Exh 4BAGENDA ITEM #4B APRIL 28, 2003 CITY OF ATLANTIC BEACH CITY COMMISSION M EETING STAFF REPORT AGENDA ITEM: Approve the contract of VIA Concepts for design, bid documents and construction administration of an approximately 6,000 square foot skate park facility in the amount of $26,174.00 SUBMITTED BY: Timmy Johnson, Parks & Recreation Director DATE: April 2, 2003 BACKGROUND: Staffwas authorized to negotiate a contract with VIA Concepts for the design, bid documents and construction administration of an approximately 6,000 square foot skate park facility. The contract includes time for two public meetings, which will be set once the contract is approved. The skate park will be constructed in Russell Park and the City Commission will approve the final plans prior to bidding. Staff also negotiated the sale of the Adele Grage building model at $800 to VIA Concepts. The sale of the model was deducted from the total cost to design the skate park. BUDGET: The budget for this phase of the project is $30,000 and is budgeted in account number 131-0000-572-63-00. RECOMMENDATION: Approve the contract of VIA Concepts for design, bid documents and construction administration of an approximately 6,000 square foot skate park facility in the amount of $26,174.00 ATTACI-Il~IENTS: Contract from VIA Conce~ REVIEWED BY CITY MANAGER: AGENDA ITEM #4B APRIL 28, 2003 f t~ ~ . f , ~ r } t,, r ` ~~ „ ti 4 T ~ ~ ' ~ J i '~. t kt~,~ ~ t~ ^ y ~: ~ ~* ~ > ~ ~"~'~ ,• ~ ~ CITY OF ATLANTIC BEACH x ~~~ ;~ , m , ~ a ~~ ~ "~~~x ~t OUTDOOR SKATE PARK `#X` j ' ~ ~ ~ fl f ; CONTRACT AGREEMENT ? r, 9~'- ;, `~~'~>~ RFQ NO. 0203-2 9 '. ',- K y" 1 ,.:~ ^'• ~,~ tS t:'^'Y 2`"_ r. 'u,5 M. :. %< m, 3 VIA Gcncepts, LLC ``' 241 Atlantic Sfvd., Suite 5 ~~ ~ Neptune Beach; FL 32266 '~ r _ ~s ~S~ 1 :}k ~I y ~... f ~ `~ • ,,. AGENDA ITEM #4B APRIL 28, 2003 AGREEMENT made as of the twenty-first day of April in the year of Two Thousand and three BETWEEN the Owner: City of Atlantic Beach 800 Seminole Road Atlantic Beach, Florida 32233 Tel: (904) 247-5808 Fax: (904) 247-5805 And the Architect: VIA Concepts, LLC 241 Atlantic Boulevard, Suite No. 5 Neptune Beach, Florida 32266 Tel: (904) 246-9900 Fax: (904) 247-3147 For the following Project: Owner's Objective The Owner's proposed project involves the design and construction of a new outdoor skate park in the City of Atlantic Beach. The location of the skate park is to be located in Jack Russell Park, Atlantic Beach, Florida. The new skate park is to be constructed in reinforced concrete. The skate park's design is gear toward beginners and intermediate level of skateboarders. Other amenities for the skate park are not fully established at this time. Support areas such as queuing and viewing area will be considered during the programming and preliminary design phase. It is the intention of the Owner to create small (approximate/y 6,000 square-foot) skate park in the center of Atlantic Beach where residents and visitors can enjoy. Project Location and Address Jack Russell Park 800 Seminole Road At/antic Beach, Florida 32233 Project Scope This proposal is for the design of a new skate park to be located in the city Atlantic Beach, Florida. The Architect will present a design solution to the Owner for review and acceptance after programming and pre-design services. The Architect will then develop the design scheme and submit for owner review at various stages of the construction drawings and specifications. The document will include Typical Area Site Plan, Skate park Plan, Demolition Plan of existing area (if needed), Details and Elevations. SkatePark contract 4-7-03.doc 1 of 1 04/21/03 AGENDA ITEM #4B APRIL 28, 2003 The following represents possible scope of services for the development of skate park design drawings in sufficient detail to allow an estimate of components of this project: SITE DESIGN: Site Inventory and Analysis • Review existing survey and geotechnica/ data • Review site drainage and topography information made available by the City of Atlantic Beach or the surveyor of record • Adaptation of utility connections to skate park • Adaptation of surface water management & drainage (site grading) • Design and detailing of