords Tens. Comp.
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.021 A-B 0 0 C-D 0 0
Spacing:24.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI:0.029 B-C 0 0 D-E 0 0
C&C Dist a:NA ft FT/RT:30(0)/10(0) Mfg Specified Camber:
I:NA GCpi:NA Plate Type(s): Maximum Bot Chord Forces Per Ply(lbs)
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15 Chords Tens.Comp. Chords Tens. Comp.
Lumber Additional Notes K-J 0 0 I-H 0 0
Top chord 4x2 SP#2 Truss must be installed as shown with top chord up. J-I 0 0 H-G 0 0
Bot chord 4x2 SP#2 The overall height of this truss excluding overhang is
Webs 4x2 SP#3 1-8-0.
Maximum Web Forces Per Ply(lbs)
Bracing Webs Tens.Comp. Webs Tens. Comp.
Sheathing is required for any longitudinal(drag) L-K 0 -10 E-G 13 0
forces.All connections to be designed by the building A-K 0 -67 G-F 0 -8
designer.
Fasten rated sheathing to one face of this frame. Maximum Gable Forces Per Ply(lbs)
Plating Notes Gables Tens.Comp. Gables Tens. Comp.
All plates are 1.5X3 except as noted. B-J 0 -170 D-H 0 -123
C-I 0 -156
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.25 4.50
BC 51 0.25 4.50
Apply purlins to any chords above or below fillers
at 24”OC unless shown otherwise above.
End Vertical Attachment
Attach notched end vertical(s)to next end vertical
using(3)qty.10d box or(0.128"x3"min)gun nails,or
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each
narrow face.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(IT'14) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /�
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru eHo u se Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
• 72128 Ply:1 SEAN:24882/T47/SY42
Cellar Residence Qty: 1 FROM: DRW:
FGE04 Wgt:86.8 lbs ... / ... 02/16/2018
H 15"8+ 1,4"H
(TYP)
A B C D E F G H I J K L M
T 38 AB-- N
i70
I — - - - - - — 0101"2
/// ////////// Q
AA Z Y X W V U T S R Q P
1113X3 1113X3
r 153" i
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs),or'=PLF
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.000 L 999 360 AA'80 /- /- /- /- /177
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.001 L 999 240 O 59 /- /- /- /- /5.5
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL):-0.001 M - - AA Min Brg Width Req= -
Des Ld: 62.00 EXP:NA HORZ(TL): 0.001 M - - 0 Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings AA&P Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.081
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.020 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.026 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:30(0)/10(0) Mfg Specified Camber: A-B 0 0 G-H 0 0
I:NA GCpi:NA Plate Type(s): B-C 0 0 H-I 0 0
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15 C-D 0 0 I-J 0 0
Lumber Additional Notes D-E 0 0 J-K 0 0
E-F 0 0 K-L 0 0
Top chord 4x2 SP#2 See detail STRBRIBR1014 for bracing and bridging F-G 0 0 L-M 0 0
Bot chord 4x2 SP#2 recommendations.
Webs 4x2 SP#3 Truss must be installed as shown with top chord up.
Maximum Bot Chord Forces Per Ply(lbs)
Bracing The overall height of this truss excluding overhang is Chords Tens.Comp. Chords Tens. Comp.
Sheathing is required for any longitudinal(drag) 1-8-0.
AA-Z 0 0 U-T 0 0
forces.All connections to be designed by the building Z-Y 0 0 T-S 0 0
designer. Y-X 0 0 S-R 0 0
Fasten rated sheathing to one face of this frame. X-W 0 0 R-Q 0 0
Plating Notes W V 0 0 Q-P 0 0
V-U 0 0 P-O 0 0
All plates are 1.5X3 except as noted.
Purlins Maximum Web Forces Per Ply(lbs)
In lieu of structural panels or rigid ceiling use purlins Webs Tens.Comp. Webs Tens. Comp.
to laterally brace chords as follows: AB-AA 0 -7 M-O 0 -5
Chord Spacing(in oc) Start(ft) End(ft) A-M 0 -44 O-N 0 -6
TC 24 0.25 15.00
BC 120 0.25 15.00
Apply purlins to any chords above or below fillers Maximum Gable Forces Per Ply(lbs)
at 24"OC unless shown otherwise above. Gables Tens.Comp. Gables Tens. Comp.
End Vertical Attachment B-Z 0 -114 H-T 0 -101
Attach notched end vertical(s)to next end vertical C-Y 0 98 I-S 0 102
using(3)qty.10d box or(0.128"x3"min)gun nails,or D-X 0 -102 J-R 0 99
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire E-W 0 -101 K-Q 0 113
staples,through wide face;or(3)qty.16-Gauge,1" F-V 0 -101 L-P 0 -52
Crown(minimum),1-1/2"length wire staples on each G-U 0 -101
narrow face.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
611'1.1) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru House Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:24883/T49/SY42 •
Cellar Residence Qty: 1 FROM: DRW:
FGE05 Wgt:75.6 lbs ... / ... 02/16/2018
H 1'5"8+ 1'4"H
(TYP)
A B C D E F G H I J K
T3"8 x 1 - - - - - - - - - L
W
I - - - - - - - - - — 010'1"2
1113X3 V U T S R Q P 0 N 1113X3
I- 13'5" 1
Loading Criteria(psi) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs),or'=PLF
TCLL: 40.00 Wind Std: NA Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 17.00 Speed: NA mph Pf:NA Ce:NA VERT(LL): 0.000 K 999 360 W 55 /- /- /- /- /5.5
BCLL: 0.00 Enclosure:NA Lu:NA Cs:NA VERT(TL): 0.000 K 999 240 M* 80 /- /- /- /- /155
BCDL: 5.00 Category:NA Snow Duration:NA HORZ(LL): 0.000 K - - W Min Brg Width Req= 1.5
Des Ld: 62.00 EXP:NA HORZ(TL): 0.001 K - - M Min Brg Width Req= -
NCBCLL: 10.00 Mean Height:NA ft Code/Misc Criteria Creep Factor:2.0 Bearings W&W Fcperp=565psi.
Soffit: 0.00 TCDL:NA psf Bldg Code: FBC 2017 RES Max TC CSI: 0.091
Load Duration:1.00 BCDL:NA psf TPI Std: 2014 Max BC CSI: 0.014 Maximum Top Chord Forces Per Ply(lbs)
Spacing:16.0" MWFRS Parallel Dist:NA Rep Factors Used:Yes Max Web CSI: 0.024 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:NA ft FT/RT:30(0)/10(0) Mfg Specified Camber: A-B 0 0 F-G 0 0
I:NA GCpi:NA Plate Type(s): . B-C 0 0 G-H 0 0
Wind Duration:NA WAVE VIEW Ver:17.02.02.1208.15 C-D 0 0 H-I 0 0
Lumber Additional Notes D-E 0 0 I-J 0 0
Top chord 4x2 SP#2 See detail STRBRIBR1014 for bracing and bridging E-F 0 0 J-K 0 0
Bot chord 4x2 SP#2 recommendations.
Webs 4x2 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Truss must be installed as shown with top chord up. Chords Tens.Comp. Chords Tens. Comp.
Bracing The overall height of this truss excluding overhang is
Sheathing is required for any longitudinal(drag) 1-8-0. W-V 0 0 Q-Q 0 0
V-U 0 0 Q-P 0 0
forces.All connections to be designed by the building U-T 0 0 P-0 0 0
designer. T-S 0 0 0-N 0 0
Fasten rated sheathing to one face of this frame. S-R 0 0 N-M 0 0
Plating Notes
All plates are 1.5X3 except as noted. Maximum Web Forces Per Ply(lbs)
Webs Tens.Comp. Webs Tens. Comp.
Purlins X-W 0 -7 K-M 0 -30
In lieu of structural panels or rigid ceiling use purlins A-W 0 -45 M-L 0 -6
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.25 13.17 Maximum Gable Forces Per Ply(lbs)
Gables Tens.Comp. Gables Tens. Comp.
120 0.25 13.17 P.
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above. B-V 0 -114 G-Q 0 101
C-U 0 -98 H-P 0 -101
End Vertical Attachment D-T 0 -102 I-0 0 -103
Attach notched end vertical(s)to next end vertical E-S 0 -101 J-N 0 94
using(3)qty.10d box or(0.128"x3"min)gun nails,or F-R 0 -101
(5)qty. 15-Gauge,7/16"Crown,2-1/2"length wire
staples,through wide face;or(3)qty.16-Gauge,1"
Crown(minimum),1-1/2"length wire staples on each
narrow face.
NOTES:
It- 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
6111) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /g*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
TrueHouse PE No.608391owski PErNo. 8544son PE No. Murray7457APE No.7 69311
• 72128 Ply:1 SEQN:24956/T6/GABL
Cellar Residence Qty: 2 FROM: DRW:
GE01 Wgt:35.0 lbs ... / ... 02/16/2018
9 1.1.4 s'q 6'8'8
z�
9 3,5"12 I 1,4"8
E
4
p 1113X4 D . T T
P
II
•
77; - iv
I G _ • • 010,•2
--IF
G 1113 4
1 6108 1
2.0"8 I
5'4" 14"8
5,4" I 6'a"8 I
6'10"8
(NNL)
I-478_1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DeflICSI Criteria ♦Maximum Reactions(lbs),or'=PLF
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.013 C 999 240 H 315 /132 /224 /- /121 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.028 C 999 180 F' 39 /19 /21 /- /- /77.0
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.002 C - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL):0.004 C - - H Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:15.00 ft Code I Misc Criteria Creep Factor:2.0 F Min Brg Width Req= -
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.647 Beatings H&B Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.231
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI:0.115 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 38 0 C-D 31 -134
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15 B-C 400 -573 D-E 3 -27
Lumber Additional Notes
Top chord 2x4 SP#3 See DWGS A16015ENC101014&GBLLETIN1014 for Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 2x4 SP#3 gable wind bracing and other requirements. Chords Tens.Comp. Chords Tens. Comp.
Webs 2x4 SP#3 Stacked top chord must NOT be notched or cut in B-G 5 -11 G-F 0 -1
:Stack Chord SC1 2x4 SP#2: area(NNL).Dropped top chord braced at 24"oc
Plating Notes intervals.Attach stacked top chord(SC)to dropped Maximum Gable Forces Per P lbs
top chord in notchable area using 3x4 tie-plates 24" Ply( )
All plates are 3X4(**)except as noted. oc.Center plate on stacked/dropped chord Gables Tens.Comp. Gables Tens. Comp.
(**)5 plate(s)require special positioning.Refer to interface,plate length perpendicular to chord length. D-G 385 -201 E-F 29 -12
scaled plate plot details for special positioning Splice top chord in notchable area using 3x6.
requirements. The overall height of this truss excluding overhang is
2-4-0.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 6.88
BC 79 0.29 6.88
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(11.11.-H) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:24957/T54/GABL •
Cellar Residence Qty: 1 FROM: DRW:
GE02 Wgt:333.2 lbs Page 1 of 2 ... / ... 02/16/2018
1'10'1 14'0'4 IN, 2911'8 3P'
I rto 1 I 122.3 I 3 r I 1710.4 ii
19'B ']'12
13%4(..)M 0
P p
,L I
K/ 111
JJ/' \U
2 i
F'. v
3X1 �® Cq ;m A 'l�I11111
AX
13%41'•)AW AV AU AT AS AR•5%5AG71 AP AO AN AL AK AJ
�s%5(.4.1AH AG AF AE AO A 1304(.•)
1 30'3 1
2611'8I-2•..s11']]-1221 13]032
I2er4
(NNL)
I.-4'013--j
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs),or`=PLF
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.005 Q 999 343 AX 271 /148 /299 /- /373 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.006 Q 999 343 AB`63 /53 /34 /- /- /357
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.011 W - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL):0.013 W - - AX Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:27.67 ft Code/Misc Criteria Creep Factor:2.0 AB Min Brg Width Req= -
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.778 Bearings AX&AX Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.110
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI: 0.114 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.03 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 70 0 N-O 338 -47
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15 B-C 308 -405 O-P 337 -47
Lumber Additional Notes B D 243 -118 P-Q 340 47
Top chord 2x4 SP#3 See DWGS A16030ENC101014&GBLLETIN1014 for D-E 313 -264 R-R 346 -44
Bot chord 2x4 SP#3 gable wind bracing and other requirements. D-E 20 07 -264 R-S 348 44
Webs 2x4 SP#3 Stacked topchord must NOT be notchedcut in E-F 191 -227 S-T 273 -33
:Stack Chord SC1 2x4 SP#3: or F-G 173 -191 T-U 207 -34
area(NNL).Dropped top chord braced at 24"oc G-H 163 -164 U-V 142 -38
Bracing intervals.Attach stacked top chord(SC)to dropped H-I 164 -146 V-W 77 55
top chord in notchable area using 3x4 tie-plates 24" I-J 164 -129 W-X 66 73
(a)Continuous lateral restraint equally spaced on oc.Center plate on stacked/dropped chord
member. interface,plate length perpendicular to chord length. J-K 229 -111 X-Y 82 -107
Splice top chord in notchable area using 3x6. K-L 296 -94 Y-Z 99 -142
Plating Notes The overall height of this truss excluding overhang is L-M 366 76 Z-AA 129 -207
All plates are 3X4 except as noted. 10-7-2. M-N 320 -49
(")11 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning Maximum Bot Chord Forces Per Ply(lbs)
requirements. Chords Tens.Comp. Chords Tens. Comp.
