Exh 8AAGENDA ITEM #8A APRIL 28, 2003 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Change Order No. 1 Aerated Sludge Holding Tank at Wastewater Treatment Plant No. 2 Bid No. 0102-22 Re-Bid SUBMITTED BY: Donna Kaluzniak, CEP, Utility Director DATE: April 18, 2003 BACKGROUND: The contract for the Aerated Sludge Holding Tank at Wastewater Treatment Plant No. 2 was awarded to Gruhn May, Inc., and the Notice to Proceed date was scheduled for January 6, 2003. After contract award, it was determined that a building permit would be required from the City of Jacksonville (COJ). Per a telephone conversation between the COJ and our engineer, Gannett Fleming, this would only require a "two-set" permit, consisting a very limited review that could be accomplished quickly. Unfortunately, upon application, COJ determined that a "ten-set" permit would be needed, requiring review by multiple departments. The ensuing permit process lasted over three months, and resulted in requirements for approximately 870 cubic yards of additional excavation to create on-site ponds for flood attenuation, as well as changes to some of the drainage design. The contractor has provided a cost for the additional work, in the amount of $22,718. Although the contractor's bid unit price for excavation was $18 per cubic yard, Gruhn May is only charging $14 per cubic yard in the change order. In addition, the contractor has been more than generous by not assessing any charges for contract delays, which could have added a substantial amount of money. BUDGET: The contract was awarded in the amount of $512,050, and no contingency was included in the award. However, sufficient monies are available in the sewer accounts due to other items that were purchased under budget (computer equipment; software and radios), and unused funds in professional services. RECOMMENDATION: Authorize a change order to the contract with Gruhn May, Inc. in the amount of $22,718 for Bid No. 0102-22 to meet flood attenuation and drainage requirements of the City of Jacksonville Building Permit. ATTACHMENTS: 1. Change Order No. 1 for Aerated Sludge Holding Tank at Wastewater Treatment Plant No. 2 _ REVIEWED BY CITY AGENDA ITEM #8A APRIL 28, 2003 CHANGE ORDER NO. 1 Contractor: Gruhn May, Inc. Owner: City of Atlantic Beach Date: 4/18/03 6897 Phillips Parkway Dr. N. Jacksonville, FL 32256 Attention: Mr. Gordon Gruhn City Bid No. 0102-22 Re-Bid Project: Aerated Sludge Holding Tank at WWTP #2 You are hereby requested to comply with the following changes in the Contract Documents: 1. Revised Scope of Work DECREASE INCREASE IN IN ITEM iJNIT CONTRACT CONTRACT NO. DESCRIPTION QTY UNIT PRICE $ - PRICE $ PRICE $ 1 Provide and install sealed manhole 1 LS $1,600 $1,600 ring and covers _ -` s_8 1 Change 15" RCP to 14" X 23" 1 LS $2,140 $2,140 ERCP Pipe 1 Excavate flood attenuation areas 1 LS $12,208 $12,208 1 Seed & mulch pond slopes 1 LS $900 ~' $900 1 Dewatering (if needed) 1 LS $5,870 $5,870 TOTAL $22,718 The Notice to Proceed Date is hereby changed to Apri121, 2003. Accepted By: Date: Contractor Approved By: Date: Owner