miscellaneous pathways and apron area • Consider pedestrian and vehicular linkages to and from this proposed facility • Consider views to and from this facility • Detail tree and shrub planting • Indication of plant removal and relocation • Selection and specification of plant materials BUILDING DESIGN: Programming Meet with. City of Atlantic Beach personnel to develop and detailed space and functional requirements for each space within the skate park. This includes criteria for finishes, power, lighting, communications, plumbing, storage, fixed equipment, etc. Develop flow and adjacency among spaces to assist in layout Establish applicable building code requirements for this project Architectural Design • Develop Skate Park Program • Dimensioned plan indicating. spaces, doors, fixed equipment, structural elements and exterior. park furnishings • Exterior elevations indicating materials heights, doors, windows • Wall sections indicating detailed construction of skate park floor retaining wall, and peripherals • Plan indicating materials, slope, and drainage Structural Design • Foundation design • Typical Details • Design of structural frame and/or columns; sizing of major structural members (as needed) Wind load calculations • Design of concrete slab • Design of equipment supports as needed Mechanical Design • To be determined Electrical Design SkatePazk contract 4-7-03.doc 2 of 2 04/21/03 AGENDA ITEM #4B APRIL 28, 2003 • Design of service to skate park • Design of distribution systems within the skate park Plumbing Design • Skate park drainage calculations, size and location of drain Life Safety • Life Safety Analysis • Review with agencies having jurisdiction Specifications • Identify and specify major materials and- systems to be utilized in the project and establishes level of quality for systems The Owner and Architect agree as set forth below 11.1 AN INITIAL PAYMENT OF One thousand five hundred Dollars ($ 1,500.00) shall be made upon execution of this Agreement and credited to the Owners's account at final payment. 11.2 BASIC COMPENSATION 11.2.iFOR BASIC SERVICES, as described in Article 2, and any other services included in Article 12 as part of Basic Services, Basic Compensation shall be computed as follows: - Said FEE for the heretofore mentioned Professional/Architectural Services of Phase Architectural Services for the new outdoor skate park in Atlantic Beach, Florida shall be charged on a lump sum basis as follow: Phase 1 Programming/Pre-design Phase Phase 2 Design The Architect shall review with the Owner alternative approaches to design and construction of the Project. Based on the mutually agreed-upon - program, schedule and construction budget requirements, the Architect shall prepare, for approval by the Owner, Design Documents consisting of drawings and other documents appropriate for the Project, and shall submit to the Owner a preliminary estimate of Construction Cost. This phase includes schematic design layout and drawings for fund raising activities. Extra Services for this phase may include Architectural Model and/or Rendering as well as extra meetings beyond the scope described above. SkatePark contract 4-7-03.doc 3 of 3 04/21/03 AGENDA ITEM #4B APRIL 28, 2003 Deliverables: Two Meetings and/or Presentations for Programming Architectural Program Preliminary Site Plan Preliminary Plan Preliminary Elevations (North, East, South, & West) Preliminary Spedfications Schedule and Construction Requirements Phase 1 & 2 Total $ 11,481.00 Extra Services: Architectural Model -This is a monochromatic model; price varies depending on the amount of detail, color, and type of materials used for model (paper, .wood, plastics, etc.) Model 1/8"Scale $ 2,000 - $4,000 Color Rendering 18"x 24" $ 1,200 - $1,800 See Basic Services Worksheet for Labor Breakdown References Phase 3 Construction Documents Phase Based on the approved Design Documents, the Architect shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Project, and shall advise the Owner of any adjustments to previous preliminary estimates of Construction Cost. The Architect shall assist the Owner in connection with the Owner's responsibility for filing documents required