Purlins AX-AW 371 -354 AM-AL 204 -113
AW-AV 191 -115 AL-AK 204 -113
In lieu of structural panels or rigid ceiling use purlins AV-AU 194 -115 AK-AJ 204 -112
to laterally brace chords as follows: AU-ATV 197 -114 AJ-AI 203 112
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 30.25 AT-AS 198 -114 Al-AH 202 -111
BC 120 0.00 30.25 AS-AR 200 -114 AH-AG 200 -111
Apply purlins to any chords above or below fillers AR-AQ 201 -113 AG-AF 199 -110
at 24"OC unless shown otherwise above. AQ-AP 202 -113 AF-AE 197 -110
AP-AO 203 -113 AE-AD 196 -109
Wind AO-AN 204 -113 AD-AC 193 -108
Wind loads based on MWFRS with additional C&C AN-AM 204 -113 AC-AB 1 -1
member design.
Maximum Web Forces Per Ply(lbs)
Webs Tens.Comp. Webs Tens. Comp.
B-AW 384 -291 AC-AA 267 -148
Maximum Gable Forces Per Ply(lbs)
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation. �\
(11'1.{) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer i�-
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use PE No.Michael
60839 G Kozlowski
039lowski
Jeffrey
585445on
PE PE No. Murray1457APE No.76769311
• 72128 Ply:1 SEQN:24957/T54/GABL
Cellar Residence Qty: 1 FROM: DRW:
GE02 Wgt:333.2 lbs Page 2 of 2 ... / ... 02/16/2018
Gables Tens.Comp. Gables Tens. Comp.
B-AX 152 -291 P-AL 27 -77
AW-C 52 -47 AK-R 6 -76
E-AV 114 -73 AJ-S 123 -75
F-AU 104 -76 Al-T 108 -75
G-AT 103 -74 AH-U 105 -75
H-AS 106 -76 AG-V 106 -76
I-AR 105 -75 AF-W 103 -74
J-AQ 105 -75 AE-X 105 -76
K-AP 110 -76 AD-Y 101 -70
L-AO 113 -77 Z-AC 135 -99
M-AN 33 -84 AA-AB 148 -260
O-AM 40 -76
•
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation. �\
(111'14 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer iff-
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo u se PE No.l 0839 Kozlowski PE No.58544 on PE No.71457y PE No.77769311
72128 Ply:1 SEQN:32230/T8/GABL '
Cellar Residence Qty: 1 FROM: DRW:
GE03 Wgt:401.8 lbs Page 1 of 2 ... / ... 02/16/2018
11'7711
109.1z 13'5'12 158,12 1TB 19'1°1 30'3'
I- 109.12 f �. f 2.1. 1 I �. I 101'12
OW
PIT m3%4.IM;
K L-„ c
J�- P
I
12
8 ,SXS �, `F ' \' Uc�= x■3%dr•tA/1ill
I illist.N.7
IIII I ■3x.1'I o
1
A - - - - - - AO AN AM AL AK Al Al AH G AF AE AD ACI •--
■3%4C7 V AU A AS AR A. •P -424 .5X7("( B2 AB 114X5(")
93'12 1 20'11,1 I
I
9'2'6 I 2'8' I 4'3'8 I 29' I 2'8' I 89,1
92'4 11'10'4 16'1'12 189'12 21'5'12 SOT
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs),or*=PLF
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):-0.232 S 917 240 AW33 /31 /- /- /- /109
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.546 S 581 212 AP 1160 /884 /- /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL):-0.203 Y - - Z' 229 /173 /- /- /- /40.0
Des Ld: 32.00 EXP:D HORZ(TL):0.322 Y - - AC /472
NCBCLL:10.00 Mean Height:29.04 ft Code/Misc Criteria Creep Factor:2.0 AB /540
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.488 AA /339
BCDL:3.0psf TPI Std: 2014 Max BC CSI: 0.561 Wind reactions based on MWFRS
Load Duration:1.25 AW Min Brg Width Req= -
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI:0.902 AP Min Brg Width Req= 1.5
C&C Dist a:3.03 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Z Min Brg Width Req= -
GCpi:0.18 Plate Type(s): Bearings AW,AP,&AC Fcperp=565psi.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20
Lumber Wind Maximum Top Chord Forces Per Ply(lbs)
Top chord 2x4 SP#1:T4 2x4 SP SS: Wind loads and reactions based on MWFRS. Chords Tens.Comp. Chords Tens. Comp.
Bot chord 2x4 SP SS:B2 2x4 SP M-31: A-B 43 -37 M-N 75 -96
Webs 2x4 SP#3 Additional Notes g_C 40 -35 N-O 202 -264
Bracing Negative reaction(s)of-278#MAX.from a non-wind C-D 44 -39 O-P 170 -225
load case requires uplift connection.See Maximum D-E 46 -41 P-Q 217 -285
(a)Continuous lateral restraint equally spaced on Reactions. E-F 45 -41 Q-R 214 -281
member. See DWGS A16030ENC101014&GBLLETIN1014 for
gable wind bracing and other requirements. F-G 56 -50 R-S 137 180
Special Loads G-H 156 -126 S-T 158 -205
-(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25) The overall height of this truss excluding overhang is H-I 99 -130 T-U 198 -255
TC:From 57 plf at 0.00 to 57 plf at 18.23 11-7-8. I-J 28 28 U-V 220 285
TC:From 28 plf at 18.23 to 28 plf at 23.52 J-K 172 -225 V-W 58 -72
TC:From 57 plf at 23.52 to 57 plf at 30.25 K-L 108 -145 W-X 106 -135
BC:From 10 plf at 0.00 to 10 plf at 18.23 L-M 165 -213 X-Y 219 -284
BC:From 5 plf at 18.23 to 5 plf at 23.52
BC:From 10 plf at 23.52 to 10 p11 at 30.25 Maximum Bot Chord Forces Per Ply(lbs)
BC: 34 lb Conc.Load at 18.23,20.23,21.52,23.52 Chords Tens.Comp. Chords Tens. Comp.
Plating Notes AW-AV 9 -16 AK-AJ 204 -153
All plates are 3X4 except as noted. AV-AU 13 -18 AJ-Al 205 -154
(")8 plate(s)require special positioning.Refer to AU-AT 15 -19 AI-AH 227 -171
scaled plate plot details for special positioning AT-AS 17 -21 AH-AG 228 -172
requirements. AS-AR 18 -22 AG-AF 132 -99
AR-AQ 19 -23 AF-AE 128 -96
Purlins AQ-AP 20 -25 AE-AD 128 -96
In lieu of structural panels or rigid ceiling use purlins AP-AO 25 -30 AD-AC 128 -96
to laterally brace chords as follows: AO-AN 22 -25 AC-AB 277 -209
Chord Spacing(in oc) Start(ft) End(ft) AN-AM 103 -74 AB-AA 137 -104
TC 24 0.00 30.25 AM-AL 105 -75 AA-Z 128 -98
BC 75 0.00 30.25
Apply purlins to any chords above or below fillers AL-AK 158 -116
at 24"OC unless shown otherwise above.
Maximum Web Forces Per Ply(lbs)
Webs Tens.Comp. Webs Tens. Comp.
NOTES:
It- 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
6'1 I 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /f*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use Michael G PE No.60839 KozlowskiJeffrey P
PE No.58544 Arneson
urra
PE No.Derek 71457y Adam K Russell
PE No.77693
•
72128 Ply:1 SEAN:32230/T8/GABL
Cellar Residence Qty: 1 FROM: DRW:
GE03 Wgt:401.8 lbs Page 2 of 2 ... / ... 02/16/2018
G-AP 49 -57 AK-O 323 -412
I-AN 890 -676 Al-Q 131 -164
K-AL 459 -352 AG-S 560 -426
Maximum Gable Forces Per Ply(lbs)
Gables Tens.Comp. Gables Tens. Comp.
A-AW 17 -21 N-AK 233 -161
B-AV 83 -88 O-AJ 199 -141
C-AU 71 -73 P-AI 82 -51
D-AT 73 -75 Q-AH 80 -56
E-AS 77 -79 R-AG 169 -213
F-AR 68 -72 S-AF 327 -418
AQ-G 200 -105 AE-T 34 0
AP-H 400 -505 AD-U 35 -22
AO-I 445 -563 AC-V 378 -474
AN-J 357 -447 AB-W 63 -13
AM-K 256 -312 AA-X 275 -166
AL-L 167 -193 Y-Z 248 -320
NOTES:
1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
6114) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
�+ Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200 fi*/\
Tru eHo u s7 a Michael G Kozlowski Jeffrey P Ameson Derek B Murray Adam K Russell APEX
PE No.60839 PE No.58544 PE Na 71457 PE No.77693
72128 Ply:1 SEQN:28073/T44/GABL
Cellar Residence Qty: 1 FROM: DRW:
GE05 Wgt:168.0 lbs ... / ... 02/16/2018
10.1 9.111 19995 19.1 f1•
1101 91 I 9.17 110'1
I.-1.1113.+1.4...1 I^29•_.f I.-15'12-4
Ji. (..)
2
- K
1141
,e5x5C
M\5X5CN
)
e l
m
„, ,p
'L ,-1i ________• ;,'IX4•N•)®
s
AG Pr"
13 4") AF AE AD AC AB AA 2 X W V U 13X4)")
1•5X5)"•) a2
j 19'11' 1
19'12 163'8 19'12
I-2'011I 19.2 I 181, I 19.11I
I---29.1-1
(NNL) (NNL)
49'1 I.-2•-1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DeflICSI Criteria ♦Maximum Reactions(lbs),or'=PLF
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in lac Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.009 J 999 240 AG 313 /104 /216 /- /321 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.011 J 999 217 T* 65 /59 /29 /- /- /233
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.011 L - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL):0.012 L - - AG Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:26.31 ft Code/Misc Criteria Creep Factor:2.0 T Min Brg Width Req= -
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.771 Bearings AG&AG Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.096
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI:0.115 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 70 0 J-K 128 -77
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20 B-C 458 -562 K-L 103 -66
Lumber Additional Notes C-D 95 -219 L-M 29 -70
Top chord 2x4 SP#3 See DWGS A16030ENC101014&GBLLETIN1014 for E-E 118 -187M-N 42 9
9
E-F
Bot chord 2x4 SP#3:B2 2x4 SP#2: gable wind bracing and other requirements. -1511 N-O 60 11119
Webs 2x4 SP
F-G 74 -115 O-P 86 -174
:Stack Chord S#3 2x4 SP#3: Stacked top chord must NOT be notched or cut in G-H 61 -85 P-Q 63 -215
:Stack Chord SC1 2x4 SP#3: area(NNL).Dropped top chord braced at 24"oc H-I 103 -69 Q-R 423 -555
intervals.Attach stacked top chord(SC)to dropped I-J 128 -77 R-S 70 0
Plating Notes top chord in notchable area using 3x4 tie-plates 24"
oc.Center plate on stacked/dropped chord
All plates are 3X4 except as noted. interface,plate length perpendicular to chord length. Maximum Bot Chord Forces Per Ply(lbs)
Plates extending outside the truss perimeter shall be Splice top chord in notchable area using 3x6. Chords Tens.Comp. Chords Tens. Comp.
positioned within the tolerance specified on the plate The overall height of this truss excluding overhang is AG-AF 317 -318 Z-Y 352 -154
placement polygon only,without use of TPI 1-2007 7-10-10. AF-AE 344 -156 Y-X 350 -153
section 3.7.2.2 alternate positioning. Steel extending AE-AD 347 -156 X-W 349 -152
above the top chord or below the bottom chord may
be trimmed or folded along the outer edge of that AD-AC 349 -155 W-V 347 -151
chord. Steel extending elsewhere beyond outermost AC-AB 350 -155 V-U 343 -150
truss members may be folded. AB-AA 352 -155 U-T 4 -3
(**)10 plate(s)require special positioning.Refer to AA-Z 352 -154
scaled plate plot details for special positioning
requirements. Maximum Web Forces Per Ply(lbs)
Webs Tens.Comp. Webs Tens. Comp.
