Loading...
Exh 7AAGENDA ITEM #7A MARCH 24, 2003 CITY OF ATLANTIC BEACH. FLORIDA ORDINANCE NO. 90-03-180 AN ORDINANCE OF THE CITY OF ATLANTIC BEACH, FLORIDA, AMENDING CHAPTER 24, ZONING, SUBDIVISION AND LAND DEVELOPMENT REGULATIONS, TO ESTABLISH STORMWATER ON-SITE STORAGE REQUIREMENTS AND TREATMENT, FLOODPLAIN STORAGE, AND NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NDPES) REQUIREMENTS, AND PROVIDING AN EFFECTIVE DATE BE IT ENACTED BY THE CITY COMMISSION ON BEHALF OF THE PEOPLE OF THE CITY OF ATLANTIC BEACH, FLORIDA: Section 24-67. Development review and issuances of development aermits; revise (d) Stormwater drainage requirements, to read: (d) Stormwater drainage, storage and treatment requirements. 1. Topography and Grading: All lots and development sites shall be constructed and graded in such a manner so that the Stormwater drains to the adjacent street, an existing natural element used to convey Stormwater (See section 22-303, definitions: Stormwater management system), or a city drainage structure after meeting on-site storage requirements, as listed in this Section. The city shall be provided with apre-construction topographical survey prior to the issuance of a development permit and apost-construction topographical survey prior to the issuance of a certificate of occupancy. The surveys shall be prepared by a licensed Florida surveyor, and the requirement for either or both surveys may be waived by the Director of Public Works if they are determined to be unnecessary. 2. On-Site Storage: The applicant will be required to provide on-site storage such that there is no increase in the rate or volume of flow to off-site, from every developed or redeveloped pazcel, and provide documentations and calculations to demonstrate compliance Subdivisions and developments previously permitted by the St. Johns River Water M ement District (SJRWMD), and have an in compliance retention/detention system that collects and controls run-off, are exempt. The requirement for on-site storage may be waived by the Director of Public Works if storage is determined to be unnecessary or unattainable. Volume calculations for lots that require on-site storage should be based on the difference in run-ofFvolume generated by the new impervious azea ("delta volume") and would be calculated bv: V=CAR/12, where V =volume of storage in cubic feet, A = area of the lot in scauaze feet, R = 25 year and 24 hour rainfall dept~9.3 inches) over the Iot area, and C =run-off coefficient, which is 0.6 for the 50% maximum imperviousness 0 4 for 25% imperviousness, and 0.2 for 0% imperviousness. AGENDA ITEM #7A MARCH 24, 2003 This delta volume (post V minus pre V in cubic feet) must be stored at least 1 foot above the wet season water table and below the overflow point to off-site (in many cases this may be the adjacent road elevation . As an option, and as approved by the Director of Public Works, the owner of the pazcel to be developed or redeveloped may implement, at the applicant's cost, off- site storage and necessary conveyance to control existing flood stages off-site. 3. Flood Plain Storage: There shall be no net loss of storage for azeas in the 100-near floodplain, where a floodplain elevation has been defined by either the Federal Emergency Management Agency (FEMA) on Flood Insurance Rate Maps (FIRMS), the 1995 Stormwater Master Plan, the Core City_proiect, or the 2002 Stormwater Master Plan Update (e.g., Hopkins Creek). Site grading shall create storage on-site to mitigate for filling of volume on-site. This stora.~e is in addition to the storage required for the increase in impervious azea. 4. Stormwater Treatment: Stormwater treatment shall be provided for a volume ~uivalent to either retention or .detention with filtration.. of the run-off from the first one (~ inch of rainfall; or as an option, for facilities with a drainage azea of less than one hundred (100 acres, the first one-half (1/z) inch of run-offpursuant to Chapter 62-25, Florida Administrative Code FAC). No discharge from any stormwater facility shall cause or contribute to a violation of water quality standards as provided in Section 62.302 of the Florida Administrative Code. This treatment volume can be included as part of the on-site storage requirement in item d (2~f this Section. 5. NPDES Requirements: All construction activities shall be in conformance with the City's National Pollutant Discharge Elimination Systems (NPDES) permit, in addition to the requirements of the Water Management District and the Florida Department of Environmental Protection. NPDES requirements include use of Best Management Practices (BMPsZprior to discharge into natural or artificial drainage systems. Beginning May 1 2003 all construction projects of one acre or more will require a NPDES permit_ 6. Enforcement: Subsequent to approval of a property owner's final grading including on site and/or flood plain storage and stormwater treatment, the improvements shall be maintained by the property owner. Failure to maintain the improvements will require restoration upon notification by the Director of Public Works within a stipulated timeframe If restoration is not timely completed, the City shall have the right to complete the restoration and the City's actual costs incurred, together with a charge of 100% of said costs to cover the City's administrative expenses, shall be charged to the owner. This ordinance shall take effect immediately upon its final passage and adoption. Passed by the City Commission on first reading this day of , 2003. Passed by the City Commission on the second and final reading this day of 2003. ATTEST: Maureen King City Clerk John S. Meserve Mayor, Presiding Officer Alan C. Jensen, Esquire City Attorney