for the approval of governmental authorities having jurisdiction over the Project. Deliverables: Phase 2 consists of the 100% Construction Documents (Drawings and Specifications). The Construction Documents are estimated as follows: Drawings: Cover Sheet Contents Site Development Site Plan & Geometry & Improvement Paving Drainage General Notes & Details Landscape Plan. & Details Architectural General Notes, Symbols and Abbreviations Demolition Plan Floor Plan Elevations SkatePark contract 4-7-03.doc 4 of 4 04/21/03 AGENDA ITEM #4B APRIL 28, 2003 Site Sections Wall Section and Details Miscellaneous Details Phase 4 Structural Foundation Plan & Ground Floor Plan Framing Plan & Notes Section and Details Mechanical, Mechanical Floor P/an, Schedules and Notes Electrical and Electrical Notes and Legend Plumbing Electrical Lighting Plan Power and Schedules Plumbing Floor Plan Specification: The technical specifications indicate detailed instruction of the required materials, finishes and workmanship -all grouped by building trades. It is common practice to include each trade in the order of actual construction. The Construction Documents, the working drawings together with the technical specifications, are the most important parts of the documents constituting the contract of the build form. In general, information on the design, location, and dimensions of the elements of building is found on working drawings, and information on the quality of materials and workmanship is found in the specifications. Phase 3 Total $ 7, 986.00 Phase 5 Bidding The Architect shall provide assistance in the bidding process. Bidder evaluation recommendation, attend pre-bid meeting and provide required addenda to revise plans and specification when necessary. Phase 4 Total Construction Administration $ 566.00 The Architect shall provide administration of the Contract for Construction as set forth in the edition of AIA Document A201, General Conditions of the Contract for Construction, current as of the date of this Agreement. Phase 4 Total $ 6,941.00 TOTAL FOR PHASE 1, PHASE 2, PHASE 3, PHASE 4 & PHASE 5 $ 26, 974.00 SkatePark contract 4-7-03.doc 5 of 5 04/21/03 AGENDA ITEM #4B APRIL 28, 2003 11.2.2Where compensation is based on a stipulated sum or percentage of Construction Cost, progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Programming & Design Phase $ 11,481.00 forty two percent(42.6 %) Construction Documents Phase: $ 7,986.00 thirty percent(29.6 %) Bidding Phase: $ 566.00 two percent( 2.1 %) Construction Administration Phase: $ 6,941.00 twenty six percent[Z5.7 %} Sub-total $ 26,974.00 one-hundre d percent( 100 %) Less Adele Grage Cultural Center Model $ 800.00 Total Basic Compensation: $ 26,174.00 (twenty six thousand one hundred seventy four dollars) 11.3 COMPENSATION FOR ADDITIONAL SERVICES 11.3.iFOR PROJECT REPRESENTATION BEYOND BASIC SERVICES, as described in Paragraph 3.2, compensation shat) be computed as follows: Average Rate/Hour Multiplier Cost/Hour Principal $50.00 2.75 $ 137.50 Design Architect $49.00 2.75 $ 134.75 Project Manager $49.00 2.75 $ 134.75 Designer/Technician $18..00 2.75 $ 49.50 Draftsperson $15.00 2.75 $ 41.25 Clerical $12.60 2.75 $ 34.65 11.3.2FOR ADDITIONAL SERVICES OF THE ARCHITECT provide under Article 3 or identified in Article 12, compensation shall be computed as follows: Additional Services required beyond the scope of this Agreement shall be authorized in writing by the Owner at the appropriate time during the progression of work.' The following hourly rates shall apply: Average Rate/Hour Multiplier Cost/Hour Principal $50.00 2.75 $ 137.50 Design Architect $49.00 2.75 $ 134.75 ~` Project Manager $49.00 2.75 $ 134.75 Designer/Technician $18.00 2.75 $ 49.50 Draftsperson $15.00 2.75 $ 41.25 Clerical $12.60 .2.75 $ 34.65 11.3.3 FOR ADDITIONAL SERVICES OF CONSULTANTS, including additional structural, mechanical and electrical engineering services and those provide under Article 3 or identified in Article 12 as part of Additional Services, a multiple of (2.75 )times the amounts billed to the Architect for such services. SkatePark contract 4-7-03.doc 6 of 6 04/21/03 AGENDA ITEM #4B APRIL 28, 2003 11.4 REIMBURSABLE EXPENSES 11.4.1 FOR REIMBURSABLE EXPENSES, as described in Paragraph 10.2, and any other items included in Article 12 as Reimbursable Expenses, a multiple of one( 1.0) times the expenses incurred by the Architect, the Architect's employees and consultants in the interest of the Project. 