Purlins
In lieu of structural panels or rigid ceiling use purlins B-AF 386 -193 U-R 381 -164
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft) Maximum Gable Forces Per Ply(lbs)
TC 24 -2.04 21.96 Gables Tens.Comp. Gables Tens. Comp.
BC 120 0.00 19.92
Apply purlins to any chords above or below fillers B-AG 109 -305 Z-K 36 -98
at 24"OC unless shown otherwise above. AF-D 75 -81 Y-L 125 -72
Wind E-AE 122 -87 X-M 99 -74
F-AD 101 -75 W-N 101 -75
Wind loads based on MWFRS with additional C&C G-AC 99 -74 V-O 121 -87
member design. H-AB 125 -72 P-U 75 -81
I-AA 51 -98 R-T 101 -305
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
TH 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo u se Michael G Kozlowski Jeffrey P Ameson
Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
• 72128 Ply:1 SEAN:24985/T27/HIP_
Cellar Residence Qty: 2 FROM: DRW:
HJ05Z Wgt:44.8 lbs ... / ... 02/16/2018
4'5"4I 6'1 1"6
4'5"4 2'6"1
D
;l 25'9"7
4.24 L/ ,3X4 C
0
o
3X4 B ih
T �,_
r::: A
1 ■' .. _�
• .F 22.3„
1114X5(' ) =3X4 14X4("
I 2'10"10 II
2'6"4
I
4'1"12 6'8" 1 "6
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DefUCSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):-0.002 C 999 240 G 220 /303 /- /- /- /7.0
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.004 F 999 180 E 125 /116 /- /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.001 D - - D 21 /- /33 /- /- I 1.5
Des Ld: 32.00 EXP:D HORZ(TL):0.001 D - - Wind reactions based on MWFRS
NCBCLL:10.00 Mean Height:24.34 ft Code/Mist Criteria Creep Factor:2.0 G Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.426 E Min Brg Width Req= -
Load Duration:1.25 BCDL:3.0 psi TPI Std: 2014 Max BC CSI: 0.104 D Min Brg Width Req= -
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI: 0.150 Bearing G Fcperp=565psi.
CBC Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber A-B 28 -23 C-D 11 -7
B-C 172 -126
Top chord 2x4 SP#2
Bot chord 2x4 SP#2
Webs 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Plating Notes
("")2 plate(s)require special positioning.Refer to G-F 0 14 F-E 94 111
scaled plate plot details for special positioning
requirements. Maximum Web Forces Per Ply(lbs)
Webs Tens.Comp. Webs Tens. Comp.
Purlins
B-G 309 -167 F-C 101 0
In lieu of structural panels or rigid ceiling use purlins B-F 107 95 C-E 161 138
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.89 6.95
BC 75 0.00 6.84
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads and reactions based on MW FRS.
Additional Notes
The overall height of this truss excluding overhang is
3-9-15.
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03.
should be used in conjunction with the architectural plans during installation.
(111'1{) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /q*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru e.Ho use PE No.Michael
60839 G Kozlowski
0 39lowski PE No.58544son
o58544son PE No Murray7457PEPE No.7 69311
72128 Ply:1 SEQN:24986/T11/HIP_
Cellar Residence Qty:2 FROM: DRW:
HJO7 Wgt:40.6 lbs ... / ... 02/16/2018
7'2"15 9'9"5
I' 7'2"1 5 I 2'6"6
2.12 o D
=3X40 T11'10"7
co I
r b L'--
iN ED
aL A Am
_ 4 l: 1 1 010'1"2
[_ e F E
III 3X4 5X5(**)
I-2'10"10 I 7'1"3 2'4"6 2
7'1"3 9'5"9 9'4"5
Loading Criteria(psf) Wind Criteria- Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.018 F 999 240 G 305 /100 /- /- /- /7.0
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.063 F 999 180 E 339 /114 /- /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.005 E - - D 3 /19 /12 /- /- /1.5
Des Ld: 32.00 EXP:D HORZ(TL):0.010 E - - Wind reactions based on MWFRS
NCBCLL:10.00 Mean Height:15.00 ft Code/Misc Criteria Creep Factor:2.0 G Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.310 E Min Brg Width Req= -
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.395 D Min Brg Width Req= -
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI:0.078 Bearing G Fcperp=565psi.
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber Additional Notes A-B 15 9 C-D 2 7
Top chord 2x4 SP#2 The overall height of this truss excluding overhang is B-C 211 -667
Bot chord 2x4 SP#2 2-0-13.
Webs 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Special Loads
(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25) B F 650 -203 F-E 632 204
TC:From 0 plf at -2.89 to 54 plf at 0.00
TC:From 2 plf at 0.00 to 2 plf at 9.77 Maximum Web Forces Per Ply(lbs)
BC:From 0 plf at -2.89 to 4 plf at 0.00 Webs Tens.Comp. Webs Tens. Comp.
BC:From 10 plf at 0.00 to 10 plf at 4.29
BC:From 2 plf at 4.29 to 2 plf at 9.77 F-C 192 0 C-E 233 -724
TC: 80 lb Conc.Load at 4.29
TC: 200 lb Conc.Load at 7.12
BC: 62 lb Conc.Load at 4.29
BC: 125 lb Conc.Load at 7.12
Plating Notes
(**)1 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.89 9.77
BC 113 0.15 9.58
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads and reactions based on MW FRS.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation. �
(i'l 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /�-/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
G APEX
Tru eHo use PE No.Michael
60839 Kozlowski
Jeffrey
No.58544son PE No. Murray7457PE No.77769311
" 72128 Ply:1 SEQN:24961/T69/JACK
Cellar Residence Qty: 2 FROM: DRW:
J01Z Wgt:8.4lbs ... / ... 02/16/2018
12 C
6 1 . 1113X4(** I I 0 23'9"15
iti
N. to o
HB 8"8
AI T-
1 OMNI 22'3"
1....=4_
CI)
ED
1113X8(**)
I- 2'0"8 _I1' -1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Def/CSI Criteria A Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pt NA Ce:NA VERT(LL):-0.000 B 999 240 E 281 /221 /280 /- /- /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.001 B 999 180 D 15 /- /5 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL):-0.000 B - - C -97 /135 /128 /- /74 /1.5
Des Ld: 32.00 EXP:D HORZ(TL):0.000 B - - Wind reactions based on MWFRS
NCBCLL:10.00 Mean Height:23.36 ft Code/Misc Criteria Creep Factor:2.0 E Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.792 D Min Brg Width Req= -
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.013 C Min Brg Width Req= -
MWFRS Parallel Dist:0 to h/2 Re Factors Used:Yes Max Web CSI: 0.283 Bearing E Fcperp=565psi.
Spacing:24.0" p
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber A-B 55 0 B-C 437 -109
Top chord 2x4 SP#2
Bot chord 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 SP#3 Chords Tens.Comp.
Plating Notes E-D 0 0
(**)2 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning Maximum Web Forces Per Ply(lbs)
requirements. Webs Tens.Comp.
Purlins B-E 950 -276
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 1.00
BC 12 0.00 1.00
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
1-10-7.
NOTES:
IC 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03.
should be used in conjunction with the architectural plans during installation.
(PTI'H) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer 7g*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
TrueHouse PE No.Michael 60139 owski PE No.58544son
o58544son PE No.71457y APE No.7 69311
72128 Ply:1 SEAN:32219/T7/MONO •
Cellar Residence Qty: 6 FROM: DRW:
J02M Wgt:7.0 lbs ... / ... 02/16/2018
12 C
8 77 T T
.._
3X4(B1) B :71- '
coA MIMI gik 22'3"
Mr
►go D „
8 H_ 1 r6" H
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DeflICSI Criteria A Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):-0.019 C 865 240 B gg /19 /73 /- /52 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.032 C 700 180 D 34 /29 /27 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL):-0.013 C - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL):0.016 C - - B Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:22.96 ft Code/Misc Criteria Creep Factor:2.0 D Min Brg Width Req= -
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.165 Bearing B Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.153
Spacing:24.0" MWFRS Parallel Dist:h/2 to h Rep Factors Used:Yes Max Web CSI:0.000 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 19 0 B-C 0 -38
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20
Lumber Maximum Bot Chord Forces Per Ply(lbs)
Top chord 2x4 SP#3 Chords Tens.Comp.
Bot chord 2x4 SP#3 B-D 0 0
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -0.54 1.50
BC 16 0.15 1.50
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MW FRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
1-4-11.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
61H) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer 7g*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
TrueHouse PE Michael
39 owski PE No.58 4son PE No.71457y PE No.7 69311
72128 Ply:1 SEQN:24962/T38/JACK
Cellar Residence Qty:4 FROM: DRW:
J03 Wgt:12.6 lbs .. / ... 02/16/2018
•
12
3 Lr C
T
3X4(**) B
ITH-3-10'10"12
42A X 3 C° (1) 10'1"2
E D
1
3r
H 2'O"8 e.� 3' H
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DeflICSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):NA E 270 /178 /151 /- /58 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL):NA D 31 /9 /25 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.002 D - - C 40 /30 /18 /- /- /1.5
Des Ld: 32.00 EXP:D HORZ(TL):0.002 D - - Wind reactions based on MWFRS
NCBCLL:10.00 Mean Height:15.00 ft Code/Misc Criteria Creep Factor:2.0 E Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.606 D Min Brg Width Req= -
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.165 C Min Brg Width Req= -
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI:0.000 Bearing E Fcperp=565psi.
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber A-B 29 0 B-C 10 -23
Top chord 2x4 SP#3
Bot chord 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp.
Plating Notes g-D 0 0
(")1 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 3.00
BC 34 0.15 3.00
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
1-1-2.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this frau drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(111'1-1)
2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77893
72128 Ply:1 SEQN:24963/T68/JACK
Cellar Residence Qty: 2 FROM: DRW:
J03Z Wgt:14.0 lbs ... / ... 02/16/2018
C
(ilip24'9"15
12
6
1113X4("*) rB288 b
in
TcoN
<V
A
1 • A� 422'3"
11.7....7:-01E► Ili D
III 3X8(**)
I--2'0"8 � 3' H
3'
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefi U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):-0.000 B 999 240 E 263 /214 /237 I- /- /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.001 B 999 180 D 45 /- /15 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL):-0.001 B - - C 42 /49 /66 /- /132 /1.5
Des Ld: 32.00 EXP:D HORZ(TL):0.001 B - - Wind reactions based on MWFRS
NCBCLL:10.00 Mean Height:23.86 ft Code/Misc Criteria Creep Factor:2.0 E Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.819 D Min Brg Width Req= -
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.139 C Min Brg Width Req= -
MWFRS Parallel Dist:0 to h/2 RepFactors Used:Yes Max Web CSI: 0.138 Bearing E Fcperp=565psi.
Spacing:24.0"
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber A-B 55 0 B-C 228 -85
Top chord 2x4 SP#3
Bot chord 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 SP#3 Chords Tens.Comp.
Plating Notes E-D 0 0
(**)2 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning Maximum Web Forces Per Ply(lbs)
requirements. Webs Tens.Comp.
Purlins B-E 463 -248
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 3.00
BC 36 0.00 3.00
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
2-10-7.
NOTES:
1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation. �
(11.;) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer �� /\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
1 ru eHo use PE MichaelNo. G3 Kozlowski Jeffrey
No. 8544son Derek B
FE No.71457y APE No.Russell
• 72128 Ply:1 SEAN:24964/T62/JACK
Cellar Residence Qty: 4 FROM: DRW:
J05 Wgt:18.2 lbs ... / ... 02/16/2018
3 L/ C
r - 11'4"12
CV
CV
3X4(**) B ti
0
2 A X 1 H31_1 0'1"2
E - - D
5'
F 2'0"8 1H
5'
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):NA E 314 /179 /164 /- /76 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL):NA D 62 /- /25 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.003 D - - C 100 /66 /34 /- /- /1.5
Des Ld: 32.00 EXP:D HORZ(TL): 0.005 D - - Wind reactions based on MWFRS
NCBCLL: 10.00 Mean Height:15.00 ft Code I Misc Criteria Creep Factor:2.0 E Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.648 D Min Brg Width Req= -
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.272 C Min Brg Width Req= -
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI: 0.000 Bearing E Fcperp=565psi.
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber A-B 29 0 B-C 24 -44
Top chord 2x4 SP#3
Bot chord 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp.
Plating Notes
B-D 0 0
(")1 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 5.00
BC 58 0.15 5.00
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
1-7-2.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03.
should be used in conjunction with the architectural plans during installation.
