Exh 8D1 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM #8D JANUARY 27, 2003 AGENDA ITEM: U grades to SCADA System P SUBMITTED BY: Donna Kaluzniak, CEP, Utility Direct DATE: January 22, 2003 BACKGROUND: The City Commission awarded design and construction of a Supervisory ' Control and Data Acquisition (SCADA) system for water and wastewater treatment facilities to Control Design, Inc. in July, 2002. The SCADA system, as proposed, will allow for remote monitoring and some control over five of the City's treatment facilities: Wastewater Plant #1 ' (1100 Sandpiper Lane), Wastewater Plant #2 (739 Wonderwood Road), Water Plant #1 (469 11`'' St.), Water Plant #2 (2301 Mayport Road) and Water Plant #3 (902 Assisi Lane). Project design is nearing completion, and the contractor has begun installation of the antennas. Originally, this system was limited in scope to providing monitoring and control for the treatment facilities as noted above. However, further research by City staff and our contractor has determined the City might realize future cost savings by modifying the original system design. Upgrading the specified radios would allow the City to eliminate several existing frame relay t connections between remote facilities and City HaII, which would eliminate their future costs. In addition, the upgraded radios will provide much faster connectivity between the City's central network and the remote locations at Public Works, the water and sewer treatment plants, and Parks and Recreation Department. This would also require a change to the antennas and programmable logic controllers to allow compatibility with the radios. t The upgrade also provides future possibilities of using the improved radio system for the police laptops to communicate with the City network, for security cameras at the City parks, and other potential uses. BUDGET: The contract was awarded in the amount of $92,174.00. The upgrade will require additional costs for upgraded radios, as well as the cost to supply new or enhanced programmable logic controllers. The additional cost is $27,610. Cost savings will not begin until the contract with BellSouth expires next year, but the cost savings beginning at that time will be $22,000 per ' year for the frame relay connections. The additional $27,610 will require amid-year budget modification from the water and sewer fund. ' _ RECOMMENDATION: Authorize a change order to the contract with Control Design, Inc. in the amount of $27,610 to upgrade the SCADA system. ATTACHMENTS: 1. Change Order No. 1 for SCADA Upgrade ' REVIEWED BY CITY MANAGER: t i ' CHANGE ORDER NO. 1 Contractor: Control Design, Inc. Owner: City of Atlantic Beach 6900 Phillips Highway Suite 19 Jacksonville, FL 32216 Attention; Mr. John Goodson City Bid No. 0102-16 Project: Design/Build SCADA System You are hereby requested to comply with the following changes in the Contract Documents: 1. Revised Scope of Work AGENDA ITEM #8D JANUARY 27, 2003 Date: 1/22/03 DECREASE INCREASE IN IN ITEM UNIT CONTRACT CONTRACT NO. DESCRIPTION QTY UNIT PRICE $ PRICE $ PRICE $ 1 Replace specified radios and 1 LS $14,292 $14,292 antennas with Cisco radios and ~ - dish antennas with mounts 1 Provide spectrum analysis of 1 LS $6,708 $6,708 radios at remote locations 1 Upgraded or new programmable 1 LS $6,610 $6,610 logic controllers for treatment plants TOTAL $27,610 This change order brings the total contract price to $119,784, with an increased contract time of 8 weeks. Accepted By: Contractor r Approved By: Owner r Date: Date: