142, 146, 150, 154 Ocean Gate Dr early powerEARLY POWER AGREEMENT & RELEASE
CITY OF ATLANTIC BEACH -/
Electric power is requested now under the conditions and terms of this fully executed Agreement & Release
Job Address:
Permit No. 1 t-Lt( S( 2 Service Type (Circle One): Overhead
We, the undersigned General Contractor and Electrician, understand and agree:
1. "Early Power" ispurely for our construction convenience it is not required by Codes and does not
substitute for Final inspections or the C/O (Certificate of OccupancyjThat must be issued betore occupancy, and as such is at the discretion of the Building Official.
2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough
inspections must have prior Approval, including meter base connections.
3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of the earl electric service.Such action is expressly prohibited and penalized by The City of Atlantic Beach
Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric service after a twenty-four hour notice.
4. "Early Power" release authority is the Electrician and/or the Contractor and must not occur before:
a.Equipment, devices and fixtures are installed (or blanked off) safely.
b.Panel is complete with breakers and cover, and (labeling required at final inspct1on).
C. Service connection and grounding is complete.
d.The electric system has safely passed through electrical check.
e.Meter can is permanently marked with address. f.Temporary address numbers displayed (Permanent numbers are required for C/O).
5. This fully completed form is to be submitted to the Building Department by hand, mail or fax.
6. Future such Agreements will not be accepted from those who violate any one of the above items.
CONTRACTOF
ELECTRICIAN
PRINT NAME
DATE 12i)I
DATE)& 3177) I
800 Seminole Road, Atlantic Beach FL 32233
Phone: (904)247-5826 Fax: (904)247-5845 http:/Iwww.coab.us revised 0130 09
EARLY POWER AGREEMENT & RELEASE
CITY OF ATLANTIC BEACH
Electric power is requested now under the conditions and terms of this fully executed Agreement & Release
Job Address:
Gyn- I c ~
" D
1 C
Permit No. $T1 EL 1Ei 51 t4 Service Type (Circle One): Overhead
We, the undersigned General Contractor and Electrician, understand and agree:
1. "Early Power" is purely for our construction convenience, it is not required by Codes and does not substitute for Final inspections or the C/O (Certificate of Occupancy)ffiat must be issued belbre occupancy,
and as such is at the discretion of the Building Official.
2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough
inspections must have prior Approval, including meter base connections.
3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of t he earl
electric service. Such action is expressly prohibited and penalized by The City of Atlantic Beac
Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric service
after a twenty-four hour notice.
4. "Early Power" release authority is the Electrician and/or the Contractor and must not occur before:
a.Equipment, devices and fixtures are installed (or blanked off) safely.
b.Panel is complete with breakers and cover, and (labeling required at final Inspection).
c.Service connection and grounding is complete.
d.The electric system has safely passed through electrical check.
e.Meter can is permanently marked with address.
f.Temporary address numbers displayed (Permanent numbers are required for C IO).
5. This fully completed form is to be submitted to the Building Department by hand, mail or fax.
6. Future such Agreements will not be accepted from those who violate any one of the above items.
CONTRACTOR DATE
ELECTRICIAN
PRINT NAME
DATE 1a7IJ
800 Seminole Road, Atlantic Beach FL 32233
Phone: (904)247-5826 Fax: (904)247-5845 http://www.coab.us revised 0130 09
EARLY POWER AGREEMENT & RELEASE
CITY OF ATLANTIC BEACH
Electric power is requested now under the conditions and terms of this fully executed Agreement & Release
Job Address:
Permit No. I Service Type (Circle One): Overhead
We, the undersigned General Contractor and Electrician, understand and agree:
1. "Early Power" ispurely for our construction convenience it is not required by Codes and does not
substitute for Final inspections or the C/O (Certificate of OccupancyjThat must be issued befbre occupancy, and as such is at the discretion of the Building Official.
2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough
inspections must have prior Approval, including meter base connections.
3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of the earl electric service.Such action is expressly prohibited and penalized by The City of Atlantic Beach Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric service
after a twenty-four hour notice.
4. "Early Power" release authority is the Electrician and/or the Contractor and must not occur before:
a.Equipment, devices and fixtures are installed (or blanked off) safely.
b.Panel is complete with breakers and cover, and (labeling required at final inspection).
C. Service connection and grounding is complete. d.The electric system has safely passed through electrical check.
e.Meter can ispermanently marked with address.
f.Temporary address numbers displayed (Permanent numbers are required for C/O).
5. This fully completed form is to be submitted to the Building Department by hand, mail or fax.
6. Future such Agreements will not be accepted from those who violate any one of the above items.
CONTRACTOI
PRINT NAME
ELECTRICIAN
PRINT NAME
DATE fl
DATE
800 Seminole Road, Atlantic Beach FL 32233
Phone: (904)247-5826 Fax: (904)247-5845 http://www.coab ,us revised 0130 09
EARLY POWER AGREEMENT & RELEASE
CITY OF ATLANTIC BEACH
Electric power is requested now under the conditions and terms of this fully executed Agreement & Release
Job Address:
Permit No. (1 E:jC , 5S 1 Service Type (Circle One): Overhead U:
We, the undersigned General Contractor and Electrician, understand and agree:
1. "Early Power" ispurely for our construction convenience it is not required by Codes and does not substitute for Final lnspections or the C/O (Certificate of Occupancyjiflat must be issued before occupancy, and as such is at the discretion of the Building Official.
2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough
inspections must have prior Approval, including meter base connections.
3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of the earl electric service. Such action is expressly prohibited and penalized by The City of Atlantic Beac h Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric service after a twenty-four hour notice.
4. "Early Power" release authority is the Electrician and/or the Contractor and must not occur before: a.Equipment, devices and fixtures are installed (or blanked off) safely. b.Panel is complete with breakers and cover, and (labeling required at final inspection). C. Service connection and grounding is complete. d.The electric system has safely passed through electrical check. e.Meter can is permanently marked with address.
f.Temporary address numbers displayed (Permanent numbers are required for C/O).
5. This fully completed form is t submitted
6. Future such Agreements will not be acce te from those who violate any one of the above items.
CONTRACTOI
PRINT NAME
ELECTRICIAN
PRINT NAME
DATE -S ~Z_-1 i I ~
DATE 'Ea1 I -
800 Seminole Road, Atlantic Beach FL 32233
Phone: (904)247-5826 Fax: (904)247-5845 http://www.coab.us revised 0130 09