(111'14) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru eHo u se Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:24965/T36/EJAC •
Cellar Residence Qty: 14 FROM: DRW:
J05Z Wgt:22.4 lbs ... / ... 02/16/2018
C
h _ 25'9"15
6 12
r--
1113X4(")B `-ro
T eir
v HB 4'8"8
A I,
1 • �1 22 3"
E►'-7-4 D
III3X8(")
I—2'0"8 I- 5 "I
5'
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pt NA Ce:NA VERT(LL):-0.000 B 999 240 E 312 /261 /262 /- /- /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.001 B 999 180 D 75 /- /25 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL):-0.001 B - - C 114 /40 /57 /- /191 /1.5
Des Ld: 32.00 EXP:D HORZ(TL):0.002 B - - Wind reactions based on MWFRS
NCBCLL:10.00 Mean Height:24.36 ft Code/Misc Criteria Creep Factor:2.0 E Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.822 D Min Brg Width Req= -
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.393 C Min Brg Width Req= -
MWFRS Parallel Dist:0 to h/2 RepFactors Used:Yes Max Web CSI:0.147 Bearing E Fcperp=565psi.
Spacing:24.0"
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber A-B 55 0 B-C 250 -92
Top chord 2x4 SP#3
Bot chord 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 SP#3 Chords Tens.Comp.
Plating Notes E-D 0 0
(")2 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning Maximum Web Forces Per Ply(lbs)
requirements. Webs Tens.Comp.
Purlins B-E 492 -287
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 5.00
BC 60 0.00 5.00
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang Is
3-10-7.
NOTES:
IC 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(IT'FI) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer %' i\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-914.821.5200
APEX
Tr u eHo u se Michael 0 Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE Na.71457 PE No.77693
•
72128 Ply:1 SEAN:24966/T70/EJAC
Cellar Residence Oty:4 FROM: DRW:
J07 Wgt:25.2 lbs ... / ... 02/16/2018
12 C
3 � T co 11'10"12
N
N
3X4(") B N N
42 A NH_10'1"2
E D
2'0"8 I 7'
H
7'
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Lidefl IJ# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):NA E 370 /192 /184 /- /94 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL):NA D 92 /- /36 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.013 D - - C 153 /100 /50 /- /- /1.5
Des Ld: 32.00 EXP:D HORZ(TL):0.020 D - - Wind reactions based on MWFRS
NCBCLL: 10.00 Mean Height:15.00 ft Code/Misc Criteria Creep Factor:2.0 E Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.906 D Min Brg Width Req= -
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.590 C Min Brg Width Req= -
Spacing:24.0" MWFRS Parallel Dist:h/2 to h Rep Factors Used:Yes Max Web CSI:0.000 Bearing E Fcperp=565psi.
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber A-B 29 0 B-C 37 -58
Top chord 2x4 SP#3
Bot chord 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp.
Plating Notes B-D 0 0
(")1 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 7.00
BC 75 0.15 7.00
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
2-1-2.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
6i) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEAN:28079/T28/MONO •
Cellar Residence Qty: 9 FROM: DRW:
JO7M Wgt:29.4 lbs ... / ... 02/16/2018
1113X4(** C ,
4 12
i� SD
CV ch
3X4(**)B
1■
43g( 10'1"2
A �
_E-S-
III 4X5(**?
1---- 2'0"8 1 610 8 I
6'1 0"8
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):NA B 369 /143 /249 /- /122 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL):NA D 197 /102 /113 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.009 D - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL): 0.015 D - - B Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:15.00 ft Code/Misc Criteria Creep Factor:2.0 D Min Brg Width Req= -
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.701 Bearing B Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.520
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI: 0.331 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 38 0 B-C 23 -84
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20
Lumber Maximum Bot Chord Forces Per Ply(lbs)
Top chord 2x4 SP#2 Chords Tens.Comp.
Bot chord 2x4 SP#3
Webs 2x4 SP#3 B-D 26 -40
Plating Notes Maximum Web Forces Per Ply(lbs)
(**)3 plate(s)require special positioning.Refer to Webs Tens.Comp.
scaled plate plot details for special positioning C-D 316 -151
requirements.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 6.88
BC 81 0.15 6.88
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MW FRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
The overall height of this truss excluding overhang is
2-7-11.
NOTES:
\' 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(Tri-1) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200 fi*/\
Tru eHo u se Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
• 72128 Ply:1 SEQN:24968/T63/JACK
Cellar Residence Qty: 1 FROM: DRW:
J08 Wgt:12.6 lbs ... / ... 02/16/2018
12 D
6 �� 23'9"15
03X4 C
N
5X5(**) B . o
N AWil
r--, � 1� 22'3"
►. 1)
►� E
rr$_�_ 2'6"2r6
2'6rr
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DeflICSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):NA B 118 /28 /76 /- /60 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL):NA E 35 /- /14 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL):-0.003 C - - D 63 /52 /39 /- /- /1.5
Des Ld: 32.00 EXP:D HORZ(TL):0.004 C - - Wind reactions based on MW FRS
NCBCLL:10.00 Mean Height:23.36 ft Code I Misc Criteria Creep Factor.2.0 B Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.225 E Min Brg Width Req= -
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.074 D Min Brg Width Req= -
Spacing:24.0" MWFRS Parallel Dist:h/2 to h Rep Factors Used:Yes Max Web CSI:0.056 Bearing B Fcperp=565psi.
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber A-B 12 -2 C-D 31 -63
B-C 134 -200
Top chord 2x4 SP#3
Bot chord 2x4 SP#3
:Lt Slider 2x4 SP#3:BLOCK LENGTH= 1.500' Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp.
Plating Notes
B-E 2 -2
(")1 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -0.54 2.50
BC 30 0.00 2.50
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
1-10-7.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03.
should be used in conjunction with the architectural plans during installation.
(111'.11) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /f*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo u se Michael B Kozlowski Jeffrey P Ameson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEAN:24969/T43/JACK •
Cellar Residence Qty: 1 FROM: DRW:
J09 Wgt:18.2 lbs ... / ... 02/16/2018
D
24'9"15
6 12
N
3X40
N
5X5(**)B
A I�
11= • 22'3"
►� E
„8 4 6„
4'6"
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):NA B 182 /43 /110 /- /101 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL):NA E 64 /- /27 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.018 C - - D 114 /88 /69 /- /- /1.5
Des Ld: 32.00 EXP:D - HORZ(TL): 0.030 C - - Wind reactions based on MWFRS
NCBCLL:10.00 Mean Height:23.86 ft Code I Misc Criteria Creep Factor:2.0 B Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.669 E Min Brg Width Req= -
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.275 D Min Brg Width Req= -
MWFRS Parallel Dist:h/2 to h RepFactors Used:Yes Max Web CSI: 0.268 Bearing B Fcperp=565psi.
Spacing:24.0"
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber:
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(lbs)
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15 Chords Tens.Comp. Chords Tens. Comp.
Lumber A-B 12 -2 C-D 54 -105
Top chord 2x4 SP#3 B C 683 822
Bot chord 2x4 SP#3
:Lt Slider 2x4 SP#3:BLOCK LENGTH= 1.500' Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp.
Plating Notes B E 2 -2
(")1 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -0.54 4.50
BC 54 0.00 4.50
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
2-10-7.
NOTES:
6.11) 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200 Af*'`
APEX
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
• 72128 Ply:1 SEQN:24970/T66/JACK
Cellar Residence Qty: 1 FROM: DRW:
J10 Wgt:11.2 lbs ... / ... 02/16/2018
C
6
•••
1 �� 24'3"15
00
:04.00002
r)B
l' t-43-
T -
� �
N
'v HB 1'8"8 b
iA , 1,„_
I. �11 22'3"
►E4
ED
III X8(**)
2'0"8 I 2H
2.
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefi U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):-0.000 B 999 240 E 251 /202 /237 /- /- /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.001 B 999 180 D 30 /- /10 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL):-0.001 B - - C -7 /71 /80 /- /103 /1.5
Des Ld: 32.00 EXP:D HORZ(TL):0.001 B - - Wind reactions based on MWFRS
NCBCLL: 10.00 Mean Height:23.61 ft Code/Misc Criteria Creep Factor:2.0 E Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.794 D Min Brg Width Req= -
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.058 C Min Brg Width Req= -
Spacing:24.0" MW FRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI: 0.239 Bearing E Fcperp=565psi.
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber A-B 55 0 B-C 376 -87
Top chord 2x4 SP#2
Bot chord 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 SP#3 Chords Tens.Comp.
Plating Notes E-D 0 0
(")2 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning Maximum Web Forces Per Ply(lbs)
requirements. Webs Tens.Comp.
Purlins B-E 803 -241
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 2.00
BC 24 0.00 2.00
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
2-4-7.
NOTES:
IC 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(111'1.1) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
T�'ueHouse Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:24971/T65/JACK
Cellar Residence Qty: 1 FROM: DRW:
J11 Wgt:18.2 lbs ... / ... 02/16/2018
C
ocipt253"15
6 12
t
1113X4(**)B
0
HB 3'8"8
A
• g( 22'3"
E ►_� D
1113X8(**)
2'0"8 _I. 4'
4'
•
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):-0.000 B 999 240 E 285 /236 /248 I- l- /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.001 B 999 180 D 60 /- /20 /- /- /1.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL):-0.001 B - - C 80 /36 /60 /- /161 /1.5
Des Ld: 32.00 EXP:D HORZ(TL):0.001 B - - Wind reactions based on MWFRS
NCBCLL:10.00 Mean Height:24.11 ft Code/Misc Criteria Creep Factor:2.0 E Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.821 D Min Brg Width Req= -
BCDL:3.0 sf TPI Std: 2014 Max BC CSI: 0.251 C Min Brg Width Req= -
Load Duration:1.25 P Bearing E Fcperp=565psi.
Spacing:24.0" MW FRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI:0.141
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber A-B 55 0 B-C 237 -88
Top chord 2x4 SP#3
Bot chord 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 SP#3 Chords Tens.Comp.
Plating Notes E-D 0 0
(")2 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning Maximum Web Forces Per Ply(lbs)
requirements. Webs Tens.Comp.
Purlins B-E 474 -265
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 4.00
BC 48 0.00 4.00
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MW FRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
3-4-7.
NOTES:
f 1 This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
6:14) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
TrueHouse PE No.Michael
08391owskiJeffrey
No 58544son
FEPE No. Murray7457PE No.77769311
72128 Ply:1 SEQN:24972/T50/SPEC
Cellar Residence Qty: 8 FROM: DRW:
PB01 Wgt:8.4 lbs ... / ... 02/16/2018
1'7"3 3'2"6
$„9 10"10 { 2'5"13 8
8H F 10"10�
12
T 8 V Cow3X4(**)
co
�101o T
s
I, A M-` E ms ' "ATO
1- 1'9„4 1 ;"9 1
1-
2'5'1 I 8"96-I
I" 8119-I-
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DeflICSI Criteria ♦Maximum Reactions(lbs),or'=PLF
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):-0.000 999 240 A 17 /21 /17 /- /32 /5.9
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.000 C 999 180 B* 75 /60 /42 /- /- /21.3
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.000 - - E 17 /21 /11 /- /- /5.9
Des Ld: 32.00 EXP:D HORZ(TL):0.000 - - Wind reactions based on MW FRS
NCBCLL:0.00 Mean Height:33.69 ft Code/Misc Criteria Creep Factor:2.0 A Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.017 B Min Brg Width Req= -
Load Duration:1.25 BCDL:2.0 psf TPI Std: 2014 Max BC CSI: 0.012 E Min Brg Width Req= 1.5
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI:0.000 Bearings A,B,&E are a rigid surface.
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber. Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15
Lumber A-B 39 -36 C-D 40 -37
Top chord 2x4 SP#3 B-C 40 37 D-E 15 -9
Bot chord 2x4 SP#3
Maximum Bot Chord Forces Per Ply(lbs)
Plating Notes Chords Tens.Comp.
All plates are 3X4(B1)except as noted. B-D 23 -9
(")1 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -0.48 2.25
BC 18 0.15 1.63
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MW FRS with additional CAC
member design.
Additional Notes
The overall height of this truss excluding overhang is
1-1-1.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(1Fi) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tr u eHo u se Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:32180/T29/HIPS •
Cellar Residence Qty: 1 FROM: DRW:
T04 Wgt:198.8 lbs ... / ... 02/16/2018
5'I8'3"8 14'3"8 20'3"8 26'3"8 29'7" 34'7"
I 3'3"8 I 6' I 6' I 6' I 3'3"8 I
5' I
5'
12 =_5X5(") =4X5 =5X7('") w T3 3X4 w4GX5 --.5X1.7(**)--.5X1.7(**))
6 2 C D T2 E F
T 0 R
06X6(••)B i/ /\/\/\/\ ` 16X6(..)