11.5 ADDITIONAL PROVISIONS 11.5.1 IF THE BASIC SERVICES covered by this Agreement have not been completed within ( ten )months of the date hereof, through no fault of the Architect, extension of the Architect's services beyond that time shall be compensated as provided in Subparagraphs 10.3.3 and 11.3.2. 11.5.2 Payments are due and payable thirty(30) ca/endar days from the date of the Architect's invoice. Amounts unpaid thirty(30) calendar days after invoice date shall bear interest from the date payment is due at the rate entered below, or in the absence thereof, at the legal rate prevailing from time to time at the principal place of business of the Architect. At the time of delivery of the drawings the balance of the remaining sum steal! be due in full. Interest at 1 1/2 percent (1.5 %) per month will be charged on the unpaid balance commencing (thirty) 30 calendar days from the delivery of the drawings. Legal and collection expenses incurred by the Architect on delinquent accounts shall be reimbursed by the Owner, including filing of liens. 11.5.3 The rates and multiples set forth for Additional Services shall be annually adjusted in accordance with normal salary review practices of the Architect. ARTICLE 12 OTHER CONDITIONS OR SERVICES The scope of this contract shall not include surveys (boundary, topography, trees, utilities), geotechnica/ exploration, off-site utilities systems design, specialty audio/visual consultant, acoustical design specialty consu/taut, lighting design consultant, audio/visual equipment procurement specifications, detailed cost estimating (beyond that provided as Basic _ Services), design of irrigation engineering, and other consultants as required. Please see Artic/e 3 -Additional Services, Section 3.1 for more reference. In the event that sealed plans of these mentioned services are required by building officials, fees for said services shall be additional to this contract and steal/ be strictly pre-approved in writing by the Owner at appropriate time during the progression of work. The scope of work in this agreement may be renegotiated after the completion of the Design Phase (Phase 1) if the Owner is unable to acquire the necessary funds to complete the project. SCHEDULE Depending upon the intent of the Owner, the over all scope of services may be accomplished within nine (9) months: SkatePark contract 4-7-03.doc 7 of 7 04/21/03 AGENDA ITEM #4B APRIL 28, 2003 Phase 1 -Programming/Pre-design (approximately 45 days) Phase 2 -Design (approximately 45 days) Phase 3 -Construction Documents (approximately 75 days) Phase 4 -Bidding (approximately IS days) _ Phase 5 -Construction (approximately 90 days) Additional times may be necessary for fundraising and community meetings to the overall project schedule This does not include any internal review and discussion time by the City of Atlantic Beach staff. Nor it includes possible fundraising period for the project. VIA Concepts is flexible to the desires of the Owner and will cooperate regarding deliverable timeframes. NOTICE The Owner shall be made aware that renovation/addition and new construction of real properties can often be a very difficult and costly process. The local and state governing bodies can impose heavy restrictions upon construction project, especially when the project is located in the property of a public park. VIA Concepts shall not be held responsible if governing bodies determine that the Owner is not permitted to proceed as proposed, or if construction and related costs exceed the Owner's proposed budget limits and time period. Your consideration of these matters is appreciated. If the terms of this agreement are acceptable, please indicate your approval by signing below. OWNER: ]im Hanson, City Manager City of Atlantic Beach Date: ARCHITECT• Tat Chan, R.A., NCARB VIA Concepts, LLC Date: ~~~i ~ ~~, SkatePazk contract 4-7-03.doc 8 of 8 04/21/03