Exh 8BAGENDA ITEM #8B APRIL 28, 2003 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Ocean Blvd. Waterline Replacement Project Change Order No. 1 SUBMITTED BY: Robert S. Kosoy, P.E. Director of Public Works DATE: Apri121, 2003 BACKGROUND: During the initial excavation of the pavement at Ocean Blvd. and Ahern Street, the contractor encountered very thick asphalt, 4-5", underlaid by the original brick paving from Ocean Blvd. This brick was the same brick that we encountered and used for construction of some areas in the Town Center.- It was originally thought that the contractor could salvage some of the brick from this 3.5' wide trench, but most of the brick was in poor condition and the time to clean and store the small amount that would be obtained was unreasonable. Since the contractor bid on the milling and replacement of approximately 1-'/z to 2" of asphalt and expected limerock base below the asphalt, the thicker asphalt and brick required additional work. He submitted a price of $6.00 per linear foot to remove and dispose of the brick and the additional attached asphalt. If the brick goes from Ahern to 7th Street, the entire length will be 2,560 linear feet. The contractor will only be paid for the length of roadway underlaid by brick. RECOMMENDATION: Approve Change Order No. 1. BUDGET: Funds will come from the 10% Contingency amount of $26,976.50. ATTACHMENT: Change Order No. 1. REVIEWED BY CITY MANAGER: AGENDA ITEM #8B APRIL 28, 2003 CHANGE ORDER NO.1 Contractor: Miranda Contracting, Inc. P.O. Box 37755 Jacksonville, FL 32236 Attention: Project: Ms. Marcia E. Tice Ocean Blvd. Water Line Replacement Project Owner: City of Atlantic Beach Date: April 18, 2003 City Bid No. 0203-3 You are hereby requested to comply with the following changes in the Contract Documents: 1. Revised Scope of Work DECREASE INCREASE IN IN ITEM U1VIT CONTRACT CONTRACT NO. DESCRIPITON QTY UNIT PRICE $ PRICE $ PRICE $ X Brick pavement work: Removal 2,560 LF $6.00 $15,360.00 of brick and asphalt attached to ~,ry it, and disposal of both. ~ ~ ~ ~,~. ~= aa . ~~;.~-:. NOTE: Item X is an addition to existing Bid Items. TOTAL $15,360.00 r NET CHANGE IN CONTRACT PRICE f ~ -~ ~~ x r~ ~~ ~ k ~ $15,360.00 4 The above Revised Scope of Work will be deducted from the 10% Contingency amount of $26,976.50. The revised Contingency amount will be $1.1,616.50. Fifteen days will be added to the Contract Completion, and the new Scheduled Completion Date is July 15, 2003. Accepted By: Date: ~ ~~ Contractor Approved By: Date: Owner