Im
1 1 A �� ,`J 4)22'3"
1113 8'(") 6X10( ") .H0514(**)0 atN3X4 =H0514(") =6X10(") 1113X8(")
A 34'7 1
1,2'0"8 I 5'1"12 I_ 6'1"12 6' I 6' I 6'1"12 I 5'1"12 12'0"8 I
5'1"12 11'3"8 17'3"8 23'3"8 29'5"4 347"
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.401 N 999 415 Q 2324 /785 /- /- /- /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.888 N 644 415 K 2324 /785 /- /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.098 K - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL): 0.158 K - - Q Min Brg Width Req= 2.7
NCBCLL:10.00 Mean Height:24.36 ft Code/Misc Criteria Creep Factor:2.0 K Min Brg Width Req= 2.7
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.984 Bearings Q&K Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.949
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI: 0.833 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.46 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 55 -41 F-G 1301 -4965
Wind Duration:1.60 WAVE,HS VIEW Ver:17.02.02.1208.20 B-C 969 -3279 G-H 828 -2915
Lumber Purlins C-D 827 -2914 H-I 969 -3279
D-E 1301 -4963 I-J 55 -41
Top chord 2x4 SP#2:T2 2x4 SP#1: In lieu of structural panels or rigid ceiling use purlins E-F 1474-5703
:T3 2x4 SP SS: to laterally brace chords as follows:
Bot chord 2x4 SP#1:82 2x4 SP SS: Chord Spacing(in oc) Start(ft) End(ft)
Webs 2x4 SP#3:W2 2x4 SP#2: TC 24 -2.04 36.63 Maximum Bot Chord Forces Per Ply(lbs)
BC 63 0.00 34.58 Chords Tens.Comp. Chords Tens. Comp.
Special Loads Apply purlins to any chords above or below fillers
(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25) at 24"OC unless shown otherwise above. Q-P 22 -8 N-M 5577 -1506
TC:From 56 plf at -2.04 to 56 plf at 5.00 P-O 4130 -1152 M-L 4128 -1151
TC:From 28 plf at 5.00 to 28 plf at 29.58 O-N 5573 -1504 L-K 21 8
TC:From 56 plf at 29.58 to 56 plf at 36.63
BC:From 4 plf at -2.04 to 4 plf at 0.00 Maximum Web Forces Per Ply(lbs)
BC:From 10 plf at 0.00 to 10 plf at 5.01 Webs Tens.Comp. Webs Tens. Comp.
BC:From 5 plf at 5.01 to 5 plf at 29.57
BC:From 10 plf at 29.57 to 10 plf at 34.58 B-Q 792 -2304 N-F 196 0
BC:From 4 plf at 34.58 to 4 plf at 36.63 B-P 2906 -825 F-M 319 -953
TC: 135 lb Conc.Load at 5.01,29.57 C-P 1119 -257 M-G 1302 -233
TC: 114 lb Conc.Load at 7.06,9.06,11.06,13.06 P-D 492-1842 G-L 490 -1838
15.06,17.06,17.52,19.52,21.52,23.52,25.52,27.52 D-O 1297 -231 L-H 1116 -255
BC: 200 lb Conc.Load at 5.01,29.57 O-E 317 -948 L-I 2907 -826
BC: 75 lb Conc.Load at 7.06,9.06,11.06,13.06
15.06,17.06,17.52,19.52,21.52,23.52,25.52,27.52 E-N 203 0 I-K 792 -2304
Plating Notes
(**)11 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
The overall height of this truss excluding overhang is
3-10-7.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
61111) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer 7�
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
■ UO■ e Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell APE X
{,(er-j �,(a PE No.60839 PE No.58544 PE No.71457 PE No.77693
•
• 72128 Ply:1 SEAN:32176/T30/HIPS
Cellar Residence Qty: 1 FROM: DRW:
T05 Wgt:207.2 lbs / ... 02/16/2018
7' 10'7"8 17'3"8 23'11"8 27'7" 34'7"
I 7' I 37'8 I 6'8" I 6'8" I 37"8 I 7' -I
e5X5("") m3X4 m5X5("") m3X4 4•5X5("")
C D E F G
12
T
6
0
v 04X5 BO /\/\/\
H 14X5
I A I
It 022'3"
• N M L K J
113X8("") =6X8(") ME 5X5(—) 5X5("") =6X8("") 1113X8("")
A 34'7" A
120"8I x192 I 6'9"12 6'8" 6'9.12 I x1"12 I20"8I
7'1"12 13'11"8 20'7"8 27'5"4 34'7"
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg.Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.156 E 999 415 0 1258 /538 /626 /- /173 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.352 E 999 415 J 1258 /538 /626 /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.040 J - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL):0.065 J - - 0 Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:24.86 ft Code I Misc Criteria Creep Factor:2.0 J Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.783 Bearings 0&J Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.978
Spacing:24.0" MWFRS Parallel Dist:h/2 to h Rep Factors Used:Yes Max Web CSI:0.706 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.46 ft FT/RT:30(0)/10(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 55 0 E-F 1351 -2014
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20 B-C 1033 -1662 F-G 1030 -1420
Lumber C-D 1029 -1420 G-H 1034 -1662
Top chord 2x4 SP#2 D-E 1351 -2014 H-I 55 0
Bot chord 2x4 SP#2
Webs 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Plating Notes
0-N 191 -190 L-K 1819 -1011
("")9 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning N-M 1819 -995 K-J 47 39
requirements. M-L 2160 -1214
Purlins Maximum Web Forces Per Ply(lbs)
In lieu of structural panels or rigid ceiling use purlins Webs Tens.Comp. Webs Tens. Comp.
to laterally brace chords as follows: B-O 918 -1226 E-L 210 -302
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 36.63 B-N 1374 -741 L-F 382 -162
BC 73 0.00 34.58 C-N 414 -214 F-K 453 -660
Apply purlins to any chords above or below fillers N-D 453 -660 K-G 414 -214
at 24"OC unless shown otherwise above. D-M 382 -162 K-H 1374 -741
• M-E 210 -302 H-J 915 -1226
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
4-10-7.
NOTES:
f' 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(911'11) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer %f*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
- APEX
Tru eHo use PE No.
Michael 6G Kozlowski3gJeffrey
No.58544son
o58544son Derek PE No.71457y PE No.Russell
693
72128 Ply:1 SEQN:32172/T34/HIPS •
Cellar Residence Qty: 1 FROM: DRW:
T06 Wgt:214.2 lbs ... / ... 02/16/2018
9'II 13'3"8 , 21'3"8 I 25'7" I 347"
9' 4'3"8 8' 4'3"8 9'
;5X7('") T2 D m5XT3 =
5("") 5X7("")
C Em 3X4 F
1.-
12 S 1t
s V
0
0.4X5 B /\/\
G 4X5
a) (a)
A H
1 1
2Z3"
M L K J PlI
1113X8("") .6X8(**) m 5X7("") -.6X8(**) 1113X8("")
1 347. I
2'0"851"12 51"12 51"12 9'1"12 2'0"8
I- 9'1"12 I 1T3"8 I 25'5"4 I- 34'7"
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in Ioc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pt:NA Ce:NA VERT(LL): 0.136 K 999 415 M 1351 /534 /636 /- /204 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.288 K 999 415 I 1352 /534 /636 /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.036 G - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL):0.057 G - - M Min Brg Width Req= 1.6
NCBCLL:10.00 Mean Height:25.36 ft Code/Misc Criteria Creep Factor:2.0 I Min Brg Width Req= 1.6
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max IC CSI: 0.971 Bearings M&I Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.976
Spacing:24.0" MWFRS Parallel Dist:h/2 to h Rep Factors Used:Yes Max Web CSI: 0.973 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.46 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 55 0 E-F 1045 -1565
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20 B-C 1025 -1847 F-G 1025 -1848
Lumber Additional Notes C-D 1045 -1564 G-H 55 0
Top chord 2x4 SP SS:T2,T3 2x4 SP#2: The overall height of this truss excluding overhang is D-E 1182 -1945
Bot chord 2x4 SP#2 5-10-7.
Webs 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Bracing
M-L 250 -236 K-J 1878 -901
(a)Continuous lateral restraint equally spaced on L-K 1876 -890 J-I 89 -67
member.
Plating Notes Maximum Web Forces Per Ply(lbs)
("")8 plate(s)require special positioning.Refer to Webs Tens.Comp. Webs Tens. Comp.
scaled plate plot details for special positioning B-M 919-1315 K-E 280 51
requirements. B-L 1475 -677 E-J 336 -526
Purlins C-L 396 -151 J-F 400 -154
L-D 334 -523 J-G 1475 -678
In lieu of structural panels or rigid ceiling use purlins D-K 283 48 G-I 916 -1315
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 36.63
BC 86 0.00 34.58
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include SCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(11-11) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
TrueHouse PE Michael
39lowski PE No.58544son
o58544son PE No Murray1457APE No.78769311
• 72128 Ply:1 SEAN:32168/T37/HIPS
Cellar Residence Qty: 1 FROM: DRW:
T07 Wgt:221.2 lbs ... / ... 02/16/2018
6'10'13I 11' I 17'3'8 I 237" , 27'8'3 , 34'7"
6'10"13 4'1'3 6'3"8 6'3"8 4'1'3 610"13
05X5("') 1113X4 m5X5("')
D E F
\ ALm3x4X5l
1:1
12
6N
to4X5 B1 en �2r3
M M CD L 0 K J
1113X8(") =6X8(") 56X8(") m6X8(") 1113X8(")
A 34'7' 1
2'0"8 6'1013 10'4"11 10'411 6'1013 2'0"8
6'10'13 I 17'3"8 I 27'8"3 I 34'7"
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Def/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.132 E 999 415 N 1421 /530 /642 /- /235 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.269 E 999 415 J 1422 /530 /642 /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.032 C - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL):0.048 C - - N Min Brg Width Req= 1.7
NCBCLL:10.00 Mean Height:25.86 ft Code/Misc Criteria Creep Factor:2.0 J Min Brg Width Req= 1.7
Soffit: 2.00 TCDL:4.2 psi Bldg Code: FBC 2017 RES Max TC CSI: 0.768 Bearings N&J Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.970
Spacing:24.0" MWFRS Parallel Dist:h/2 to h Rep Factors Used:Yes Max Web CSI:0.660 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.46 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 55 0 E-F 1105 -1841
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20 B-C 1010-1971 F-G 1178 -1943
Lumber C-D 1178-1941 G-H 1010 -1972
D-E 1105-1841 H-I 55 0
Top chord 2x4 SP#2
Bot chord 2x4 SP#2:B2 2x4 SP#1:
Webs 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Plating Notes
N-M 246 -250 L-K 1524 -646
(")7 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning M-L 1524 -614 K-J 33 26
requirements.
Maximum Web Forces Per Ply(lbs)
Purlins Webs Tens.Comp. Webs Tens. Comp.
In lieu of structural panels or rigid ceiling use purlins B-N 904 -1410 L-F 521 -201
to laterally brace chords as follows: B-M 1674 -743 F-K 343 -208
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 36.63 C-M 348 -323 K-G 348 -323
BC 115 0.00 34.58 M-D 341 -207 K-H 1675 -744
Apply puffins to any chords above or below fillers D-L 522 -201 H-J 902 -1411
at 24"OC unless shown otherwise above. E-L 321 -382
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
6-10-7.
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include SCSI 1-03.
should be used in conjunction with the architectural plans during installation.
611) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer 7q*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
ru eHo use PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply 1 SEQN:32164/T40/HIPS •
Cellar Residence Qty: 1 FROM: DRW:
T08 Wgt:218.4 lbs ... / ... 02/16/2018
6'10"10I 13' I 21'7" I 27'8"6 I 347"
6'10"10 6'1"6 87' 6'1"6 6'10"10
_5XD7(-.) T3 e:5X7("')
E
12
6 05X5("")C F 145X5 )
(a)
04X5 B G\4X5
i
T A + H
1 1 , !i1 273"
NI M L K J I
1113X8(") m4X5 =6X8("") m5X5(`") =5X5 1113X8("")
A 34'7" 1
2'0"8 , 6'9"1I 6'4"11 I 8'5"4 I 6'2"15 I 6'9"1 , 70"8
6'9"1 13'1"12 217' 2T9"15 34'7"
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DefUCSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.102 K 999 415 N 1326 /526 /642 /- /266 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.219 K 999 415 I 1344 /526 /642 /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.033 I - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL):0.052 I - - N Min Brg Width Req= 1.6
NCBCLL:10.00 Mean Height:26.36 ft Code/Misc Criteria Creep Factor:2.0 I Min Brg Width Req= 1.6
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.762 Bearings N&I Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.999
Spacing:24.0" MWFRS Parallel Dist:h/2 to h Rep Factors Used:Yes Max Web CSI: 0.643 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.46 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 55 0 E-F 995 -1635
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20 B-C 988 -1761 F-G 988 -1789
Lumber Additional Notes C-D 992-1592 G-H 55 0
Top chord 2x4 SP#2:T3 2x4 SP#1: The overall height of this truss excluding overhang is D-E 978 -1365
Bot chord 2x4 SP#2 7-10-7.
