Loading...
1798 Atlantic Beach Dr early power releaseCITY OFF ATLAIN, 7il 1C I'D Electric power is requested now under tlic conditions and terms of this fully executed Agreement & Release Job Address: 798 ., (�{-l9nt« PermitNo. ! — C_]C){ Sen -lice Type (Circle One): Overhead Underground We, the undersigned General Contractor and Electrician, understand and agree: "Eariv Power" isurely for our construction convenience, it is rant required by Codes, and does not substitute for Final inspections or the C/O (Certificate of Occupancy}�t imust ust be issued before occupant}, and as such is at the discretion of the Building tfeial. ?. The City of Atlantic Beach will male a special inspection prior to the early power energizing. All rough inspections must have prior Approval, including meter base connections, g 3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of the early a dig antes- A vio atioic; service- n of actihis Agri rnent shly all prohibited din atrequestfgrdp ompt removalThe of e Atlantic service after a twenq -four ljour notice. 4 "Early Power" release authority, is the Electrician and/or the Contractor and must not occur before: a. _qui went, devices and fixtures are installed (or blanked off) safely, b_ _qui is complete with breakers and cover, .and (labeling required at final inspection). c_ Service connection and grounding is complete, d_ The electric system has safely passu through electrical check. e. deter can is permanently marked with address. f Temporary address numbers displayed (Permanent numbers are required for CIO). 5. This fully completed farm is to be submitted to the Building Department by hand, mail or fax, 6. Future such Agreements will not be accepted from those who violate 2 -ay one of the above items. COX -TRACTOR PRINT NAME ELECT PR NT ZIF DAT'b DATE 300 Seminole Road, Atlantic Beach FL 32233 Phone: (900247-5826 Fax_ (904)247-5845 http:1/Nm—% .coab.us revised Ql 30 ©9