Loading...
Exh 8AAGENDA ITEM #8A MARCH 10, 2003 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Construction Inspection Services for Relocation, Installation and Coating of Elevated Storage Tank at Water Plant 2 Bid No. 0203-2 (Re-Bid) SUBMITTED BY: Donna Kaluzniak, CEP, Utility Director DATE: March 14, 2003 BACKGROUND: On Monday, March 10, 2003, the City Commission awarded the contract for the Relocation, Installation and Coating of Elevated Storage Tank at Water Plant 2 to Gruhn May, Inc. Approval for the yard piping, electrical and construction inspection services for the project was requested during the verbal staffrecommendation. Although the vendors and amounts for these services were included in the written staff report, a specific request for the amount and a recommendation to waive the formal bidding procedures was not included. We are requesting this waiver in order to expedite the project, as the tank owner originally requested the tank be removed from his property by early January, and has already been very patient in awaiting the re-bid of the project. Regarding the construction inspection, HGTI has been active in this project from the beginning, including performing the inspection of the tank prior to bidding the project and preparing specifications for the project. In addition, they have performed all of the City's tank inspection work for many years. Staff has been pleased with their service, and their costs are typically about 30 - 35% below competing vendors.The cost proposal for this work is 5% of the tank relocation, construction and coating, or $16,850. We requested quotes from our existing annual contractors, Gruhn May, Inc. and Brooks Limbaugh Electrical, for the yard piping and electrical installation. The yard piping cost is $26,830 and the electrical is $10,000. These costs are based on the annual contractors' existing bid rates for labor, equipment and overhead. BUDGET: Funds for the construction inspection work can come from the Water Treatment Fund, Account No. 400-5502-533-3100 where there is $20,000 budgeted for miscellaneous professional services. Funds for the yard piping and electrical work totaling $36,830 will be transferred from the Water Fund during amid-year budget modification. These funds were AGENDA ITEM #8A MARCH 24, 2003 included in the total project amount discussed during the verbal staffreport to the Commission on March 10, 2003. RECOMMENDATION: Award a contract for the Construction Inspection services for the Relocation, Installation and Coating of Elevated Storage Tank at Water Plant 2 to HGTI in the amount of $16,850. Authorize installation of the yard piping for Gruhn May, Inc. in the amount of $26,830 and electrical work for Brooks Limbaugh for $10,000 and and waive the formal bidding procedures in order to expedite completion of the project. REVIEWED BY CITY M 2