Webs 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Bracing N-M 279 -279 K-J 1534 -749
(a)Continuous lateral restraint equally spaced on M-L 1508 -709 J-I 46 -25
member.
L-K 1398 -577
Plating Notes
(**) plate(s) q specialpositioning. Maximum Web Forces Per P (Ibis)
8 late s require ositionin Refer to Ply
scaled plate plot details for special positioning Webs Tens.Comp. Webs Tens. Comp.
requirements. B-N 902 -1291 E-K 345 -86
Purlins B-M 1471 -724 K-F 215 -221
M-C 157 -179 F-J 157 -192
In lieu of structural panels or rigid ceiling use purlins C-L 216 -235 J-G 1496 -724
to laterally brace chords as follows: D-L 315 -87 G-I 899 -1308
Chord Spacing(in oc) Start(ft) End(ft) L-E 160 -250
TC 24 -2.04 36.63
BC 100 0.00 34.58
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
NOTES:
6r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
1I 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /ft/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
•
' 72128 Ply:1 SEAN:32158/T41/HIPS
Cellar Residence Qty: 1 FROM: DRW:
T09 Wgt:242.9 lbs ... / ... 02/16/2018
6'10'10 12295 15 1T3"8 197" 22'4'1 27'8"6 t, 34'T
6'10'10 I 5'4'5 II I 2'3'8) 2'3'8( 25'1 5'4•5 6'10"10
05X7(**) 114X44 5X7(")
83X4eeee. H*813X412
6
05X5(")C 1%5X5("")
o (a) (a)
io
84X5 B / 4X5,T AK
1 -•■ .� �- _022'3"
Q P O N M L
113X8(••) 05X5 -.5X5(") -3X8 =5X5(") m5X5 1113X8(")
I 347' I
2081 65'1 I 5'2'5 I 5'4'1 I 5'4'1 I 5'2.5 I 69'1 12'0"8
691 11'11'7 17'3'8 227'9 27'9"15 347'
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Cf:NA CAT:NA PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.141 0 999 415 R 1344 /374 /638 /- /296 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.299 0 999 415 L 1345 /374 /638 /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.040 D - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL):0.063 D - - R Min Brg Width Req= 1.6
NCBCLL:10.00 Mean Height:26.86 ft Code I Misc Criteria Creep Factor:2.0 L Min Brg Width Req= 1.6
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.618 Bearings R&L Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.986
Spacing:24.0" MWFRS Parallel Dist:h to 2h Rep Factors Used:Yes Max Web CSI:0.622 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.46 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 55 0 F-G 866 -1194
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20 B-C 964-1800 G-H 917 -1341
Lumber Additional Notes C-D 990-1641 H-I 990 -1642
Top chord 2x4 SP#2:T3 2x6 SP SS Dense: The overall height of this truss excluding overhang is E-E 917-1394 J-K 55 0
.-J 964 -1800
E-F 866-119 4
Bot chord 2x4 SP#2 8-10-7.
Webs 2x4 SP#3
Maximum Bot Chord Forces Per Ply(lbs)
Bracing Chords Tens.Comp. Chords Tens. Comp.
(a)Continuous lateral restraint equally spaced on R-Q 309 -310 O-N 1387 -575
member.
Q-P 1544 -687 N-M 1544 -726
Plating Notes P-O 1387 -538 M-L 42 -26
(")8 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning Maximum Web Forces Per Ply(lbs)
requirements. Webs Tens.Comp. Webs Tens. Comp.
Purlins B-R 895-1311 F-O 634 -357
B-Q 1511 -700 H-N 275 -110
In lieu of structural panels or rigid ceiling use purlins Q-C 154 -179 N-I 201 -234
to laterally brace chords as follows: C-P 200 -234 I-M 154 -178
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 36.63 P-D 274 -110 M-J 1512 -701
BC 115 0.00 34.58 D-O 273 -395 J-L 893 -1312
Apply purlins to any chords above or below fillers 0-H 273 -396
at 24"OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03.
should be used in conjunction with the architectural plans during installation. /f*/\
TH 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:32150/T33/HIPS •
Cellar Residence Qty: 1 FROM: DRW:
T10 Wgt:252.0 lbs ... / ... 02/16/2018
4'9" 99.8 149"12 18'6" 239"329'0"10 36'1"
I 4'9" 4'9"8 I 4'9"4 I 47'4 { 5'3"3 I 5'3"7 I 7'0"6
G
3X4F H 3X4
12 0
6
00
r 03X4E
o
__(a)
D
T4
i3X4C Jg4x5
1 22'3"
R 0 P 0 N M L
1113X4 =3X4 =3X8 E5X5 113X8(")
1 36'1" 1
n 4 7"8 I 4 7"8 I 4 9"4 I_ 10'0"7 I 5'3.3 I 6'9"1 12'0"8
4'7"8 9'3" 14'0"4 24'0"11 29'3"15 36'1"
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs),or'=PLF
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udetl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.130 P 999 409 B* 666 /183 /302 /- /173 /23.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.279 P 999 409 L 1383 /376 /640 /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.048 L - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL): 0.075 L - - B Min Brg Width Req= -
NCBCLL:10.00 Mean Height:27.36 ft Code/Misc Criteria Creep Factor:2.0 L Min Brg Width Req= 1.6
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.700 Bearings B&L Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.978
Spacing:24.0" MWFRS Parallel Dist:h to 2h Rep Factors Used:Yes Max Web CSI:0.601 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.61 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 12 -3 F-G 916 -1404
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20 B-C 1159-2087 G-H 904 -1412
Lumber Additional Notes C-D 1099-2041 H-I 974 -1718
D-E 1099-1997 I-J 948 -1861
Top chord 2x4 SP#1:T3,T4 2x4 SP#2: The overall height of this truss excluding overhang is E-F 1015 -1736 J-K 55 0
Bot chord 2x4 SP#2 9-10-7.
Webs 2x4 SP#3
:Lt Slider 2x4 SP#2:BLOCK LENGTH= 2.000' Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Bracing
(a)Continuous lateral restraint equally spaced on B-R 3569 -1741 O-N 1464 562
member. R-0 17:: -874 N-M 1598 -704
Q-P 1730 -747 M-L 44 -28
Plating Notes P-0 1488 -551
All plates are 5X5(")except as noted.
7 plate(s)require special positioning. Maximum Web Forces Per Ply(lbs)
O p q p Refer to
Webs Tens.Comp. Webs Tens. Comp.
scaled plate plot details for special positioning
requirements. R-D 117 -135 0-H 354 -481
Purlins D-Q 144 -106 H-N 258 -97
Q-E 180 -59 N-I 187 -213
In lieu of structural panels or rigid ceiling use purlins E-P 285 -358 I-M 149 -186
to laterally brace chords as follows: P-F 363 -180 M-J 1564 -677
Chord Spacing(in oc) Start(ft) End(ft) F-O 409 -562 J-L 890 -1349
TC 24 -0.54 38.13 G-O 937 -577
BC 101 0.00 36.08
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(IrrH) 2.Apex Technology is a fictitious name owned by Jan Apex Technology Inc.,Florida Corporation. Florida Engineer /gt\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru House Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
' 72128 Ply:1 SEQN:32255/T35/SPEC
Cellar Residence Qty: 1 FROM: DRW:
T11 Wgt:236.6 lbs ... / ... 02/16/2018
8'4"10 13'9"1318'9"8 23'9'7 29'0.10 361"
8'4'10 I 5'5"3 I 4'11'11 I 4'11'15 I 5'3'3 I 7'0'6
Fm5X5("')
s 3X4E '`G'45X5('")
12
6
n ' /**********
P 055X5(")D 5X5(")
m
=5x7('•)B4X4C
1 "4
T
A ._; =: J T)
i 7
idIi4X5
; ;;� 1 22'3'
P 0 N M L
M3X4 =-5X5("') =3X8 w5X5(") =5X5 IN3X8('")
1 361" j
Ft6"8 8'4'13 I 5'1'7 I 5'3'3 I 5'3'3 I 5'3'3 I 65'1 12'0'8
1 8'4"13 13'6"5 18'9"8 24'0'11 29'3'15 36'1'
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.152 C 999 433 B 1293 /360 /588 /- /342 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.351 C 999 433 K 1394 /385 /647 /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.077 C - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL): 0.120 C - - B Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:27.43 ft Code/Misc Criteria Creep Factor:2.0 K Min Brg Width Req= 1.6
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.906 Bearings B&K Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.978
Spacing:24.0" MWFRS Parallel Dist:h to 2h Rep Factors Used:Yes Max Web CSI: 0.837 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.61 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 12 -3 F-G 935 -1438
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20 B-C 1628-2721 G-H 1003 -1740
Lumber Additional Notes C-D 1178 -2219 H-I 974 -1882
Top chord 2x4 SP#2:T1 2x4 SP#1: The overall height of this truss excluding overhang is E-E 1943 -1436 I-J 55 0
E-F 943 -1436
Bot chord 2x4 SP#2 10-0-3.
Webs 2x4 SP#3
:Lt Slider 2x4 SP#3:BLOCK LENGTH= 1.500' Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Bracing
(a)Continuous lateral restraint equally spaced on B P 1911 -892 N-M 1483 586
member. P-O 1910 -892 M-L 1617 -727
0-N 1558 -606 L-K 44 -28
Plating Notes
(**)8 plate(s)require special positioning.Refer to Maximum Web Forces Per Ply(lbs)
scaled plate plot details for special positioning Webs Tens.Comp. Webs Tens. Comp.
requirements.
P-D 223 0 G-M 253 -96
Purlins D-0 376 -467 M-H 186 -213
In lieu of structural panels or rigid ceiling use purlins O-E 404 -211 H-L 153 188
to laterally brace chords as follows: E-N 409 -584 L-I 1582 701
Chord Spacing(in oc) Start(ft) End(ft) F-N 937 -561 I-K 905 -1361
TC 24 -0.54 38.13 N-G 343 -475
BC 99 0.00 36.08
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
.. )
should be used in conjunction with the architectural plans during installation. � �
(9}1 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer %�-/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo u se Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:32154/T39/COMN •
Cellar Residence Qty: 1 FROM: DRW:
T11A Wgt:235.2 lbs ... / ... 02/16/2018
I 70"9 I 12'2"11 I 17.3"8 I 22'4"1 I ' 6 278" I 3347"
I
7'0"9 5'2"2 5'0"13 5'0"9 5'4"5 6'10"10
0.5X5(—)
12 05X51"")C" E4a3X4
6
c 03X48 F>5X5("")
.x
04X5("")A Gl4X5
"
_ 1 W■ ■ 22' 3"
OiiN Ni L K J
113X8("") .5X5 m5X5(") =3X8 w5X5("") .5X5 113X8(")
1 34'7" 1
6'9"1 5'2"5 5'4"1 5'4"1 5'2"5 6'9"1 2'0"8
I 6'9"1 I 11'11"7 I 17'3"8 I 227"9 I 27'9"15 I 34'7" I I
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.111 L 999 415 0 1218 /346 /514 /- /305 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.236 L 999 415 I 1348 /381 /627 /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.033 I - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL): 0.052 I - - 0 Min Brg Width Req= 1.5
NCBCLL: 10.00 Mean Height:27.43 ft Code/Misc Criteria Creep Factor:2.0 I Min Brg Width Req= 1.6
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.836 Bearings 0&I Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.992
Spacing:24.0" MWFRS Parallel Dist:h to 2h Rep Factors Used:Yes Max Web CSI: 0.927 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.46 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 972-1821 E-F 948 -1653
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.20 B-C 983-1661 F-G 923 -1803
Lumber Additional Notes C-D 888-1339 G-H 55 0
D-E 876-1340
Top chord 2x4 SP#2 The overall height of this truss excluding overhang is
Bot chord 2x4 SP#2 10-0-3.
