Loading...
Exh 3AAGENDA ITEM 3A FEBRUARY 24, 2003 February 18, 2003 MEMORANDUM TO: The Honorable Mayor and Members of the City Commission FROM: SUBJECT: Beach Renourishment; A meeting was held on February 12, 2003 on beach renourishment with the Corps of Engineers, representatives from the Cities of Jacksonville, Jacksonville Beach and Atlantic Beach and others. The purpose was to discuss the remediation of poor materials that had been placed in Jacksonville Beach and quality control measures to ensure that new materials being placed both in Jacksonville Beach and Atlantic Beach would meet "beach sand" criteria. The Corps of Engineers outlined plans to bring in a contractor with specialized equipment to remove approximately 50,000 cubic yards of shell from Jacksonville Beach. They plan to complete the work by April 1 ~. They also outlined plans to obtain new material for the beach renourishment by taking only the top layer of sand from the river dredging project rather than using the materials removed to the full depth of the deepening project. This should provide for proper beach quality sand. However, another question has come up as to whether there is enough of this sand to complete the renourishment project. Testing will be done on a new dredging process during the week of February 17th to February 21St and is incomplete as of the writing of this report. The Corps also outlined plans for a more complete inspection process while materials are being pumped onto the beach. The City of Jacksonville also agreed to put a quality control inspector on the beach during the pumping process. It was the general feeling by parties in the meeting that proper steps were being considered to remove the unacceptable material and ensure that the new sand will met beach quality standards. However, several remaining questions must be resolved. Those pertaining to Atlantic Beach include whether or not the new process for dredging will produce proper quality sand for the beach, whether there will be enough sand, and how to work together with all the involved parties to obtain future sources of beach quality sand. The Corps of Engineers has been invited to attend the City Commission meeting on February 24th to outline what steps they are taking to get proper sand placed on our beach and answer any other questions. Sign Regulations; At the last city commission meeting, staffwas requested to prepare an ordinance to amend the City's sign regulations by adding a provision that existing, non- conforming signs must be brought into compliance within a ten year period. Staff is AGENDA ITEM 3A FEBRUARY 24, 2003 preparing the ordinance which should be ready for the Commission's consideration as a first reading at the next meeting on March 10, 2003. Fill on Lot on 19th Street; A question was raised about the amount of fill being brought in by a contractor in connection with a new home construction on 19th Street. This lot was checked by the Public Works Director and found to be in compliance with the approved lot-grading plan. Most of the dirt will be used to fill in under the foundation of the house. As the work progresses, City staff will continue to inspect to see that the project does not create adverse impacts on the neighbors.