Loading...
Item 8B- Resolution No. 18-10.pdfCITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Bid 1718-03R: Lifeguard Tower Renovation SUBMITTED BY: Scott Williams, Public Works Director DATE: March 8, 2018 BACKGROUND: Bids were opened for Bid 1718-03R for the Lifeguard Tower Renovation Project on March 7, 2018. Five bids were receiving as follows: Bidder: Breaking Ground Contracting E,B. Morris General Contractors Hager Construction Holman, Inc. KBT Contracting Corp. Lump Sura Bid: $98,785.00 $86,900.00 $164,009.23 $184,537.00 $156,753.00 The scope of work includes enclosing the third floor to make a control room similar to the existing second floor control room. New hurricane -rated windows will be added above the existing windows on the second floor. Interior walls and the ceiling will be painted sheetrock and flooring will be sheet vinyl. Electrical work includes lighting and power and new wiring for TV, communications, data and speakers. Work also includes the installation of a new standing seam metal roof. The existing building has experienced water intrusion at the roof and around the windows. Work will include inspection of the existing sheathing and framing to determine the extent of damage, replacement of damaged wood, and the installation of new weather barrier, insulation and shingles on the affected structure. The existing windows on the second floor will be replaced with new hurricane -rated windows. New sheetrock and paint will be installed on the second floor over areas where framing has to be replaced. Work on the first floor is limited to replacement of the entry door and hardware. BUDGET: $90,000.00 is budgeted in account 120-6040-572-6300 (Project PM1805) RECQIVIMENDATION: Award Bid 1718-03R to E. B. Morris General Contractors in the amount of $86,900.00 and authorize the City Manager to execute the contract documents. ATTACHMENTS: Bid 1718-03R Bid Tabulation Resolution 18-10 REVIEWED BY CITY MANAGER: Clity o f Atlas lir 11 a cl Lill gu:ndlog el Fernvalie s-RFB1O Wedi ei day Marr h 01, 2118 Bib 8 1718-03R Required Documents Bn a king Ground Ca r treating E.B. Monts General Contractors Hager Construction Holman, Inc. KBT Contracting ( a rp. Submission in Triplicate X X X X X Document Requirements Checklist X X X X X W-9 Form X X X X X Bid Form X X X X X Bid Bond - 5% X X X NC X Drug Free Workplace Certification X X X X X Public Entity Grime s Statement X X X X X Public Records F roe sie n Fe m X X X X X New Vendor Info uretic n Form X X X X X Proof of Experience - 5 years of construction X X X X X License - General Contractor X X X x X Financials - Last 2 Yer rs X X X NC X Insurance X X X X X References -1 X X X NC X Documentation of Receipt of any Adele nth(One, 03106/18) X X X NC X lel al (lest 1on Pre jc ct - Li nip Sum 8/ 8,185,1 0 : 86,100,10 $164,( 01.23 $184,517.( 0 1151, 53.01 Awa rd c f 1 id t ecl i r Di parlmc nt An lysis and City N enai er end/or Coromii r is n A ppm is I RESOLUTION NO. 18-10 A RESOLUTION OF THE CITY OF ATLANTIC BEACH, FLORIDA, AWARDING BID #1718-03R FOR 1'HIE LIFEGUARD TOWER RENOVATION PROJECT. WHEREAS, on March 7, 2018, five bids were received and opened for City Bid #1718-03 tor the Liteguard Tower Renovation Project; and WHEREAS, lump sum bids received ranged in price from $86,900 to $184,537; and WHEREAS, E.B. Morris General Contractors submitted the low bid of $86,900 and provided all iequiied docunnent5 ;u then bid aubnnnittal; and WHEREAS, the project includes enclosing the third floor to make a control room similar to the existing control room on the second floor. New hurricane -rated windows will be added above the existing windows on the second floor. Interior walls and the ceiling will be painted sheetrock and flooring will be sheet vinyl. Electrical work includes lighting and power aiid new wiring Jit TV, communications, data and speakers. work also includes the installation ot a new standing seam metal roof. The exi3ting building has expeiienced wain nth uaion at the roof and around the Windows. Wolk will include inspection ot the existing sheathing and framing to determine the extent of damage, replacement of damaged Wood, and the inn3tallation of Hew weather ban in, inaulatinnn and shingles on the affected structure. The existing windows on the second floor will be replaced with new hurricane -rated WindoWS. New 5heetnock and paint will be installed on the beconnd floor over areas where framing has to be replaced. Work on the first floor is limited to replacement of the entry door and hardware; and WHEREAS, the Contractor will be given sixty (60) days to complete the project; and WHEREAS, the project is fended under account 120-6040-572-6300; project #PM1805. NOW THEREFORE, be it resolved by the City Commi55irm of the City of Atlantic Beach as follows: SECTION 1. The City Commission hereby awards Bid #1718-03R for the Lifeguard Tower Renovation Project m E.B. Monn13 G'cucnal Contnaeton•, inn the annount of $66,900.00 inn accordance with the bid specifications; and SECTION 2. The City Commission hereby authorizes the City Manager to execute the Contract With E.B. Monni, Gencnal Contractors: and SECTION 3. Thio Resolution shall take effect immediately upon its passage and adoption. rASSED AND ADOPTED by the City of Atlantic Beach, this 26th day ot March, 2018. Ellen Gla3acn, Mayon Attest: Dorura L. Bartle, City Clerk Approved as to torm and correctness: Brenna M. Durden, City Attorney