Webs 2x4 SP#3 Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Bracing O-N 329 -328 L-K 1406 -543
(a)Continuous lateral restraint equally spaced on N-M 1570 -715 K-J 1546 -685
member. M-L 1409 -530 J-I 44 -27
Plating Notes
("")8 plate(s)require special positioning.Refer to Maximum Web Forces Per Ply(lbs)
scaled plate plot details for special positioning Webs Tens.Comp. Webs Tens. Comp.
requirements. A-O 704 -1185 L-E 345 -485
Purlins A-N 1513 -706 E-K 261 -100
N-B 154 -178 K-F 189 -217
In lieu of structural panels or rigid ceiling use purlins B-M 244 -244 F-J 146 178
to laterally brace chords as follows: M-C 278 -138 J-G 1511 -658
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.00 36.63 C-L 348 -489 G-I 873 -1315
BC 110 0.00 34.58 D-L 849 -511
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
NOTES:
f
61}{) 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Flonda Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru eHo use usse
PE No.l 60839 PE
PE No 58544effrey P son PE No. Murray7457PE No.7Adam K7769311
APEX
• 72128 Ply:3 SEQN:24987/T5/COMN
Cellar Residence Qty: 1 FROM: DRW:
T12 Wgt:924.0 lbs ... / ... 02/16/2018
3'7"11 I 7'2"8 I 10'7"12 i 14'1"8 I 17'3"8 I '"20'5"8 I '"
23'11"4 I 27'4"8 I 30'11"5 I 347"
3'7"11 3'6"13 3'5"4 3'5"12 3'2" 32 3 3'5"4 3'6"13 3'7"11
F_6X6(..)
Nii-
04X8 E C'.44X8
12
6 f 5X5(•.)U W11 H.45X5(..)
C I
.48X12(")
/8X12(-) B J
(I) T" 4
4� I�
113X4('•) 113X4(•")
T r Ave(a) la) W1
1 ■ i ■
22'3-
V 1110X12(•') U T S R a P O N M "IL W
4X4 =6x8(••) .5X5 8X8 •5X5 ;a8X8(•-) m4X4 1110x12("")
A 347" A
37"4I 3'3"12 I 3'5"8 I 3'5"8 i 3'5"8 I 3'5"8 I 3'5"8 I 3'5"8 I 3'3"12 I 3'7"4
3'7"4 6'11" 10'4"8 13'10" 17'3"8 209" 24'2"8 27'8" 30'11"12 347"
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.298 R 999 415 V 11681/6828 /- /- /- /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.650 R 875 415 W 11642/6913 /- /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.096 C - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL): 0.153 C - - V Min Brg Width Req= 4.2
NCBCLL:0.00 Mean Height:27.94 ft Code/Misc Criteria Creep Factor:2.0 W Min Brg Width Req= 4.2
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.901 Bearings V&W Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.605
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI: 0.841 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.46 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 150 -247 F-G 2545 -4314
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15 B-C 3402-5811 G-H 2930 -4956
Lumber Plating Notes C-D 3243-5529 H-I 3264 -5512
D-E 2930-4982 I-J 3433 -5791
Top chord 2x4 SP#2 All plates are 3X4 except as noted. E-F 2545 -4314 J-K 152 -246
Bot chord 2x6 SP SS Dense (I)-plates so marked were sized using 0%
Webs 2x4 SP#3:W1 2x6 SP#2: Fabrication Tolerance, 0 degrees Rotational
:W2,W11 2x4 SP#2: Tolerance,and/or zero Positioning Tolerance. Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Bracing (")11 plate(s)require special positioning.Refer to
(a)Continuous lateral restraint equally spaced on scaled plate plot details for special positioning V-U 4719 -2756 0-P 4372 -2581
member. requirements. U-T 4733-2764 P-O 4879 -2885
T-S 5170-3024 0-N 5153 -3051
Nailnote Purlins S-R 4894 -2868 N-M 4718 -2797
Nail Schedule:0.131"x3",min. In lieu of structural panels or rigid ceiling use purlins R-0 4393 -2581 M-L 4703 -2788
Top Chord: l1 Row @12.00"3",mmnails to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
Bot Chord:2 Rows @ 5.00"o.c.(Each Row) TC 24 0.00 34.58 Maximum Web Forces Per Ply(lbs)
Webs :1 Row @ 4"o.c. BC 120 0.00 34.58 Webs Tens.Comp. Webs Tens. Comp.
Repeat nailing as each layer is applied.Use equal Apply purlins to any chords above or below fillers
spacing between rows and stagger nails in each rowat 24"OC unless shown otherwise above. A-V 105 -164 0-G 819 -1363
to avoid splitting. V-B 3343 -5727 G-P 1529 -899
12"o.c.spacing of nails perpendicular and parallel to Additional Notes B-U 625 -337 P-H 609 -1013
grain required in area over bearings greater than 12" B-T 588 -348 H-0 1076 -628
The overall height of this truss excluding overhang is T-C 384 -196 0-I 248 -406
Special Loads 10-0-3.
C-S 233 -411 I-N 379 -213
(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25) S-D 1057 -586 N-J 585 -342
TC:From 56 plf at 0.00 to 56 plf at 34.58 D-R 572 -996 M-J 624 -353
BC:From 5 plf at 0.00 to 5 plf at 34.58 R-E 1594 -898 J-L 3382 -5708
BC:1251 lb Conc.Load at 2.06,4.06,6.06,8.06 E-0 819 -1420 K-L 106 164
10.06,12.06,14.06 F-Q 3726 -2177
BC:1247 lb Conc.Load at 16.15,16.65,18.65,20.65
22.52,24.52,26.52,28.52,30.52,32.52
Wind
Wind loads and reactions based on MWFRS.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03.
should be used in conjunction with the architectural plans during installation.
(11'}{) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /g /\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use PE No.Michael
0839lowski PE No.58544son
o58544son PE No. Murray7457APE No.7 69311
72128 Ply:1 SEQN:24980/T42/SPEC •
Cellar Residence Qty: 10 FROM: DRW:
T13H Wgt:217.0 lbs ... / ... 02/16/2018
4'11'2 I 15'6'12 I 25'0'2 I 30'3' I
I 4'11'2 10'7'10 10'76 4'5'16
-
°.44X4(")
T3
12 /5X71•')0 #4161 Il16.
E.45x7)")
8 V alD0
•- e F
d
r.
WS
0/6X5(")
4k455(")n T
I -� _
11 �: 22.3-
N M L K J I H
1H0310)") .8X8(") .5X5(") .4X4 .8X8(") 11H0310(")
1 30'3' 1
67'10 4'11'2 6' 1'60.1`` 4'11'2 4'5'14 4'76
I 4'7'10 I 9'6'12 I 15'6'12 46'7.10 21'6'12 I 26'0'10 I 30'3' I
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl!CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.294 L 999 363 N 1231 /720 /478 /- /363 /-
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.673 L 771 363 H 1247 /723 /462 /- /- /-
BCDL: 5.00 Risk Category:11 Snow Duration:NA HORZ(LL): 0.235 K - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL): 0.344 K - - N Min Brg Width Req= -
NCBCLL:10.00 Mean Height:29.04 ft Code I Misc Criteria Creep Factor:2.0 H Min Brg Width Req= -
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.573
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.870 Maximum Top Chord Forces Per Ply(lbs)
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI: 0.450 Chords Tens.Comp. Chords Tens. Comp.
C&C Dist a:3.03 ft FT/RT:30(0)/10(0) Mfg Specified Camber: A-B 866 -1466 D-E 357 -457
GCpi:0.18 Plate Type(s): B-C 930-1533 E-F 928 -1512
Wind Duration:1.60 WAVE,HS VIEW Ver:17.02.02.1208.15 C-D 353 -453 F-G 748 -1257
Lumber Additional Notes
Top chord 2x4 SP#1:T3,T4 2x4 SP#2: The overall height of this truss excluding overhang is Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 2x6 SP SS Dense:B3 2x4 SP#2: 11-11-11. Chords Tens.Comp. Chords Tens. Comp.
Webs 2x4 SP#3:W5 2x4 SP#2: N-M 360 -369 K-J 1203 -495
Plating Notes M-L 1182 -668 J-I 1022 -545
L-K 1203 -495 I-H 13 -14
All plates are 3X4 except as noted.
(")10 plate(s)require special positioning.Refer to Maximum Web Forces Per Ply(lbs)
scaled plate plot details for special positioning
requirements. Webs Tens.Comp. Webs Tens. Comp.
A-N 732 -1189 O-E 704 -901
Purlins A-M 1182 -621 E-J 403 -68
In lieu of structural panels or rigid ceiling use purlins M-B 228 -412 J-F 466 -283
to laterally brace chords as follows: B-L 374 -344 F-I 280 -614
Chord Spacing(in oc) Start(ft) End(ft) L-C 409 -65 I-G 1067 -563
TC 24 0.00 30.25 C-O 704 -901 G-H 725 -1190
BC 105 0.00 30.25
Apply purlins to any chords above or below fillers D-O 42 33
at 24"OC unless shown otherwise above.
Hangers I Ties
(J)Hanger Support Required,by others
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(191'1.1) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200 fiV\
TrueHouse PE No Michael
6039Kozlowski ffrNo 58544son
PE PE No. Murray71457 Adam K E No.77769311
Derek BAPEX
72128 Ply:1 SEAN.24981/T1/SPEC
Ce,' r Res rr-,_.... Qty: 7 FROM: DRW:
f 3 Wgt:228.2 lbs ... / ... 02/16/2018
4'10'14I 13'11"3 ( 17'75 I 259'2 I 30'3'
I
4'10"14 9'0"5 3'3"2 813"13 4'514
%455("") 415X7("")
E F
D Al
�O R
8 12
T4
0,5X")
5
I/4X5(")
04x56 i f'
=I A 1—.. /�I, NI-I■ a ii�r 1 __4,z23
P 0 N M L K J
IH0310(") +18X8('") m5X5(^) s 4X4 1618168("") 180310("")
1 30'3" i
I.'208 I 4'7'10 I 4'11 '2 I 4715 ( 24"15 1 1 43 I 4'5 '14 476
4 '7'10 9'6'12 14711 16'7"10 21'6'12 26'0'10 30'3'
,,
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Def1/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.261 N 999 363 P 1370 /785 /615 /- /373 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.596 N 873 363 J 1251 /697 /473 /- /- /-
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.208 M - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL):0.300 M - - P Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:27.81 ft Code/Misc Criteria Creep Factor.2.0 J Min Brg Width Req= -
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.460 Bearing P Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.570
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI:0.447 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.03 ft FT/RT:30(0)/10(0) Mfg Specified Camber. Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 70 0 E-F 405 -358
Wind Duration:1.60 WAVE,HS VIEW Ver:17.02.02.1208.15 B-C 837 -1453 F-G 393 -503
Lumber Additional Notes C-D 892 -1534 G-H 896 -1518
D-E 393 -499 H-1 723 -1263
Top chord 2x4 SP#2:T4 2x4 SP#1: The overall height of this truss excluding overhang is
Bot chord 2x6 SP SS Dense:B3 2x4 SP#2: 10-10-10.
Webs 2x4 SP#3:W5 2x4 SP#2: Maximum Bot Chord Forces Per Ply(lbs)
Chords Tens.Comp. Chords Tens. Comp.
Plating Notes P-O 362 -357 M-L 1203 -470
All plates are 3X4 except as noted. O-N 1160 -631 L-K 1028 -528
(**)9 plate(s)require special positioning.Refer to N-M 1203 -470 K-J 11 -12
scaled plate plot details for special positioning
requirements.
Maximum Web Forces Per Ply(lbs)
Purlins Webs Tens.Comp. Webs Tens. Comp.
In lieu of structural panels or rigid ceiling use purlins B-P 847 -1324 Q-F 139 -137
to laterally brace chords as follows: B-O 1173 -526 R-F 28 -20
Chord Spacing(in oc) Start(ft) End(ft) O-C 209 -413 R-G 610 -854
TC 24 -2.04 30.25 C-N 351 -305 G-L 389 -54
BC 75 0.00 30.25 N-D 391 -53 L-H 452 -279
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above. D-Q 605 -848 H-K 269 -612
E-Q 106 -102 K-I 1075 -547
Hangers/Ties Q-R 608 -853 I-J 699 -1195
(J)Hanger Support Required,by others
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
( iFII)
2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer if*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru eHo u se Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:3 SEAN:24988/T55/COMN
Cellar Residence Qty: 1 FROM: DRW:
T16 Wgt:512.4 lbs ... / ... 02/16/2018
3'7'5I 6'11'3 I 9'11'8 I 12'11'13 16'3'11 I 19'11'
3'7'5 3'3'13 3'0'5 3'0'5 3'3'13 37.5
D 84x5(")
111
/4X4 C E omx5
12 i
8
/3x4 e F\3x4
L
w5x5(")q .t4 5i XIi
_ 1 1 il ' 1 (022'3'
M L K J I "r r "H
11H0310(") 11567(R) 443X4 =8x8(") =4X4 =6X6 0
A 19'11' 1
3113 3113 3'3'133'3'13 3'3'13 3'3'13
3'3'13 I 6'7"11 I 9'11'8 I 13'3'5 I 167.3 I 19'11' '
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) DeflICSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.068 J 999 240 N 6213 /3771 /- /- /- /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.150 J 999 239 0 7331 /4424 /- /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.026 B - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D --- HORZ(TL): 0.042 B - - N Min Brg Width Req= 2.4
NCBCLL:0.00 Mean Height:27.17 ft Code I Misc Criteria Creep Factor:2.0 0 Min Brg Width Req= 2.9
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.277 Bearings N&0 Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.587
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI:0.817 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 1381 -2275 D-E 1102 -1814
Wind Duration:1.60 WAVE,HS VIEW Ver:17.02.02.1208.15 B-C 1344 -2213 E-F 1374 -2264
Lumber Purlins C-D 1102 -1814 F-G 1493 -2467
Top chord 2x4 SP#2 In lieu of structural panels or rigid ceiling use purlins
Bot chord 2x6 SP#2 to laterally brace chords as follows: Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 SP#3 Chord Spacing(in oc) Start(ft) End(ft) Chords Tens.Comp. Chords Tens. Comp.
