177 Maritime Oak Drive blower door test results Permit#: RES C7 -OCA x}
Blower Door Test Form
Job Information
Builder:
• n _I_ n.. .. a cul Lot#:
Community:
Address: 1-11 1 �A 2k
Unit#:
City,State,Zip:
Air Infiltration Test Results
CFM(50)=_ Volume= Q d
ACH(50)=CFM(50)X 60/Volume=
.3
Pass
❑ Fail passing results must be 7 ACH(50)or less
Certification of Test Results
R402.4.1.2 Testing.The building or dwelling unit shall be tested and verified as having an air leakage rate of not ezceeding 7 air changes
either individuals as defined in Section 553.993(5) or (7).F.S. or
per hour in Climate Zones 1 and i,3 air changes per hour in Climate Zones 3 through a.Testing shall be conducted with a blower door a a
or h or an approved third party. A written report of the results of the test
pressure or 0.2 inches w.g. (50 Pascals).o Testing shall be conducted by nmen at any time after creation of
individuals licensed as set foconductingrth in 'oh 9t and3provided to the code o�jci-l.Testing shall be performed
,hall be signed by the party
all penetrations of the building thermal envelope.
Authorized
I hereby certify the above results and that I hold the below certification:
_Class A or BA1C contractor or Mechanical contractor
License No.
--
_RESNET approved HERS Rater or Residential Field Inspector
Certification No._�---
BPI approved Building Analyst or Energy Auditor
Certification No.ZDSgaS*aL _
License No.�---
-Professional Engineer
Mechanical ventilation has been added: Yes
No
Signature:
kes Date:
Printed Name:
C„ ul
o,......,d
./c/7n17