TC 24 0.00 19.92
Nailnote BC 120 0.00 19.92 N-M 14 -9 K-J 1838 -1111
Nail Schedule:0.131"x3",min.nails Apply purlins to any chords above or below fillers M-L 1876-1136 J-I 2024 -1222
Top Chord:1 Row @12.00"o.c.
at 24"OC unless shown otherwise above. L-K 1798-1088 I-H 20 -13
Bot Chord:2 Rows @ 5.00"o.c.(Each Row)
Webs :1 Row @ 4"o.c. Additional Notes Maximum Web Forces Per Ply(lbs)
Repeat nailing as each layer is applied.Use equal The overall height of this truss excluding overhang is Webs Tens.Comp. Webs Tens. Comp.
spacing between rows and stagger nails in each row 8-2-14.
to avoid splitting. A-N 1192-1956 K-E 426 -703
12"o.c.spacing of nails perpendicular and parallel to A-M 1981 -1197 E-J 821 -477
grain required in area over bearings greater than 12" M-B 25 0 J-F 143 -237
B-L 50 -79 F-I 224 -110
Special Loads L-C 720 -418 I-G 2144 -1293
----(Lumber Dur.Fac.=1.25/Plate Dur.Fac=1.25) C-K 377 -620 G-H 1287 -2118
TC:From 57 plf at 0.00 to 57 plf at 19.92 D-K 1913 -1137
BC:From 5 plf at 0.00 to 5 plf at 19.92
BC:1231 lb Conc.Load at 2.06,4.06,6.06,8.06
10.06,12.06,13.94,15.94,17.94,18.44
Plating Notes
(I)-plates so marked were sized using 0%
Fabrication Tolerance, 0 degrees Rotational
Tolerance,and/or zero Positioning Tolerance.
("")6 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MW FRS.
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(l;II:E.it) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
Tru eHo u se Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:24982/T45/COMN
Cellar Residence Qty: 1 FROM: DRW:
T17 Wgt:134.4 lbs ... / ... 02/16/2018
5'3'4I 9'11'8 I 14'7'12 ( 19'11'
II
5'3'4 4'8'4 4'8'4 5'3'4
04X4-.-
12
8 /3X4 B D 443X4
i
Eo
113X4(3)A E 113X4(R)
r,
MI
- 1&11 1
1 J, 'I R G F 223
113X8(") =3X4 =5X7(") =3X4 113X8(")
1 19'11' 1
411'12 411'12 411'12 411'12
411'12 I 9.11'8 I 14'11'4 I 19'11'
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL):-0.021 H 999 240 J 665 /448 /307 /- /230 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.045 H 999 239 F 665 /448 /307 /- /- /5.5
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL):-0.009 B - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL): 0.012 B - - J Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:27.17 ft Code/Misc Criteria Creep Factor:2.0 F Min Brg Width Req= 1.5
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.490 Bearings J&F Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.820
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI:0.451 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 512 -752 C-D 548 -601
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15 B-C 548 -601 D-E 512 -752
Lumber
Top chord 2x4 SP#2 Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 2x4 SP#2 Chords Tens.Comp. Chords Tens. Comp.
Webs 2x4 SP#3
J-I 244 -238 H-G 573 -331
Plating Notes I-H 573 -331 G-F 22 -23
(")3 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning Maximum Web Forces Per Ply(lbs)
requirements. Webs Tens.Comp. Webs Tens. Comp.
Purlins A-J 459 -643 H-D 286 -230
A-I 565 -312 D-G 114 -88
In lieu of structural panels or rigid ceiling use purlins I-B 114 -88 G-E 565 -312
to laterally brace chords as follows: B-H 286 -230 E-F 459 -643
Chord Spacing(in oc) Start(ft) End(ft) C-H 332 -377
TC 24 0.00 19.92
BC 120 0.00 19.92
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
The overall height of this truss excluding overhang is
8-2-14.
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(11:14) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
TrueHouse Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell APEX
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEON:24990/T10/HIPM
Cellar Residence Qty: 2 FROM: DRW:
T18 Wgt:42.0lbs ... / ... 02/16/2018
I- 7' I 9'10"8
7' 2'10"8
1113Xzg**)
3 12 C=4X8
II
s_
_N
=3X4(")B N io
N
F 1114X5(R)E 1
1113X4
A 9108 i
I~2'0"8 I 7'1"12 2'8"12
7'1"12 I 9'10"8
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl!CSI Criteria A Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pt NA Ce:NA VERT(LL): 0.029 F 999 240 G 637 /283 /- /- /- /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.064 F 999 180 E 859 /325 /- /- /- /-
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.010 E - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL):0.015 E - - G Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:15.00 ft Code/Misc Criteria Creep Factor:2.0 E Min Brg Width Req= -
Soffit: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.659 Bearing G Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.974
Spacing:24.0" MWFRS Parallel Dist:0 to h/2 Rep Factors Used:Yes Max Web CSI:0.301 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 29 -17 C-D 4 -9
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15 B-C 409-1102
Lumber Wind
Top chord 2x4 SP#2 Wind loads and reactions based on MWFRS. Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 2x4 SP#2 Chords Tens.Comp. Chords Tens. Comp.
Webs 2x4 SP#3 Right end vertical not exposed to wind pressure.
B-F 1026 -369 F-E 1070 -377
Special Loads Additional Notes
_ The overall height of this truss excluding overhang is Maximum Web Forces Per Plylbs
---(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25) 2-1-2. (lbs)
TC:From 54 plf at -2.04 to 54 plf at 7.00Webs Tens.Comp. Webs Tens. Comp.
TC:From 27 p11 at 7.00 to 27 plf at 9.88 C-F 541 97 D-E 99 153
BC:From 4 plf at -2.04 to 4 plf at 0.00
BC:From 10 Of at 0.00 to 10 plf at 7.01 C-E 439 -1252
BC:From 5 plf at 7.01 to 5 plf at 9.88
TC: 156 lb Conc.Load at 7.01
TC: 153 lb Conc.Load at 9.06
BC: 431 lb Conc.Load at 7.01
BC: 92 lb Conc.Load at 9.06
Plating Notes
(**)2 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 9.88
BC 108 0.15 9.88
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Hangers/Ties
(J)Hanger Support Required,by others
NOTES:
r 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(11'11) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer /1*/\
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tr u eHo use Michael S Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEAN:24983/T22/HIPM
Cellar Residence Qty: 2 FROM: DRW:
T19 Wgt:44.8 lbs ... / ... 02/16/2018
5'S"4I 9'10"8
5'5"4 4'5"4
D
T 12 1113X4('*) T
3
=3X40 N
N
.�
E•-• En N
N N -
O
1 =3X4(")B
—
y A — —/ 110'1"2
F 1114X5(R)E O
r 9'10"8 1
I----2'0"8 I- 9'10"8
9'10"8
Loading Criteria(psi) Wind Criteria Snow Criteria(Pg,Pt in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 20.00 Wind Std: ASCE 7-10 Pg:NA Ct:NA CAT:NA PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.025 E 999 240 F 457 /216 /216 /- /114 /5.5
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(TL): 0.096 E 999 180 E 302 /115 /110 /- /- /-
BCDL: 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.007 E - - Wind reactions based on MWFRS
Des Ld: 32.00 EXP:D HORZ(TL): 0.018 E - - F Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:15.00 ft Code I Misc Criteria Creep Factor:2.0 E Min Brg Width Req= -
Sofflt: 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.385 Bearing F Fcperp=565psi.
Load Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.707
Spacing:24.0" MWFRS Parallel Dist:h/2 to h Rep Factors Used:Yes Max Web CSI: 0.250 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 29 0 C-D 0 -56
Wind Duration:1.60 WAVE VIEW Ver:17.02.02.1208.15 B-C 347 -565
Lumber
Top chord 2x4 SP#2 Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 2x4 SP#2 Chords Tens.Comp.
Webs 2x4 SP#3
B-E 525 -420
Plating Notes
(")2 plate(s)require special positioning.Refer to Maximum Web Forces Per Ply(lbs)
scaled plate plot details for special positioning Webs Tens.Comp. Webs Tens. Comp.
requirements. C-E 428 -528 D-E 91 -101
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 9.60
BC 117 0.15 9.88
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Hangers I Ties
(J)Hanger Support Required,by others
Wind
Wind loads based on MW FRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
The overall height of this truss excluding overhang is
2-7-2.
NOTES:
II' 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include BCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(TH) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc..Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
Tru eHo use Michael G Kozlowski Jeffrey P Arneson Derek B Murray Adam K Russell
PE No.60839 PE No.58544 PE No.71457 PE No.77693
72128 Ply:1 SEQN:24984/T52/MONO
Cellar Residence Qty: 8 FROM: DRW:
T20 Wgt:44.8 lbs ... / ... 02/16/2018
5'5"4 9'10"8
5'5"4 I 4'5"4
1113X4(**
3 12 T
3X40
...
N 5,, M
M
3X4(**)B _
4z A i 010'1"2
F• = 1114X5(R)E
i;� .,q 9'10"8 I
l;
9'10"8
2'0 r
1r ♦ • Ae 9'10.'8
Loading Criteria(psi) Wind•Criteria''",;„a.. Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 0.00 - Wine Std.' ASCE 7-t0 ', Pg:NA Ct:NA CAT:NA PP Deflection in loc Udell LJ# Loc R /U /Rw /Rh /RL /W
TCDL: x1.00 Speed: 130 mph Pf:NA Ce:NA VERT(LL): 0.025 E 999 240 F 457 /215 /216 /- /124 /5.5
BCLL: j 0.00 Enclosure:Closed Lu:NA ' Cs:NA VERT(TL): 0.096 E 999 180 E 299 /145 /123 /- /- /-
BCDL,V. 5.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.007 E - - Wind reactions based on MWFRS
Des Ld: .32.00 EXP:D HORZ(TL):0.018 E - - F Min Brg Width Req= 1.5
NCBC{t„ 10.00 Mean Height:15.00 ft Code(Misc Criteria Creep Factor:2.0 E Min Brg Width Req= -
Soffit�!""� 2.00 TCDL:4.2 psf Bldg Code: FBC 2017 RES Max TC CSI: 0.358 Bearing F Fcperp=565psi.
Loal Duration:1.25 BCDL:3.0 psf TPI Std: 2014 Max BC CSI: 0.745
Spacing:24.0” MWFRS Parallel Dist:h/2 to h Rep Factors Used:Yes Max Web CSI: 0.258 Maximum Top Chord Forces Per Ply(lbs)
C&C Dist a:3.00 ft FT/RT:30(0)/10(0) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 29 0 C-D 12 -47
Wind Duration:1.60 •WAVE VIEW Ver:17.02.02.1208.15 B-C 318 -570
Lumber",
•
Top chord SP#2 Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 4 sr#2 . i Chords Tens.Comp.
Webs2x4 SP#3. B-E 531 -402
is
Plating Notes
(**)2 plate(s)require special positioning.Refer to Maximum Web Forces Per Ply(lbs)
scaled plate plot details for special positioning Webs Tens.Comp. Webs Tens. Comp.
requirements. C-E 419 -543 D-E 134 -95
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -2.04 9.88
BC 117 0.15 9.88
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Hangers I Ties
(J)Hanger Support Required,by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
The overall height of this truss excluding overhang is
2-9-12.
NOTES:
f 1.This drawing is not sufficient alone for installation. Additional instructions accompanying this truss drawing,include SCSI 1-03,
should be used in conjunction with the architectural plans during installation.
(11-1.1) 2.Apex Technology is a fictitious name owned by Jax Apex Technology Inc.,Florida Corporation. Florida Engineer
Business No.7547-4745 Sutton Park Court,Suite 402,Jacksonville,FL 32224-904.821.5200
APEX
TrueHouse PE No.l 60839 E No. 8544PE No.
Kozlowski Jeffrey 71457PE No.Murray Adam 77769311